CN105666146B - The U-shaped ring automatic assembly line of electric armour clamp and its production technology - Google Patents

The U-shaped ring automatic assembly line of electric armour clamp and its production technology Download PDF

Info

Publication number
CN105666146B
CN105666146B CN201610122647.0A CN201610122647A CN105666146B CN 105666146 B CN105666146 B CN 105666146B CN 201610122647 A CN201610122647 A CN 201610122647A CN 105666146 B CN105666146 B CN 105666146B
Authority
CN
China
Prior art keywords
automatic
workpiece
shaped ring
assembly line
armour clamp
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610122647.0A
Other languages
Chinese (zh)
Other versions
CN105666146A (en
Inventor
黎汉昌
刘志全
黎敏杰
黎兴文
杨军华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Chengyu Engineering Consulting And Supervision Co ltd
Foshan Power Supply Bureau of Guangdong Power Grid Corp
Original Assignee
Guangdong Anthen Iron Tower & Steel Structure Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Anthen Iron Tower & Steel Structure Co Ltd filed Critical Guangdong Anthen Iron Tower & Steel Structure Co Ltd
Priority to CN201610122647.0A priority Critical patent/CN105666146B/en
Publication of CN105666146A publication Critical patent/CN105666146A/en
Application granted granted Critical
Publication of CN105666146B publication Critical patent/CN105666146B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P23/00Machines or arrangements of machines for performing specified combinations of different metal-working operations not covered by a single other subclass
    • B23P23/06Metal-working plant comprising a number of associated machines or apparatus

Landscapes

  • Physics & Mathematics (AREA)
  • Optics & Photonics (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Forging (AREA)

Abstract

The invention discloses a kind of U-shaped ring automatic assembly line of electric armour clamp and its production technologies, its production line includes sequentially connected automatic sawing machine, automatic charging device, first intermediate-frequency heating furnace, cross wedge rolling machine, forging equipment, first stamping equipment, second stamping equipment, second intermediate-frequency heating furnace, third stamping equipment and storage tank, pass through blanking, heating, roll embryo, molding, trimming, the production technology of drilling and bending, realize U-shaped ring high-volume automatic assembly line processing, it is low to solve the U-shaped ring production efficiency of existing electric armour clamp, large labor intensity, it is big to produce noise, utilization rate of raw materials is low, energy consumption height and the low problem of Product Precision.

Description

The U-shaped ring automatic assembly line of electric armour clamp and its production technology
Technical field
The present invention relates to the U-shaped ring processing technique fields of electric armour clamp, and in particular to a kind of U-shaped ring of electric armour clamp produces automatically Line and its production technology.
Background technique
It needing during power Transmission using a large amount of electric armour clamp, U-shaped ring is the electric armour clamp that wherein demand is most, Therefore need U-shaped ring that there is mass production technique.The production technology of the U-shaped ring of domestic electrical fitting is generally very backward at present, Embryo processed mainly uses jumping-up and dead man, and since the workpiece blank precision of both techniques processing is not high, heating uses briquet stove heating Energy consumption is high for low efficiency, while both ends need to heat respectively, jumping-up, molding, low, large labor intensity that there are production efficiencys, production noise Greatly, the problems such as utilization rate of raw materials is low, energy consumption is high low with Product Precision.Therefore current domestic existing U-shaped ring overall manufacturing technique Level can not be promoted, and production and processing method low efficiency, production product quality is bad, production economy benefit is low, not adapt to market Demand.
Summary of the invention
The object of the present invention is to provide a kind of U-shaped ring automatic assembly line of electric armour clamp and its production technologies, solve existing electricity The U-shaped ring production efficiency of power fitting is low, large labor intensity, production noise is big, utilization rate of raw materials is low, energy consumption is high low with Product Precision The problem of.
The technical solution adopted by the present invention to solve the technical problems is: a kind of U-shaped ring automatic assembly line of electric armour clamp, packet Include sequentially connected automatic sawing machine, automatic charging device, the first intermediate-frequency heating furnace, cross wedge rolling machine, forging equipment, the first punching press are set Standby, the second stamping equipment, the second intermediate-frequency heating furnace, third stamping equipment and storage tank, the first intermediate-frequency heating furnace setting There is material storing box, and the front and back end of first intermediate-frequency heating furnace is respectively equipped with automatic feeder and automatic feeding.
A kind of production technology of the U-shaped ring automatic assembly line of electric armour clamp, it is characterised in that include the following steps:
1) sorting calculates U-shaped ring hangers maximum cross-section area according to the developed dimension of product, and embryo size, then root are rolled in determination According to the cross wedge rolling contraction percentage of area for rolling embryo, the outer diameter and length of raw material are determined;
2) mold design designs U-shaped ring both-end one-off hole-piercing mould according to the developed dimension of product, and piercing die has automatic Stripper according to raw material size and rolls embryo size, calculates the main technologic parameters of U-shaped looping mill rolling mould, according to rolling embryo, end product rule Very little and smithing technological parameter designs U-shaped ring both-end one-pass molding mould, and shaping mould has automatic releasing device;
3) blanking selects automatic sawing machine blanking, and is delivered to automatic charging device material storing box through automatic delivering belt;
4) it heats, when selecting the heating of intermediate-frequency heating furnace according to the mill speed of cross wedge rolling and the weight of raw material first Between, raw material are sent into the first intermediate-frequency heating furnace using automatic charging device and automatic feeder;
5) embryo is rolled, the workpiece after heating is pushed into cross wedge rolling machine, the infrared inductor of cross wedge rolling machine by automatic feeding Start automatic rolling after being connected to signal;
6) it forms, the workpiece after rolling is delivered to forging equipment through automatic delivering belt, and workpiece realizes that both-end is once forged into Type, both-end one-pass molding mould and automatic releasing device eject workpiece after molding;
7) trimming, workpiece after molding are delivered to the first stamping equipment through automatic delivering belt, cut overlap to workpiece implementation;
8) drilling, the workpiece after trimming are delivered to the second stamping equipment through automatic delivering belt, and both ends hangers is rushed in workpiece implementation Hole one-off hole-piercing, automatic releasing device eject the workpiece after punching;
9) it heats, the workpiece after drilling is delivered to the second intermediate-frequency heating furnace through automatic delivering belt, before implementing bending to workpiece Heating;
10) bending, the workpiece after heating are delivered to third stamping equipment through automatic delivering belt, according to product final size heat O ing, automatic releasing device eject the workpiece after bending, are delivered to storage tank through automatic delivering belt.
Preferably, the temperature that workpiece heats in the step 4) is 1150 ± 5 DEG C.
Preferably, the initial temperature that workpiece rolls in the step 5) is 1150 ± 5 DEG C, and finishing temperature is 1050 ± 5 DEG C.
Preferably, the initial forging temperature of workpiece is 1050 ± 5 DEG C in the step 6), and final forging temperature is 900 ± 5 DEG C.
Preferably, it is 850 DEG C~900 DEG C that the workpiece temperature to stamping equipment is sent in the step 7).
Preferably, the heating temperature before implementing bending in the step 9) to workpiece is 650 DEG C~900 DEG C.
The beneficial effects of the present invention are: can be used for the mass production of U-shaped ring, realize that production is energy-saving, produces comprehensively High-efficient, the good quality of production, good overall economic efficiency are provided with for the sound development that State Grid builds and try hard to keep Barrier.
Detailed description of the invention
Fig. 1 is the U-shaped ring automatic assembly line plan view of electric armour clamp.
Fig. 2 is the U-shaped ring product expanded view of electric armour clamp.
Fig. 3 is the U-shaped ring cross wedge rolling schematic illustration of electric armour clamp.
Fig. 4 is the U-shaped ring-rolling blank drawing of electric armour clamp.
Fig. 5 is the U-shaped ring both-end one-pass molding mould of electric armour clamp.
Fig. 6 is the U-shaped ring finished product figure of electric armour clamp.
1- automatic sawing machine, 2- automatic delivering belt, 3- automatic charging device, 4- automatic feeder, the first intermediate frequency of 5- in figure Heating furnace, 6- automatic feeding, 7- cross wedge rolling machine, 8- automatic delivering belt, 9- forging equipment, 10- automatic delivering belt, 11- One stamping equipment, 12.- automatic delivering belt, the second stamping equipment of 13-, 14- automatic delivering belt, the second intermediate-frequency heating furnace of 15-, 16- Automatic delivering belt, 17- third stamping equipment, 18- automatic delivering belt, 19- storage tank.
Specific embodiment
In order to which the technical problems, technical solutions and beneficial effects solved by the present invention is more clearly understood, below in conjunction with Attached drawing and embodiment, the present invention is further illustrated.It should be appreciated that embodiment described herein is used only for explaining this Invention, is not intended to limit the present invention.
As shown in Figure 1, a kind of U-shaped ring automatic assembly line of electric armour clamp of the present invention, including sequentially connected automatic sawing machine 1, Automatic charging device 3, the first intermediate-frequency heating furnace 5, cross wedge rolling machine 7, forging equipment 9, the first stamping equipment 11, the second stamping equipment 13, the second intermediate-frequency heating furnace 15, third stamping equipment 17 and storage tank 19, the first intermediate-frequency heating furnace 5 are provided with material storing box, and The front and back end of one intermediate-frequency heating furnace 5 is respectively equipped with automatic feeder 4 and automatic feeding 6;Automatic sawing machine 1 and automatic charging Between device 3, between cross wedge rolling machine 7 and forging equipment 9, between forging equipment and the first stamping equipment, the first stamping equipment and Between second stamping equipment, between the second stamping equipment and the second intermediate-frequency heating furnace, the second intermediate-frequency heating furnace and third punching press set It is connected respectively by automatic delivering belt (2,8,10,12,14,16,18) between standby, between third stamping equipment and storage tank.
As shown in Fig. 2, calculating U-shaped ring hangers maximum cross-section area according to the U-shaped ring product expanded view of electric armour clamp, determine Embryo size is rolled, further according to the cross wedge rolling contraction percentage of area for rolling embryo, determines the outer diameter and length of raw material.Simultaneously according to the exhibition of product Size is opened, U-shaped ring both-end one-off hole-piercing mould is designed, piercing die has automatic releasing device.
As shown in figure 3, figure 4 and figure 5, according to cross wedge rolling principle, raw material size and embryo size is rolled, calculates U-shaped looping mill rolling mould, Its main technologic parameters (contraction percentage of area, forming angle, limit broadening angle and rolled piece movement of the end), according to rolling embryo, end product rule Very little and smithing technological parameter designs U-shaped ring both-end one-pass molding mould, and shaping mould has automatic releasing device.
As shown in fig. 6, bending-forming mold is filled with automatic material separator according to U-shaped ring finished product work parameter designing U-shaped ring bending-forming mold It sets.
According to the process flow of above-mentioned automatic assembly line processing method, following procedure of processing is established:
1) blanking selects automatic sawing machine blanking, and is delivered to automatic charging device material storing box through automatic delivering belt.
2) it heats, when selecting the heating of intermediate-frequency heating furnace according to the mill speed of cross wedge rolling and the weight of raw material first Between, raw material are sent into intermediate-frequency heating furnace using automatic charging device and automatic feeder, workpiece is heated to 1150 ± 5 DEG C.
3) embryo is rolled, the workpiece after heating is pushed into cross wedge rolling machine, the infrared inductor of cross wedge rolling machine by automatic feeding Start automatic rolling after being connected to signal, workpiece rolls 1150 DEG C of initial temperature, 1050 DEG C of finishing temperature.
4) it forms, the workpiece after rolling is delivered to forging equipment through automatic delivering belt, and workpiece realizes that both-end is once forged into Type, 1050 DEG C of initial forging temperature, 900 DEG C of final forging temperature, both-end one-pass molding mould automatic releasing device ejects workpiece after molding.
5) trimming, workpiece after molding, are delivered to stamping equipment through automatic delivering belt, to work by 850 DEG C~900 DEG C of temperature Overlap is cut in part implementation.
6) drilling, the workpiece after trimming are delivered to stamping equipment through automatic delivering belt, and both ends hangers hole one is rushed in workpiece implementation Secondary punching, automatic releasing device eject the workpiece after punching.
7) it heats, the workpiece after drilling is delivered to intermediate-frequency heating furnace through automatic delivering belt, to adding before workpiece implementation bending Heat, 650 DEG C~900 DEG C of temperature.
8) bending, the workpiece after heating are delivered to stamping equipment through automatic delivering belt, according to product final size hot bending at Shape, automatic releasing device eject the workpiece after bending, are delivered to storage tank through automatic delivering belt.
Case study on implementation
The U-shaped link U-7 automatic assembly line processing method of example 1 is compared with substep processing method
The U-shaped link U-21S automatic assembly line processing method of example 2 is compared with substep is processed
By above-mentioned case study on implementation, automatic assembly line processing method has a clear superiority compared with substep processing method:
1) production efficiency improves 3~10 times.Cross wedge rolling produces 8~20 per minute, and die forging produces shaft forgings, needs multiple tracks Process produces 2~4 per minute.
2) service load is small, and die life is long.The service load of cross wedge rolling is die forging part to only point One of, so weight of equipment is small, die life is long.
3) stock utilization is high.The element precision of cross wedge rolling forming is high, the step close to right angle can be shaped, without overlap Loss, only material head are lost, and stock utilization improves 10%~25%.
4) noise is small.The noise of cross wedge rolling is less than 60dB, and the noise of die forging is greater than 100dB etc..
5) equipment investment and operator reduce 60%.Cross wedge rolling is not only high-efficient, and production is full-automatic.Equipment and people Member reduces 60% or so.
6) production cost averagely declines 30% or so.Due to section material, people, high-efficient etc. are saved, production cost averagely declines 30% Left and right.
The foregoing is merely presently preferred embodiments of the present invention, is not intended to limit the invention, it is all in spirit of the invention and Made any modifications, equivalent replacements and improvements within principle, should all fall within the scope and spirit of the invention.

Claims (6)

1. a kind of U-shaped ring automatic assembly line of electric armour clamp, including sequentially connected automatic sawing machine, automatic charging device, in first Frequency heating furnace, cross wedge rolling machine, forging equipment, the first stamping equipment, the second stamping equipment, the second intermediate-frequency heating furnace, third punching press Equipment and storage tank, first intermediate-frequency heating furnace are provided with material storing box, and the front and back end of first intermediate-frequency heating furnace point Not She You automatic feeder and automatic feeding, the production technology of the U-shaped ring automatic assembly line of electric armour clamp includes following step It is rapid:
1) sorting calculates U-shaped ring hangers maximum cross-section area according to the developed dimension of product, and embryo size is rolled in determination, further according to rolling The cross wedge rolling contraction percentage of area of embryo determines the outer diameter and length of raw material;
2) mold design designs U-shaped ring both-end one-off hole-piercing mould according to the developed dimension of product, and piercing die has automatic material separator Device according to raw material size and rolls embryo size, calculates the main technologic parameters of U-shaped looping mill rolling mould, according to roll embryo, finished size and Smithing technological parameter designs U-shaped ring both-end one-pass molding mould, and shaping mould has automatic releasing device;
3) blanking selects automatic sawing machine blanking, and is delivered to automatic charging device material storing box through automatic delivering belt;
4) it heats, first according to the heating time of the mill speed of cross wedge rolling and the weight of raw material selection intermediate-frequency heating furnace, benefit Raw material are sent into the first intermediate-frequency heating furnace with automatic charging device and automatic feeder;
5) embryo is rolled, the workpiece after heating is pushed into cross wedge rolling machine by automatic feeding, and the infrared inductor of cross wedge rolling machine is connected to Start automatic rolling after signal;
6) it forms, the workpiece after rolling is delivered to forging equipment through automatic delivering belt, and workpiece realizes forging molding of both-end, double End one-pass molding mould and automatic releasing device eject workpiece after molding;
7) trimming, workpiece after molding are delivered to the first stamping equipment through automatic delivering belt, cut overlap to workpiece implementation;
8) drilling, the workpiece after trimming are delivered to the second stamping equipment through automatic delivering belt, and both ends hangers hole one is rushed in workpiece implementation Secondary punching, automatic releasing device eject the workpiece after punching;
9) it heats, the workpiece after drilling is delivered to the second intermediate-frequency heating furnace through automatic delivering belt, to adding before workpiece implementation bending Heat;
10) bending, the workpiece after heating are delivered to third stamping equipment through automatic delivering belt, according to product final size hot bending at Shape, automatic releasing device eject the workpiece after bending, are delivered to storage tank through automatic delivering belt.
2. the U-shaped ring automatic assembly line of electric armour clamp according to claim 1, it is characterised in that: workpiece in the step 4) The temperature of heating is 1150 ± 5 DEG C.
3. the U-shaped ring automatic assembly line of electric armour clamp according to claim 1, it is characterised in that: workpiece in the step 5) The initial temperature of rolling is 1150 ± 5 DEG C, and finishing temperature is 1050 ± 5 DEG C.
4. the U-shaped ring automatic assembly line of electric armour clamp according to claim 1, it is characterised in that: workpiece in the step 6) Initial forging temperature be 1050 ± 5 DEG C, final forging temperature be 900 ± 5 DEG C.
5. the U-shaped ring automatic assembly line of electric armour clamp according to claim 1, it is characterised in that: sent in the step 7) to The workpiece temperature of stamping equipment is 850 DEG C~900 DEG C.
6. the U-shaped ring automatic assembly line of electric armour clamp according to claim 1, it is characterised in that: to work in the step 9) Heating temperature before part implementation bending is 650 DEG C~900 DEG C.
CN201610122647.0A 2016-03-04 2016-03-04 The U-shaped ring automatic assembly line of electric armour clamp and its production technology Active CN105666146B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610122647.0A CN105666146B (en) 2016-03-04 2016-03-04 The U-shaped ring automatic assembly line of electric armour clamp and its production technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610122647.0A CN105666146B (en) 2016-03-04 2016-03-04 The U-shaped ring automatic assembly line of electric armour clamp and its production technology

Publications (2)

Publication Number Publication Date
CN105666146A CN105666146A (en) 2016-06-15
CN105666146B true CN105666146B (en) 2019-02-26

Family

ID=56306766

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610122647.0A Active CN105666146B (en) 2016-03-04 2016-03-04 The U-shaped ring automatic assembly line of electric armour clamp and its production technology

Country Status (1)

Country Link
CN (1) CN105666146B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108356192B (en) * 2018-04-09 2019-09-20 清华大学 A kind of Integral die-forged method of railway frog
CN109227044A (en) * 2018-09-29 2019-01-18 河北博途仓储设备有限公司 Novel upright post for shelf processing technology
CN108971256A (en) * 2018-10-19 2018-12-11 四川西蜀电力金具集团有限公司 A kind of processing method of the U-shaped link of power equipment
CN111496162A (en) * 2020-05-06 2020-08-07 江苏中宇电力器材有限公司 Manufacturing process of U-shaped ring
CN111571235B (en) * 2020-05-12 2022-06-14 艾伯纳工业炉(太仓)有限公司 Metal plate's thermoforming production line

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10059545B4 (en) * 2000-11-30 2021-05-06 Schaeffler Technologies AG & Co. KG Process for the production of a lever-like cam follower and sheet metal blank in the form of a plate for forming a lever-like cam follower
CN103071746A (en) * 2012-08-22 2013-05-01 昌利锻造有限公司 Machining method for rear cylinder trunnion
CN102922291A (en) * 2012-11-26 2013-02-13 山东泰金精密成型制品有限公司 Joint production equipment for producing engine connecting rod finished products by round steel
CN102975028B (en) * 2012-11-30 2017-04-12 天津市天锻压力机有限公司 Production line for producing oil drill rod joint

Also Published As

Publication number Publication date
CN105666146A (en) 2016-06-15

Similar Documents

Publication Publication Date Title
CN105666146B (en) The U-shaped ring automatic assembly line of electric armour clamp and its production technology
CN104759850B (en) A kind of aluminium alloy height barrier part processing technique
CN201684773U (en) Die for forming disc type forging
CN104014996B (en) Aluminum alloy annular blank manufacturing method and backward extruding die
CN102527897A (en) Forging method for thin-walled step short sleeve type main shaft flange of water turbine
CN102672096A (en) Precision die forging and shaping technical method for automobile steering knuckle rough type parts
CN102240772A (en) Forming method of single throw crankshaft forgings
CN104697338B (en) The automatic feeder of forging press intermediate frequency furnace
CN110479938A (en) The forging and molding mold and manufacturing process of flanged ball valve forging
CN104139279A (en) Manufacturing process for inner-trapezoid-groove ring piece
CN102225449A (en) Method for forging manganese-containing stainless steel ingot
CN104815936A (en) Forge forming method and special mold for fork type pieces such as high reinforcing bars and thin web plates
CN109663875B (en) Forging process for die pressing groove of groove ring
CN106040944B (en) A kind of light-duty slip yoke forging mold and its combined forging technique
CN105964846B (en) A kind of manufacturing process of hollow double wedge forging
CN207508018U (en) The reshaping device of heavily loaded elastic clip product
CN107414001A (en) Especially big Type Titanium Alloy propeller hub forging substep forging forming method
CN204504131U (en) Forging press pay-off
CN108620519B (en) A kind of high-alloy steel ultra-wide slab six sides forging operating method
CN107214283A (en) The H profile steel manufacture mould of nuclear fusion stack magnet support
CN109834208A (en) The top cover forging method of nuclear pressure container
CN111167983B (en) Forging process of large cake forging with center hole and conical surface
CN101722270A (en) Wind driven generator principal shaft molding technique
CN210817239U (en) Corrugated ring forming die for nuclear power reactor internals
CN106623740A (en) Method for manufacturing automobile front shaft through upsetting and correcting technology

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Li Hanchang

Inventor after: Liu Zhiquan

Inventor after: Li Minjie

Inventor after: Li Xingwen

Inventor after: Yang Junhua

Inventor before: Li Hanchang

Inventor before: Liu Zhiquan

Inventor before: Li Minjie

Inventor before: Li Xingwen

Inventor before: Yang Junhua

CB02 Change of applicant information

Address after: 528000 Fumin Third Road West, Guanyao Hongsha High-tech Zone, Shishan Town, Nanhai District, Foshan City, Guangdong Province

Applicant after: GUANGDONG ANTHEN IRON TOWER & STEEL STRUCTURE Co.,Ltd.

Address before: 528000 west side of langbao Road, Chengxi Industrial Development Zone, Chancheng District, Foshan, Guangdong, China

Applicant before: GUANGDONG ANTHEN IRON TOWER & STEEL STRUCTURE Co.,Ltd.

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20191105

Address after: 528000 Guangdong Province Nanhai District of Foshan City Shishan town kiln Red Sand Road West (Foshan high tech Zone Three Fumin huaibo science and Technology Industrial Co., Ltd.) by 1

Co-patentee after: FOSHAN POWER SUPPLY BUREAU OF GUANGDONG POWER GRID Co.,Ltd.

Patentee after: GUANGDONG ANTHEN IRON TOWER & STEEL STRUCTURE Co.,Ltd.

Address before: 528000 Guangdong Province Nanhai District of Foshan City Shishan town kiln Red Sand Road West (Foshan high tech Zone Three Fumin huaibo science and Technology Industrial Co., Ltd.) by 1

Patentee before: GUANGDONG ANTHEN IRON TOWER & STEEL STRUCTURE Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230718

Address after: 528000 Floor 12-13, No. 7, Guicheng South 3rd Road, Nanhai District, Foshan City, Guangdong Province (residence declaration)

Patentee after: Guangdong Chengyu Engineering Consulting and Supervision Co.,Ltd.

Patentee after: FOSHAN POWER SUPPLY BUREAU OF GUANGDONG POWER GRID Co.,Ltd.

Address before: 528000 Fumin Third Road West, Guanyao Hongsha High-tech Zone, Shishan Town, Nanhai District, Foshan City, Guangdong Province

Patentee before: GUANGDONG ANTHEN IRON TOWER & STEEL STRUCTURE Co.,Ltd.

Patentee before: FOSHAN POWER SUPPLY BUREAU OF GUANGDONG POWER GRID Co.,Ltd.