CN105672684A CN201610030365.8A CN201610030365A CN105672684A CN 105672684 A CN105672684 A CN 105672684A CN 201610030365 A CN201610030365 A CN 201610030365A CN 105672684 A CN105672684 A CN 105672684A
Authority
CN
China
Prior art keywords
stone material
hollowing
epoxide
resin glue
stone
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610030365.8A
Other languages
Chinese (zh)
Other versions
CN105672684B (en
Inventor
曹颖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610030365.8A priority Critical patent/CN105672684B/en
Publication of CN105672684A publication Critical patent/CN105672684A/en
Application granted granted Critical
Publication of CN105672684B publication Critical patent/CN105672684B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0203Arrangements for filling cracks or cavities in building constructions
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0203Arrangements for filling cracks or cavities in building constructions
    • E04G23/0211Arrangements for filling cracks or cavities in building constructions using injection
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0285Repairing or restoring flooring

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Adhesives Or Adhesive Processes (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention relates to construction methods for repairing ground stone hollowing. The stone boundary hollowing repairing method and the stone muddle hollowing repairing method include the specific steps of 1, preparation of a repairing material; 2, trepanning of stone; 3, preparation of epoxy resin adhesive; 4, pouring of the epoxy resin adhesive; 5, solidification and clearing of the solidification. The construction methods for repairing ground stone hollowing have the advantages that stone protection performance is enhanced; the solidification content is high, and contraction is small; connection between stone and cement and connection among cement, mortar and grids on the back of the stone can be achieved; repairing can be conducted without knocking off stone, and the stone layout effect is not influenced; repairing time is short, and efficiency is high; connection strength is high, and meanwhile the strength of the ground can be increased.

Description

A kind of construction method repairing ground stone hollowing
Technical field
The present invention relates to the method for repairing and mending of a kind of indoor and outdoor ground wet combining stone material hollowing and the hollowing method for repairing and mending of ground wet combining vitrified tile, ceramic tile.
Background technology
Along with the development in city, progress is day by day accelerated, and various architectural styles and relevant construction material, new decorative material come into the market one after another, make the looks in city there occurs change with rapid changepl. never-ending changes and improvements. China has become the first big producing country and use big country that stone decoration, ceramic tile are decorated in the world; and stone material, vitrified tile, ceramic tile decorative appearance is serious, air is grand; occupy the sizable ratio of decoration, become high-grade decoration, the major part of building decoration.
Building site owing to robbing work, crossed construction, stone material paving, floor tile paving, cement mortar does not solidify, and the time is short, maintenance not in time, after stone material paving, do not set fence protection, local pressure formed hollowing; Also having due to the temperature difference, cement mortar proportion, paving terminates the maintenance deficiency in later stage and forms hollowing; It is better that the reinforcing of part Stone back mesh, protective agent do, and the back side is smooth, can be easily separated without adhesive force with cement, forms hollowing.
Process the conventional method of stone material hollowing at present, ground stone hollowing area is bigger, and he is pulled down, from new paving, stone material is easily broken, and needing the stone material changed, manufacturer also needs floral material, and processing again, transport and workman install, increase great amount of cost expense, high-grade stone, after having changed stone material, aberration is difficult to control to.
The ground stone of little area hollowing, with cement and water cement paste, strikes with hammer on stone material, stone material shakes, irrigating from sealing slowly, due to the water of cement mortar, is gone to ground by stone material, the original mortar inspiration of paver material, cement is plugged entering sealing, inside stone material, position cement mortar of hollowing enters not go, or hollowing, and repair efficiency is bad, not reaching stone material paving specification acceptance requirement, carelessness is handed over.
Therefore, in order to solve building site because of hollowing serious, it has to replace stone material, the waste problem thereby resulted in, carry out innovation, have found resin infusion and specially control the construction method of stone material hollowing.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of method for repairing and mending that can effectively process floor empty drum phenomenon.
For solving above-mentioned technical problem, the technical scheme is that a kind of construction method repairing ground stone hollowing, its innovative point is in that: 4 steps that described stone material border hollowing is repaired, the middle hollowing of stone material is repaired,
Described stone material border hollowing repairs step:
(1) patching material prepare: epoxide-resin glue, firming agent, accelerator, Bai Wan, iron oxide red, iron oxide yellow, iron oxide black, chrome green, titanium ultramarine, titanium dioxide, etc. various oxidation color, mill base, color essence, cellophane, putty knife, cutting machine, rubber hammer, brush, cup, one-shot injector, splash bar, blade;
(2) stone material joint-cutting: the position according to stone material hollowing, cuts the sealing of paving stone material edgewise, waits ground stone to dry, if ground is not done, what condition possessed turns on the aircondition, and can dry by force;
(3) epoxide-resin glue configuration: the color according to hollowing stone material, the epoxide-resin glue stone powder with former stone material, add quartz sand, aluminium hydroxide, inorganic powder, particulate filler, Bai Wan, iron oxide red, iron oxide yellow, iron oxide black, chrome green, titanium ultramarine, titanium dioxide, various oxidation color, mill base, color essence pigment, being transferred to hollowing stone material color, light colour is the same; Materials needed for area according to hollowing stone material, take 100g epoxide-resin glue and put in disposable cup, inhale 3g firming agent with one-shot injector to put in cup and stir, inhale 3g accelerator followed by one-shot injector and put stirring in cup into and terminate, add the firming agent of 1% 4% according to temperature, 1%-4% accelerator, can first prepare the color of glue used, but firming agent, accelerator can not be added in advance, in epoxide-resin glue, now with the current, control to solidify at 10 minutes as far as possible;
(4) epoxy resin perfusion: the dust of air pressure cleaning sealing, with the epoxide-resin glue prepared, it is poured on stone material sealing, allow resin glue flow to, stone material hollowing local above with rubber hammer striking gently, epoxide-resin glue flowing to slowly, air is discharged, resin glue does not flow, and epoxide-resin glue is filled with the gap below stone material naturally, and setting time controls at 8-10 minute;
(5) after epoxide-resin glue solidification, with blade, resin unnecessary above stone material being cleaned out rapidly, stone jointing polishes or does minute surface.
In the middle of described stone material, hollowing repairing step is:
(1) patching material prepares: epoxide-resin glue, firming agent, accelerator, Bai Wan, iron oxide red, iron oxide yellow, iron oxide black, chrome green, titanium ultramarine, titanium dioxide, various oxidation color, mill base, color essence, cellophane, putty knife, electric drill, engraving machine, cutting machine, brush, cup, one-shot injector, splash bar, blade;
(2) stone material perforate: as larger in size in ground stone block number, hollowing in the middle of stone material, that just considers in the centre of stone material hollowing, stone material color is easy to the position repaired, and opens a little hole with engraving machine, electric drill on stone material, and hole surface layer is deformity as far as possible, dry Deng ground stone, as ground is not done, drying that what condition possessed turn on the aircondition, or dry by force with warmer;
(3) epoxide-resin glue configuration: the color according to hollowing stone material, the epoxide-resin glue stone powder with former stone material, add quartz sand, aluminium hydroxide, inorganic powder, particulate filler, Bai Wan, iron oxide red, iron oxide yellow, iron oxide black, chrome green, titanium ultramarine, titanium dioxide, various oxidation color, color is starched, color essence pigment, it is transferred to hollowing stone material color, light colour is the same, materials needed for area according to hollowing stone material, take 100g epoxide-resin glue and put in disposable cup, put in cup with one-shot injector suction 3g firming agent and stir, put stirring in cup into followed by one-shot injector suction 3g accelerator to terminate, the firming agent of 1% 4% is added according to temperature, 1%-4% accelerator, can first prepare the color of glue used, but firming agent, accelerator can not be added in advance, in with epoxide-resin glue, now with the current, control to solidify at 10 minutes as far as possible,
(4) epoxide-resin glue perfusion: the dust at air pressure cleaning hole, with the epoxide-resin glue prepared, it is poured on stone material hole, resin glue is allowed to flow to, with rubber hammer striking gently on the local stone material of stone material hollowing, epoxide-resin glue flowing to slowly, air is discharged, resin glue does not flow, epoxide-resin glue is filled with the gap of hollowing below stone material naturally, and setting time controlled at 8-10 minute, if hollowing area is little, directly with the epoxide-resin glue perfusion configured, the available colourless resin that area is big first irrigates;
(5) after epoxide-resin glue solidification, with blade, resin unnecessary above stone material being cleaned out rapidly, stone jointing polishes or does minute surface;
It is an advantage of the current invention that:
(1) permeate the alkali on the epoxide-resin glue energy blocking concrete ground entered, increase the performance of stone protector;
(2) penetration of resin is good, good leveling property, solidifies content high, shrink little after solidification, and resin is oiliness, because the liquid-permeability of oiliness is very strong, as long as there being the place in pore, gap, just can permeate;
(3) permeating the resin glue entered and can connect ground mortar, grid stone material can reinforced with mortar and back face of stone with cement, cement is connected;
(4) this construction technology, does not need stone material to knock out, can directly repair, and does not affect the effect of stone material typesetting, but patching material cost is high;
(5) the repairing time of this technique is short, and effect is high;
(6) repairing of this technique, bonding strength is high, can increase the intensity on ground simultaneously.
Detailed description of the invention
The following examples can make professional and technical personnel more fully understand the present invention, but does not therefore limit the present invention among described scope of embodiments.
Embodiment 1
The present embodiment is that stone material border hollowing is repaired
(1) patching material prepare: epoxide-resin glue, firming agent, accelerator, Bai Wan, iron oxide red, iron oxide yellow, iron oxide black, chrome green, titanium ultramarine, titanium dioxide, etc. various oxidation color, mill base, color essence, cellophane, putty knife, cutting machine, rubber hammer, brush, cup, one-shot injector, splash bar, blade;
(2) stone material joint-cutting: the position according to stone material hollowing, cuts the sealing of paving stone material edgewise, waits ground stone to dry, if ground is not done, what condition possessed turns on the aircondition, and can dry by force;
(3) epoxide-resin glue configuration: the color according to hollowing stone material, the epoxide-resin glue stone powder with former stone material, add quartz sand, aluminium hydroxide, inorganic powder, particulate filler, Bai Wan, iron oxide red, iron oxide yellow, iron oxide black, chrome green, titanium ultramarine, titanium dioxide, various oxidation color, mill base, color essence pigment, being transferred to hollowing stone material color, light colour is the same; Materials needed for area according to hollowing stone material, take 100g epoxide-resin glue and put in disposable cup, inhale 3g firming agent with one-shot injector to put in cup and stir, inhale 3g accelerator followed by one-shot injector and put stirring in cup into and terminate, add the firming agent of 1% 4% according to temperature, 1%-4% accelerator, can first prepare the color of glue used, but firming agent, accelerator can not be added in advance, in epoxide-resin glue, now with the current, control to solidify at 10 minutes as far as possible;
(4) epoxy resin perfusion: the dust of air pressure cleaning sealing, with the epoxide-resin glue prepared, it is poured on stone material sealing, allow resin glue flow to, stone material hollowing local above with rubber hammer striking gently, epoxide-resin glue flowing to slowly, air is discharged, resin glue does not flow, and epoxide-resin glue is filled with the gap below stone material naturally, and setting time controls at 8-10 minute;
(5) after epoxide-resin glue solidification, with blade, resin unnecessary above stone material being cleaned out rapidly, stone jointing polishes or does minute surface.
Embodiment 2
The present embodiment is that hollowing in the middle of stone material is repaired
(1) patching material prepares: epoxide-resin glue, firming agent, accelerator, Bai Wan, iron oxide red, iron oxide yellow, iron oxide black, chrome green, titanium ultramarine, titanium dioxide, various oxidation color, mill base, color essence, cellophane, putty knife, engraving machine, electric drill, cutting machine, brush, cup, one-shot injector, splash bar, blade;
(2) stone material perforate: as larger in size in ground stone block number, hollowing in the middle of stone material, that just considers in the centre of stone material hollowing, stone material color is easy to the position repaired, and opens a little hole with engraving machine, electric drill on stone material, and hole surface layer is deformity as far as possible, dry Deng ground stone, as ground is not done, drying that what condition possessed turn on the aircondition, or dry by force with warmer;
(3) epoxide-resin glue configuration: the color according to hollowing stone material, the epoxide-resin glue stone powder with former stone material, add quartz sand, aluminium hydroxide, inorganic powder, particulate filler, Bai Wan, iron oxide red, iron oxide yellow, iron oxide black, chrome green, titanium ultramarine, titanium dioxide, various oxidation color, mill base, color essence pigment, being transferred to hollowing stone material color, light colour is the same; Materials needed for area according to hollowing stone material, take 100g epoxide-resin glue and put in disposable cup, put in cup with one-shot injector suction 3g firming agent and stir, and put stirring in cup into followed by one-shot injector suction 3g accelerator and terminate; The firming agent of 1% 4%, 1%-4% accelerator is added according to temperature; Can first prepare the color of glue used, but firming agent, accelerator can not be added in advance, in epoxide-resin glue, now with the current, control to solidify at 10 minutes as far as possible;
(4) epoxide-resin glue perfusion: the dust at air pressure cleaning hole, with the epoxide-resin glue prepared, it is poured on stone material hole, resin glue is allowed to flow to, with rubber hammer striking gently on the local stone material of stone material hollowing, epoxide-resin glue flowing to slowly, air is discharged, resin glue does not flow, epoxide-resin glue is filled with the gap of hollowing below stone material naturally, and setting time controlled at 8-10 minute, if hollowing area is little, directly with the epoxide-resin glue perfusion configured, the available colourless resin that area is big first irrigates;
(5) after epoxide-resin glue solidification, with blade, resin unnecessary above stone material being cleaned out rapidly, stone jointing polishes or does minute surface;
The ultimate principle of the present invention and principal character and advantages of the present invention have more than been shown and described. Skilled person will appreciate that of the industry; the present invention is not restricted to the described embodiments; described in above-described embodiment and description is that principles of the invention is described; without departing from the spirit and scope of the present invention; the present invention also has various changes and modifications, and these changes and improvements both fall within the claimed scope of the invention. Claimed scope is defined by appending claims and equivalent thereof.

Claims (1)

1. the construction technology repairing ground stone hollowing, it is characterised in that: 4 steps that described stone material border hollowing is repaired, the middle hollowing of stone material is repaired,
Described stone material border hollowing repairs step:
(1) patching material prepare: epoxide-resin glue, firming agent, accelerator, Bai Wan, iron oxide red, iron oxide yellow, iron oxide black, chrome green, titanium ultramarine, titanium dioxide, etc. various oxidation color, mill base, color essence, cellophane, putty knife, cutting machine, rubber hammer, brush, cup, one-shot injector, splash bar, blade;
(2) stone material joint-cutting: the position according to stone material hollowing, cuts the sealing of paving stone material edgewise, waits ground stone to dry, if ground is not done, what condition possessed turns on the aircondition, and can dry by force;
(3) epoxide-resin glue configuration: the color according to hollowing stone material, the epoxide-resin glue stone powder with former stone material, add quartz sand, aluminium hydroxide, inorganic powder, particulate filler, Bai Wan, iron oxide red, iron oxide yellow, iron oxide black, chrome green, titanium ultramarine, titanium dioxide, various oxidation color, mill base, color essence pigment, being transferred to hollowing stone material color, light colour is the same; Materials needed for area according to hollowing stone material, take 100g epoxide-resin glue and put in disposable cup, inhale 3g firming agent with one-shot injector to put in cup and stir, inhale 3g accelerator followed by one-shot injector and put stirring in cup into and terminate, add the firming agent of 1% 4% according to temperature, 1%-4% accelerator, can first prepare the color of glue used, but firming agent, accelerator can not be added in advance, in epoxide-resin glue, now with the current, control to solidify at 10 minutes as far as possible;
(4) epoxy resin perfusion: the dust of air pressure cleaning sealing, with the epoxide-resin glue prepared, it is poured on stone material sealing, allow resin glue flow to, stone material hollowing local above with rubber hammer striking gently, epoxide-resin glue flowing to slowly, air is discharged, resin glue does not flow, and epoxide-resin glue is filled with the gap below stone material naturally, and setting time controls at 8-10 minute;
(5) after epoxide-resin glue solidification, with blade, resin unnecessary above stone material being cleaned out rapidly, stone jointing polishes or does minute surface;
In the middle of described stone material, hollowing repairing step is:
(1) patching material prepares: epoxide-resin glue, firming agent, accelerator, Bai Wan, iron oxide red, iron oxide yellow, iron oxide black, chrome green, titanium ultramarine, titanium dioxide, various oxidation color, mill base, color essence, cellophane, putty knife, electric drill, engraving machine, cutting machine, brush, cup, one-shot injector, splash bar, blade;
(2) stone material perforate: as larger in size in ground stone block number, hollowing in the middle of stone material, that just considers in the centre of stone material hollowing, stone material color is easy to the position repaired, and opens a little hole with engraving machine, electric drill on stone material, and hole surface layer is deformity as far as possible, dry Deng ground stone, as ground is not done, drying that what condition possessed turn on the aircondition, or dry by force with warmer;
(3) epoxide-resin glue configuration: the color according to hollowing stone material, the epoxide-resin glue stone powder with former stone material, add quartz sand, aluminium hydroxide, inorganic powder, particulate filler, Bai Wan, iron oxide red, iron oxide yellow, iron oxide black, chrome green, titanium ultramarine, titanium dioxide, various oxidation color, color is starched, color essence pigment, it is transferred to hollowing stone material color, light colour is the same, materials needed for area according to hollowing stone material, take 100g epoxide-resin glue and put in disposable cup, put in cup with one-shot injector suction 3g firming agent and stir, put stirring in cup into followed by one-shot injector suction 3g accelerator to terminate, the firming agent of 1% 4% is added according to temperature, 1%-4% accelerator, can first prepare the color of glue used, but firming agent, accelerator can not be added in advance, in with epoxide-resin glue, now with the current, control to solidify at 10 minutes as far as possible,
(4) epoxide-resin glue perfusion: the dust at air pressure cleaning hole, with the epoxide-resin glue prepared, it is poured on stone material hole, resin glue is allowed to flow to, with rubber hammer striking gently on the local stone material of stone material hollowing, epoxide-resin glue flowing to slowly, air is discharged, resin glue does not flow, epoxide-resin glue is filled with the gap of hollowing below stone material naturally, and setting time controlled at 8-10 minute, if hollowing area is little, directly with the epoxide-resin glue perfusion configured, the available colourless resin that area is big first irrigates;
(5) after epoxide-resin glue solidification, with blade, resin unnecessary above stone material being cleaned out rapidly, stone jointing polishes or does minute surface.
CN201610030365.8A 2016-01-18 2016-01-18 A kind of construction method for repairing ground stone hollowing Expired - Fee Related CN105672684B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610030365.8A CN105672684B (en) 2016-01-18 2016-01-18 A kind of construction method for repairing ground stone hollowing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610030365.8A CN105672684B (en) 2016-01-18 2016-01-18 A kind of construction method for repairing ground stone hollowing

Publications (2)

Publication Number Publication Date
CN105672684A true CN105672684A (en) 2016-06-15
CN105672684B CN105672684B (en) 2019-07-05

Family

ID=56301179

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610030365.8A Expired - Fee Related CN105672684B (en) 2016-01-18 2016-01-18 A kind of construction method for repairing ground stone hollowing

Country Status (1)

Country Link
CN (1) CN105672684B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106285037A (en) * 2016-09-19 2017-01-04 余春冠 A kind of finishing material hollowing comes off method for repairing and mending
CN107313605A (en) * 2017-07-14 2017-11-03 深圳市坤巽建筑设计顾问有限公司 A kind of hollowing restorative procedure
CN108915226A (en) * 2018-07-02 2018-11-30 沈喜刚 A kind of ceramic tile side bottom gap automatic filling device
CN111335665A (en) * 2020-03-16 2020-06-26 上海宝冶集团有限公司 Construction method for repairing hollowing micropores of wear-resistant emery terrace
CN111441608A (en) * 2020-05-28 2020-07-24 建修科技有限公司 Method for repairing bottom of swimming pool
CN112983033A (en) * 2019-12-16 2021-06-18 中车唐山机车车辆有限公司 Method for repairing floor cloth of railway vehicle

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101550266A (en) * 2009-03-12 2009-10-07 北京聚合筋建筑修复技术中心 Method for preparing and using foaming epoxy resin base grouting material for treating concrete floor empty drum
CN103470067A (en) * 2013-10-08 2013-12-25 武汉武大巨成加固实业有限公司 Transformation and construction method used for facing bare concrete of existing building outer wall
CN203361677U (en) * 2013-06-17 2013-12-25 中冶天工上海十三冶建设有限公司 Partial hollowing reinforcing device of integrated floor
CN204571337U (en) * 2015-01-14 2015-08-19 济南捷盛建材新技术有限公司 A kind of fixed structure repairing floor empty drum cracking
CN105003087A (en) * 2015-06-08 2015-10-28 江苏鼎达建筑新技术有限公司 Ground hollow detection and repair method based on infrared imaging

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101550266A (en) * 2009-03-12 2009-10-07 北京聚合筋建筑修复技术中心 Method for preparing and using foaming epoxy resin base grouting material for treating concrete floor empty drum
CN203361677U (en) * 2013-06-17 2013-12-25 中冶天工上海十三冶建设有限公司 Partial hollowing reinforcing device of integrated floor
CN103470067A (en) * 2013-10-08 2013-12-25 武汉武大巨成加固实业有限公司 Transformation and construction method used for facing bare concrete of existing building outer wall
CN204571337U (en) * 2015-01-14 2015-08-19 济南捷盛建材新技术有限公司 A kind of fixed structure repairing floor empty drum cracking
CN105003087A (en) * 2015-06-08 2015-10-28 江苏鼎达建筑新技术有限公司 Ground hollow detection and repair method based on infrared imaging

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106285037A (en) * 2016-09-19 2017-01-04 余春冠 A kind of finishing material hollowing comes off method for repairing and mending
CN107313605A (en) * 2017-07-14 2017-11-03 深圳市坤巽建筑设计顾问有限公司 A kind of hollowing restorative procedure
CN108915226A (en) * 2018-07-02 2018-11-30 沈喜刚 A kind of ceramic tile side bottom gap automatic filling device
CN112983033A (en) * 2019-12-16 2021-06-18 中车唐山机车车辆有限公司 Method for repairing floor cloth of railway vehicle
CN111335665A (en) * 2020-03-16 2020-06-26 上海宝冶集团有限公司 Construction method for repairing hollowing micropores of wear-resistant emery terrace
CN111441608A (en) * 2020-05-28 2020-07-24 建修科技有限公司 Method for repairing bottom of swimming pool

Also Published As

Publication number Publication date
CN105672684B (en) 2019-07-05

Similar Documents

Publication Publication Date Title
CN105672684A (en) Construction methods for repairing ground stone hollowing
CN107237511B (en) A kind of efficient shear wall through-wall bolt holes blocking method
CN106088530A (en) Large area method for constructing terrace
CN108442724B (en) Earthen site crack repairing method
CN107246124A (en) Imprint the preparation method on color concrete ground
CN207420088U (en) A kind of detachable combination cornice for facade rebuilding construction
CN204282784U (en) A kind of face brick filleting compression tool
CN105545006A (en) HF-3 double-component polysulfide building sealant crack repairing method
CN111779226A (en) Large stone parquet floor and construction method thereof
CN105235052B (en) A kind of method for repairing air entrained concrete sheet material defect
CN107304632B (en) Stone gum construction method
CN105666704A (en) Construction method for rapidly connecting stones through epoxy resin adhesive
CN107327117A (en) The preparation method on flat-die color concrete ground
CN212263096U (en) Material mixing device
CN214006723U (en) Close eaves formula tang tower ancient building structure
CN108640589A (en) A kind of preparation method of the pavior brick with guiding gutter
CN203856170U (en) Non-deforming quartz stone manufactured on site
CN102850836B (en) Putty and preparation method thereof
CN102605895B (en) Installation and construction method of ceiling board heat insulation mortar prefabricated block
CN206800659U (en) A kind of water bar
CN106013799B (en) A kind of construction method of structure bracket clear-water concrete protective cap
CN109750851A (en) A kind of ancient building brick wall surface protection crack repairing method
CN217802527U (en) Special drill bit of ceramic tile hollowing problem maintenance
CN110241675B (en) Construction method for construction joint and expansion joint of colored asphalt permeable concrete pavement
CN105625670B (en) A kind of stone material point hanging technique

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190705

Termination date: 20210118

CF01 Termination of patent right due to non-payment of annual fee