CN105704038B - A kind of communication guarantee method for the electric power grid of guarantor temporarily - Google Patents

A kind of communication guarantee method for the electric power grid of guarantor temporarily Download PDF

Info

Publication number
CN105704038B
CN105704038B CN201610044622.3A CN201610044622A CN105704038B CN 105704038 B CN105704038 B CN 105704038B CN 201610044622 A CN201610044622 A CN 201610044622A CN 105704038 B CN105704038 B CN 105704038B
Authority
CN
China
Prior art keywords
multiplexer
control centre
next stage
transmission
routing table
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610044622.3A
Other languages
Chinese (zh)
Other versions
CN105704038A (en
Inventor
胡宏
沈培锋
甘海庆
汪自虎
杨少华
陈静
练华庆
陈堃
冯磊
刘政生
吴思若
李刚
潘岳峰
吴昊
沈军
杨沁
陆跃华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU SUYUAN HIGH-TECH Co Ltd
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Nanjing Power Supply Co of Jiangsu Electric Power Co
Original Assignee
JIANGSU SUYUAN HIGH-TECH Co Ltd
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Nanjing Power Supply Co of Jiangsu Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU SUYUAN HIGH-TECH Co Ltd, State Grid Corp of China SGCC, State Grid Jiangsu Electric Power Co Ltd, Nanjing Power Supply Co of Jiangsu Electric Power Co filed Critical JIANGSU SUYUAN HIGH-TECH Co Ltd
Priority to CN201610044622.3A priority Critical patent/CN105704038B/en
Publication of CN105704038A publication Critical patent/CN105704038A/en
Application granted granted Critical
Publication of CN105704038B publication Critical patent/CN105704038B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/06Management of faults, events, alarms or notifications
    • H04L41/0654Management of faults, events, alarms or notifications using network fault recovery
    • H04L41/0668Management of faults, events, alarms or notifications using network fault recovery by dynamic selection of recovery network elements, e.g. replacement by the most appropriate element after failure
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L45/00Routing or path finding of packets in data switching networks
    • H04L45/02Topology update or discovery
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L45/00Routing or path finding of packets in data switching networks
    • H04L45/74Address processing for routing

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The present invention relates to a kind of for protecting the communication guarantee method of electric power grid temporarily, belong to Communication Control Technology field.This method detection device communicates in accordance with the following steps with control centre:1) communication network between the two is established;2)Initialize routing table;3)Monitor operating status.The guarantor's electricity power grid electricity data transmission network to be communicated using this method, communication reliability higher have interim networking higher applicability, have the scalability and flexibility.

Description

A kind of communication guarantee method for the electric power grid of guarantor temporarily
Technical field
The present invention relates to a kind of communication guarantee methods, belong to Communication Control Technology field.
Background technology
In electric system, need to carry out important client comprehensive guarantor's electricity, be often designed planning in the early stage, it is real Now ensure supply of electric power and power demand.Such as arrange it is that can consider to protect electric monitoring device such as doing planning to certain building power grid What is distributed.
More than measure can meet the demand for solving the client that needs protect electricity for a long time, however protect electricity for certain needs are interim Client, then want troublesome more, for example, the Olympic Games protect electricity, World Expo protect electricity, the Asian Games protect electricity or other occasions protect electricity.More than These large-scale activities all have some common features such as, timeliness, provisional, heavy workload, arduous task and needs The completion task guaranteed both quality and quantity.Therefore electric equipment is protected for particular arrangement and is monitored cost with regard to bigger, and in activity end Used device, which is difficult to recycle, afterwards causes the wasting of resources, it is therefore desirable to interim to protect electricity to solve problem above.
Interim electricity of protecting is that a kind of installed additional on detection device is realized with the multiplexer for acquiring transfer function, described Detection device(Sensor)Including:The equipment of a variety of brands such as multifunctional electric energy meter, electrical parameter metering equipment, is mainly used for Electricity consumption data is measured, the parameters such as record current, voltage, power.And electricity is protected temporarily nor perfect, how to protect The interim telecommunication reliability of protecting of barrier is also the significant problem for needing to solve.
We should appreciate that router plays a crucial role in communication process, therefore we have to be understood that first The operation principle of router, to be preferably applied in daily Working Life.In a computer network, routing table or road By selecting domain information library(RIB)It is an electrical form being stored in router or Net-connected computer(File)Or class data Library.Routing table stores the path for being directed toward particular network address(In some cases, the route metric value for having path is also recorded. Metric represents distance, they are used for determining optimal routing when finding and routeing.Each routing algorithm when generating routing table, Can be that each generates a numerical value by the path of network(Metric), minimum value represents optimal path.Certainly also exist Other decision rules, just do not enumerate here.)The groundwork of router is exactly for each data packet by router A best transmission path is found, and the data are effectively transmitted to purpose website.It can be seen that selection optimal path Strategy is the key point that routing algorithm is router.It works to complete this, in the router in store various transmission roads The related data of diameter --- routing table(Routing Table), for being used during Route Selection, the information included in table determines number According to the strategy of forwarding.It draws an analogy, routing table identifies various routes, routing table just as the map that we usually use In the flag information of in store subnet, the number of web router and next router the contents such as name.Routing table can be with It is to be fixedly installed by system manager, can also be changed by system dynamic, can be by router adjust automatically, it can also be by Host computer control(Such as it is realized by sending the modes such as route discovery order).This case will just be passed using this characteristic for data Defeated communication network provides reliable guarantee.
Because power supply department can not obtain the electric data information of user, supply of electric power can not be just ensured well, therefore protect One reliable communication network for data transmission of barrier is the significant challenge proposed to protecting electricity.And the communication network of electricity is protected temporarily It builds temporarily, therefore ensures that reliability and stability is just particularly important.How to ensure that the real-time Transmission of information is sent, The timely of problem finds to solve to become the major issue to be solved instantly.Only under the premise of the solution of these problems, ability The business pipes such as effective dispatching of power netwoks, distribution planning, power quality, network line loss, power supply reliability to protecting electricity temporarily Manage support of submitting necessary information.
Invention content
The technical problem to be solved by the present invention is in view of the shortcomings of the prior art, propose a kind of reliability higher, self-healing property more The strong communication guarantee method for the electric power grid of guarantor temporarily.
The technical solution that its is proposed to solve above-mentioned technical problem of the present invention is:It is a kind of to be protected for protecting the communication of electric power grid temporarily Barrier method, described protect are equipped with several detection devices for being used to measure the electric power grid electricity data of the guarantor, and equipped with control in electric power grid Center processed;The detection device communicates in accordance with the following steps with control centre:
1)It installs multiplexer additional respectively on the detection device, is then connected in the control by cable network The heart;Install the router for storing routing table, there is radio function, institute additional in the control centre and the multiplexer again Alternate wireless network is formed by router;The multiplexer will receive for receiving the electric data from detection device Electric data be transferred to the control centre;
2)The control centre initializes the routing table, and each multiplexer has been recorded to the control in the routing table The transmission path of central transmission data;
3)In the process of running, each multiplexer inquires the routing table,
1. when upper level is multiplexer, then each multiplexer sends heartbeat signal, institute to its upper level multiplexer It states the heartbeat signal that the monitoring of upper level multiplexer receives and records the time, compare the time between the adjacent cardiac time received Difference if the difference between each time difference is no more than signa, judges that the multiplexer for sending heartbeat signal is in normal Operating status does not update routing table at this time;If the difference between each time difference is more than signa, the transmission heartbeat signal Multiplexer be likely to be at abnormal operating condition, at this time multiplexing from the upper level multiplexer to the transmission heartbeat signal fill Transmission test data is put, and the multiplexer of heartbeat signal to be sent is waited to give a response;
If the upper level multiplexer receives response in the given time, the multiplexing dress of the transmission heartbeat signal is judged It puts in normal operating condition, while judges between the multiplexer of the transmission heartbeat signal and the upper level multiplexer First connection circuit is in abnormal operating condition, and the control centre updates routing table, and the described first connection circuit is excluded The transmission path;
If the upper level multiplexer does not receive response in the given time, the multiplexing of the transmission heartbeat signal is judged Device is in abnormal operating condition, and the control centre updates routing table, the multiplexer of the transmission heartbeat signal is excluded Whole network;
2. when upper level center in order to control, then each multiplexer sends heartbeat signal, the control centre to control centre Monitor the heartbeat signal that receives and record the time, compare the time difference between the adjacent cardiac time received, if each time difference it Between difference be no more than signa, then judge send heartbeat signal multiplexer be in normal operating condition, at this time not Update routing table;If the difference between each time difference is more than signa, the multiplexer of the transmission heartbeat signal may In abnormal operating condition, the control centre sends test data, and wait to the multiplexer of the transmission heartbeat signal at this time Treat that the multiplexer of the transmission heartbeat signal gives a response;
If the control centre receives response in the given time, judge that the multiplexer of the transmission heartbeat signal is in Normal operating condition, while judge the second connecting line between the multiplexer for sending heartbeat signal and the control centre Road is in abnormal operating condition, and the control centre updates routing table, and the described second connection circuit is excluded the transmission road Diameter;
If the control centre does not receive response in the given time, at the multiplexer for judging the transmission heartbeat signal In abnormal operating condition, the control centre updates routing table, the multiplexer of the transmission heartbeat signal is excluded entire net Network;
The first connection circuit and the second connection circuit include line channel and/or wireless channel.
It is of the invention to be using the advantageous effect of above-mentioned technical proposal:Since the communication network reliability for protecting electricity temporarily is difficult to protect Barrier, thus the present invention at the beginning of networking just as consideration, be designed by the thought supplemented by primary wireless network of cable network, In the case where that can not ensure cable data normal transmission, carry out data transmission being made up with wireless network, wired, wireless data Transmission is complementary, ensures the real-time normal transmission of data, solves transmission channel(Transmission path)This unreliable problem.But this is resulted in There are problems that a plurality of transmission path in network, this problem is solved by the routing being integrated on multiplexer, utilizes routing The setting of communication protocol and routing table make not interfereing with each other between each path, and transmission path is made of multiple channels(With wired letter In wired failure wirelessly to replace based on road), provide possibility to certain faulty channel or failed equipment is got around, thus When breaking down, it will not lead to not due to transmission path is fixed into row data communication, protecting electric data cannot transmit in time, then So that protecting electricity work encounters obstacle.Whole network in operation, can detect automatically, pinpoint the problems a little, find out failure cause, and will Troubleshooting goes out the smoothness of the network guarantee network operation.
The improvement of above-mentioned technical proposal is:The method of initialization routing table is as follows in this method step 2):
1. when the control centre according to the transmission path in router default routing table by wire channel to next stage When multiplexer sends test data,
A. the control centre waits for the next stage multiplexer to give a response,
If the control centre receives response within the first predetermined time, judge that the next stage multiplexer is in just Normal operating status jumps to step X;
If the control centre does not receive response within the first predetermined time, the next stage multiplexer is likely to be at Abnormal operating condition performs step b.;
B. the control centre will send test data, and wait by the first wireless channel to the next stage multiplexer Treat that the next stage multiplexer gives a response,
If the control centre receives response within second scheduled time, judge that the next stage multiplexer is in just Normal operating status jumps to step X.;
If the control centre does not receive response within second scheduled time, the next stage multiplexer still may at In abnormal operating condition, first wireless channel may also be in abnormal operating condition, perform step c.;
C. the control centre will send test data, and wait by second wireless channel to the next stage multiplexer Treat that the next stage multiplexer gives a response,
If the control centre receives response within the third predetermined time, judge that the next stage multiplexer is in just Normal operating status jumps to step X.;
If the control centre does not receive response within the third predetermined time, if repeatedly step c. repeats step c. five times The wireless channel of test data can be sent by not finding yet afterwards, then judges that the next stage multiplexer is in misoperation shape State, while judge that wire channel and each wireless channel for sending test data are in normal operating condition, in the control The heart initializes the routing table, and the next stage multiplexer is excluded whole network;
X. final step,
When by step a. jump procedure X., the wire channel for judging to be used for transmission test data is in normal operation shape State, the routing table do not change;
When by step b. jump procedure X., judgement is to be used for transmission the wire channel of test data to be in misoperation shape State, the control centre initialize the routing table, the wire channel for being used for transmission test data are excluded entire net Network;
When by step c. jump procedure X., judge to be used for transmission the first wireless channel of test data and be used for transmission survey The wire channel of examination data is in abnormal operating condition, and control centre will initialize routing table, by first wireless channel and Confirm that the wire channel in abnormality excludes whole network;
2. when the multiplexer according to the transmission path in router default routing table by wire channel to next stage When multiplexer sends test data,
A. the multiplexer waits for the next stage multiplexer to give a response,
If the multiplexer receives response within the first predetermined time, judge that the next stage multiplexer is in just Normal operating status jumps to step X;
If the multiplexer does not receive response within the first predetermined time, the next stage multiplexer is likely to be at Abnormal operating condition performs step b.;
B. the multiplexer will send test data, and wait by the first wireless channel to the next stage multiplexer Treat that the next stage multiplexer gives a response,
If the multiplexer receives response within second scheduled time, judge that the next stage multiplexer is in just Normal operating status jumps to step X.;
If the multiplexer does not receive response within second scheduled time, the next stage multiplexer still may at In abnormal operating condition, first wireless channel may also be in abnormal operating condition, perform step c.;
C. the multiplexer will send test data, and wait by second wireless channel to the next stage multiplexer Treat that the next stage multiplexer gives a response,
If the multiplexer receives response within the third predetermined time, judge that the next stage multiplexer is in just Normal operating status jumps to step X.;
If the multiplexer does not receive response within the third predetermined time, if repeatedly step c. repeats step c. five times The wireless channel of test data can be sent by not finding yet afterwards, then judges that the next stage multiplexer is in misoperation shape State, while judge that wire channel and each wireless channel for sending test data are in normal operating condition, in the control The heart initializes the routing table, and the next stage multiplexer is excluded whole network;
X. final step,
When by step a. jump procedure X., the wire channel for judging to be used for transmission test data is in normal operation shape State, the routing table do not change;
When by step b. jump procedure X., judgement is to be used for transmission the wire channel of test data to be in misoperation shape State, the control centre initialize the routing table, the wire channel for being used for transmission test data are excluded entire net Network;
When by step c. jump procedure X., judge to be used for transmission the first wireless channel of test data and be used for transmission survey The wire channel of examination data is in abnormal operating condition, and control centre will initialize routing table, by first wireless channel and Confirm that the wire channel in abnormality excludes whole network;
Complete the initialization of routing table.
The improvement of above-mentioned technical proposal is:First predetermined time is less than second predetermined time, and described second is pre- It fixes time less than the third predetermined time.
It is of the invention to be using the advantageous effect of above-mentioned technical proposal:By investigating repeatedly, question classification is found out, determines networking At the beginning of situation, so that the guarantor's electricity communication system of power grids system built can put into operation as early as possible temporarily.Because it is interim networking, it is impossible to Ensure that equipment is all normal operation, and each equipment of inspection its workload one by one is excessively huge so that project progress It is delayed, this technological improvement of the invention is exactly to be fixed a breakdown a little, and be updated by routing table by verification repeatedly, with This come it is faster establish one can unobstructed transmission data communication network, reduce the workload of staff.
The improvement of above-mentioned technical proposal is:When there is multiplexer that need to add in network, which passes through cable network The application that networks is submitted to the control centre, the control centre receives other multiplexers in the backward network of networking application and sends out Route discovery order is sent, and updates routing table.
It is of the invention to be using the advantageous effect of above-mentioned technical proposal:In above-mentioned technical solution, trouble point is only quilt Network is excluded, but does not mention and how equipment is added in into network, in the above-mentioned technical solutions, entire communication network can be not Keep interim while protect electric electric network data transmission under shutdown status, by the device after operation and maintenance or new device again Be linked into network and use, this improve so that present networks autgmentability it is stronger it is more flexible be more suitable for practical production application, gram The provisional caused problem of interim guarantor's electricity is taken.
The improvement of above-mentioned technical proposal is:The multiplexer is gathered data and transmits data integrated device.
It is of the invention to be using the advantageous effect of above-mentioned technical proposal:It can also be transmitted since multiplexer can acquire, Each multiplexer is both collection point and relay point.
The improvement of above-mentioned technical proposal is:The router is according to metric size selection wireless channel, first nothing The metric of line channel is minimum, and the metric of the second channel is more than the metric of first wireless channel.
It is of the invention to be using the advantageous effect of above-mentioned technical proposal:Using router own protocol, metric size is judged, The stability for the wireless channel set up is determined with this.Wireless channel setting up, stablizing can be reduced largely The bit error rate of data transmission, it is ensured that the accuracy and reliability of data transmission, it will not be due to being used to substitute the wireless of faulty channel The situation that channel itself is unstable and transmission reliability is caused to reduce occurs.
Description of the drawings
The invention will be further described below in conjunction with the accompanying drawings:
Fig. 1 is the communication network work main-process stream schematic diagram of the present invention.
The communication network that Fig. 2 is the present invention monitors flow diagram in real time.
Fig. 3 is the communication network initialization flow diagram of the present invention.
Specific embodiment
Embodiment
The multiplexer that the present embodiment uses is the first communication for being integrated with MCU module, router and coordinating with MCU module Module and the second communication module, so as to fulfill transmitting and acquiring, the first communication module is used for downlink data transmission, the second communication mould Block is used for transmitting uplink data, and for communication module according to the work of UART communications protocol, the signal code of wire transmission mode is 4- 20mA, wireless mode is with 2.4G wireless modules or 470M wireless modules, depending on concrete foundation field condition, selectes interference smaller Radio band.The electrical equipment real time information that downlink is collected with the acquisition of the second communication module by live various kinds of sensors, and Collected data are transmitted to next multiplexer by uplink second communication module while being stored in local big storage. For convenience of describing and understand that multiplexer and router are isolated multiplexer by this case, and utilize bridge joint and road between router It is worked by each agreement of device.
For protecting electric communication system of power grids support method temporarily, Fig. 1 is initialized and is run for communication network one kind of the present embodiment Flow diagram, protects and several detection devices for being used to measure the electric power grid electricity data of the guarantor is equipped in electric power grid, i.e. scene is each Class is used to collect the sensor of electric equipment real time information, and equipped with control centre, supervisory function bit plays in control centre, and controls There are some necessary address informations at center, and each multiplexer collected data information from sensor will be aggregated into control Center processed, and control centre is then the master control end that the operation of electricity scene is protected in management and planning, detection device is with control centre according to such as Lower step communicates:
1)It installs multiplexer additional respectively on the detection device, is then connected in the control by cable network The heart;Install the router for storing routing table, there is radio function, institute additional in the control centre and the multiplexer again Alternate wireless network is formed by router;The multiplexer will receive for receiving the electric data from detection device Electric data be transferred to the control centre;
2)The control centre initializes the routing table, and each multiplexer has been recorded to the control in the routing table The transmission path of central transmission data;
The step of initialization, is as follows:
201 when the control centre according to the transmission path in router default routing table by wire channel to next stage When multiplexer sends test data,
A. the control centre waits for the next stage multiplexer to give a response,
If the control centre receives response within the first predetermined time, judge that the next stage multiplexer is in just Normal operating status jumps to step X;
If the control centre does not receive response within the first predetermined time, the next stage multiplexer is likely to be at Abnormal operating condition performs step b.;
B. the control centre will send test data, and wait by the first wireless channel to the next stage multiplexer Treat that the next stage multiplexer gives a response,
If the control centre receives response within second scheduled time, judge that the next stage multiplexer is in just Normal operating status jumps to step X.;
If the control centre does not receive response within second scheduled time, the next stage multiplexer still may at In abnormal operating condition, first wireless channel may also be in abnormal operating condition, perform step c.;
C. the control centre will send test data, and wait by second wireless channel to the next stage multiplexer Treat that the next stage multiplexer gives a response,
If the control centre receives response within the third predetermined time, judge that the next stage multiplexer is in just Normal operating status jumps to step X.;
If the control centre does not receive response within the third predetermined time, if repeatedly step c. repeats step c. five times The wireless channel of test data can be sent by not finding yet afterwards, then judges that the next stage multiplexer is in misoperation shape State, while judge that wire channel and each wireless channel for sending test data are in normal operating condition, in the control The heart initializes the routing table, and the next stage multiplexer is excluded whole network;
X. final step,
When by step a. jump procedure X., the wire channel for judging to be used for transmission test data is in normal operation shape State, the routing table do not change;
When by step b. jump procedure X., judgement is to be used for transmission the wire channel of test data to be in misoperation shape State, the control centre initialize the routing table, the wire channel for being used for transmission test data are excluded entire net Network;
When by step c. jump procedure X., judge to be used for transmission the first wireless channel of test data and be used for transmission survey The wire channel of examination data is in abnormal operating condition, and control centre will initialize routing table, by first wireless channel and Confirm that the wire channel in abnormality excludes whole network;
202 when the multiplexer according to the transmission path in router default routing table by wire channel to next stage When multiplexer sends test data,
A. the multiplexer waits for the next stage multiplexer to give a response,
If the multiplexer receives response within the first predetermined time, judge that the next stage multiplexer is in just Normal operating status jumps to step X;
If the multiplexer does not receive response within the first predetermined time, the next stage multiplexer is likely to be at Abnormal operating condition performs step b.;
B. the multiplexer will send test data, and wait by the first wireless channel to the next stage multiplexer Treat that the next stage multiplexer gives a response,
If the multiplexer receives response within second scheduled time, judge that the next stage multiplexer is in just Normal operating status jumps to step X.;
If the multiplexer does not receive response within second scheduled time, the next stage multiplexer still may at In abnormal operating condition, first wireless channel may also be in abnormal operating condition, perform step c.;
C. the multiplexer will send test data, and wait by second wireless channel to the next stage multiplexer Treat that the next stage multiplexer gives a response,
If the multiplexer receives response within the third predetermined time, judge that the next stage multiplexer is in just Normal operating status jumps to step X.;
If the multiplexer does not receive response within the third predetermined time, if repeatedly step c. repeats step c. five times The wireless channel of test data can be sent by not finding yet afterwards, then judges that the next stage multiplexer is in misoperation shape State, while judge that wire channel and each wireless channel for sending test data are in normal operating condition, in the control The heart initializes the routing table, and the next stage multiplexer is excluded whole network;
X. final step,
When by step a. jump procedure X., the wire channel for judging to be used for transmission test data is in normal operation shape State, the routing table do not change;
When by step b. jump procedure X., judgement is to be used for transmission the wire channel of test data to be in misoperation shape State, the control centre initialize the routing table, the wire channel for being used for transmission test data are excluded entire net Network;
When by step c. jump procedure X., judge to be used for transmission the first wireless channel of test data and be used for transmission survey The wire channel of examination data is in abnormal operating condition, and control centre will initialize routing table, by first wireless channel and Confirm that the wire channel in abnormality excludes whole network;
Complete the initialization of routing table;
3)In the process of running, each multiplexer inquires the routing table,
301 when upper level is multiplexer, then each multiplexer sends heartbeat signal, institute to its upper level multiplexer It states the heartbeat signal that the monitoring of upper level multiplexer receives and records the time, compare the time between the adjacent cardiac time received Difference if the difference between each time difference is no more than signa, judges that the multiplexer for sending heartbeat signal is in normal Operating status does not update routing table at this time;If the difference between each time difference is more than signa, the transmission heartbeat signal Multiplexer be likely to be at abnormal operating condition, at this time multiplexing from the upper level multiplexer to the transmission heartbeat signal fill Transmission test data is put, and the multiplexer of heartbeat signal to be sent is waited to give a response;
If the upper level multiplexer receives response in the given time, the multiplexing dress of the transmission heartbeat signal is judged It puts in normal operating condition, while judges between the multiplexer of the transmission heartbeat signal and the upper level multiplexer First connection circuit is in abnormal operating condition, and the control centre updates routing table, and the described first connection circuit is excluded The transmission path;
If the upper level multiplexer does not receive response in the given time, the multiplexing of the transmission heartbeat signal is judged Device is in abnormal operating condition, and the control centre updates routing table, the multiplexer of the transmission heartbeat signal is excluded Whole network;
302 work as upper level center in order to control, then each multiplexer sends heartbeat signal, the control centre to control centre Monitor the heartbeat signal that receives and record the time, compare the time difference between the adjacent cardiac time received, if each time difference it Between difference be no more than signa, then judge send heartbeat signal multiplexer be in normal operating condition, at this time not Update routing table;If the difference between each time difference is more than signa, the multiplexer of the transmission heartbeat signal may In abnormal operating condition, the control centre sends test data, and wait to the multiplexer of the transmission heartbeat signal at this time Treat that the multiplexer of the transmission heartbeat signal gives a response;
If the control centre receives response in the given time, judge that the multiplexer of the transmission heartbeat signal is in Normal operating condition, while judge the second connecting line between the multiplexer for sending heartbeat signal and the control centre Road is in abnormal operating condition, and the control centre updates routing table, and the described second connection circuit is excluded the transmission road Diameter;
If the control centre does not receive response in the given time, at the multiplexer for judging the transmission heartbeat signal In abnormal operating condition, the control centre updates routing table, the multiplexer of the transmission heartbeat signal is excluded entire net Network;
The first connection circuit and the second connection circuit include line channel and/or wireless channel.
The first predetermined time in the present embodiment was less than for the second predetermined time, and the second predetermined time was less than the pre- timing of third Between.Interval time is stepped up, in order to avoid because equipment response go wrong caused by erroneous judgement.
When the present embodiment has multiplexer that need to add in network, which is submitted by cable network to control centre Network application, and control centre receives other multiplexers transmission route discovery order into network after the networking application, and updates Routing table.The multiplexer mentioned here that network need to be added in refers to, after the new multiplexer for accessing network or troubleshooting The multiplexer rejoined.
The multiplexer of the present embodiment is gathered data and transmits data integrated device as previously described.
Router in the present embodiment is according to metric size selection wireless channel, and the metric of the first wireless channel is most Small, the metric of second channel is more than the metric of the first wireless channel.
It, can also be in the form of hardware as can be seen that the present invention can realize in a software form from the embodiment of the present invention Realize, naturally it is also possible to the mode of soft or hard combination is realized, but finally is realized in which way, to see implementation this method main body according to According to concrete condition comprehensive consideration, its economic convenient form is taken to be achieved, it is certainly every to use method mentioned in the present invention Way of realization should all fall into the present invention realization in the range of, without this kind of feelings that should be limited only to described in the embodiment of the present invention Condition.

Claims (3)

1. it is a kind of for protecting the communication guarantee method of electric power grid temporarily, it is equipped in the electric power grid of guarantor several described for measuring The detection device of electric power grid electricity data is protected, and equipped with control centre;It is characterized in that, the detection device and control centre according to Following steps communicate:
1)It installs multiplexer additional respectively on the detection device, the control centre is then connected to by cable network;Again Install the router for storing routing table, there is radio function, Suo Youlu additional in the control centre and the multiplexer Alternate wireless network is formed by device;The multiplexer is used to receive the electric data from detection device, and the electricity that will be received Data are transferred to the control centre;
2)The control centre initializes the routing table, and each multiplexer has been recorded to the control centre in the routing table Transmit the transmission path of data;
3)In the process of running, each multiplexer inquires the routing table,
1. when upper level be multiplexer when, then each multiplexer to its upper level multiplexer send heartbeat signal, it is described on Level-one multiplexer monitors the heartbeat signal received and records the time, compares the time difference between the adjacent cardiac time received, If the difference between each time difference is no more than signa, the multiplexer for judging to send heartbeat signal is in normal operation State does not update routing table at this time;If the difference between each time difference is more than signa, which answers Abnormal operating condition is likely to be at device, the upper level multiplexer is sent out to the multiplexer of the transmission heartbeat signal at this time Test data is sent, and the multiplexer of heartbeat signal to be sent is waited to give a response;
If the upper level multiplexer receives response in the given time, at the multiplexer for judging the transmission heartbeat signal In normal operating condition, at the same judge between the multiplexer of the transmission heartbeat signal and the upper level multiplexer first Connection circuit is in abnormal operating condition, and the control centre updates routing table, the described first connection circuit is excluded described Transmission path;
If the upper level multiplexer does not receive response in the given time, the multiplexer of the transmission heartbeat signal is judged In abnormal operating condition, the control centre updates routing table, and the multiplexer of the transmission heartbeat signal is excluded entirely Network;
2. when upper level center in order to control, then each multiplexer sends heartbeat signal to control centre, and the control centre monitors The heartbeat signal that receives simultaneously records the time, compares the time difference between the adjacent cardiac time received, if between each time difference Difference is no more than signa, then the multiplexer for judging to send heartbeat signal is in normal operating condition, does not update at this time Routing table;If the difference between each time difference is more than signa, the multiplexer of the transmission heartbeat signal is likely to be at Abnormal operating condition, the control centre sends test data to the multiplexer of the transmission heartbeat signal at this time, and waits for and being somebody's turn to do The multiplexer for sending heartbeat signal gives a response;
If the control centre receives response in the given time, judge that the multiplexer of the transmission heartbeat signal is in normal Operating status, while judge at the second connection circuit between the multiplexer for sending heartbeat signal and the control centre In abnormal operating condition, the control centre updates routing table, and the described second connection circuit is excluded the transmission path;
If the control centre does not receive response in the given time, judge that the multiplexer of the transmission heartbeat signal is in different Normal operating status, the control centre update routing table, the multiplexer of the transmission heartbeat signal are excluded whole network;
The first connection circuit and the second connection circuit include line channel and/or wireless channel;
The process of initialization routing table is in step 2),
1. when the control centre is multiplexed according to the transmission path in router default routing table by wire channel to next stage When device sends test data,
a1The control centre waits for the next stage multiplexer to give a response,
If the control centre receives response within the first predetermined time, judge that the next stage multiplexer is in normal fortune Row state jumps to step X1.;
If the control centre does not receive response within the first predetermined time, the next stage multiplexer is likely to be at exception Operating status performs step b1.;
b1The control centre will send test data, and wait for and being somebody's turn to do by the first wireless channel to the next stage multiplexer Next stage multiplexer gives a response,
If the control centre receives response within second scheduled time, judge that the next stage multiplexer is in normal fortune Row state jumps to step X1.;
If the control centre does not receive response within second scheduled time, the next stage multiplexer is still likely to be at different Normal operating status, first wireless channel may also be in abnormal operating condition, perform step c1.;
c1The control centre will send test data, and wait for and being somebody's turn to do by second wireless channel to the next stage multiplexer Next stage multiplexer gives a response,
If the control centre receives response within the third predetermined time, judge that the next stage multiplexer is in normal fortune Row state jumps to step X1.;
If the control centre does not receive response within the third predetermined time, repeatedly step c1If repeat step c1After five times The wireless channel of test data can be sent by not finding yet, then judges that the next stage multiplexer is in abnormal operating condition, Judge wire channel for sending test data simultaneously and each wireless channel is in normal operating condition, at the beginning of the control centre The next stage multiplexer is excluded whole network by the beginningization routing table;
X1Final step,
When by step a1Jump procedure X1When, the wire channel for judging to be used for transmission test data is in normal operating condition, institute Routing table is stated not change;
When by step b1Jump procedure X1When, judgement is to be used for transmission the wire channel of test data to be in abnormal operating condition, The control centre initializes the routing table, and the wire channel for being used for transmission test data is excluded whole network;
When by step c1Jump procedure X1When, judge to be used for transmission the first wireless channel of test data and be used for transmission test The wire channel of data is in abnormal operating condition, and control centre will initialize routing table, by first wireless channel and really Recognize the wire channel in abnormality and exclude whole network;
2. when the multiplexer is multiplexed according to the transmission path in router default routing table by wire channel to next stage When device sends test data,
a2The multiplexer waits for the next stage multiplexer to give a response,
If the multiplexer receives response within the first predetermined time, judge that the next stage multiplexer is in normal fortune Row state jumps to step X2.;
If the multiplexer does not receive response within the first predetermined time, the next stage multiplexer is likely to be at exception Operating status performs step b2.;
b2The multiplexer will send test data, and wait for and being somebody's turn to do by the first wireless channel to the next stage multiplexer Next stage multiplexer gives a response,
If the multiplexer receives response within second scheduled time, judge that the next stage multiplexer is in normal fortune Row state jumps to step X2.;
If the multiplexer does not receive response within second scheduled time, the next stage multiplexer is still likely to be at different Normal operating status, first wireless channel may also be in abnormal operating condition, perform step c2.;
c2The multiplexer will send test data, and wait for and being somebody's turn to do by second wireless channel to the next stage multiplexer Next stage multiplexer gives a response,
If the multiplexer receives response within the third predetermined time, judge that the next stage multiplexer is in normal fortune Row state jumps to step X2.;
If the multiplexer does not receive response within the third predetermined time, repeatedly step c2If repeat step c2After five times The wireless channel of test data can be sent by not finding yet, then judges that the next stage multiplexer is in abnormal operating condition, Judge wire channel for sending test data simultaneously and each wireless channel is in normal operating condition, at the beginning of the control centre The next stage multiplexer is excluded whole network by the beginningization routing table;
X2Final step,
When by step a2Jump procedure X2When, the wire channel for judging to be used for transmission test data is in normal operating condition, institute Routing table is stated not change;
When by step b2Jump procedure X2When, judgement is to be used for transmission the wire channel of test data to be in abnormal operating condition, The control centre initializes the routing table, and the wire channel for being used for transmission test data is excluded whole network;
When by step c2Jump procedure X2When, judge to be used for transmission the first wireless channel of test data and be used for transmission test The wire channel of data is in abnormal operating condition, and control centre will initialize routing table, by first wireless channel and really Recognize the wire channel in abnormality and exclude whole network;
Complete the initialization of routing table;
When there is multiplexer that need to add in network, which submits networking Shen by cable network to the control centre Please, the control centre receives other multiplexers transmission route discovery order into network after the networking application, and updates road By table.
2. a kind of communication guarantee method for the electric power grid of guarantor temporarily as described in claim 1, it is characterised in that:Described first Predetermined time is less than second predetermined time, and second predetermined time is less than the third predetermined time.
3. a kind of communication guarantee method for the electric power grid of guarantor temporarily as claimed in claim 1 or 2, it is characterised in that:It is described Multiplexer is gathered data and transmits data integrated device.
CN201610044622.3A 2016-01-22 2016-01-22 A kind of communication guarantee method for the electric power grid of guarantor temporarily Active CN105704038B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610044622.3A CN105704038B (en) 2016-01-22 2016-01-22 A kind of communication guarantee method for the electric power grid of guarantor temporarily

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610044622.3A CN105704038B (en) 2016-01-22 2016-01-22 A kind of communication guarantee method for the electric power grid of guarantor temporarily

Publications (2)

Publication Number Publication Date
CN105704038A CN105704038A (en) 2016-06-22
CN105704038B true CN105704038B (en) 2018-07-06

Family

ID=56228578

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610044622.3A Active CN105704038B (en) 2016-01-22 2016-01-22 A kind of communication guarantee method for the electric power grid of guarantor temporarily

Country Status (1)

Country Link
CN (1) CN105704038B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107681788A (en) * 2017-11-14 2018-02-09 广东电网有限责任公司电力科学研究院 A kind of larger power user electricity consumption data acquisition method and system
CN117439866A (en) * 2023-10-12 2024-01-23 南京麦杰软件有限公司 Method and apparatus for ensuring network communication during maintenance work

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101924391A (en) * 2010-08-03 2010-12-22 国网电力科学研究院武汉南瑞有限责任公司 Electric distribution network feeder automation system based on wireless ad hoc network and networking method thereof
CN103116346A (en) * 2013-02-22 2013-05-22 西安众恒科技有限公司 Power quality online monitoring system of network topology wireless communication
CN105120484A (en) * 2015-08-21 2015-12-02 华中科技大学 Method of building communication network current differential emergency protection channel

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060039288A1 (en) * 2004-08-17 2006-02-23 National Applied Research Laboratories National Center For High-Performance Computing Network status monitoring and warning method
CN102308487B (en) * 2009-05-08 2014-01-08 华为技术有限公司 Method, equipment and system for managing lines between access device at central office end and terminal devices
DE102012210126A1 (en) * 2012-06-15 2013-12-19 Siemens Aktiengesellschaft Method for operating a network arrangement, network device and network arrangement

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101924391A (en) * 2010-08-03 2010-12-22 国网电力科学研究院武汉南瑞有限责任公司 Electric distribution network feeder automation system based on wireless ad hoc network and networking method thereof
CN103116346A (en) * 2013-02-22 2013-05-22 西安众恒科技有限公司 Power quality online monitoring system of network topology wireless communication
CN105120484A (en) * 2015-08-21 2015-12-02 华中科技大学 Method of building communication network current differential emergency protection channel

Also Published As

Publication number Publication date
CN105704038A (en) 2016-06-22

Similar Documents

Publication Publication Date Title
JP5249950B2 (en) Method and system for utility network outage detection
CN102111310B (en) Method and system for monitoring content delivery network (CDN) equipment status
EP2651098B1 (en) Event processing system for an electrical power system
CN102308522B (en) Method, device and system for locating network fault
CA2602289A1 (en) Using a fixed network wireless data collection system to improve utility responsiveness to power outages
CN110535710A (en) Remote diagnosis method and system, the network equipment and Cloud Server of the network equipment
CN107231430A (en) Charging pile, charging pile group-network construction and charging pile management method
US7720050B1 (en) Method and apparatus for implementing and managing a network architecture
CN105871674B (en) The guard method of ring protection link failure, equipment and system
KR20140009070A (en) Network, master, hub, and method for providing a bluetooth infrastructure
CN109067592A (en) A kind of intelligent control device and management-control method for matching electricity consumption towards intelligence
EP2509273A1 (en) Method and system for updating network topology in multi-protocol label switching system
CN107465454A (en) It is a kind of to judge method and apparatus of the physics with route
AU2013203125B2 (en) Network administrator interface systems and methods for monitoring industrial wireless, self organizing mesh communication networks
CN105790990A (en) Method and system for monitoring and managing power distribution and utilization communication business
CN105704038B (en) A kind of communication guarantee method for the electric power grid of guarantor temporarily
CN108156004A (en) SDN controllers and switch management method
CN104125079A (en) Method and device for determining double-device hot-backup configuration information
CN108494625A (en) A kind of analysis system on network performance evaluation
CN105591787B (en) Basic reason analysis method, device and system in a kind of network
CN108599980A (en) A kind of method for diagnosing faults and its device
CN117061357A (en) Network topology management method and system based on virtual private network
CN103178997B (en) Detection method that a kind of MAC Address based on LLDP agreement is identical and equipment
CN113691454B (en) Industrial Internet of things data acquisition and management method and system
CN111917182B (en) Method and system for directly transmitting data of double main stations of low-voltage distribution network

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant