CN105652931B - Transformer station's armouring central switch cabinet intelligent regulating system and its adjusting method - Google Patents

Transformer station's armouring central switch cabinet intelligent regulating system and its adjusting method Download PDF

Info

Publication number
CN105652931B
CN105652931B CN201610189303.1A CN201610189303A CN105652931B CN 105652931 B CN105652931 B CN 105652931B CN 201610189303 A CN201610189303 A CN 201610189303A CN 105652931 B CN105652931 B CN 105652931B
Authority
CN
China
Prior art keywords
temperature
air
dehumidifying
setting valve
switch cabinet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610189303.1A
Other languages
Chinese (zh)
Other versions
CN105652931A (en
Inventor
叶秋诗
汪年斌
叶宏
倪汇川
夏宗杰
权运良
曾伟华
申磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Qihai Intelligent Control Technology Co ltd
State Grid Anhui Comprehensive Energy Service Co.,Ltd. Tongling Branch
Tongling Power Supply Co of State Grid Anhui Electric Power Co Ltd
Original Assignee
Anhui Seven Sea Intelligent Control Technology Co Ltd
Tongling Power Supply Co of State Grid Anhui Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Seven Sea Intelligent Control Technology Co Ltd, Tongling Power Supply Co of State Grid Anhui Electric Power Co Ltd filed Critical Anhui Seven Sea Intelligent Control Technology Co Ltd
Priority to CN201610189303.1A priority Critical patent/CN105652931B/en
Publication of CN105652931A publication Critical patent/CN105652931A/en
Application granted granted Critical
Publication of CN105652931B publication Critical patent/CN105652931B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05DSYSTEMS FOR CONTROLLING OR REGULATING NON-ELECTRIC VARIABLES
    • G05D27/00Simultaneous control of variables covered by two or more of main groups G05D1/00 - G05D25/00
    • G05D27/02Simultaneous control of variables covered by two or more of main groups G05D1/00 - G05D25/00 characterised by the use of electric means

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Drying Of Gases (AREA)

Abstract

The present invention relates to transformer station's armouring central switch cabinet intelligent regulating system and its adjusting method, including host apparatus, input channel and output channel, the host apparatus includes casing and the temp and humidity regulator in casing, the casing is provided with air-in and air-out, the air-in is connected by input channel with the air output end of armouring central switch cabinet, and the air-out is connected by output channel with the air input of armouring central switch cabinet.The present invention has dehumidifying, temperature adjustment and prevents the filthy function of electrical equipment, aspirates wet, hot-air in switch cubicle by sealing pipeline and is dehumidified, temperature control and removes the filth in cabinet in air, conscientiously raising safe operation of electric network reliability.

Description

Transformer station's armouring central switch cabinet intelligent regulating system and its adjusting method
Technical field
The present invention relates to switch cubicle dehumidifying technology field, and in particular to transformer station's armouring central switch cabinet intelligent regulating system And its adjusting method.
Background technology
Transformer station's armouring central switch cabinet belongs to high voltage distribution installation, by bus, connection row, dolly, open circuit in its cabinet The part such as device and disconnecting link and control protective unit is set up and is divided into each electrical separation cell by steel plate, insulating part, for converging Collection, distribution electric energy and detection and automatic excision failure etc., are transformer station, the important component of generating plant stand.Made at present Armouring central switch cabinet is compact to design, and alternate and its distance to the ground is small, and each part insulation, cooling requirements are high, insulation and moisture, Dust-proof and cooling never obtains essence solution, and armouring central switch cabinet has problems with:1st, armouring central switch cabinet The actual conditions such as interior generation short circuit, ground connection or electric discharge flashover happen occasionally, and have developed to the degree of replacing cabinet interior insulation part comprehensively, Humidity directly jeopardizes electrical equipment safe operation.2nd, the electronic equipment such as protection, observing and controlling in armouring central switch cabinet operation ring Border temperature is too high and busbar junction, the part of switch contact are radiated and the spring of operating mechanism is overheated(Supercooling)Generation elasticity Change causes contact is compressed and opening velocity changes etc., and high temperature equally also directly jeopardizes electrical equipment safe operation.3rd, use Industrial dehumidifier dehumidifies to switch gear room, and the moisture in switch cubicle is difficult to remove, during industrial dehumidifier summer operation, dry-air blast outlet temperature Degree is up to 53 DEG C or so, and fuel factor caused by accumulation can make in-cabinet temperature locally rise, in-cabinet temperature can be made more to raise.4th, part Power supply enterprise installs air conditioner dehumidification cooling in switch gear room, and the divulging information of switch gear room wall bottom, explosion-proof glazing are closed.Work as cabinet During interior generation short trouble, institute discharges with the huge energy occurred, will be leaked release by switching chamber ventilated, explosion proof window, directly Meet operational outfit or the staff jeopardized outside window.
The content of the invention
It is an object of the invention to provide a kind of transformer station's armouring central switch cabinet intelligent regulating system with being put out in armouring The system and its adjusting method of cabinet composition are closed, with dehumidifying, temperature control, dust-proof and dedusting function, is opened by sealing pipeline suction Close wet, hot in cabinet and dehumidified containing dusty air, temperature control, dust-proof and air cleaning, realize in armouring central switch cabinet electric Equipment safety reliability service.
To achieve the above object, present invention employs following technical scheme:
Transformer station's armouring central switch cabinet intelligent regulating system, including host apparatus, input channel and output channel, it is described Host apparatus includes casing and the temp and humidity regulator in casing, and the casing is defeated provided with air-in and air Outlet, the air-in is connected by input channel with the air output end at the top of armouring central switch cabinet, institute Air-out is stated by output channel with the air input positioned at armouring central switch cabinet bottom to be connected.
Led provided with air cleaning moist chamber, the inner circulating air being connected with air cleaning moist chamber the inside of the casing Flow chamber, the collection chamber being connected with inner circulating air diversion chamber and the dry and cold purification air output room being connected with collection chamber, institute The bottom that air-in and air-out are located at casing is stated, and air-in is connected with the air cleaning moist chamber Logical, air-out is connected with the dry and cold purification air output room.
The temp and humidity regulator includes the dehydrating unit being located in the air cleaning moist chamber and located at the collection Enter centrifugal blower provided with interior circulation pair in air chamber, the interior circulation pair enters the air outlet and the dry and cold purification air of centrifugal blower The air inlet of output room is connected.
The dehydrating unit includes the double air intake centrifugal blower fans of dehumidifying, dehumidifier and dehumidifying compressor, the double air intakes of the dehumidifying The air inlet of centrifugal blower is corresponding with air-in, and its air outlet is connected with the air inlet of the dehumidifier.
Cleaning filtration screen of air is provided with the air cleaning moist chamber, the cleaning filtration screen of air is insertion with casing Formula is connected.
The dehumidifier includes condenser and evaporator, and the air inlet of the condenser is removed by blower fan kuppe with described The air outlet of wet pair of air intake centrifugal blower fan is connected, and the lower section of the dehumidifier is provided with condensed water water-collecting tray.
The first board-like sensible heat exchanger is provided between the air cleaning moist chamber and inner circulating air diversion chamber, it is described interior The second board-like sensible heat exchanger is provided between circulation air diversion chamber and collection chamber.
The casing be divided into above and below two layers, the dry and cold purification air output room and air cleaning moist chamber are located at casing Lower floor, the inner circulating air diversion chamber is located at the right side in casing and adjacent with the collection chamber and air cleaning moist chamber Closely.
Air cooling axial flow blower is equipped with front side of the first board-like sensible heat exchanger and the second board-like sensible heat exchanger, its Rear side is equipped with air intake louver.
Water atomization plant is equipped with the air intake louver and on the inside of air cooling axial flow blower.
Temperature sensor and humidity sensor are mounted in the collection chamber and air-in;The dehumidifying compressor Pressure piping and low pressure pipeline on be mounted on high and low pressure protection sensor, the dehumidifying compressor is close to compressor air-discharging Mounting temperature sensor on pressure piping near mouthful;TEMP is respectively mounted on the hydrophilic aluminium foil fin of the dehumidifier Device.
A kind of transformer station's armouring central switch cabinet intelligent adjusting method, comprises the following steps:
(A)Start, the double air intake centrifugal blower fans of interior circulation are by the crawl frequency startup optimization adjusted, air cooling axial flow blower With the double air intake centrifugal blower fans of dehumidifying by frequency startup optimization is adjusted, dehumidify compressor start power frequency operation, power frequency operation after 180 seconds First setting time makes to enter automatic control state after air is fully circulated in armouring central switch cabinet;
(B)Into after automatic control state, the temperature and relative humidity in host apparatus installed in air-in position is examined The air epidemic disaster extracted out in armouring central switch cabinet is surveyed, setting valve is stopped when Air Temperature, humidity value are respectively lower than the first temperature When stopping setting valve with the first humidity, then host apparatus enters resting state;When Air Temperature, humidity value respectively reach second temperature When setting valve and the second humidity setting valve, then double air intake centrifugal wind that dehumidify are run according to temperature change variable frequency starting, except Wet Compression Machine starts power frequency operation, and the double air intake centrifugal blower fans of interior circulation are by the crawl frequency startup optimization adjusted, air cooling axial flow blower Run according to temperature change variable frequency starting;
(C)When the air themperature rise in armouring central switch cabinet reaches that temperature control three starts setting valve, high-pressure atomization Water pump is by the startup, dwell time gap startup optimization adjusted;When the air themperature reduction in armouring central switch cabinet reaches the When four temperature stop setting valve, the work out of service of high-pressure atomization water pump;
(D)The current temperature value in temperature sensor detection host apparatus on the hydrophilic aluminium foil fin of dehumidifier, if working as When preceding temperature value reduction reaches that the first molten frost adjusts temperature value, dehumidifying compressor is out of service, if current temperature value is higher than second When Rong Shuan adjusts temperature value, and the dehumidifying compressor shutdown time exceeds after preset time, and is installed according to air-in position Temperature and relative humidity detection humidity value logic judgment dehydrating unit whether dehumidify operation;
(E)When overheat, overcurrent condition occurs in the motor of temp and humidity regulator and water atomization plant, then humiture is adjusted Regulating device and high-pressure atomization water pump are out of service, and send corresponding protection switch alarm signal;If when temp and humidity regulator When there is frequency conversion failure, then the motor inverter of temp and humidity regulator is out of service, and sends corresponding failure alarm signal;
(F)Host apparatus control logic malfunctions or machine of delaying, and continuously opening 3 times certainly can not recover, then the double air intake centrifugals of interior circulation Blower fan and air cooling axial flow blower automatically switch to power frequency operation, dehumidifying compressor, the double air intake centrifugal blower fans of dehumidifying and water smoke makeup Power supply disconnection is put, and sends alarm signal.
Further, the 3rd temperature starts the temperature of setting valve >=the 4th and stops setting valve >=second temperature and start to adjust It is worth the >=the first temperature and stops setting valve.
Further, step(C)It is further comprising the steps of afterwards:
(C1)Temperature sensor detection temperature rise on pressure piping near dehumidifying exhaust outlet of compressor reaches the 5th When temperature shuts down setting valve, dehumidifying compressor is out of service and sends the too high alarm signal of temperature;Its temperature sensor detection temperature Degree reduction reaches that the 6th temperature starts setting valve and met simultaneously after the delay of dehumidifying compressor shutdown time >=240 second, again according to Whether the temperature and relative humidity detection humidity value logic judgment installed according to air-in tuyere position dehumidifies operation;
(C2)The detection pressure value rise of the high voltage protective sensor on the pressure piping of compressor that dehumidifies reaches the first high pressure When setting valve is shut down in protection, dehumidifying compressor and the double air intake centrifugal blower fans of dehumidifying are simultaneously out of service, and accordingly send alarm signal Number;
(C3)The detection pressure value reduction of the low-voltage variation sensor on the low pressure pipeline of compressor that dehumidifies reaches the 3rd low pressure When setting valve is shut down in protection, dehumidifying compressor and the double air intake centrifugal blower fans of dehumidifying are simultaneously out of service, and accordingly send alarm signal Number.
As shown from the above technical solution, the present invention can meet iron-clad switchgear operation to the humidity of environment, temperature and remove The technical requirements for going air filthy, significantly improve electric equipment operation security reliability, and cold dry air inputs total pipeline and damp and hot Air delivery trunk road is arranged in underground or cable duct, utilizes the seasonal temperature change below earth's surface and electric equipment operation temperature Spend space in the opposite rule of changes in demand and spray water air cooling way and the armouring central switch cabinet of closing and be much smaller than switch Room space and open dehumidifying and cooling mode, transformer station's armouring central switch cabinet intelligent regulating system are energy-saving clearly, Operation of Electric Systems maintenance cost is greatly reduced.
Brief description of the drawings
Fig. 1 is the system diagram of the present invention;
Fig. 2 is the front view of the host apparatus of the present invention;
Fig. 3 is Fig. 2 internal structure schematic diagram;
Fig. 4 is the sectional view of A-A in Fig. 2;
Fig. 5 is Fig. 3 right view;
Fig. 6 is dehumidifying and cooling air flow schematic diagram in armouring central switch cabinet side view.
Embodiment
The present invention will be further described below in conjunction with the accompanying drawings:
As shown in figs. 1 to 6, transformer station's armouring central switch cabinet intelligent regulating system, including host apparatus 1, input channel 2 With output channel 3, host apparatus 1 includes casing and the epidemic disaster adjusting means in casing, and casing is inputted provided with air Mouthfuls 15 and air-out 16, air-in 15 is defeated by input channel 2 and the air that is located at the top of armouring central switch cabinet Go out end to be connected, air-out 16 is connected by output channel 3 with the air input positioned at armouring central switch cabinet bottom Connect.Because air output end is located at the top of switch cubicle, air input is located at the bottom of switch cubicle, so the interior circulation dehumidifies Cool down wind and form " malleation " feeding from switch cubicle bottom, keep air in cabinet to consistently form malleation, to improve intelligent regulating system Dehumidifying, temperature control, dust-proof and dust removing effects.
As shown in Fig. 2 the inside of the casing is provided with air cleaning moist chamber 11, be connected with air cleaning moist chamber 11 Inner circulating air diversion chamber 12, the collection chamber 13 being connected with inner circulating air diversion chamber 12 and be connected with collection chamber 13 it is dry Cold cleaning air exports room 14, and air-in 15 and air-out 16 are located at the bottom of casing, and air-in 15 It is connected with air cleaning moist chamber 11, air-out 16 is connected with dry and cold purification air output room 14.
The epidemic disaster adjusting means includes the dehydrating unit being located in air cleaning moist chamber 11 and in collection chamber 13 Enter centrifugal blower 131 provided with interior circulation pair, interior circulation pair enters the air outlet of centrifugal blower 131 and dry and cold purification air output room 14 Air inlet be connected.The dehydrating unit includes the double air intake centrifugal blower fans 111 of dehumidifying, dehumidifier 112 and dehumidifying compressor 113, The air inlet of the double air intake centrifugal blower fans 111 of dehumidifying is corresponding with air-in 15, the air inlet of its air outlet and dehumidifier 112 It is connected.Dehumidifier 112 includes condenser and evaporator, and the air inlet of condenser is entered by blower fan kuppe 115 and dehumidifying pair The air outlet of wind centrifugal blower 111 is connected, and the lower section of dehumidifier 112 is provided with condensed water water-collecting tray 116.
Cleaning filtration screen of air 114 is provided with air cleaning moist chamber 11, cleaning filtration screen of air 114 and casing are slotting Enter formula connection.The first board-like sensible heat exchanger 17 is provided between air cleaning moist chamber 11 and inner circulating air diversion chamber 12, The second board-like sensible heat exchanger 18 is provided between inner circulating air diversion chamber 12 and collection chamber 13.
The casing of the present embodiment be divided into above and below two layers, it is dry and cold purification air output room 14 and air cleaning moist chamber 11 be located at The lower floor of casing, inner circulating air diversion chamber 12 be located at casing in right side and with collection chamber 13 and the phase of air cleaning moist chamber 11 Close on.The front side of the first board-like sensible heat exchanger 18 of board-like sensible heat exchanger 17 and second is equipped with air cooling axial flow blower 19, its Rear side is equipped with air intake louver 10.On air intake louver 10 and the inner side of air cooling axial flow blower 19 is equipped with water Atomising device 118, the water atomization plant 118 includes atomization water tank and atomization high-pressure pump.In collection chamber 13 and air-in 15 Inside it is mounted on temperature sensor and humidity sensor;It is mounted on the pressure piping and low pressure pipeline of dehumidifying compressor 113 High and low pressure protects sensor, and dehumidifying compressor 113 installs TEMP on the pressure piping near exhaust outlet of compressor Device;Temperature sensor is respectively mounted on the hydrophilic aluminium foil fin of dehumidifier 112.
The method of transformer station's armouring central switch cabinet Intelligent adjustment, comprises the following steps:
S1:Start, the double air intake centrifugal blower fans 131 of interior circulation are by the crawl frequency startup optimization adjusted, air cooling axle stream Blower fan 19 and the double air intake centrifugal blower fans 111 of dehumidifying are by frequency startup optimization is adjusted, and the compressor start power frequency that dehumidified after 180 seconds is transported OK, the first setting time of operation makes to enter automatic control state after air is fully circulated in armouring central switch cabinet;
S2:Into after automatic control state, the epidemic disaster in host apparatus 1 installed in air-in tuyere position is passed Air epidemic disaster in the air epidemic disaster extracted out in sensor detection armouring central switch cabinet, armouring central switch cabinet is low respectively When the first temperature stops setting valve and the first humidity stops setting valve, then host apparatus 1 enters resting state.Resting state When, at interval of the second setting time section, the double air intake centrifugal blower fans 131 of interior circulation by the crawl frequency startup optimization adjusted, And run the first setting time;
In the step, extracted out in the temperature and relative humidity detection armouring central switch cabinet that air-in position is installed Air epidemic disaster, when the air humidity rise in armouring central switch cabinet reaches that the second humidity starts setting valve, interior circulation is double The crawl frequency startup optimization of air intake centrifugal blower fan 131, the double air intake centrifugal blower fans 111 of dehumidifying change frequency conversion with condenser temperature Startup optimization, dehumidify compressor start after 180 seconds at interval.When the air humidity reduction in armouring central switch cabinet reaches that first is wet When degree stops setting valve, the double air intake centrifugal blower fans 131 of interior circulation, the double air intake centrifugal blower fans 111 of dehumidifying and dehumidifying compressor 113 stop Only run.
The air extracted out in the temperature and relative humidity detection armouring central switch cabinet that air-in tuyere position is installed Epidemic disaster, when the air themperature rise in armouring central switch cabinet reaches that second temperature starts setting valve, the double air intakes of interior circulation Centrifugal blower 131 and air cooling axial flow blower 19 are run with temperature change variable frequency starting in armouring central switch cabinet.When in armouring When putting the reduction of the air themperature in switch cubicle and reaching that the first temperature stops setting valve, double air intake centrifugal blower fans 131 of interior circulation and empty Cold axial flow blower 19 is out of service.
S3:The sky extracted out in the temperature and relative humidity detection armouring central switch cabinet that air-in tuyere position is installed Gas epidemic disaster, when the air themperature rise in armouring central switch cabinet reaches that the 3rd temperature starts setting valve, high-pressure atomization water Pump gap startup optimization, high-pressure atomization water pump operation reaches out of service after the 3rd setting time, then is opened through the 4th setting time Dynamic circulation work.When the air themperature reduction in armouring central switch cabinet reaches that the 4th temperature stops setting valve, high-pressure atomization Water pump stops circular flow work.Water pressure sensor at high-pressure atomization pump intake detects tap water pressure and is less than During the first atomized water setting value of pressure, high-pressure atomization water pump is forbidden running and accordingly sending " atomization water shortage " alarm.
Air themperature setting valve logical relation in armouring central switch cabinet:3rd temperature starts setting valve >=temperature control four and stopped Only setting valve >=second temperature starts the temperature of setting valve >=first and stops setting valve.
S4:Temperature sensor detection temperature rise on pressure piping near dehumidifying exhaust outlet of compressor reaches the 5th temperature Degree shuts down setting valve, and dehumidifying compressor is out of service and accordingly sends " the dehumidifying Tail Pipe Temperature of compressor 113 is too high " alarm;Its Temperature sensor detection temperature reduction reach the 6th temperature start setting valve and simultaneously meet dehumidifying the downtime of compressor 113 >= After delay in 240 seconds, it is again depending on the temperature and relative humidity detection humidity value logic judgment that air-in tuyere position is installed No dehumidifying operation;
S5:When the high voltage protective sensor detection pressure value rise on the pressure piping of dehumidifying compressor 113 reaches first When high voltage protective shuts down setting valve, dehumidifying compressor 113 and the double air intake centrifugal blower fans 111 of dehumidifying are simultaneously out of service, and accordingly Send " action of dehumidifying compressor 113 pipeline high voltage protective " alarm;
S6:The detection pressure value reduction of the low-voltage variation sensor on the low pressure pipeline of compressor 113 that dehumidifies reaches that the 3rd is low When setting valve is shut down in pressure protection, dehumidifying compressor 113 and the double air intake centrifugal blower fans 111 of dehumidifying are simultaneously out of service, and accordingly send out Go out " action of dehumidifying compressor 113 pipeline low-voltage variation " alarm;
S7:The temperature sensor detection temperature on the evaporator hydrophilic aluminium foil fin of two devices that dehumidifies reduction reaches the first molten frost When adjusting temperature value, dehumidifying compressor 113 is out of service, and the rise of its temperature sensor detection temperature reaches that the second molten frost adjusts temperature Meet during angle value and simultaneously after downtime >=240 second of compressor 113 delay that dehumidifies, again depending on air-in tuyere position Whether the temperature and relative humidity detection humidity value logic judgment of installation dehumidifies operation.
S8:The double motor power frequency operation overheats of air intake centrifugal blower fan 131 of interior circulation(Excessively stream)Protect contactor action, interior circulation Double air intake centrifugal blower fans 131 are out of service, and accordingly send " the double air intake centrifugal blower motor overheats of interior circulation(Excessively stream)Protection is opened Pass is acted " alarm.
The double motor power frequency operation overheats of air intake centrifugal blower fan 131 of interior circulation(Excessively stream)Contactor action is protected, interior circulation is double Air intake centrifugal blower fan 131 is out of service, and accordingly sends " the double air intake centrifugal blower motor overheats of interior circulation(Excessively stream)Protection switch Action " alarm.The double motor power frequency operation overheats of air intake centrifugal blower fan 111 of dehumidifying(Excessively stream)Contactor action is protected, except Wet Compression Machine 113 and the double air intake centrifugal blower fans 111 of dehumidifying are simultaneously out of service, and accordingly send " the double air intake centrifugal blower motor mistakes of dehumidifying Heat(Excessively stream)Protection switch is acted " alarm.Dehumidify the motor overheating of compressor 113(Excessively stream)Protection switch is acted, and dehumidify compressor 113 is simultaneously out of service with the double air intake centrifugal blower fans 111 of dehumidifying, and accordingly sends " dehumidifying compressor motor overheating(Excessively stream)Protect Protect switch motion " alarm.The motor power frequency operation of air cooling axial flow blower 19 is overheated(Excessively stream)Protect contactor action, air cooling axle stream wind Machine 19 is out of service, and accordingly sends " air cooling Axial-flow fan motor overheat(Excessively stream)Protection switch is acted " alarm.High-pressure atomization Pump motor is overheated(Excessively stream)Protection switch is acted, and high-pressure atomization water pump is out of service, and accordingly sends " atomization pump motor mistake Heat(Excessively stream)Protection switch is acted " alarm;
S9:The motor inverter failure of air cooling axial flow blower 19, the motor inverter of air cooling axial flow blower 19 is out of service, machinery Air cooling axial flow blower 19 is switched to power frequency operation by interlocking contactor by VFC, and accordingly sends " air cooling axial flow blower electricity Machine frequency converter failure " is alarmed.
The double motor inverter failures of air intake centrifugal blower fan 131 of interior circulation, the double motor frequency conversions of air intake centrifugal blower fan 131 of interior circulation Device is out of service, and the double air intake centrifugal blower fans 131 of interior circulation are switched to power frequency operation by contact apparatus of mechanical interlock by VFC, and Accordingly send " the double air intake centrifugal blower motor frequency converter failures of interior circulation " alarm;The event of the motor inverter of air cooling axial flow blower 19 Barrier, the motor inverter of air cooling axial flow blower 19 is out of service, and contact apparatus of mechanical interlock is by air cooling axial flow blower 19 by VFC Power frequency operation is switched to, and accordingly sends " air cooling Axial-flow fan motor frequency converter failure " alarm.The double air intake centrifugal blower fans of dehumidifying 111 motor inverter failures, double air intake centrifugal 111 motor inverters of blower fan of dehumidifying are out of service, and contact apparatus of mechanical interlock will be removed Wet pair of air intake centrifugal blower fan 111 is switched to power frequency operation by VFC, and accordingly sends " the double air intake centrifugal blower motors of dehumidifying Frequency converter failure " is alarmed;
S10:System and device control logic malfunctions or machine of delaying, and continuously opening 3 times certainly can not recover, then the double air intake centrifugals of interior circulation Blower fan 131 and air cooling axial flow blower 19 automatically switch to power frequency operation, dehumidifying compressor 113, the double air intake centrifugal blower fans 111 of dehumidifying Disconnected with high-pressure atomization pump power, device scene accordingly sends " sound, light " alarm.
The air extracted out in the temperature and relative humidity detection armouring central switch cabinet that air-in tuyere position is installed Epidemic disaster, its detection temperature is reduced to the 7th temperature startup setting valve and while the air met in armouring central switch cabinet is wet When degree rise reaches that the second humidity starts setting valve, air in the electric boiling plate electrified regulation cabinet in each armouring central switch cabinet; The air themperature extracted out in the temperature and relative humidity detection armouring central switch cabinet that air-in tuyere position is installed is increased to When the air humidity reduction that 8th temperature stops in setting valve or armouring central switch cabinet reaches that the first humidity stops setting valve, respectively Electric boiling plate in armouring central switch cabinet is surveyed to stop being powered.
The air extracted out in the temperature and relative humidity detection armouring central switch cabinet that air-in tuyere position is installed The humidity real time contrast in collection chamber that the temperature and relative humidity of epidemic disaster and gas collection indoor location is detected, when air is defeated The humidity of entrance tuyere position detection air is less than the humidity of detection air in collection chamber, accordingly sends " device bad seals " report It is alert;
Transformer station's armouring central switch cabinet intelligent regulating system interior circulation is the environment of a relative closure, and its own has Dust reduction capability, and the air of air cleaning dehumidifying circulating inside always has part to pass through the air purification filter being inserted vertically into Dust in net, armouring central switch cabinet will be remained on screen pack, and periodically removing dust on screen pack can make in armouring Put clean air in switch cubicle.
Embodiment described above is only that the preferred embodiment of the present invention is described, not to the model of the present invention Enclose and be defined, on the premise of design spirit of the present invention is not departed from, technical side of the those of ordinary skill in the art to the present invention In various modifications and improvement that case is made, the protection domain that claims of the present invention determination all should be fallen into.

Claims (3)

1. a kind of transformer station's armouring central switch cabinet intelligent adjusting method, it is characterised in that comprise the following steps:
(A)Start, the double air intake centrifugal blower fans of interior circulation air cooling axial flow blower and are removed by the crawl frequency startup optimization adjusted Wet pair of air intake centrifugal blower fan is by frequency startup optimization is adjusted, and dehumidify compressor start power frequency operation, power frequency operation first after 180 seconds Setting time makes to enter automatic control state after air is fully circulated in armouring central switch cabinet;
(B)Into after automatic control state, installed in the temperature and relative humidity detection armour of air-in position in host apparatus The air epidemic disaster extracted out in central switch cabinet is filled, setting valve and the are stopped when Air Temperature, humidity value are respectively lower than the first temperature When one humidity stops setting valve, then host apparatus enters resting state;Start when Air Temperature, humidity value respectively reach second temperature When setting valve and the second humidity setting valve, then double air intake centrifugal wind that dehumidify are run according to temperature change variable frequency starting, except Wet Compression Machine starts power frequency operation, and the double air intake centrifugal blower fans of interior circulation are by the crawl frequency startup optimization adjusted, air cooling axial flow blower Run according to temperature change variable frequency starting;
(C)When the air themperature rise in armouring central switch cabinet reaches that the 3rd temperature starts setting valve, high-pressure atomization water pump By the startup, dwell time gap startup optimization adjusted;When the air themperature reduction in armouring central switch cabinet reaches the 4th temperature When degree stops setting valve, the work out of service of high-pressure atomization water pump;
(D)The current temperature value in temperature sensor detection host apparatus on the hydrophilic aluminium foil fin of dehumidifier, if current temperature When angle value reduction reaches that temperature value is adjusted in the first defrosting, dehumidifying compressor is out of service, if current temperature value is higher than the second defrosting When adjusting temperature value, and dehumidifying the compressor shutdown time exceed preset time after, and according to air-in position install temperature, Whether humidity sensor detection humidity value logic judgment dehydrating unit dehumidifies operation;
(E)When overheat, overcurrent condition occurs in the motor of temp and humidity regulator and water atomization plant, then temperature and humidity regulation is filled Put and high-pressure atomization water pump is out of service, and send corresponding protection switch alarm signal;If when temp and humidity regulator occurs During frequency conversion failure, then the motor inverter of temp and humidity regulator is out of service, and sends corresponding failure alarm signal;
(F)Host apparatus control logic malfunctions or machine of delaying, and continuously opening 3 times certainly can not recover, then the double air intake centrifugal blower fans of interior circulation Power frequency operation, dehumidifying compressor, the double air intake centrifugal blower fans of dehumidifying and water atomization plant electricity are automatically switched to air cooling axial flow blower Source disconnects, and sends alarm signal.
2. transformer station's armouring central switch cabinet intelligent adjusting method according to claim 1, it is characterised in that:Described 3rd Temperature starts the temperature of setting valve >=the 4th and stops setting valve >=second temperature and start the temperature of setting valve >=first stopping setting valve.
3. a kind of transformer station's armouring central switch cabinet intelligent adjusting method according to claim 1, it is characterised in that:Step (C)It is further comprising the steps of afterwards:
(C1)Temperature sensor detection temperature rise on pressure piping near dehumidifying exhaust outlet of compressor reaches the 5th temperature When shutting down setting valve, dehumidifying compressor is out of service and sends the too high alarm signal of temperature;Its temperature sensor detection temperature drops It is low to reach that the 6th temperature starts setting valve and met simultaneously after the delay of dehumidifying compressor shutdown time >=240 second, again depending on sky Whether the temperature and relative humidity detection humidity value logic judgment that gas input port tuyere position is installed dehumidifies operation;
(C2)The detection pressure value rise of the high voltage protective sensor on the pressure piping of compressor that dehumidifies reaches the first high voltage protective When shutting down setting valve, dehumidifying compressor and the double air intake centrifugal blower fans of dehumidifying are simultaneously out of service, and accordingly send alarm signal;
(C3)The detection pressure value reduction of the low-voltage variation sensor on the low pressure pipeline of compressor that dehumidifies reaches the 3rd low-voltage variation When shutting down setting valve, dehumidifying compressor and the double air intake centrifugal blower fans of dehumidifying are simultaneously out of service, and accordingly send alarm signal.
CN201610189303.1A 2016-03-30 2016-03-30 Transformer station's armouring central switch cabinet intelligent regulating system and its adjusting method Active CN105652931B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610189303.1A CN105652931B (en) 2016-03-30 2016-03-30 Transformer station's armouring central switch cabinet intelligent regulating system and its adjusting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610189303.1A CN105652931B (en) 2016-03-30 2016-03-30 Transformer station's armouring central switch cabinet intelligent regulating system and its adjusting method

Publications (2)

Publication Number Publication Date
CN105652931A CN105652931A (en) 2016-06-08
CN105652931B true CN105652931B (en) 2017-10-13

Family

ID=56495844

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610189303.1A Active CN105652931B (en) 2016-03-30 2016-03-30 Transformer station's armouring central switch cabinet intelligent regulating system and its adjusting method

Country Status (1)

Country Link
CN (1) CN105652931B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106774553A (en) * 2016-12-25 2017-05-31 青岛海盈智高新技术有限公司 A kind of transformer station's automatic dehumidifying temperature-controlling system
CN107332140B (en) * 2017-08-08 2023-04-11 国网福建省电力有限公司 Intelligent variable-frequency combined dehumidification system and dehumidification method for transformer substation
CN109713595B (en) * 2018-11-28 2023-11-10 贵州电网有限责任公司 Internal and external circulation control device and control method for switch cabinet in transformer substation
CN110230859A (en) * 2019-06-27 2019-09-13 国网湖南省电力有限公司 A kind of high-voltage switch gear room and its environment self-checking device and application method
CN111431067B (en) * 2020-03-30 2021-10-29 国网福建省电力有限公司南平供电公司 Method for cooling armored cabinet of transformer substation
CN112393482B (en) * 2020-11-20 2023-03-24 珠海格力电器股份有限公司 Variable-frequency air-cooled water chilling unit and variable-working-condition starting control method thereof
CN117526129B (en) * 2023-11-13 2024-04-19 国网上海市电力公司 Dehumidification system for transformer substation switch cabinet

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203501379U (en) * 2013-03-27 2014-03-26 叶秋诗 Special energy-saving sealed pipeline type dehumidifying and temperature regulating machine for electric equipment box
JP2015137795A (en) * 2014-01-22 2015-07-30 アズビル株式会社 Device and method for supporting setting of environmental parameter
CN105302201A (en) * 2014-07-31 2016-02-03 惠铁军 Intelligent temperature and humidity controller
CN105305251B (en) * 2015-09-30 2018-05-08 广东康鼎电力科技有限公司 A kind of power switch cabinet
CN205507592U (en) * 2016-03-30 2016-08-24 无锡柒海智能控制技术有限公司 Put cubical switchboard intelligent regulation system in transformer substation's armor

Also Published As

Publication number Publication date
CN105652931A (en) 2016-06-08

Similar Documents

Publication Publication Date Title
CN105652931B (en) Transformer station's armouring central switch cabinet intelligent regulating system and its adjusting method
CN203240661U (en) Intelligent integrated equipment for controlling indoor environment of transformer station
CN106253104B (en) A kind of high voltage power transmission and transforming is except condensation assembly and its removes condensation method
US20210092875A1 (en) Mobile data center and method of operating the same
CN108281913B (en) Cascade type circulating channel cooling, dehumidifying and condensation-preventing electric equipment guaranteeing system and method
CN110571684B (en) Electrical switch cabinet cooling system and control method
CN106058652A (en) Power distribution cabinet for humid and dusty outdoor environment
CN214044439U (en) High tension switchgear with isolating structure area monitoring function
CN112421444A (en) Prevent electrical switchgear of condensation
CN106659058A (en) Integrated internal circulation server rack
CN205507592U (en) Put cubical switchboard intelligent regulation system in transformer substation's armor
CN102878649A (en) Intelligent ventilated energy-saving system for base station
US10674642B2 (en) Electrical equipment housing
CN112153874A (en) 5G base station integrated cabinet with self-cleaning maintenance-free fresh air cooling function and control method
CN110212415A (en) A kind of condensation-proof electric system and method
CN214227560U (en) Ventilation structure of capacitor chamber and grounding transformer chamber of substation
CN114937935A (en) Remote control has explosion-proof function's intelligent ring box with a net
CN205864938U (en) Circulating server rack in a kind of integration
CN208817821U (en) A kind of integrated refrigeration station
CN114017867A (en) Intelligent environment control machine
CN208161330U (en) For switching the air dry-set of bin
CN207069395U (en) A kind of high temperature-proof power distribution cabinet
CN209374999U (en) A kind of box-type substation micro-positive pressure system
CN113764987A (en) Active intelligent dehumidification system and method for switch cabinet without drainage
CN207353719U (en) A kind of switchgear radiator structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Ye Qiushi

Inventor after: Wang Nianbin

Inventor after: Ye Hong

Inventor after: Ni Huichuan

Inventor after: Xia Zongjie

Inventor after: Quan Yunliang

Inventor after: Zeng Weihua

Inventor after: Shen Lei

Inventor before: Ye Qiushi

Inventor before: Ye Hong

Inventor before: Yan Shi

Inventor before: Ling Duanwei

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20170905

Address after: 244000 Tongling Changjiang Road, Anhui, No. 91

Applicant after: TONGLING POWER SUPPLY COMPANY OF STATE GRID ANHUI ELECTRIC POWER Co.

Applicant after: ANHUI QIHAI INTELLIGENT CONTROL TECHNOLOGY CO.,LTD.

Address before: 214000, room 1, building 311, No. 1515-1, Yan Xin Road, Huishan Economic Development Zone, Wuxi, Jiangsu, Wuxi

Applicant before: WUXI QIHAI INTELLIGENT CONTROL TECHNOLOGY Co.,Ltd.

GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 244000 No.91 middle Changjiang Road, Tongling City, Anhui Province

Patentee after: STATE GRID ANHUI ELECTRIC POWER CO., LTD. TONGLING POWER SUPPLY Co.

Patentee after: ANHUI QIHAI INTELLIGENT CONTROL TECHNOLOGY CO.,LTD.

Address before: 244000 No.91 middle Changjiang Road, Tongling City, Anhui Province

Patentee before: TONGLING POWER SUPPLY COMPANY OF STATE GRID ANHUI ELECTRIC POWER Co.

Patentee before: ANHUI QIHAI INTELLIGENT CONTROL TECHNOLOGY CO.,LTD.

TR01 Transfer of patent right

Effective date of registration: 20231102

Address after: 244000 No.91 middle Changjiang Road, Tongling City, Anhui Province

Patentee after: STATE GRID ANHUI ELECTRIC POWER CO., LTD. TONGLING POWER SUPPLY Co.

Patentee after: State Grid Anhui Comprehensive Energy Service Co.,Ltd. Tongling Branch

Patentee after: ANHUI QIHAI INTELLIGENT CONTROL TECHNOLOGY CO.,LTD.

Address before: 244000 No.91 middle Changjiang Road, Tongling City, Anhui Province

Patentee before: STATE GRID ANHUI ELECTRIC POWER CO., LTD. TONGLING POWER SUPPLY Co.

Patentee before: ANHUI QIHAI INTELLIGENT CONTROL TECHNOLOGY CO.,LTD.

TR01 Transfer of patent right