CN105694920A - Method for repairing inter-leakage of silicon carbide brick walls of coke oven regenerative chamber in production - Google Patents

Method for repairing inter-leakage of silicon carbide brick walls of coke oven regenerative chamber in production Download PDF

Info

Publication number
CN105694920A
CN105694920A CN201610229208.XA CN201610229208A CN105694920A CN 105694920 A CN105694920 A CN 105694920A CN 201610229208 A CN201610229208 A CN 201610229208A CN 105694920 A CN105694920 A CN 105694920A
Authority
CN
China
Prior art keywords
regenerator
silicon carbide
string
repairing
leak
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610229208.XA
Other languages
Chinese (zh)
Other versions
CN105694920B (en
Inventor
焦玉雪
李昌琦
王玖文
杨逢庭
段伦涛
苗振华
张侠
孟庆领
玄振法
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LAIWU TAISHAN COKING CO Ltd
Original Assignee
LAIWU TAISHAN COKING CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LAIWU TAISHAN COKING CO Ltd filed Critical LAIWU TAISHAN COKING CO Ltd
Priority to CN201610229208.XA priority Critical patent/CN105694920B/en
Publication of CN105694920A publication Critical patent/CN105694920A/en
Application granted granted Critical
Publication of CN105694920B publication Critical patent/CN105694920B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10BDESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
    • C10B29/00Other details of coke ovens
    • C10B29/06Preventing or repairing leakages of the brickwork

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Materials Engineering (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Organic Chemistry (AREA)
  • Furnace Housings, Linings, Walls, And Ceilings (AREA)

Abstract

The invention discloses a method for repairing inter-leakage of silicon carbide brick walls of a coke oven regenerative chamber in production. The method is characterized by including the steps of accurately positioning and selecting medium term and later period of coking of a coking chamber; repairing by firstly blocking coal gas branch pipes correspondingly , feeding compressed air to observe leakage position of the inter-leakage silicon carbide brick walls, sealing through orifices of orifice plates on the coal gas branch pipes via blind plates, and changing a hole-plate case into an-orifice plate case with the orifice 38mm in diameter; changing burned-out silicon carbide bricks at the inter-leakage position; spraying refractories; and recovering coal gas for heating of a combustion chamber, thereby completing repairing of the inter-leakage position of the silicon carbide brick walls of the regenerative chamber. The method can be implemented during production, is easy to operate, is stable and reliable, needs short time for repairing, and is particularly applicable to repairing of silicon carbide brick walls of the regenerative chamber in production, and further has the advantages of reducing labor intensity and improving production efficiency greatly and more importantly, protecting oven bricks effectively.

Description

Coke oven regenerator carborundum brick wall string leakage method for repairing and mending in production process
Technical field
The present invention relates to the improvement of a kind of coke oven technique, specifically the one leakage method for repairing and mending that is exclusively used in production process coke oven regenerator carborundum brick wall string。
Background technology
Coke oven is a kind of stove stolen with refractory block by refractory brick, including burner 1, combustor 2, carbonizing chamber 3, regenerator 4, and is connected with chimney by flue;Described regenerator 4 includes regenerator sealing wall 41, checker brick 42, branch gas tube 8, branch gas tube 8 side by side be provided with first to the 7th, it is provided with aperture plate 14 in the bottom of every branch gas tube 8, the lower end of branch gas tube 8 all connects with gas transverse pipe 5, the both sides of branch gas tube 8 are regenerator sealing wall 41 and checker brick 42, the upper end of every branch gas tube 8 is equipped with carborundum brick wall 6, and extends corresponding combustor 2 inner bottom part, and carborundum brick wall 6 is accessed by chute 43 in the upper end of checker brick 42;Combustor 2 includes the first to the 7th flue 7 side by side, and with branch gas tube 8 one_to_one corresponding of regenerator 4;It is carbonizing chamber 3 between adjacent flue 7;Gas transverse pipe 5 is responsible for 9 by communicating pipe 10 with coal gas and is connected, and the middle part in communicating pipe 10 is provided with macroporous plate box 11;The aperture of described macroporous plate box 11 is 46mm;(as shown in Figure 1)。At present, string leakage phenomenon often occurs between this regenerator carborundum brick wall, string leak usually occurs in the carborundum metope place of first to fourth branch gas tube 8 correspondence, herein after the string leakage of regenerator carborundum brick wall, as repaired not in time, may proceed to expand regenerator carborundum brick wall string leakage area, cause the checker brick burning out regenerator, damage body of heater, affect coke oven heating, waste coal gas, impact produces。So regenerator carborundum brick wall string leak must be repaired in time, not affect normal production。To the method for repairing and mending of regenerator carborundum brick wall string leak it is at present: adopting pulp shooting machine to connect the branch gas tube below string leakage flue, the carborundum brick wall string leak that furnace wall gunning refractory is sprayed on the branch gas tube below this string leakage flue carries out grouting spray repair。The deficiency of this method is in that: be only attached to string leak surface of wall due to gunning refractory, and in conjunction with firm not, so after furnace wall spray repair, holding time very short, it is necessary to spray repair repeatedly, impact produces。
By retrieving, it is related to the report of coke oven at present, as Chinese patent 201110227378.1 discloses " a kind of coke oven body mending process ", get the grout hole of connection including at string leakage brickwork joint place, fire clay is sprayed in grout hole, by high pressure mud jacking, this technique, due to string leak punching grouting, make material for repairing difficult drop-off, extend the use time, but owing to regenerator carborundum brick wall is in the bottom in combustor, temperature is high, narrow space, so, this technique is not suitable for the repairing of regenerator carborundum brick wall string leak。Have not yet to see the report for regenerator carborundum brick wall string leak repair technology。
Summary of the invention
It is an object of the invention to provide a kind of when not affecting production, be exclusively used in regenerator carborundum brick wall string leak repair production process in coke oven regenerator carborundum brick wall string leakage method for repairing and mending。
In order to reach object above, the technical solution adopted in the present invention is: coke oven regenerator carborundum brick wall string leakage method for repairing and mending in this production process, it is characterised in that: comprise the following steps:
(1) flue number residing for coke oven regenerator carborundum brick wall string leak, is confirmed: first pass through and adopt colour comparatour thermal detector to carry out thermometric at the thermometer hole place of coke-stove gas arm lower end, fall change comparison according to temperature, confirms the flue number that coke oven regenerator carborundum brick wall string leak is corresponding;
(2) the repairing time, is determined: after determined the flue number that coke oven regenerator carborundum brick wall string leak is corresponding by step (1), check the carbonization chamber Coking adjacent with this flue number again, this carbonization chamber coking later stage in mid-term is selected to repair, owing to now charge of coke temperature is of a relatively high, will not because temporarily having blocked the branch gas tube of this position when repairing this string leakage carborundum brick wall, cause this heating wall surface temperature sharply to decline, affect furnace temperature and production;
(3), repair: after determining the repairing time by step (2), then operation according to the following steps:
String branch gas tube corresponding to leak flue that A, closure step (1) confirm, stops coal gas input, pulls out regenerator sealing wall and the checker brick of these branch gas tube both sides;
B, it is accurately positioned string leak: access the branch gas tube of closure with air compressor, pass into compression air, observes the air leak position of this string leakage carborundum brick wall, the string leak of regenerator carborundum brick wall can be accurately positioned;
C, reduce string leak combustor coal gas input quantity: the aperture plate blind plate gone here and there on branch gas tube corresponding to leak is sealed through hole, change the macroporous plate box on communicating pipe into orifice plate box that diameter is 38mm again, coal gas input quantity is made to reduce 2/5, other branch gas tube input heated by gas can be made, avoid again, because reducing the damage to coke oven furnace wall of the coal gas input quantity chilling, being additionally favorable for reducing temperature operation;
The silicon carbide brick that D, replacing string leak burn out: the silicon carbide brick first will changed is preheated in advance, the temperature making the silicon carbide brick to change is consistent with the silicon carbide brick temperature of string leak, combines not tight to avoid the silicon carbide brick stolen inconsistent with the silicon carbide brick temperature of string leak;
E, gunite: to refractory matter on the silicon carbide brick replaced with and adjacent SiC silica brick mating surface material spraying machine spray repair thereof, allow it solidify, after solidifying 20 minutes, branch gas tube again through compression air input closure, regenerator carborundum brick wall is carried out pressure testing, it is qualified that carborundum brick wall leakage-proof point is, and then the regenerator lattice brick pulled out and regenerator sealing wall is stolen again;
F, recover this combustor heating gas: taken out by the blind plate being enclosed in step C in the aperture plate on branch gas tube, the orifice plate box that diameter is 38mm simultaneously the macroporous plate box on communicating pipe changed into, it is changed to the macroporous plate box of the diameter 46mm of heating again, recover this flue heating gas amount, observe flue combustion flame from peephole and reach requirement, namely complete the repairing of this regenerator carborundum brick wall string leak。
The whole process of the method can complete for 4 hours。
The beneficial effects of the present invention is: coke oven regenerator carborundum brick wall string leakage method for repairing and mending in this production process, can carry out in process of production, easily operation, time are short, reliable and stable, it is particularly well-suited to the leakage of regenerator carborundum brick wall string repair, and labor intensity can be greatly lowered, improve production efficiency。The more important thing is that furnace wall brick obtains fabulous arriving to be protected。
Accompanying drawing explanation
Fig. 1 is the structure cross-sectional schematic of one embodiment of the invention。
In figure: 1, burner;2, combustor;3, carbonizing chamber;4, regenerator;41, regenerator sealing wall;42, checker brick;43, chute;5, gas transverse pipe;6, carborundum brick wall;7, flue;8, branch gas tube;9, coal gas supervisor;10, communicating pipe;11, macroporous plate box;12, thermometer hole;13, peephole;14, aperture plate。
Detailed description of the invention
Embodiment
Fig. 1 gives the cross-sectional schematic of the embodiment that the present invention implements in our factory's coke oven。With reference to Fig. 1, the invention will be further described。Described coke oven, including burner 1, combustor 2, carbonizing chamber 3, regenerator 4, and is connected with chimney by flue;Described regenerator 4 includes regenerator sealing wall 41, checker brick 42, branch gas tube 8, branch gas tube 8 side by side be provided with first to the 7th, it is provided with aperture plate 14 in the bottom of every branch gas tube 8, the lower end of branch gas tube 8 all connects with gas transverse pipe 5, the both sides of branch gas tube 8 are regenerator sealing wall 41 and checker brick 42, the upper end of every branch gas tube 8 is equipped with carborundum brick wall 6, and extends the bottom in combustor 2, and the carborundum brick wall 6 of correspondence is accessed by chute 43 in the upper end of checker brick 42;Combustor 2 includes the first to the 7th flue 7 side by side, and with branch gas tube 8 one_to_one corresponding of regenerator 4;It is carbonizing chamber 3 between adjacent flue 7。Coke oven regenerator carborundum brick wall string leakage method for repairing and mending in this production process, it is characterised in that: comprise the following steps:
(1) flue number residing for coke oven regenerator carborundum brick wall string leak, is confirmed: first pass through and adopt colour comparatour thermal detector to carry out thermometric at thermometer hole 12 place of coke-stove gas arm 8 lower end, fall change comparison according to temperature, the temperature of the first branch gas tube 8 lower end reduces by 15 DEG C than the temperature of the second branch gas tube 8 lower end, the temperature of other branch gas tube 8 lower end is consistent, confirm the first branch gas tube 8 upper end the leakage of carborundum brick wall string;
(2) the repairing time, is determined: after the carborundum brick wall string being determined the first branch gas tube 8 upper end by step (1) is leaked, check carbonization chamber 3 Coking between the first flue 7 and second flue 7 of correspondence again, repair in this carbonization chamber 3 coking later stage in mid-term;
(3), repair: after determining the repairing time by step (2), then operation according to the following steps:
First branch gas tube 8 of string leak the first flue 7 correspondence that A, closure step (1) confirm, stops coal gas input, pulls out regenerator sealing wall 41 and the checker brick 42 of the first branch gas tube 8 both sides;
B, it is accurately positioned string leak: access the first branch gas tube 8 of closure with air compressor, pass into compression air, observes the air leak position of this string leakage carborundum brick wall 6, the string leak of regenerator carborundum brick wall 6 can be accurately positioned;
C, reduce string combustor 3 coal gas input quantity corresponding to leak: the aperture plate 14 gone here and there on the first branch gas tube 8 corresponding to leak is sealed through hole with blind plate, change the macroporous plate box 11 on communicating pipe 10 into orifice plate box that diameter is 38mm again, coal gas input quantity is made to reduce 2/5, other branch gas tube input heated by gas can be made, avoid again, because reducing the damage to coke oven furnace wall of the coal gas input quantity chilling, being additionally favorable for reducing temperature operation;
D, change the silicon carbide brick that the first branch gas tube 8 upper end burns out: the silicon carbide brick first will changed is preheated in advance, the temperature making the silicon carbide brick to change is consistent with the silicon carbide brick temperature of string leak, combines not tight to avoid the silicon carbide brick stolen inconsistent with the silicon carbide brick temperature that string leak burns out;
E, gunite: to refractory matter on the silicon carbide brick replaced with and adjacent carborundum brick wall surface material spraying machine spray repair thereof, allow it solidify, solidify 20 minutes, the first branch gas tube 8 again through compression air input closure, regenerator carborundum wall is carried out pressure testing, it is qualified that carborundum wall leakage-proof point is, and then the regenerator lattice brick 42 pulled out and regenerator sealing wall 41 is stolen again;
F, recover this combustor heating gas: taken out by the blind plate in the aperture plate 14 being enclosed in step C on the first branch gas tube 8, the orifice plate box that diameter is 38mm simultaneously the macroporous plate box 11 on communicating pipe 10 changed into, it is changed to the macroporous plate box 11 of the diameter 46mm of heating again, recover the first flue 7 heating gas amount, observe the first flue combustion flame from peephole 13 and reach requirement, namely complete the repairing of the carborundum brick wall string leak of this regenerator the first branch gas tube 8 upper end。
In like manner, it is possible to repair the carborundum brick wall string leak of other branch gas tube 8 upper ends。
Whole mending course completes for 4 hours。

Claims (1)

1. coke oven regenerator carborundum brick wall string leakage method for repairing and mending in production process, it is characterised in that: comprise the following steps:
(1) flue number residing for coke oven regenerator carborundum brick wall string leak, is confirmed: first pass through and adopt colour comparatour thermal detector to carry out thermometric at the thermometer hole place of coke-stove gas arm lower end, fall change comparison according to temperature, confirms the flue number that coke oven regenerator carborundum brick wall string leak is corresponding;
(2), the repairing time is determined: after determined the flue number that coke oven regenerator carborundum brick wall string leak is corresponding by step (1), then check the carbonization chamber Coking adjacent with this flue number, select this carbonization chamber coking later stage in mid-term to repair;
(3), repair: after determining the repairing time by step (2), then operation according to the following steps:
String branch gas tube corresponding to leak flue that A, closure step (1) confirm, stops coal gas input, pulls out regenerator sealing wall and the checker brick of these branch gas tube both sides;
B, it is accurately positioned string leak: access the branch gas tube of closure with air compressor, pass into compression air, observes the air leak position of this string leakage carborundum brick wall, the string leak of regenerator carborundum brick wall can be accurately positioned;
C, reduce string leak combustor coal gas input quantity: the aperture plate blind plate gone here and there on branch gas tube corresponding to leak is sealed through hole, then changes the macroporous plate box on communicating pipe into orifice plate box that diameter is 38mm, make coal gas input quantity reduce 2/5;
The silicon carbide brick that D, replacing string leak burn out: the silicon carbide brick first will changed is preheated in advance, the temperature making the silicon carbide brick to change is consistent with the silicon carbide brick temperature of string leak;
E, gunite: to refractory matter on the silicon carbide brick replaced with and adjacent SiC silica brick mating surface material spraying machine spray repair thereof, allow it solidify, after solidifying 20 minutes, branch gas tube again through compression air input closure, regenerator carborundum brick wall is carried out pressure testing, it is qualified that carborundum brick wall leakage-proof point is, and then the regenerator lattice brick pulled out and regenerator sealing wall is stolen again;
F, recover this combustor heating gas: taken out by the blind plate being enclosed in step C in the aperture plate on branch gas tube, the orifice plate box that diameter is 38mm simultaneously the macroporous plate box on communicating pipe changed into, it is changed to the macroporous plate box of the diameter 46mm of heating again, recover this flue heating gas amount, observe flue combustion flame from peephole and reach requirement, namely complete the repairing of this regenerator carborundum brick wall string leak。
CN201610229208.XA 2016-04-14 2016-04-14 Coke oven regenerator silicon carbide brick wall string leaks method for repairing and mending in production process Active CN105694920B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610229208.XA CN105694920B (en) 2016-04-14 2016-04-14 Coke oven regenerator silicon carbide brick wall string leaks method for repairing and mending in production process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610229208.XA CN105694920B (en) 2016-04-14 2016-04-14 Coke oven regenerator silicon carbide brick wall string leaks method for repairing and mending in production process

Publications (2)

Publication Number Publication Date
CN105694920A true CN105694920A (en) 2016-06-22
CN105694920B CN105694920B (en) 2018-08-31

Family

ID=56219954

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610229208.XA Active CN105694920B (en) 2016-04-14 2016-04-14 Coke oven regenerator silicon carbide brick wall string leaks method for repairing and mending in production process

Country Status (1)

Country Link
CN (1) CN105694920B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106190185A (en) * 2016-08-22 2016-12-07 宣化钢铁集团有限责任公司 The method of coke oven part combustor displacement heated by gas
CN108264907A (en) * 2018-01-27 2018-07-10 新余钢铁股份有限公司 A kind of pneumatic mending device of oven top of coke oven layer blowby and its pneumatic spray repair method
CN110003922A (en) * 2019-04-30 2019-07-12 山东泰山钢铁集团有限公司 A kind of method for repairing and mending of peephole brick cup down tube brick

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001019968A (en) * 1999-07-05 2001-01-23 Kawasaki Steel Corp Repairing method for coke oven
CN2908503Y (en) * 2006-05-30 2007-06-06 宝山钢铁股份有限公司 Spray gun for repairing blowby of regenerative chamber of coke oven
CN101974339A (en) * 2010-11-03 2011-02-16 芜湖新兴铸管有限责任公司 Repairing method of coking chamber of coke oven by using silica bricks
CN102304367A (en) * 2011-08-09 2012-01-04 莱芜钢铁集团有限公司 Coke oven body mending process

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001019968A (en) * 1999-07-05 2001-01-23 Kawasaki Steel Corp Repairing method for coke oven
CN2908503Y (en) * 2006-05-30 2007-06-06 宝山钢铁股份有限公司 Spray gun for repairing blowby of regenerative chamber of coke oven
CN101974339A (en) * 2010-11-03 2011-02-16 芜湖新兴铸管有限责任公司 Repairing method of coking chamber of coke oven by using silica bricks
CN102304367A (en) * 2011-08-09 2012-01-04 莱芜钢铁集团有限公司 Coke oven body mending process

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106190185A (en) * 2016-08-22 2016-12-07 宣化钢铁集团有限责任公司 The method of coke oven part combustor displacement heated by gas
CN106190185B (en) * 2016-08-22 2018-12-18 宣化钢铁集团有限责任公司 The method of coke oven part burning chamber replacement heated by gas
CN108264907A (en) * 2018-01-27 2018-07-10 新余钢铁股份有限公司 A kind of pneumatic mending device of oven top of coke oven layer blowby and its pneumatic spray repair method
CN108264907B (en) * 2018-01-27 2023-08-29 新余钢铁股份有限公司 Blow-by gas gunning device for top layer of coke oven and pneumatic gunning method thereof
CN110003922A (en) * 2019-04-30 2019-07-12 山东泰山钢铁集团有限公司 A kind of method for repairing and mending of peephole brick cup down tube brick

Also Published As

Publication number Publication date
CN105694920B (en) 2018-08-31

Similar Documents

Publication Publication Date Title
JP4917188B2 (en) Coke oven gas way repair method and gas way repair device
CN101974339B (en) Repairing method of coking chamber of coke oven by using silica bricks
CN105694920A (en) Method for repairing inter-leakage of silicon carbide brick walls of coke oven regenerative chamber in production
JP6753338B2 (en) Hot brick transshipment repair method for coke oven
CN111363563B (en) Grouting sealing system and method for coke oven gas lower spray pipe brick gas flue by slurry filling method
CN104357067A (en) Coke oven maintenance method
JP2017137447A (en) Mending method of combustion chamber of coke oven
CN109306387B (en) Method for protecting and repairing furnace shell after blast furnace cooling wall burning loss
CN105062510B (en) Coke oven observation hole hot repairing method and hot repairing tool thereof
CN106032469A (en) Coke oven regenerative chamber checker brick on-line replacing method
CN209481554U (en) A kind of improved coke oven brick gas passage provisions for grouting
CN111778043A (en) Method for repairing tamping coke oven wall melting hole
CN104059677A (en) Device and method for treating leakage of observation hole of coke furnace
US3880967A (en) Method for lining gun brick in coke ovens
CN203938642U (en) A kind of coke oven peephole string leakage device of administering
JP6502436B2 (en) Repair method of ceiling of coke oven
JP3355014B2 (en) Coke oven hot repair method
CN112898993A (en) Method for repairing small flue of coke oven
JPS6154350B2 (en)
CN113528161B (en) Control method for coke oven top uncovering repair without blowby
CN216513938U (en) Blast furnace tuyere large sleeve plugging device
CN113736484B (en) Coke oven burner supplementary heating method
CN108949195B (en) Method for repairing melting hole in furnace wall in thermal state of coke oven
CN209307211U (en) A kind of heat blower of regenerative chamber dredging
CN201729791U (en) Heat-insulation protective plate guard of coke oven regenerator protection wall

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant