CN105696601A - Reusable foundation pit supporting device with water stopping function and construction method - Google Patents
Reusable foundation pit supporting device with water stopping function and construction method Download PDFInfo
- Publication number
- CN105696601A CN105696601A CN201610106718.8A CN201610106718A CN105696601A CN 105696601 A CN105696601 A CN 105696601A CN 201610106718 A CN201610106718 A CN 201610106718A CN 105696601 A CN105696601 A CN 105696601A
- Authority
- CN
- China
- Prior art keywords
- breast boards
- stake
- support system
- screw rod
- retaining plates
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
The invention provides a reusable foundation pit supporting device with a water stopping function and a construction method, and the foundation pit supporting device and the construction method are mainly used for excavation and support of foundation pits in building construction. The construction method comprises the steps that a plurality of piles (1) are gradually driven or pressed into the designed elevation under the ground from the ground by a pile driver according to the design requirement; soil retaining plates (2) are sequentially installed between pile bodies of the two adjacent piles (1), and all the soil retaining plates (2) are pressed into the position under the ground by 1000 mm or so through special pile pressing-pulling equipment; a soil layer of which the height is 1000 mm or so is excavated in a supporting system formed by the piles (1) and the soil retaining plates (2), and supporting and excavating are conducted at the same time through the same method till the supporting system is completed; and when the supporting system is dismantled, threaded rods (5) are clamped through the special pile pressing-pulling equipment, hydraulic rods are started, the lowest section of the soil retaining plates (2) are lifted through the threaded rods (5), the rest of the soil retaining plates (2) are driven to be lifted, all the soil retaining plates (2) are dismantled, and finally the piles (1) are pulled out through a traditional method, so that the supporting system is dismantled.
Description
Technical field
Present invention is mainly used for the realm of building construction Support of Foundation Pit Excavation foundation ditch to use。
Background technology
Construct the at present excavation supporting method of deep basal pit of China generally has: diaphram wall, bored concrete pile, SMW stake, steel sheet pile, Section-steel Piles etc.;The diaphram wall supporting degree of depth is big, and stagnant water effect is good, but long construction period, cost is the highest, it is impossible to recycling;The same cost of bored concrete pile is high, need to have measures of preventing water with the use of, long construction period, it is impossible to recycling;The SMW stake supporting degree of depth is relatively big, and stagnant water effect is better, and shaped steel therein can extract recycling, but deep-mixed pile can not be extracted, and cost is still higher;Although steel sheet pile has water stopping function, a short construction period, but run into boulder or cobble interlayer then cannot be squeezed into, be suitable for stratum limited, and driving depth is limited;Although Section-steel Piles is easily squeezed into, the supporting degree of depth is big but does not have water stopping function。
Summary of the invention
Instant invention overcomes the problems referred to above, multiple stakes (1) of the present invention are squeezed into from ground by designing requirement by piling machine or are pressed into subterranean designation absolute altitude by one by one, then between the pile body of adjacent two stakes (1), breast boards (2) is installed successively, with proprietary pressure pile pulling device, each breast boards (2) is pressed into underground 1000 millimeter, spoil layer depth 1000 millimeter in the support system that stake (1) and breast boards (2) are formed again, props up safe edge with same method limit and excavates until support system completes;When removing support system, with proprietary pressure pile pulling device, screw rod (5) is clamped, start hydraulic stem, first segment breast boards (2) is mentioned by screw rod (5), and drive all the other respectively to save breast boards (2) to mention, removing each joint breast boards (2), finally stake (1) extracted by traditional method, support system has been removed。
The present invention is mainly by stake (1), breast boards (2), baffle plate (3), breast boards hole (4), screw rod (5), sealing rod (7), rhombus head (8), female thread (9), cavity (10), compacted bar (11) forms;Stake (1) can directly be selected I-steel or become I-steel with Plate Welding, and baffle plate (3) is respectively welded at the web both sides of stake (1);Breast boards (2) has breast boards hole (4) and sealing rod (7), and next joint breast boards (2) has sealing rod (7), rhombus head (8) and female thread (9);Screw rod (5) is each passed through the breast boards hole (4) of multiple breast boards (2), the external screw thread of its lower end is screwed in the female thread (9) of next joint breast boards (2), and each breast boards (2) is compressed and fixes by its upper end nut;In the cavity (10) that the left or right termination of the web of compacted bar (11) insertion stake (1), lower flange, baffle plate (3) and breast boards (2) is formed;Need to illustrate: sealing rod (7) has certain elastic deformability;The construction method of the present invention is: first squeeze into stake of the present invention (1) one by one to designed elevation by deep foundation pit support layout design sideline on smooth place, such as hard boulder, when stake (1) is difficult to squeeze into, it is possible to avoid boulder and squeeze into;The lower end external screw thread of screw rod (5) is screwed in the female thread (9) of next joint breast boards (2), again two ends, left and right of next joint breast boards (2) are inserted between lower flange and the baffle plate (3) of stake (1), the same breast boards hole (4) that all the other respectively save breast boards (2) penetrates screw rod (5) and between lower flange and baffle plate (3) by two ends, left and right insertion stake (1), when the cumulative height of the installation of each joint breast boards (2) (working depth of the hydraulic stem of this highly also proprietary just pressure pile pulling device) when 1000 millimeter, with proprietary pressure pile pulling device, each breast boards (2) is pressed into underground 1000 millimeter, in the support system that stake (1) and breast boards (2) are formed, excavation soil layer 1000 millimeter is deep again, by same method, all the other each breast boards (2) are installed again high to accumulative height 1000 millimeter, excavate soil layer 1000 millimeter deeper, so circulation is until support system completes, earth excavation completes;In soil layer digging process, remaining that next joint breast boards (2) inserts in soil layer 300 millimeters, namely retaining 300 millimeters thick soil layers does not excavate, and so can play temporary leaking water effect;If support system leaks, seep water phenomenon, with proprietary pressure pile pulling device, compacted bar (11) is pressed in cavity (10), and extracts compacted bar (11), cementing material is poured in the cavity extracted, it is pressed into compacted bar (11) again, cementing material is compacted, until completely subsoil water being stopped;When removing support system, first traditionally backfill the earthwork between support system and underground beyond the region of objective existence wall, with proprietary pressure pile pulling device, screw rod (5) is clamped again, start hydraulic stem, screw rod (5) will be mentioned by next joint breast boards (2), and drive all the other respectively to save breast boards (2) to mention, remove each joint breast boards (2), finally stake (1) being extracted by traditional method, support system has been removed。
Accompanying drawing explanation
Description of reference numerals: 1-stake, 2-breast boards, 3-baffle plate, 4-breast boards hole, 5-screw rod, the soil layer of 6-gear soil, 7-sealing rod, 8-rhombus head, 9-female thread, 10-cavity, the compacted bar of 11-。
Fig. 1 is the horizontal sectional drawing of a supporting unit of the present invention。
Fig. 2 is the horizontal sectional drawing of two supporting unit of the present invention。
Fig. 3 is the vertical cross section elevation of the present invention next joint and adjacent breast boards (2)。
Fig. 4 is the left and right vertical cross section elevation of the present invention next joint breast boards (2)。
Fig. 5 is stake of the present invention (1), breast boards (2), baffle plate (3) and compacted bar (11) relative position enlarged drawing。
Detailed description of the invention
Summary of the invention has described the specific embodiment of the present invention in detail, is not repeated herein, and need to illustrate as follows:
Beating or during jacked pile (1), if owing to the impact of boulder, the spacing of two stakes (1) can be inconsistent with the spacing of other each stake, need to adjust the length of breast boards (2), and all the other components are constant。
Why each breast boards (2) is first pressed into underground 1000 millimeter by the present invention, and remain that next joint breast boards (2) inserts 300 millimeter in soil layer, it is primarily to when each breast boards (2) is pressed in soil layer, the rhombus head (8) of first segment breast boards (2) can the soil layer of compacted breast boards (2) periphery, especially can natural soil layer in compacted cavity (10), block subsoil water by the passage inside outer side inflow supporting, play the sealing effect at breast boards (2) two ends and adjacent two stake (1) junctions, if stagnant water effect is bad certainly, can also in the process of press-in breast boards (2), with proprietary pressure pile pulling device, compacted bar (11) is pressed in cavity (10) simultaneously, and extract compacted bar (11), cementing material is poured in the cavity extracted, it is pressed into compacted bar (11) again, cementing material is compacted, until completely subsoil water being stopped。Certainly, the sealing rod (7) that each breast boards (2) sealing in-between is compressed each breast boards (2) by screw rod (5) solves, and material is thus formed the sealing system of complete set。
If necessary, the present invention need to coordinate the supporting of horizontal support beam body system。
Cavity (10) has certain width in the horizontal direction, it is possible to regulate due to horizontal range error when adjacent two stakes (1) are squeezed into。
Claims (1)
1. there is foundation pit support device and the construction method of the repeatable utilization of water stopping function, it is characterized in that: it is mainly by stake (1), breast boards (2), baffle plate (3), breast boards hole (4), screw rod (5), sealing rod (7), rhombus head (8), female thread (9), cavity (10), compacted bar (11) forms;Stake (1) can directly be selected I-steel or become I-steel with Plate Welding, and baffle plate (3) is respectively welded at the web both sides of stake (1);Breast boards (2) has breast boards hole (4) and sealing rod (7), and next joint breast boards (2) has sealing rod (7), rhombus head (8) and female thread (9);Screw rod (5) is each passed through the breast boards hole (4) of multiple breast boards (2), the external screw thread of its lower end is screwed in the female thread (9) of next joint breast boards (2), and each breast boards (2) is compressed and fixes by its upper end nut;In the cavity (10) that the left or right termination of the web of compacted bar (11) insertion stake (1), lower flange, baffle plate (3) and breast boards (2) is formed;Need to illustrate: sealing rod (7) has certain elastic deformability;The construction method of the present invention is: first squeeze into stake of the present invention (1) one by one to designed elevation by deep foundation pit support layout design sideline on smooth place, such as hard boulder, when stake (1) is difficult to squeeze into, it is possible to avoid boulder and squeeze into;The lower end external screw thread of screw rod (5) is screwed in the female thread (9) of next joint breast boards (2), again two ends, left and right of next joint breast boards (2) are inserted between lower flange and the baffle plate (3) of stake (1), the same breast boards hole (4) that all the other respectively save breast boards (2) penetrates screw rod (5) and between lower flange and baffle plate (3) by two ends, left and right insertion stake (1), when the cumulative height of the installation of each joint breast boards (2) (working depth of the hydraulic stem of this highly also proprietary just pressure pile pulling device) when 1000 millimeter, with proprietary pressure pile pulling device, each breast boards (2) is pressed into underground 1000 millimeter, in the support system that stake (1) and breast boards (2) are formed, excavation soil layer 1000 millimeter is deep again, by same method, all the other each breast boards (2) are installed again high to accumulative height 1000 millimeter, excavate soil layer 1000 millimeter deeper, so circulation is until support system completes, earth excavation completes;In soil layer digging process, remaining that next joint breast boards (2) inserts in soil layer 300 millimeters, namely retaining 300 millimeters thick soil layers does not excavate, and so can play temporary leaking water effect;If support system leaks, seep water phenomenon, with proprietary pressure pile pulling device, compacted bar (11) is pressed in cavity (10), and extracts compacted bar (11), cementing material is poured in the cavity extracted, it is pressed into compacted bar (11) again, cementing material is compacted, until completely subsoil water being stopped;When removing support system, first traditionally backfill the earthwork between support system and underground beyond the region of objective existence wall, with proprietary pressure pile pulling device, screw rod (5) is clamped again, start hydraulic stem, screw rod (5) will be mentioned by next joint breast boards (2), and drive all the other respectively to save breast boards (2) to mention, remove each joint breast boards (2), finally stake (1) being extracted by traditional method, support system has been removed。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610106718.8A CN105696601A (en) | 2016-02-27 | 2016-02-27 | Reusable foundation pit supporting device with water stopping function and construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610106718.8A CN105696601A (en) | 2016-02-27 | 2016-02-27 | Reusable foundation pit supporting device with water stopping function and construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105696601A true CN105696601A (en) | 2016-06-22 |
Family
ID=56223599
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610106718.8A Pending CN105696601A (en) | 2016-02-27 | 2016-02-27 | Reusable foundation pit supporting device with water stopping function and construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105696601A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110629765A (en) * | 2019-09-29 | 2019-12-31 | 河南乾坤路桥工程有限公司 | Safety protection device and protection method for H-shaped steel foundation pit |
CN113605404A (en) * | 2021-08-02 | 2021-11-05 | 江苏东合南岩土科技股份有限公司 | Steel plate-H-shaped steel combined type foundation pit supporting structure and construction method thereof |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100642341B1 (en) * | 2006-07-27 | 2006-11-15 | (주)유원건축사사무소 | A pile for retaining wall |
CN202482888U (en) * | 2012-02-01 | 2012-10-10 | 华侨大学 | Novel building block of retaining wall |
CN203905018U (en) * | 2014-05-26 | 2014-10-29 | 中国建筑股份有限公司 | Supporting and protecting system with combined double-row piles in combination with oblique anchors |
CN204703175U (en) * | 2015-05-28 | 2015-10-14 | 浙江中林勘察研究股份有限公司 | Combine double sheet pile support system |
CN105064379A (en) * | 2015-08-29 | 2015-11-18 | 彭宝安 | H-shaped steel foundation pit supporting device and method |
-
2016
- 2016-02-27 CN CN201610106718.8A patent/CN105696601A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100642341B1 (en) * | 2006-07-27 | 2006-11-15 | (주)유원건축사사무소 | A pile for retaining wall |
CN202482888U (en) * | 2012-02-01 | 2012-10-10 | 华侨大学 | Novel building block of retaining wall |
CN203905018U (en) * | 2014-05-26 | 2014-10-29 | 中国建筑股份有限公司 | Supporting and protecting system with combined double-row piles in combination with oblique anchors |
CN204703175U (en) * | 2015-05-28 | 2015-10-14 | 浙江中林勘察研究股份有限公司 | Combine double sheet pile support system |
CN105064379A (en) * | 2015-08-29 | 2015-11-18 | 彭宝安 | H-shaped steel foundation pit supporting device and method |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110629765A (en) * | 2019-09-29 | 2019-12-31 | 河南乾坤路桥工程有限公司 | Safety protection device and protection method for H-shaped steel foundation pit |
CN113605404A (en) * | 2021-08-02 | 2021-11-05 | 江苏东合南岩土科技股份有限公司 | Steel plate-H-shaped steel combined type foundation pit supporting structure and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106013151A (en) | Continuous pile wall construction method and construction device used for continuous pile wall construction method | |
CN108612111B (en) | Steel pipe pile, foundation pit support structure and construction method of foundation pit support structure | |
CN104652418B (en) | Diaphragm wall underground utilities position construction method | |
CN105780779A (en) | Externally arranged, compacted and grouted Larsen steel sheet pile composite retaining structure and use method thereof | |
CN204253056U (en) | A kind of shield machine export & import reinforcing structure | |
CN105064379B (en) | H-shaped steel foundation pit supporting device and method | |
CN108532586A (en) | A kind of construction method of garage parking diaphram wall | |
CN105804107A (en) | High-pressure-jetting and anti-seepage treatment method for triple tube of joint of underground diaphragm wall | |
CN102660955A (en) | Quick construction method for foundation pit slope support | |
CN201972155U (en) | Topdown-construction-method foundation pit supporting structure of steel plate pile | |
JP6934697B2 (en) | Ground improvement method | |
CN105696601A (en) | Reusable foundation pit supporting device with water stopping function and construction method | |
CN104727332A (en) | Steel sheet pile cofferdam bottom rock-socketed anchoring method | |
CN202559363U (en) | Foundation pit supporting structure for underground diaphragm wall with steel structure | |
CN106978814A (en) | A kind of Fabricated Structure for Support of Excavation | |
WO2015152826A1 (en) | Method for installing a multi-section suction caisson | |
CN101886384A (en) | Vacuum and dynamic compaction synchronization method | |
CN107700508A (en) | A kind of shaped steel stirs the construction method of water spray soil curtain support pile | |
CN208870053U (en) | Deep well dado steel construction supports | |
JP2012233349A (en) | Earth retaining method | |
JP2008274746A (en) | Method of demolishing and removing underground structure | |
CN105672328B (en) | Slip casting ductule resists the H profile steel foundation pit support device of earth lateral pressure | |
JP2015148105A (en) | Ground improving method and ground improving system | |
CN106013198A (en) | Gap pretreatment construction method for foundation pit support structure | |
CN113293771A (en) | Combined steel plate anchoring body |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C41 | Transfer of patent application or patent right or utility model | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20161012 Address after: Room 2, building 457, Huangpu Road, Huangdao, Shandong, Qingdao, 266555, China Applicant after: Qingdao Lantian Chuangxian Technology Services Limited Address before: 430064, Wuhan, Hubei province Hongshan District lion mountain street, school 84, 73, 7, 2 room Applicant before: WUHAN CHUANGXIAN PATENT TECHNOLOGY SERVICE CO., LTD. |
|
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160622 |