CN105672678A - Method for mounting overall steel protective shed cantilever frame - Google Patents

Method for mounting overall steel protective shed cantilever frame Download PDF

Info

Publication number
CN105672678A
CN105672678A CN201610048707.9A CN201610048707A CN105672678A CN 105672678 A CN105672678 A CN 105672678A CN 201610048707 A CN201610048707 A CN 201610048707A CN 105672678 A CN105672678 A CN 105672678A
Authority
CN
China
Prior art keywords
steel
protection canopy
bar
builder
jack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610048707.9A
Other languages
Chinese (zh)
Inventor
杜勇
张朝伟
翟林军
陆海天
高晓罡
殷向辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Nantong No3 Construction Group Co Ltd
Original Assignee
Jiangsu Nantong No3 Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Nantong No3 Construction Group Co Ltd filed Critical Jiangsu Nantong No3 Construction Group Co Ltd
Priority to CN201610048707.9A priority Critical patent/CN105672678A/en
Publication of CN105672678A publication Critical patent/CN105672678A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • E04G21/3204Safety or protective measures for persons during the construction of buildings against falling down
    • E04G21/3223Means supported by building floors or flat roofs, e.g. safety railings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a method for mounting an overall steel protective shed cantilever frame. The method comprises the following steps: mounting and fixing I-steel by using a reinforced ring which is pre-buried on an outside beam of a main body structure floor and a lower-layer temporary outer scaffold cantilever frame, wherein the I-steel is fixed on the edge of cantilever shape steel by using the reinforced ring; welding channel steel as an inclined support rod by using a hydraulic adjustable support rod; connecting and fixing assembled hinging components at two ends of the inclined support rod; welding a short reinforced head with I-steel on the ground, laying steel plates on adjacent pieces of I-steel, welding a plurality of reinforcing steel bars on the surfaces of the steel plates so as to form reinforcing ribs, inserting an outer scaffold vertical rod into the short reinforced head to form an outer building protective frame, erecting horizontal long steel tubes and vertical short steel tubes to form a protective shed, inserting the vertical short steel tubes into the short reinforced head, laying a bamboo scaffold plate on the horizontal long steel tubes, and setting a protective rail outside the protecting shed. As a manufactured double-layer protective shed is lifted in place by using a tower crane, the method is safe, economic and rapid, no ground or solid foundation is needed as a support, and the bearing capacity of a cantilever steel beam can be greatly increased due to twice oblique-pulled unloading of high-strength steel wire ropes.

Description

The installation method of a kind of overall shaped steel protection canopy builder's jack
Technical field
The present invention relates to the installation method of a kind of builder's jack, particularly relate to the installation method of a kind of overall shaped steel protection canopy builder's jack.
Background technology
In existing protection canopy builder's jack installation process, adopt two the oblique pull unloadings of High Tensile Steel Wire rope, fall personnel for top, it is a potential dangerous matter sources, because, when top personal height falls, falling velocity is very fast, encountering wireline, can occur to injure for two times, this is also that the flat net of applicable safety arranges middle Problems existing.
Existing protection canopy load-carrying member is complicated, and cost is too high, and from burying in advance, concrete reaches requirement of strength to built-in fitting completely, and required time is very long, is unsuitable for construction speed flowing water requirement, and installation process needs tower crane to lift, and too increases machinery expenses cost.
It is thus desirable to provide a kind of new technical scheme solves the problem.
Summary of the invention
The technical problem to be solved in the present invention is to provide the installation method of a kind of overall shaped steel protection canopy builder's jack.
For solving the problems of the technologies described above, the installation method of a kind of overall shaped steel protection canopy builder's jack of the present invention, comprises the following steps:
The reinforced steel bar ring that a, utilization are embedded on the outer side bar of agent structure floor, fixing joist steel installed by the recycling lower floor interim builder's jack of out-mould scaffold, joist steel is fixed on overhanging type steel edge by reinforced steel bar ring, then weld channel-section steel with hydraulic pressure adjustable support bar and make diagonal brace bar, the assembled hinge assembly at diagonal brace bar two ends is connected and fixed, regulate safe guarding shed hinged pedestal to control on this layer of same level line, and weld adjustment by the hinged plate of built-in fitting and steel and be subject to power interface point and exterior wall or side bar on same vertical surface;
B, formula hinge assembly to be assembled is installed after fixing and is removed the interim builder's jack of lower floor's out-mould scaffold, welding short steel rod head on joist steel on ground, steel plate laid by adjacent joist steel, surface of steel plate adopts many reinforcing bars to be welded into strengthening rib, out-mould scaffold frame vertical rod is inserted on bar dowel head, form the outer protective frame of building, the long steel pipe of level sets up into protection canopy with vertical short steel pipes, vertical short steel pipes is inserted on bar dowel head, level long steel pipe upper berth bamboo stage plank, guardrailing is set outside protection canopy, the plane of protection canopy adopts low outer Gao Zhangshe in big eye net, the side of protection canopy adopts closely-knitted safety net to close, the protection canopy made is lifted again in place on joist steel with tower crane,
Peripheral hardware Cantilever Beams oblique pull wireline on c, overhanging type steel, wireline is fixed in overhanging type steel by round steel built-in fitting, upper reverse drawing anchorage node and lower interface point are on a vertical line, and wireline tension adopts flower basket bolt, then sets up exterior wall Steel Pipe Scaffold on shaped steel outrigger.
Further, diagonal brace bar and pin joint adopt bayonet joint.
Between each layer of assembled shaped steel suspension scaffolding protection canopy, rational height is no more than 18m.
The useful effect of the present invention: adopt the builder's jack of overall section steel manufacture as scaffolding and the protection canopy load-carrying member of encorbelmenting, and increase diagonal brace stabilizing member, the double-deck protection canopy utilizing tower crane lifting to make is in place, safely, economical, quick, do not need ground and solid foundation as supporting, the supporting ability of overhanging type steel beam is substantially increased by two the oblique pull unloadings of High Tensile Steel Wire rope, assembled hinge assembly reclaims convenient, turnover uses number of times many, and double-deck protection adopts steel plate and bamboo stage plank to improve bearing capacity and the resistance to impact shock of protection canopy.
Accompanying drawing explanation
Fig. 1 is the structural representation of the overall shaped steel protection canopy builder's jack of the present invention.
Fig. 2 is the structural representation of assembled hinge assembly of the present invention.
Fig. 3 is the structural representation of reverse drawing anchoring point round steel built-in fitting of the present invention.
Wherein: 1, reinforced steel bar ring, 2, joist steel, 3, channel-section steel, 4, hinged pedestal, 5, the hinged plate of steel, 6, steel plate, 7, vertical short steel pipes, 8, the long steel pipe of level, 9, reinforcing bar, 10, bamboo stage plank, 11, guardrailing, 12, big eye net, 13, wireline, 14, upper reverse drawing anchorage node, 15, lower interface point, 16, built-in fitting, 17, the interim builder's jack of out-mould scaffold, 18, exterior wall, 19, overhanging type steel, 20, out-mould scaffold frame vertical rod, 21, round steel built-in fitting, 22, hydraulic pressure adjustable support bar, 23, bar dowel head.
Embodiment
In order to deepen the understanding of the present invention, below in conjunction with embodiment and accompanying drawing, the invention will be further described, and this embodiment, only for explaining the present invention, does not form the restriction to protection scope of the present invention.
As shown in Figures 1 to 3, the installation method of a kind of overall shaped steel protection canopy builder's jack of the present invention, comprises the following steps:
The reinforced steel bar ring 1 that a, utilization are embedded on the outer side bar of agent structure floor, fixing joist steel 2 installed by the recycling lower floor interim builder's jack 17 of out-mould scaffold, joist steel 2 is fixed on overhanging type steel 19 edge by reinforced steel bar ring 1, then weld channel-section steel 3 with hydraulic pressure adjustable support bar 22 and make diagonal brace bar, the assembled hinge assembly at diagonal brace bar two ends is connected and fixed, regulate safe guarding shed hinged pedestal 4 to control on this layer of same level line, and weld adjustment by built-in fitting 16 plate 5 hinged with steel and be subject to power interface point and exterior wall 18 or side bar on same vertical surface;
B, formula hinge assembly to be assembled is installed after fixing and is removed the interim builder's jack of lower floor's out-mould scaffold, welding short steel rod head 23(250 height on joist steel 2 on ground), steel plate 6(3 laid by adjacent joist steel 2 thick), steel plate 6 surface adopts many reinforcing bars 9 to be welded into strengthening rib, out-mould scaffold frame vertical rod 20 is inserted in bar dowel head 23(250 height) on, form the outer protective frame of building, the long steel pipe of level 8 and vertical short steel pipes 7(600 height) set up into protection canopy, vertical short steel pipes 7 is inserted on bar dowel head 23, level long steel pipe 8 upper berth bamboo stage plank 10, guardrailing 11(1500 height is set outside protection canopy), the plane of protection canopy adopts the low outer Gao Zhangshe of 12 li, big eye net, the side of protection canopy adopts closely-knitted safety net to close, the protection canopy made is lifted again in place on joist steel 2 with tower crane,
Peripheral hardware Cantilever Beams oblique pull wireline 13 on c, overhanging type steel 19, wireline 13 is fixed in overhanging type steel 19 by round steel built-in fitting 21, upper reverse drawing anchorage node 14 and lower interface point 15 are on a vertical line, the spacing of adjacent round steel built-in fitting 21 is 1500mm, wireline 13 is strained and is adopted flower basket bolt, setting up exterior wall Steel Pipe Scaffold again on shaped steel outrigger 19, between each layer of assembled shaped steel suspension scaffolding protection canopy, rational height is no more than 18m.
Diagonal brace bar and pin joint adopt bayonet joint, the built-in pin of assembled hinge assembly.
Adopt hydraulic pressure adjustable support bar 22 to weld channel-section steel 3 and make diagonal brace bar, stability height, adjustable position; The framework of vertical protection and horizontal protective is globality; Whole protection canopy builder's jack is easy and simple to handle, and it is convenient to install.
Assembled hinge assembly reclaims convenient, and turnover uses number of times many. As seen from Figure 2, channel-section steel 3 two ends welding hydraulic pressure adjustable support bar 22, hydraulic pressure adjustable support bar 22 is connected with assembled hinge assembly again, and the hinged plate 5 of the steel of assembled hinge assembly welds with built-in fitting 16, and built-in fitting 16 is fixed on exterior wall or beam.
Adopting the builder's jack of overall section steel manufacture as scaffolding and the protection canopy load-carrying member of encorbelmenting, and increase diagonal brace stabilizing member, the double-deck protection canopy utilizing tower crane lifting to make is in place, safety, economical, fast, it is not necessary to ground and solid foundation are as supporting. The supporting ability of overhanging type steel beam is substantially increased by two the oblique pull unloadings of High Tensile Steel Wire rope. Joist steel arranges steel plate and bamboo stage plank, double-deck protection, it is to increase the bearing capacity of protection canopy and resistance to impact shock.
As seen from Figure 3, according to specification design requirements, make the round steel built-in fitting of this figure.
Adopting overall shaped steel protection canopy builder's jack, turnover uses number of times many, and material makes simple, and bulk deformation is little; Overall shaped steel protection canopy builder's jack construction easy accessibility, outer frame protection canopy installation workload decreases 60% than common steel tube protection canopy, and labour intensity reduces 65%; Protection canopy can be followed construction speed sectional different from using function requirement and be removed, thus reduces the turnover lease expenses such as scaffolding steel pipe, fastener. Different kinds of construction can be constructed when being independent of each other simultaneously simultaneously, substantially reduces the duration.

Claims (3)

1. the installation method of an overall shaped steel protection canopy builder's jack, it is characterised in that, comprise the following steps:
The reinforced steel bar ring that a, utilization are embedded on the outer side bar of agent structure floor, fixing joist steel installed by the recycling lower floor interim builder's jack of out-mould scaffold, joist steel is fixed on overhanging type steel edge by reinforced steel bar ring, then weld channel-section steel with hydraulic pressure adjustable support bar and make diagonal brace bar, the assembled hinge assembly at diagonal brace bar two ends is connected and fixed, regulate safe guarding shed hinged pedestal to control on this layer of same level line, and weld adjustment by the hinged plate of built-in fitting and steel and be subject to power interface point and exterior wall or side bar on same vertical surface;
B, formula hinge assembly to be assembled is installed after fixing and is removed the interim builder's jack of lower floor's out-mould scaffold, welding short steel rod head on joist steel on ground, steel plate laid by adjacent joist steel, surface of steel plate adopts many reinforcing bars to be welded into strengthening rib, out-mould scaffold frame vertical rod is inserted on bar dowel head, form the outer protective frame of building, the long steel pipe of level sets up into protection canopy with vertical short steel pipes, vertical short steel pipes is inserted on bar dowel head, level long steel pipe upper berth bamboo stage plank, guardrailing is set outside protection canopy, the plane of protection canopy adopts low outer Gao Zhangshe in big eye net, the side of protection canopy adopts closely-knitted safety net to close, the protection canopy made is lifted again in place on joist steel with tower crane,
Peripheral hardware Cantilever Beams oblique pull wireline on c, overhanging type steel, wireline is fixed in overhanging type steel by round steel built-in fitting, upper reverse drawing anchorage node and lower interface point are on a vertical line, and wireline tension adopts flower basket bolt, then sets up exterior wall Steel Pipe Scaffold on shaped steel outrigger.
2. the installation method of a kind of overall shaped steel protection canopy builder's jack according to claim 1, it is characterised in that: the pin joint of diagonal brace bar and hinged pedestal adopts bayonet joint.
3. the installation method of a kind of overall shaped steel protection canopy builder's jack according to claim 1, it is characterised in that: between each layer of assembled shaped steel suspension scaffolding protection canopy, rational height is no more than 18m.
CN201610048707.9A 2016-01-26 2016-01-26 Method for mounting overall steel protective shed cantilever frame Pending CN105672678A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610048707.9A CN105672678A (en) 2016-01-26 2016-01-26 Method for mounting overall steel protective shed cantilever frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610048707.9A CN105672678A (en) 2016-01-26 2016-01-26 Method for mounting overall steel protective shed cantilever frame

Publications (1)

Publication Number Publication Date
CN105672678A true CN105672678A (en) 2016-06-15

Family

ID=56302524

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610048707.9A Pending CN105672678A (en) 2016-01-26 2016-01-26 Method for mounting overall steel protective shed cantilever frame

Country Status (1)

Country Link
CN (1) CN105672678A (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106150088A (en) * 2016-08-11 2016-11-23 上海嘉实(集团)有限公司 Large cantilever beam slab combined type formwork system and construction method
CN106193573A (en) * 2016-07-20 2016-12-07 南京理工大学 Support means for thin-walled body of wall scaffold cradle
CN107100187A (en) * 2017-05-22 2017-08-29 庄爱军 Tower crane steel girder erection structure and installation method
CN107461033A (en) * 2017-09-08 2017-12-12 深圳前海特辰科技有限公司 Construction protection canopy and its construction method
CN107587711A (en) * 2017-09-25 2018-01-16 中铁五局集团建筑工程有限责任公司 A kind of regularization assembled overhanging protection canopy and its assembly method
CN109853976A (en) * 2018-11-28 2019-06-07 十九冶成都建设有限公司 Overhanging safe guarding shed and its erection method
CN109989590A (en) * 2019-04-09 2019-07-09 中建一局集团建设发展有限公司 For the auxiliary fixing device of roof overlength steel girder erection and the hanging method of girder steel
CN110792276A (en) * 2019-09-27 2020-02-14 中建四局第六建筑工程有限公司 Unit type shaped horizontal protective shed with super high-rise structure and construction method thereof
CN110821197A (en) * 2019-12-10 2020-02-21 广西建工集团第五建筑工程有限责任公司 Angle-adjustable assembly type horizontal cantilever protection shed and construction method thereof
CN113356620A (en) * 2021-04-30 2021-09-07 上海建工四建集团有限公司 Crank arm advanced protection railing and protection fence
CN113356621A (en) * 2021-04-30 2021-09-07 上海建工四建集团有限公司 Adjustable crank arm advanced protection railing and protection fence
CN113356619A (en) * 2021-04-30 2021-09-07 上海建工四建集团有限公司 Construction method of crank arm advanced protection fence
CN113356618A (en) * 2021-04-30 2021-09-07 上海建工四建集团有限公司 Construction method of adjustable crank arm advanced protection fence
CN113374284A (en) * 2021-04-30 2021-09-10 上海建工四建集团有限公司 Multifunctional advanced protection railing, protection fence and monitoring method
CN113622642A (en) * 2021-08-05 2021-11-09 中建八局广西建设有限公司 Push-pull type section steel cantilever protection platform and installation method thereof
CN115341701A (en) * 2022-08-19 2022-11-15 山东金城建设有限公司 High-altitude overhanging steel bar truss floor support plate hanging formwork construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201381653Y (en) * 2009-04-14 2010-01-13 江苏省华建建设股份有限公司 Assembled type overhang safety protection shelter structure for high-rise building construction
CN201649678U (en) * 2010-03-24 2010-11-24 陕西建工集团总公司 Semi-automatic safety protective shed for high-rise building construction
CN202596143U (en) * 2012-05-29 2012-12-12 北京城建建设工程有限公司 Overhanging double-pole scaffold
CN103993728A (en) * 2014-05-05 2014-08-20 泰兴市第一建筑安装工程有限公司 Assembly-type section steel cantilever protective shed

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201381653Y (en) * 2009-04-14 2010-01-13 江苏省华建建设股份有限公司 Assembled type overhang safety protection shelter structure for high-rise building construction
CN201649678U (en) * 2010-03-24 2010-11-24 陕西建工集团总公司 Semi-automatic safety protective shed for high-rise building construction
CN202596143U (en) * 2012-05-29 2012-12-12 北京城建建设工程有限公司 Overhanging double-pole scaffold
CN103993728A (en) * 2014-05-05 2014-08-20 泰兴市第一建筑安装工程有限公司 Assembly-type section steel cantilever protective shed

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106193573A (en) * 2016-07-20 2016-12-07 南京理工大学 Support means for thin-walled body of wall scaffold cradle
CN106150088B (en) * 2016-08-11 2019-07-26 上海嘉实(集团)有限公司 Large cantilever beam slab combined type formwork system and construction method
CN106150088A (en) * 2016-08-11 2016-11-23 上海嘉实(集团)有限公司 Large cantilever beam slab combined type formwork system and construction method
CN107100187A (en) * 2017-05-22 2017-08-29 庄爱军 Tower crane steel girder erection structure and installation method
CN107100187B (en) * 2017-05-22 2019-07-30 庄爱军 Tower crane steel girder erection structure and installation method
CN107461033A (en) * 2017-09-08 2017-12-12 深圳前海特辰科技有限公司 Construction protection canopy and its construction method
CN107587711A (en) * 2017-09-25 2018-01-16 中铁五局集团建筑工程有限责任公司 A kind of regularization assembled overhanging protection canopy and its assembly method
CN109853976A (en) * 2018-11-28 2019-06-07 十九冶成都建设有限公司 Overhanging safe guarding shed and its erection method
CN109989590B (en) * 2019-04-09 2024-01-23 中建一局集团建设发展有限公司 Auxiliary fixing device for mounting roof overlong steel beam and hoisting method of steel beam
CN109989590A (en) * 2019-04-09 2019-07-09 中建一局集团建设发展有限公司 For the auxiliary fixing device of roof overlength steel girder erection and the hanging method of girder steel
CN110792276A (en) * 2019-09-27 2020-02-14 中建四局第六建筑工程有限公司 Unit type shaped horizontal protective shed with super high-rise structure and construction method thereof
CN110821197A (en) * 2019-12-10 2020-02-21 广西建工集团第五建筑工程有限责任公司 Angle-adjustable assembly type horizontal cantilever protection shed and construction method thereof
CN113356621A (en) * 2021-04-30 2021-09-07 上海建工四建集团有限公司 Adjustable crank arm advanced protection railing and protection fence
CN113356619A (en) * 2021-04-30 2021-09-07 上海建工四建集团有限公司 Construction method of crank arm advanced protection fence
CN113356618A (en) * 2021-04-30 2021-09-07 上海建工四建集团有限公司 Construction method of adjustable crank arm advanced protection fence
CN113374284A (en) * 2021-04-30 2021-09-10 上海建工四建集团有限公司 Multifunctional advanced protection railing, protection fence and monitoring method
CN113356620A (en) * 2021-04-30 2021-09-07 上海建工四建集团有限公司 Crank arm advanced protection railing and protection fence
CN113622642A (en) * 2021-08-05 2021-11-09 中建八局广西建设有限公司 Push-pull type section steel cantilever protection platform and installation method thereof
CN115341701A (en) * 2022-08-19 2022-11-15 山东金城建设有限公司 High-altitude overhanging steel bar truss floor support plate hanging formwork construction method
CN115341701B (en) * 2022-08-19 2024-05-28 山东金城建设有限公司 Hanging formwork construction method for high-altitude overhanging steel bar truss floor support plate

Similar Documents

Publication Publication Date Title
CN105672678A (en) Method for mounting overall steel protective shed cantilever frame
CN108643544B (en) High-altitude overhanging construction platform support system and construction method
CN104389419B (en) Encorbelment and prop up mould structure for mounting platform and a constructional method
CN101886468B (en) Construction method of suspension type template support in high-position conjoined structure
CN106337555A (en) Method for constructing triangular steel support for cantilever structure of outer wall of building
CN104453197A (en) High-altitude large-cantilever concrete structure structural steel supporting platform
CN103993728B (en) A kind of assembling shaped steel is encorbelmented protection canopy
CN102535845A (en) Construction method of bearing frame of corridor structure
CN204311719U (en) External hanging type scaffold
CN108979131B (en) Integral lifting platform device for high-rise building construction steel formwork and operation frame
CN111809850A (en) Method for mounting basket diagonal draw bar type cantilever frame
CN211736298U (en) Double-rod diagonal cantilever scaffold
CN107100187A (en) Tower crane steel girder erection structure and installation method
CN202370233U (en) Pull rod type external wall cantilever discharging platform setting-up structure
CN111472530A (en) Flower basket pull rod I-shaped steel cantilever bearing frame for constructional engineering and mounting method thereof
CN203891441U (en) Assembly type section steel overhung protective shed
CN204282803U (en) To encorbelment formwork structure for mounting platform
CN202658590U (en) Integral assembled drilling platform
CN109518940A (en) Coal silo warehouse construction sliding form apparatus and system
CN213804905U (en) Bailey beam suspension structure
CN212336672U (en) I-steel overhanging bearing frame of basket pull rod for constructional engineering
CN212507296U (en) High formwork system
CN103291116A (en) Grid-type formwork supporting and operating platform for construction of water tank on top of inverted-cone water tower
CN212866793U (en) Assembled construction elevator stops layer platform
CN211341789U (en) Wall form reinforcing tool

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160615