用于沿海地区的浮运式整体钢闸坝 Download PDFInfo
- Publication number
- CN105672213A CN105672213A CN201610176536.8A CN201610176536A CN105672213A CN 105672213 A CN105672213 A CN 105672213A CN 201610176536 A CN201610176536 A CN 201610176536A CN 105672213 A CN105672213 A CN 105672213A
- Authority
- CN
- China
- Prior art keywords
- gate
- dam
- transportation
- integral steel
- pier
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B7/00—Barrages or weirs; Layout, construction, methods of, or devices for, making same
- E02B7/20—Movable barrages; Lock or dry-dock gates
- E02B7/40—Swinging or turning gates
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Barrages (AREA)
Abstract
本发明公开了一种用于沿海地区的浮运式整体钢闸坝,包括闸底板、闸墩、工作闸门、液压启闭机、闸墩顶部交通桥,闸底板和闸墩为整体预制而成的空箱式钢筋混凝土结构,闸底板上的空箱为多个,每个空箱上设置有充水管和排气管,液压启闭机安装于闸墩空箱内,工作闸门为底轴翻板门,布置于两闸墩之间,工作闸门液压启闭机、闸墩顶部交通桥安装到整体预制而成的闸底板和闸墩上形成整体钢闸坝,整体钢闸坝浮运至现场沉放就位。施工期无需围堰、导流明渠等临时建筑物,降低了工程造价,不断流、不断航,降低了施工期对防洪、航运和周围环境的影响。
Description
技术领域
本发明涉及一种水闸,尤其是一种用于沿海地区的浮运式整体钢闸坝。
背景技术
沿海地区河道往往具有河道较宽,河道纵坡较小,航运发达的特点。由于沿海地区经济普遍较为发达,对景观要求也相对较高。
在这些地区采用传统施工方式修建传统形式的水闸具有以下缺点:传统水闸需与专门的船闸配合以满足通航要求;传统水闸往往为高耸结构,对河道原有景观和风貌改变较大,且制约区域景观的整体规划;传统施工方式需采用明渠导流或者河道分期导流,上下游围堰挡水形成基坑,临时工程费用较高,且对航运影响较大。
发明内容
本发明要解决的技术问题是,提供一种适用于沿海地区的、具备双向挡水功能的、施工期不断流、不断航的浮运式整体钢闸坝。
为了解决上述技术问题,本发明采用的技术方案是:一种用于沿海地区的浮运式整体钢闸坝,包括闸底板、闸墩、工作闸门、液压启闭机、闸墩顶部交通桥,闸底板和闸墩为整体预制而成的空箱式钢筋混凝土结构,闸底板上的空箱为多个,每个空箱上设置有充水管和排气管,液压启闭机安装于闸墩空箱内,工作闸门为底轴翻板门,布置于两闸墩之间,工作闸门液压启闭机、闸墩顶部交通桥安装到整体预制而成的闸底板和闸墩上形成整体钢闸坝,整体钢闸坝浮运至现场沉放就位。
还包括有上下游检修闸门,上下游检修闸门也安装到整体预制而成的闸墩上。
在闸底板上设置有防渗墙施工底板预埋管。
所述整体钢闸坝的闸室宽度15-35m。
本发明的有益效果是:浮运式钢闸坝适应了沿海地区河道较宽、河道纵坡较小、航运、经济发达、对景观要求较高等特点,除能实现传统水闸的功能外,还能实现双向挡水、开度任意调节、通航等功能;施工期无需围堰、导流明渠等临时建筑物,降低了工程造价,不断流、不断航,降低了施工期对防洪、航运和周围环境的影响;闸门坚固耐用,启闭速度快,且可以任意调节开度,运行灵活可靠;建筑物新颖、美观,门顶过流时能形成人工瀑布,能够造就美观、大气的景观效果,且不会制约区域景观的整体规划。浮运式整体钢闸坝在沿海地区的推广应用,将会产生巨大的经济、社会和环境效益。
附图说明
图1是本发明的用于沿海地区的浮运式整体钢闸坝横断面;
图2是本发明的用于沿海地区的浮运式整体钢闸坝闸门纵断面;
图3是本发明的用于沿海地区的浮运式整体钢闸坝闸墩纵断面。
具体实施方式
下面结合附图和具体实施方式对本发明做进一步的详细说明:
如图1-3所示,本发明的用于沿海地区的浮运式整体钢闸坝,包括闸底板1、闸墩2、工作闸门3、液压启闭机5、闸墩顶部交通桥6,闸底板1和闸墩2为整体预制而成的空箱式钢筋混凝土结构,闸底板1上的空箱为多个,每个空箱上设置有充水管9和排气管10,液压启闭机5安装于闸墩2空箱内,工作闸门3为底轴翻板门,布置于两闸墩之间,工作闸门3、液压启闭机5、闸墩顶部交通桥6安装到整体预制而成的闸底板1和闸墩2上形成整体钢闸坝,整体钢闸坝浮运至现场沉放就位。
也可以还包括有上下游检修闸门4,上下游检修闸门4也安装到整体预制而成的闸墩2上。
在闸底板1上设置有防渗墙施工底板预埋管8。
所述整体钢闸坝的闸室宽度15-35m。
所述底轴翻板工作闸门3是门页围绕底轴心旋转的结构,液压启闭机5布置于两侧闸墩2的空箱内,液压启闭机5通过固定于底轴端部的拐臂驱动底轴翻板工作闸门3。
底轴翻板工作闸门3闭门时能够实现双向挡水,卧倒时行洪、排涝、纳潮,适当开启调节水位,闸门门顶能够溢流。
整体式闸室结构由空箱式闸底板1和空箱式闸墩2组成,闸室在船坞或者甲板驳船上集中预制,达到设计要求强度并安装其他设备后即可直接拖运至下水点安装。
闸室沉放安装前根据水闸闸址处的地质情况,针对性地选择挖泥船水上作业清淤、水上抛填粗砂换基、打桩船水上作业预制桩、水上施工搅拌桩、沉箱基础施工等基础处理措施对闸基进行处理。
闸室沉放安装选择在风浪小、无雨天气进行。安装前在两岸安排测量人员利用全站仪等仪器控制安装位置,拖船组牵引闸室大体就位,待稳定后,陆上测量人员控制方向,调整闸室沉放位置,直到满足精度要求。然后通过充水管9往空箱式闸底板1充水,使闸室缓慢下沉,在水准仪的测控下,调整各空箱充水量使闸室保持水平,实时监控调整闸室平面位置,直至平稳沉放到基础上。
浮运式整体钢闸坝空箱在闸室浮运就位过程中充当浮箱功能。闸墩2空箱兼做液压启闭机5的启闭机室。
施工期,上下游检修闸门4就位后,能为基础防渗墙7施工提供干地作业条件;基础防渗墙7施工通过预埋于底板预埋管8进行。
运行期,上下游检修闸门4就位后,可以为底轴翻板工作闸门3及其埋件提供干地检修条件。
本发明的钢闸坝具有良好的双向挡水功能和水位调节性能。立门时既可以实现上游侧蓄水,下游侧挡潮。卧门时可以行洪、排涝、纳潮,且可以利用闸室通航。适当开启可以调节上游水位,按照需求使内河水位维持在一定的高度,满足两岸景观和亲水的需求;还可以利用闸门门顶溢流,形成人工瀑布。
水闸结构简单,跨度较大,建筑物基本与水面齐平,对河道原有的景观和风貌不会产生冲击,不会制约区域景观的整体规划。
各联闸室在船坞或者甲板驳船上集中预制,混凝土浇筑质量易于保证;水闸和闸门整体浮运至现场沉放,建设期无需施工导流,施工期间不断流、不断航,节省了施工围堰、导流明渠等临时建筑物的投资,施工期对河道防汛、航运和周围环境的影响较小。
上下游检修闸门,能够为底轴翻板工作闸门及埋件提供检修条件,还能为水闸基础旋喷或者摆喷桩防渗墙施工提供干地作业条件。
闸门为钢结构,坚固耐用。闸门采用液压启闭机启闭,启闭速度快,一般在2-3分钟内即可完成操作;启闭机配备特有的锁定装置,可以锁定于0°-90°范围内的任意角度,水位可以任意调节。启闭机可以配置手动装置,若遇停电或故障者依然可以保证水闸正常运行。
钢闸坝外观新颖、美观,跨度较大,门顶过流时形成人工瀑布,能够造就大尺度、大格局的景观效果。
本发明基于对钢坝闸工作原理和浮运施工的深入研究,创造性的提出了一种适用于沿海地区的浮运式整体钢闸坝及其配套的实施方案。本发明具备双向挡水、开度任意调节、通航等功能;施工期无需围堰、导流明渠等临时建筑物,不断流、不断航,对防洪、航运和周围环境的影响较小;闸门坚固耐用,启闭迅速,可以任意调节开度,运行灵活可靠;建筑物新颖、美观,运行时能形成人工瀑布,且投资较省,具有良好的经济、社会和环境效益。
以上所述的实施例仅用于说明本发明的技术思想及特点,其目的在于使本领域的技术人员能够理解本发明的内容并据以实施,不能仅以本实施例来限定本发明的专利范围,即凡本发明所揭示的精神所作的同等变化和修饰,仍落在本发明的专利范围内。
Claims (4)
1.一种用于沿海地区的浮运式整体钢闸坝,包括闸底板(1)、闸墩(2)、工作闸门(3)、液压启闭机(5)、闸墩顶部交通桥(6),其特征在于,闸底板(1)和闸墩(2)为整体预制而成的空箱式钢筋混凝土结构,闸底板(1)上的空箱为多个,每个空箱上设置有充水管(9)和排气管(10),液压启闭机(5)安装于闸墩(2)空箱内,工作闸门(3)为底轴翻板门,布置于两闸墩之间,工作闸门(3)、液压启闭机(5)、闸墩顶部交通桥(6)安装到整体预制而成的闸底板(1)和闸墩(2)上形成整体钢闸坝,整体钢闸坝浮运至现场沉放就位。
2.根据权利要求1所述的用于沿海地区的浮运式整体钢闸坝,其特征在于,还包括有上下游检修闸门(4),上下游检修闸门(4)也安装到整体预制而成的闸墩(2)上。
3.根据权利要求1所述的用于沿海地区的浮运式整体钢闸坝,其特征在于,在闸底板(1)上设置有防渗墙施工底板预埋管(8)。
4.根据权利要求1-3任一项所述的用于沿海地区的浮运式整体钢闸坝,其特征在于,所述整体钢闸坝的闸室宽度15-35m。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610176536.8A CN105672213A (zh) | 2016-03-24 | 2016-03-24 | 用于沿海地区的浮运式整体钢闸坝 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610176536.8A CN105672213A (zh) | 2016-03-24 | 2016-03-24 | 用于沿海地区的浮运式整体钢闸坝 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105672213A true CN105672213A (zh) | 2016-06-15 |
Family
ID=56225267
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610176536.8A Pending CN105672213A (zh) | 2016-03-24 | 2016-03-24 | 用于沿海地区的浮运式整体钢闸坝 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105672213A (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109750591A (zh) * | 2019-01-15 | 2019-05-14 | 中国电建集团北京勘测设计研究院有限公司 | 一种布置在水电站闸坝上的门机交通桥 |
CN110258457A (zh) * | 2019-06-26 | 2019-09-20 | 中国电建集团成都勘测设计研究院有限公司 | 峡谷区水电工程导流洞全洞段检修用挡水坝结构 |
CN110331701A (zh) * | 2019-06-13 | 2019-10-15 | 中交第三航务工程勘察设计院有限公司 | 一种软土地基上的整体预制型水闸闸室结构及其施工方法 |
CN110820693A (zh) * | 2019-09-30 | 2020-02-21 | 江苏省太湖水利规划设计研究院有限公司 | 浮运式橡胶坝 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20010109058A (ko) * | 2000-05-30 | 2001-12-08 | 한상관 | 전면부 개폐식 자동수문의 구성방법 |
CN104179156A (zh) * | 2014-08-22 | 2014-12-03 | 天津港航工程有限公司 | 箱筒型基础水闸结构及围埝合拢口的施工方法 |
CN104762985A (zh) * | 2015-04-13 | 2015-07-08 | 天津大学 | 一种箱筒型基础取水闸结构及其应用 |
CN205475122U (zh) * | 2016-03-24 | 2016-08-17 | 中水北方勘测设计研究有限责任公司 | 一种用于沿海地区的浮运式整体钢闸坝 |
-
2016
- 2016-03-24 CN CN201610176536.8A patent/CN105672213A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20010109058A (ko) * | 2000-05-30 | 2001-12-08 | 한상관 | 전면부 개폐식 자동수문의 구성방법 |
CN104179156A (zh) * | 2014-08-22 | 2014-12-03 | 天津港航工程有限公司 | 箱筒型基础水闸结构及围埝合拢口的施工方法 |
CN104762985A (zh) * | 2015-04-13 | 2015-07-08 | 天津大学 | 一种箱筒型基础取水闸结构及其应用 |
CN205475122U (zh) * | 2016-03-24 | 2016-08-17 | 中水北方勘测设计研究有限责任公司 | 一种用于沿海地区的浮运式整体钢闸坝 |
Non-Patent Citations (1)
Title |
---|
季永兴等: "苏州河河口水闸工程设计特色", 《水利水电科技进展》 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109750591A (zh) * | 2019-01-15 | 2019-05-14 | 中国电建集团北京勘测设计研究院有限公司 | 一种布置在水电站闸坝上的门机交通桥 |
CN110331701A (zh) * | 2019-06-13 | 2019-10-15 | 中交第三航务工程勘察设计院有限公司 | 一种软土地基上的整体预制型水闸闸室结构及其施工方法 |
CN110258457A (zh) * | 2019-06-26 | 2019-09-20 | 中国电建集团成都勘测设计研究院有限公司 | 峡谷区水电工程导流洞全洞段检修用挡水坝结构 |
CN110258457B (zh) * | 2019-06-26 | 2024-02-13 | 中国电建集团成都勘测设计研究院有限公司 | 峡谷区水电工程导流洞全洞段检修用挡水坝结构 |
CN110820693A (zh) * | 2019-09-30 | 2020-02-21 | 江苏省太湖水利规划设计研究院有限公司 | 浮运式橡胶坝 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101408027B (zh) | 软土地基上大型钢浮箱的施工方法 | |
CN105672213A (zh) | 用于沿海地区的浮运式整体钢闸坝 | |
CN106149626A (zh) | 一种以洪防洪的自动河堤 | |
CN102561379A (zh) | 一种新型桥梁设置基础及其施工方法 | |
CN205475122U (zh) | 一种用于沿海地区的浮运式整体钢闸坝 | |
Rasmussen | Concrete immersed tunnels—Forty years of experience | |
CN203977437U (zh) | 一种已建水电枢纽坝下防冲过水的围堰结构 | |
CN104060573B (zh) | 珊瑚岛上快速筑堤方法 | |
CN101929162A (zh) | 三栖式滩涂土方筑堤机施工方法 | |
CN201459687U (zh) | 水下卧倒门水闸 | |
CN108867758A (zh) | 一种码头沉箱取水装置及施工方法 | |
US10876265B2 (en) | Modular hydropower unit | |
KR20140092217A (ko) | 작업선을 이용한 교각의 수중설치공법. | |
CN208830255U (zh) | 一种集束干线多功能堤防 | |
CN101597894A (zh) | 水下卧倒门水闸 | |
JP5669189B2 (ja) | 透過式海域制御構造物の構築方法 | |
CN101408028B (zh) | 钢浮箱沉放平面位置控制方法 | |
CN101806049B (zh) | 箱涵式水闸浮运安装工艺 | |
CN208949969U (zh) | 一种码头沉箱取水装置 | |
CN101182706A (zh) | 一种闸底板的浮运沉放方法 | |
CN110820675A (zh) | 人工沙滩形成施工工法 | |
CN115110474A (zh) | 一种消浪堤坝及消浪堤坝*** | |
Milne | THE QUEEN ELIZABETH II DOCK, EASTHAM. | |
Fishback | Keystone on the Cumberland | |
Hall et al. | Deas island tunnel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20160615 |
|
WD01 | Invention patent application deemed withdrawn after publication |