CN105672062B - A kind of Straddle type monorail support rail system and its construction method - Google Patents

A kind of Straddle type monorail support rail system and its construction method Download PDF

Info

Publication number
CN105672062B
CN105672062B CN201610063462.7A CN201610063462A CN105672062B CN 105672062 B CN105672062 B CN 105672062B CN 201610063462 A CN201610063462 A CN 201610063462A CN 105672062 B CN105672062 B CN 105672062B
Authority
CN
China
Prior art keywords
pile
construction method
subgrade
bent cap
roadbed body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610063462.7A
Other languages
Chinese (zh)
Other versions
CN105672062A (en
Inventor
陈侃
黄波
黄健平
丁静
杨恒艳
韩磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Design Group Co Ltd
Original Assignee
Design Group Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Design Group Ltd By Share Ltd filed Critical Design Group Ltd By Share Ltd
Priority to CN201610063462.7A priority Critical patent/CN105672062B/en
Publication of CN105672062A publication Critical patent/CN105672062A/en
Application granted granted Critical
Publication of CN105672062B publication Critical patent/CN105672062B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B25/00Tracks for special kinds of railways
    • E01B25/08Tracks for mono-rails with centre of gravity of vehicle above the load-bearing rail
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B1/00Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
    • E01B1/002Ballastless track, e.g. concrete slab trackway, or with asphalt layers
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B25/00Tracks for special kinds of railways
    • E01B25/08Tracks for mono-rails with centre of gravity of vehicle above the load-bearing rail
    • E01B25/10Mono-rails; Auxiliary balancing rails; Supports or connections for rails

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)

Abstract

The invention discloses a kind of Straddle type monorail support rail system and its construction method, the support rail system includes:Track girder is installed on roadbed body, the bottom layer of subgrade being layed on roadbed body, the bedding top layer being layed on bottom layer of subgrade, the pile being embedded in roadbed body and bottom layer of subgrade and the bent cap for being arranged at pile top, bent cap.It is beneficial in that:The Straddle type monorail support rail system of the present invention uses the support rail system that roadbed body is combined with pile, take full advantage of the supporting role of roadbed body between pile, the stress effect of road structure can be improved, compared to existing overhead system track girder, while single-line railway beam span is improved, overhead track girder, elevated structure bridge pier and basic material consumption are effectively reduced, structure stress is both improved, investment is saved again, with significant Social benefit and economic benefit.

Description

A kind of Straddle type monorail support rail system and its construction method
Technical field
The present invention relates to a kind of Straddle type monorail support rail system and its construction method, belong to technical field of transportation.
Background technology
With movement of population and economic development, China urban traffic congestion is on the rise, and transport structure is single, to environment shadow The problems such as ringing big is become increasingly conspicuous, and these traffic problems are solved at all, existing transport structure form must be just adjusted.And conduct The Monorail PC Track Girders of medium-heavy road traffic have the advantages that strong adaptability, noise are low, radius of turn is small, climbing capacity is strong, are symbols The traffic form of China's city demand is closed, with certain development prospect.Single track support rail form is usually overhead form, with accounting for Ground area is small, the advantages of can make full use of city space, good visual effect, but overhead track beam span it is smaller, basic and Bridge pier quantity is more, and quantities is big, and cost is higher, it is therefore necessary to carry out technological improvement.
The content of the invention
To solve the deficiencies in the prior art, it is an object of the invention to provide a kind of Straddle type monorail support rail system and its apply Work method, can effectively reduce overhead track girder, elevated structure bridge pier and basis while single-line railway beam span is improved Material usage.
In order to realize above-mentioned target, the present invention is adopted the following technical scheme that:
The present invention discloses a kind of Straddle type monorail support rail system first, including:Roadbed body, it is layed on roadbed body Bottom layer of subgrade, the bedding top layer being layed on bottom layer of subgrade, the pile that is embedded in roadbed body and bottom layer of subgrade and set It is placed on the bent cap on pile top, the bent cap and track girder is installed.
Preferably, foregoing pile is steel-pipe pile, and the bent cap is made up of shaped steel.
It is highly preferred that foregoing pile is concrete-pile, the bent cap is made up of armored concrete.
More preferably, the section of foregoing roadbed body, bottom layer of subgrade and bedding top layer is trapezoidal.
In addition, the invention also discloses a kind of foregoing construction method of Straddle type monorail support rail system, for stake Post is steel-pipe pile, and bent cap is the support rail system of shaped steel, is comprised the following steps:
S1, roadbed body are filled:Carry out construction survey, setting-out and build to carry out cross section at sidewalk, basic body of first satisfying the need Overall with, it is longitudinal layered fill, complete one layer and unload after soil, coordinated with bull-dozer land leveller to fill out paving pave it is smooth, then Carry out watering and dry work, then be compacted with vibrated roller, be finally to carry out road surface, side slope re-shaping exercise;
S2, bottom layer of subgrade construction:Construction method is identical with the construction method that roadbed body is filled;
S3, pile construction:Directly steel-pipe pile is squeezed into roadbed body surface, and pile top is fixedly connected with bent cap, The bent cap is that two shaped steel are connected and composed by Interal fixation;
S4, the construction of bedding top layer:Construction method is identical with the construction method that roadbed body is filled;
S5, the progress attachment rail beam on bent cap, the track girder are steel box-girder form.
And be concrete-pile for pile, bent cap is the support rail system of armored concrete, is comprised the following steps:
S1, roadbed body are filled:Carry out construction survey, setting-out and build to carry out cross section at sidewalk, basic body of first satisfying the need Overall with, it is longitudinal layered fill, complete one layer and unload after soil, coordinated with bull-dozer land leveller to fill out paving pave it is smooth, then Carry out watering and dry work, then be compacted with vibrated roller, be finally to carry out road surface, side slope re-shaping exercise;
S2, bottom layer of subgrade construction:Construction method is identical with the construction method that roadbed body is filled;
S3, pile construction:Pile is concrete-pile, squeezes into steel pile casting, drilling, descending reinforcing cage, pours a diameter of 1.0m's Concrete-pile rod structure, it is reserved connect a batch reinforcing bar, in pile top cast-in-situ steel reinforced concrete bent cap;
S4, the construction of bedding top layer:Construction method is identical with the construction method that roadbed body is filled;
S5, the progress attachment rail beam on bent cap, the track girder are steel box-girder form.
The present invention is advantageous in that:The Straddle type monorail support rail system of the present invention is mutually tied using roadbed body with pile The support rail system of conjunction, takes full advantage of the supporting role of roadbed body between pile, can improve the stress effect of road structure, phase Than existing overhead system track girder, while single-line railway beam span is improved, overhead track girder, overhead knot are effectively reduced Structure bridge pier and basic material consumption, both improve structure stress, and investment is saved again, with significant social benefit and economic effect Benefit.
Brief description of the drawings
Fig. 1 is a kind of structural representation of Straddle type monorail support rail system of the present invention.
The implication of reference in figure:1st, roadbed body, 2, bottom layer of subgrade, 3, pile, 4, bent cap, 5, bedding top layer, 6, Track girder.
Embodiment
Make specific introduce to the present invention below in conjunction with the drawings and specific embodiments.
Referring to Fig. 1, Straddle type monorail support rail system of the invention includes:Roadbed body 1, it is layed on roadbed body 1 Bottom layer of subgrade 2, the bedding top layer 5 being layed on bottom layer of subgrade 2, the pile 3 being embedded in roadbed body 1 and bottom layer of subgrade 2 with And the bent cap 4 on the top of pile 3 is arranged at, the section of roadbed body 1, bottom layer of subgrade 2 and bedding top layer 5 is trapezoidal, in bent cap 4 On track girder 6 is installed.In practice of construction, pile 3 is steel-pipe pile or concrete-pile, and bent cap 4 is accordingly by shaped steel or reinforcing bar Concrete is made.
In order to preferably implement the present invention, the construction method of the Straddle type monorail support rail system is also disclosed, is specifically included Following steps:
S1, roadbed body 1 are filled:Carry out progress at construction survey, setting-out and build sidewalk, basic body of first satisfying the need 1 cross-section Face overall with, it is longitudinal layered fill, complete one layer and unload after soil, coordinated with bull-dozer land leveller to fill out paving pave it is smooth, so Watering is carried out afterwards and dries work, then is compacted with vibrated roller, is finally to carry out road surface, side slope re-shaping exercise;Work above Inspected for acceptance into rear by standard inspection, it is substandard to do up on request until qualified.
S2, bottom layer of subgrade 2 are constructed:Construction method is identical with the construction method that roadbed body 1 is filled, and is a difference in that bedding Degree of compaction standard is higher;
S3, pile 3 are constructed:Two schemes construction can be divided into,(1), directly squeeze into steel-pipe pile on the surface of roadbed body 1, and The top of pile 3 is set to be fixedly connected with bent cap 4, bent cap 4 is that two shaped steel are connected and composed by Interal fixation;(2), pile 3 be Concrete-pile, squeezes into steel pile casting, drilling, descending reinforcing cage, the structure of concrete pile 3 for pouring a diameter of 1.0m, reserved connects a batch steel Muscle, in the top cast-in-situ steel reinforced concrete bent cap 4 of pile 3;
S4, bedding top layer 5 are constructed:Construction method is identical with the construction method that roadbed body 1 is filled;
S5, the progress attachment rail beam 6 on bent cap 4, the track girder 6 is steel box-girder form.
To sum up, Straddle type monorail support rail system of the invention uses the support rail system that roadbed body 1 is combined with pile 3, The supporting role of 3 roadbed bodies 1 of pile is taken full advantage of, the stress effect of road structure can be improved, compared to existing height Posture track girder 6, while single-line railway 6 span of beam is improved, effectively reduces overhead track girder 6, elevated structure bridge pier And basic material consumption, structure stress is both improved, investment is saved again, with significant Social benefit and economic benefit.
The basic principles, principal features and advantages of the present invention have been shown and described above.The technical staff of the industry should Understand, the invention is not limited in any way for above-described embodiment, it is all to be obtained by the way of equivalent substitution or equivalent transformation Technical scheme, all falls within protection scope of the present invention.

Claims (2)

1. a kind of construction method of Straddle type monorail support rail system, it is characterised in that the Straddle type monorail support rail system includes: Roadbed body, the bottom layer of subgrade being layed on roadbed body, the bedding top layer being layed on bottom layer of subgrade, it is embedded in roadbed body With the pile in bottom layer of subgrade and it is arranged on the bent cap on pile top, the bent cap track girder is installed;The roadbed sheet The section of body, bottom layer of subgrade and bedding top layer is trapezoidal;The pile is steel-pipe pile, and the bent cap is made up of shaped steel;
Construction method comprises the following steps:
S1, roadbed body are filled:Carry out construction survey, setting-out and build sidewalk, carry out at basic body of first satisfying the need cross section overall with, It is longitudinal layered to fill, complete one layer and unload after soil, coordinate land leveller pave smooth to filling out paving with bull-dozer, then spilt Water drying work, then be compacted with vibrated roller, it is finally to carry out road surface, side slope re-shaping exercise;
S2, bottom layer of subgrade construction:Construction method is identical with the construction method that roadbed body is filled;
S3, pile construction:Directly steel-pipe pile is squeezed into roadbed body surface, and pile top is fixedly connected with bent cap, it is described Bent cap is that two shaped steel are connected and composed by Interal fixation;
S4, the construction of bedding top layer:Construction method is identical with the construction method that roadbed body is filled;
S5, the progress attachment rail beam on bent cap, the track girder are steel box-girder form.
2. a kind of construction method of Straddle type monorail support rail system, it is characterised in that the Straddle type monorail support rail system includes: Roadbed body, the bottom layer of subgrade being layed on roadbed body, the bedding top layer being layed on bottom layer of subgrade, it is embedded in roadbed body With the pile in bottom layer of subgrade and it is arranged on the bent cap on pile top, the bent cap track girder is installed;The roadbed sheet The section of body, bottom layer of subgrade and bedding top layer is trapezoidal;The pile is concrete-pile, and the bent cap is by armored concrete system Into;
Construction method comprises the following steps:
S1, roadbed body are filled:Carry out construction survey, setting-out and build sidewalk, carry out at basic body of first satisfying the need cross section overall with, It is longitudinal layered to fill, complete one layer and unload after soil, coordinate land leveller pave smooth to filling out paving with bull-dozer, then spilt Water drying work, then be compacted with vibrated roller, it is finally to carry out road surface, side slope re-shaping exercise;
S2, bottom layer of subgrade construction:Construction method is identical with the construction method that roadbed body is filled;
S3, pile construction:Pile is concrete-pile, squeezes into steel pile casting, drilling, descending reinforcing cage, the coagulation for pouring a diameter of 1.0m Native pile structure, it is reserved connect a batch reinforcing bar, in pile top cast-in-situ steel reinforced concrete bent cap;
S4, the construction of bedding top layer:Construction method is identical with the construction method that roadbed body is filled;
S5, the progress attachment rail beam on bent cap, the track girder are steel box-girder form.
CN201610063462.7A 2016-01-29 2016-01-29 A kind of Straddle type monorail support rail system and its construction method Active CN105672062B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610063462.7A CN105672062B (en) 2016-01-29 2016-01-29 A kind of Straddle type monorail support rail system and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610063462.7A CN105672062B (en) 2016-01-29 2016-01-29 A kind of Straddle type monorail support rail system and its construction method

Publications (2)

Publication Number Publication Date
CN105672062A CN105672062A (en) 2016-06-15
CN105672062B true CN105672062B (en) 2017-09-15

Family

ID=56303830

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610063462.7A Active CN105672062B (en) 2016-01-29 2016-01-29 A kind of Straddle type monorail support rail system and its construction method

Country Status (1)

Country Link
CN (1) CN105672062B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106283972B (en) * 2016-09-15 2017-10-31 中铁第四勘察设计院集团有限公司 Medium-and low-speed maglev traffic engineering single line embankment location pile foundation combined type support rail girder construction
CN106283969B (en) * 2016-09-15 2017-11-17 中铁第四勘察设计院集团有限公司 Medium-and low-speed maglev traffic engineering two-wire excavation location independence pier stud type support rail girder construction
CN106283966B (en) * 2016-09-15 2018-01-02 中铁第四勘察设计院集团有限公司 Medium-and low-speed maglev single line embankment location independence pier stud type support rail beam transition section structure
CN106283968B (en) * 2016-09-15 2017-10-31 中铁第四勘察设计院集团有限公司 Medium-and low-speed maglev two-wire embankment location pile foundation is combined framing type support rail girder construction
CN109720985A (en) * 2019-01-28 2019-05-07 上海隧道工程有限公司 Track bearing system and construction method for gantry crane operation

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2052007C1 (en) * 1988-02-29 1996-01-10 Петр Степанович Лобов Railway track and method for its construction
CN201713742U (en) * 2010-05-14 2011-01-19 中铁第一勘察设计院集团有限公司 Buried type continuous pile-board structure
CN201924250U (en) * 2011-01-30 2011-08-10 中铁第四勘察设计院集团有限公司 Pile foundation for treating railway short-embankment deep and thick soft soil groundwork
CN102425082A (en) * 2011-09-09 2012-04-25 中铁二院工程集团有限责任公司 Subgrade strengthening structure for highly karstified station turnout zone on high-speed railway
CN202323568U (en) * 2011-11-16 2012-07-11 中铁二院昆明勘察设计研究院有限责任公司 Pipe pile network/beam structure strengthening high-speed railway soft soil subgrade
CN202849876U (en) * 2012-09-01 2013-04-03 中铁二院工程集团有限责任公司 Overhead-type roadbed pile board structure for high speed railway
CN204000470U (en) * 2014-02-28 2014-12-10 中铁第四勘察设计院集团有限公司 The U-shaped waterproof construction of high stake

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2052007C1 (en) * 1988-02-29 1996-01-10 Петр Степанович Лобов Railway track and method for its construction
CN201713742U (en) * 2010-05-14 2011-01-19 中铁第一勘察设计院集团有限公司 Buried type continuous pile-board structure
CN201924250U (en) * 2011-01-30 2011-08-10 中铁第四勘察设计院集团有限公司 Pile foundation for treating railway short-embankment deep and thick soft soil groundwork
CN102425082A (en) * 2011-09-09 2012-04-25 中铁二院工程集团有限责任公司 Subgrade strengthening structure for highly karstified station turnout zone on high-speed railway
CN202323568U (en) * 2011-11-16 2012-07-11 中铁二院昆明勘察设计研究院有限责任公司 Pipe pile network/beam structure strengthening high-speed railway soft soil subgrade
CN202849876U (en) * 2012-09-01 2013-04-03 中铁二院工程集团有限责任公司 Overhead-type roadbed pile board structure for high speed railway
CN204000470U (en) * 2014-02-28 2014-12-10 中铁第四勘察设计院集团有限公司 The U-shaped waterproof construction of high stake

Also Published As

Publication number Publication date
CN105672062A (en) 2016-06-15

Similar Documents

Publication Publication Date Title
CN105672062B (en) A kind of Straddle type monorail support rail system and its construction method
CN205205635U (en) Stride footpath bailey frame steel suspension bridge structure greatly
CN207314069U (en) A kind of Bridgehead by Blastig structure backfilled using EPS and solidified fly ash combination
CN107245912B (en) A kind of Foam lightweight soil railway bed structure and engineering method
CN103334357A (en) Viaduct road embankment structure with lower pile foundation bearing platform extending in roadbed, and construction method
CN105887586A (en) Low implantation line double-wire section terminal spine type bearing rail beam limiting structure in medium and low speed magnetic levitation transportation engineering
CN106835880A (en) Highway lateral support type peg board formula is without earth roadbed
CN202247575U (en) Structure for strengthening roadbed in high-speed railway station turnout area with highly developed karst
CN206956481U (en) A kind of town road local stiffening structure
CN105926380A (en) Limiting structure between terminal spine type rail bearing beam joints of single-line segment for medium-low-speed magnetic levitation traffic engineering low-arranged line
CN203334154U (en) Embankment structure for preventing bearing platform of pile foundation from stretching in roadbed under viaduct
CN107700299A (en) A kind of elevated bridge lower floor road structure and its construction method
CN107642109A (en) A kind of town road heavy well cover walling crib ruggedized construction and its construction method
CN208415020U (en) A kind of roadbed composite structure
CN204676593U (en) A kind of superelevation overall steel-plastic Geogrid Reinforced Soil abutment wall-retaining structure
CN206328641U (en) A kind of filling plate-type ballastless track of use emulsified asphalt slurry
CN103603263B (en) Railway Prestressed Concrete trough girder partial cable-stayed bridge
CN207347861U (en) Prefabricated reinforced concrete roadbed
CN202081383U (en) Temporary support used in construction striding over existing line bridge
CN207228166U (en) A kind of town road heavy well cover walling crib ruggedized construction
CN209636588U (en) A kind of inside has the reinforcement subgrade and pavement of geotechnological water-permeable pipe
CN206941328U (en) Prevent the bridge paving structure that pave-load layer ftractures at Steel Continuous Box beam bridge central bearing point
CN207597177U (en) A kind of elevated bridge lower floor road structure
CN207484194U (en) A kind of seamless road surface of assembling beam and slab type
CN207760837U (en) A kind of device measuring the sedimentation of highway filled-up ground

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 210014 Ziyun Road, Qinhuai District, Jiangsu, No. 9, No.

Applicant after: CHINA DESIGN GROUP Co.,Ltd.

Address before: 210014 Ziyun Road, Qinhuai District, Jiangsu, No. 9, No.

Applicant before: Jiangsu Provincial Communications Planning and Design Institute Co.,Ltd.

COR Change of bibliographic data
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 210014 No. 9, Ziyun Avenue, Qinhuai District, Jiangsu, Nanjing

Patentee after: China Design Group Co.,Ltd.

Address before: 210014 No. 9, Ziyun Avenue, Qinhuai District, Jiangsu, Nanjing

Patentee before: CHINA DESIGN GROUP Co.,Ltd.

CP01 Change in the name or title of a patent holder