CN105696594B - A kind of anti-lateral deflection anti-float anchor rod of retardation setting type and its construction method - Google Patents

A kind of anti-lateral deflection anti-float anchor rod of retardation setting type and its construction method Download PDF

Info

Publication number
CN105696594B
CN105696594B CN201610141042.6A CN201610141042A CN105696594B CN 105696594 B CN105696594 B CN 105696594B CN 201610141042 A CN201610141042 A CN 201610141042A CN 105696594 B CN105696594 B CN 105696594B
Authority
CN
China
Prior art keywords
metal tube
rod
lateral deflection
float anchor
setting type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610141042.6A
Other languages
Chinese (zh)
Other versions
CN105696594A (en
Inventor
王功
王一功
周诚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhong Jiao Airport Co Ltd Of Surveying And Designing Institute
CCCC FHDI Engineering Co Ltd
Original Assignee
Zhong Jiao Airport Co Ltd Of Surveying And Designing Institute
CCCC FHDI Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhong Jiao Airport Co Ltd Of Surveying And Designing Institute, CCCC FHDI Engineering Co Ltd filed Critical Zhong Jiao Airport Co Ltd Of Surveying And Designing Institute
Priority to CN201610141042.6A priority Critical patent/CN105696594B/en
Publication of CN105696594A publication Critical patent/CN105696594A/en
Application granted granted Critical
Publication of CN105696594B publication Critical patent/CN105696594B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/10Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against soil pressure or hydraulic pressure
    • E02D31/12Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against soil pressure or hydraulic pressure against upward hydraulic pressure

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Piles And Underground Anchors (AREA)
  • Foundations (AREA)

Abstract

The invention provides a kind of anti-lateral deflection anti-float anchor rod of retardation setting type and its construction method, the anti-lateral deflection anti-float anchor rod of retardation setting type includes the body of rod, metal tube, retarding mortar, cock body;The metal tube is anchored in basis, the inner hollow of metal tube and is perfused with retarding mortar, the upper end closed and lower ending opening of metal tube;In the bottom implantation foundation soil of the body of rod, the top of the body of rod through cock body and is stretched into metal tube;The cock body is arranged at metal tube lower ending opening, and metal tube lower ending opening is blocked and is relatively fixed metal tube and the body of rod;An intersegmental gap is left between the upper end of the body of rod and the upper end inwall of metal tube.Compared with prior art, the anti-lateral deflection anti-float anchor rod of retardation setting type provided by the present invention has more preferable anti-floating binding effect to basement, also ensure that lever strength does not reduce because pressing drawing repeatedly.

Description

A kind of anti-lateral deflection anti-float anchor rod of retardation setting type and its construction method
Technical field
The present invention relates to field of civil engineering, more particularly to a kind of anti-lateral deflection anti-float anchor rod of retardation setting type and its construction method.
Background technology
Anti-float anchor rod is a kind of conventional structural elements for providing underground structure, underground structure anti-floating ability.Its The body of rod is made by reinforcing bar, steel strand wires, steel pipe etc., and most of to be implanted into foundation soil, upper end is anchored into basis.Work as hypogee When thing, structures are by upward water buoyancy, anti-float anchor rod will constrain building, structures, prevent its floating.
In construction period due to using precipitation means, basement and the effect for being not affected by upward water buoyancy;As top is built The progressively construction of thing is built, downward pressure incrementally increases, and basis is inevitable to produce downwards certain sedimentation.And the anti-float anchor rod body of rod is Elongated metallic member, larger anti-pulling capacity can be produced but pressure can not be born, therefore with setting of ground, anchor rod body Inevitable compressive buckling.
When construction is completed, precipitation terminates, and when basement starts to bear upward water buoyancy, is stretched in the anti-float anchor rod of lateral deflection After be only possible to basement provide constraint.So not only anti-float anchor rod is poor to basement anti-floating binding effect, and anti-floating anchor Under pressure is drawn repeatedly, intensity can also decline club shaft.
Therefore, it is necessary to prior art is improved.
The content of the invention
It is an object of the invention to provide a kind of anti-lateral deflection anti-float anchor rod of retardation setting type and its construction method, construction period is prevented Anti-float anchor rod compressive buckling, and then weaken anti-floating binding effect and lever strength.
To achieve the above object, the present invention uses following technical scheme:
A kind of anti-lateral deflection anti-float anchor rod of retardation setting type, including the body of rod, metal tube, retarding mortar, cock body;The metal tube anchoring In basis, the inner hollow of metal tube and retarding mortar is perfused with, the upper end closed and lower ending opening of metal tube;The body of rod Bottom implantation foundation soil in, the top of the body of rod is through cock body and stretches into metal tube;The cock body is arranged at metal tube lower end Opening, metal tube lower ending opening is blocked and is relatively fixed metal tube and the body of rod;The upper end of the body of rod and the upper end of metal tube An intersegmental gap is left between inwall.
Further, the metal tube is metal bellows.
Further, the cock body is in round table-like rubber stopper, and the middle part of rubber stopper is provided with the through hole passed through for the body of rod.
Further, the upper end of the metal tube is provided with aspirating hole.
The construction method of the anti-lateral deflection anti-float anchor rod of retardation setting type described in more than one, including:
S1, metal tube is inverted, retarding mortar is injected in metal tube;
S2, cock body is enclosed on the body of rod, and body of rod top is inserted in metal tube;
S3, after using cock body, metal tube lower ending opening is blocked, metal tube is together just being put with the body of rod;
S4, treat that retarding mortar flow to metal tube bottom, gap is formed on metal tube top;
S5, it is implanted into foundation soil internal drilling and by the bottom of the body of rod, then is cased with pouring at metal tube on body of rod top and smashes construction Basis.
Further, the S4 also includes:Extract the air in gap out.
The present invention utilizes the characteristic of retarding mortar, by above-mentioned construction, as upper load increases base in work progress Plinth starts to settle, and during retarding mortar ot-yet-hardened, the body of rod can the free movement in metal tube, ensure the body of rod not by lateral deflection;Treat Construction finishes, and after foundation settlement is stable, retarding mortar solidification, the body of rod plays anti-floating effect.
Compared with prior art, the anti-lateral deflection anti-float anchor rod of retardation setting type provided by the present invention has preferably anti-to basement Floating binding effect, it also ensure that lever strength does not reduce because pressing drawing repeatedly.
Brief description of the drawings
Fig. 1 is a kind of structural representation of the anti-lateral deflection anti-float anchor rod of retardation setting type provided in an embodiment of the present invention;
Fig. 2 is a kind of end enlarged drawing of the anti-lateral deflection anti-float anchor rod of retardation setting type provided in an embodiment of the present invention.
Fig. 3 is the structural representation of the metal tube in the embodiment of the present invention.
Fig. 4 is the structural representation of the cock body in the embodiment of the present invention.
Embodiment
Technical scheme is described in detail below in conjunction with accompanying drawing and specific embodiment.
As depicted in figs. 1 and 2, anti-floating binding effect and the body of rod are weakened to solve construction period anti-float anchor rod compressive buckling The problem of intensity, the invention provides a kind of anti-lateral deflection anti-float anchor rod of retardation setting type.Specifically, it includes the body of rod 1, metal tube 2, delayed Solidifying mortar 3, cock body 4;The metal tube 2 is anchored in basis 5, the inner hollow of metal tube 2 and is perfused with retarding mortar 3, gold Belong to the upper end closed and lower ending opening of pipe 2;In the bottom implantation foundation soil 6 of the body of rod 1, the top of the body of rod 1 passes through cock body 4 simultaneously Stretch into metal tube 2;The cock body 4 is arranged at the lower ending opening of metal tube 2, the lower ending opening of metal tube 2 is blocked and by metal Pipe 2 and the body of rod 1 are relatively fixed;An intersegmental gap 10 is left between the upper end of the body of rod 1 and the upper end inwall of metal tube 2.
Retarding mortar 3 be by cement, compound retarder and sand through suitably matching the extraordinary mortar formed, can one compared with Do not solidified in the long period, and can reach higher-strength after solidifying, it is more at present to be applied in advance as grouting material In power concrete works.
By above-mentioned construction, as upper load increases in work progress, when basis 5 starts sedimentation, retarding mortar 3 is not yet Solidification, the body of rod 1 can the free movement in metal tube 2, ensure the body of rod 1 not by lateral deflection.It is to be onstructed to finish, after basic 5 settlement stabilities, Retarding mortar 3 solidifies, and the body of rod 1 plays anti-floating effect.
Further, as shown in figure 3, in the embodiment of the present invention, the metal tube 2 preferably uses metal bellows, ripple It can strengthen and be engaged ability between metal tube 2 and retarding mortar 3 and basis 5.
Further, as shown in figure 4, the cock body 4 is in round table-like rubber stopper, the middle part of rubber stopper, which is provided with, supplies the body of rod 1 through hole 41 passed through.The main function of cock body 4 is to prevent that retarding mortar 3 from leaking down and the motion to the body of rod 1 play the guiding role, plug The compressibility of the above-mentioned shape cooperation rubber of body 4, when basis 5 sinks, cock body 4 is progressively squeezed into metal tube 2, with reduction pair Hindered caused by the free movement of the body of rod 1.
Further, as shown in figure 3, the upper end of the metal tube 2 is provided with aspirating hole 20.Provided in an embodiment of the present invention After the anti-lateral deflection anti-float anchor rod of retardation setting type is completed, the air in gap 10 can be extracted by aspirating hole 20, to reduce the portion Dividing air compression, the free movement to the body of rod 1 produces obstruction afterwards to a certain extent.
The embodiment of the present invention additionally provides the construction method of the anti-lateral deflection anti-float anchor rod of retardation setting type described in more than one, specifically Ground, the construction method include:
S1, metal tube 2 is inverted, retarding mortar 3 is injected in metal tube 2;
S2, cock body 4 is enclosed on the body of rod 1, and the top of the body of rod 1 is inserted in metal tube 2;
S3, after using cock body 4, the lower ending opening of metal tube 2 is blocked, metal tube 2 is together just being put with the body of rod 1;
S4, treat that retarding mortar 3 flow to the bottom of metal tube 2, after forming gap 10 on the top of metal tube 2;Pass through aspirating hole 20 Extract the air in gap 10 out;
S5, according in general anti-float anchor rod work progress, be implanted into the internal drilling of foundation soil 6 and by the bottom of the body of rod 1, then The top of the body of rod 1, which is cased with pouring at metal tube 2, smashes construction basis 5.
Embodiment described above only expresses the several embodiments of the present invention, and its description is more specific and detailed, but simultaneously Therefore the limitation to the scope of the claims of the present invention can not be interpreted as.It should be pointed out that for one of ordinary skill in the art For, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to the guarantor of the present invention Protect scope.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (6)

1. a kind of anti-lateral deflection anti-float anchor rod of retardation setting type, it is characterised in that including the body of rod, metal tube, retarding mortar, cock body;It is described Metal tube is anchored in basis, the inner hollow of metal tube and is perfused with retarding mortar, the upper end closed of metal tube and lower end is opened Mouthful;In the bottom implantation foundation soil of the body of rod, the top of the body of rod through cock body and is stretched into metal tube;The cock body is arranged at At metal tube lower ending opening, metal tube lower ending opening is blocked and is relatively fixed metal tube and the body of rod;The upper end of the body of rod and gold An intersegmental gap is left between the upper end inwall of category pipe.
2. the anti-lateral deflection anti-float anchor rod of retardation setting type according to claim 1, it is characterised in that the metal tube is wavy metal Pipe.
3. the anti-lateral deflection anti-float anchor rod of retardation setting type according to claim 1, it is characterised in that the cock body is in round table-like Rubber stopper, the middle part of rubber stopper are provided with the through hole passed through for the body of rod.
4. the anti-lateral deflection anti-float anchor rod of retardation setting type according to claim 1, it is characterised in that the upper end of the metal tube is provided with Aspirating hole.
A kind of 5. construction method of any described anti-lateral deflection anti-float anchor rod of retardation setting type of Claims 1-4, it is characterised in that bag Include:
S1, metal tube is inverted, retarding mortar is injected in metal tube;
S2, cock body is enclosed on the body of rod, and body of rod top is inserted in metal tube;
S3, after using cock body, metal tube lower ending opening is blocked, metal tube is together just being put with the body of rod;
S4, treat that retarding mortar flow to metal tube bottom, gap is formed on metal tube top;
S5, it is implanted into foundation soil internal drilling and by the bottom of the body of rod, then is cased with pouring at metal tube on body of rod top and smashes construction basis.
6. construction method according to claim 5, it is characterised in that the S4 also includes:Extract the air in gap out.
CN201610141042.6A 2016-03-14 2016-03-14 A kind of anti-lateral deflection anti-float anchor rod of retardation setting type and its construction method Active CN105696594B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610141042.6A CN105696594B (en) 2016-03-14 2016-03-14 A kind of anti-lateral deflection anti-float anchor rod of retardation setting type and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610141042.6A CN105696594B (en) 2016-03-14 2016-03-14 A kind of anti-lateral deflection anti-float anchor rod of retardation setting type and its construction method

Publications (2)

Publication Number Publication Date
CN105696594A CN105696594A (en) 2016-06-22
CN105696594B true CN105696594B (en) 2017-11-28

Family

ID=56221229

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610141042.6A Active CN105696594B (en) 2016-03-14 2016-03-14 A kind of anti-lateral deflection anti-float anchor rod of retardation setting type and its construction method

Country Status (1)

Country Link
CN (1) CN105696594B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112575743B (en) * 2020-11-12 2022-06-07 中国电建集团中南勘测设计研究院有限公司 Geomembrane anchor seal structure

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001059221A (en) * 1999-08-23 2001-03-06 Asahi Tec Corp Underground anchor
JP4672213B2 (en) * 2001-08-30 2011-04-20 岡部株式会社 Slope stabilization method
CN102865088B (en) * 2012-09-12 2015-04-08 山东科技大学 Tension and compression coupling type high-strength and high-deformation anchor rod and method for using same
CN203248179U (en) * 2013-05-24 2013-10-23 中国葛洲坝集团股份有限公司 Seat plate adjustable prestress anchor rod device
CN204267064U (en) * 2014-11-04 2015-04-15 中国矿业大学 Embedded classification constant-resistance shearing resistance large deformation anchor device
CN104819003B (en) * 2015-04-01 2017-12-12 中国矿业大学 A kind of full anchor anchor for being easier to apply pretightning force
CN205857174U (en) * 2016-03-14 2017-01-04 中交第四航务工程勘察设计院有限公司 A kind of retardation setting type anti-lateral deflection anti-float anchor rod

Also Published As

Publication number Publication date
CN105696594A (en) 2016-06-22

Similar Documents

Publication Publication Date Title
CN106958243B (en) Anchor formula anti-float anchor rod and its construction method after a kind of
CN104389314B (en) A kind of shallow clay grouting and reinforcing device and method
CN101736738B (en) Production method of pressure resistance and pull-out resistance grouted gravel pile
CN102828498B (en) Method for constructing gravel pile of hoop of immersed tube for reinforcing soft foundation
CN201746840U (en) Foundation pit support system equipped with a plurality of inclined rear anchors capable of recycling
CN203514303U (en) Post-grouting enlarged-toe uplift micropile
CN201722789U (en) Prestressed steel bar-pressed flat joint cement joint pedestal
CN206448269U (en) A kind of expansion bolt hollow anchor bar
CN110485437A (en) Roadbed side slope entirety green safeguard structure and its construction method
CN111794216A (en) Construction method of uplift carrier pile
CN103603379A (en) Anti-floating system combining anti-floating cement soil pile and anti-floating anchor rod and construction process of anti-floating system
CN105696594B (en) A kind of anti-lateral deflection anti-float anchor rod of retardation setting type and its construction method
CN208379585U (en) A kind of architectural engineering anchor-rod positioner
CN205857174U (en) A kind of retardation setting type anti-lateral deflection anti-float anchor rod
CN208251138U (en) A kind of communication pole and tower foundation using self-locking anchor bar
CN208517977U (en) A kind of anti-float anchor rod that existing basement bottom board is reinforced
CN105951874B (en) A kind of retaining wall reinforcement structure and its construction method
CN203741830U (en) Concrete comprehensive acting pile
CN103556629B (en) A kind of construction method of shaped pile
CN206655217U (en) Precast concrete drainage pile
CN205329682U (en) What blade was expanded in area expands bottom tube stake
CN205653821U (en) Anti device that floats of soft soil foundation basement
CN208251057U (en) Post-tensioning pile composite foundation
CN204983246U (en) Hollow shear wall structure of close post of assembled
CN107905222A (en) Pile foundation lining material and apply the lining material prefabricated band bellend prestressing pipe pile construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant