CN105631597A - Construction method for transformer substation three-dimensional visual platform - Google Patents

Construction method for transformer substation three-dimensional visual platform Download PDF

Info

Publication number
CN105631597A
CN105631597A CN201511012838.3A CN201511012838A CN105631597A CN 105631597 A CN105631597 A CN 105631597A CN 201511012838 A CN201511012838 A CN 201511012838A CN 105631597 A CN105631597 A CN 105631597A
Authority
CN
China
Prior art keywords
data
platform
visual
situation
analysis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201511012838.3A
Other languages
Chinese (zh)
Inventor
方文崇
梁寿愚
唐羿轩
胡荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Southern Power Grid Co Ltd
Original Assignee
China Southern Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Southern Power Grid Co Ltd filed Critical China Southern Power Grid Co Ltd
Priority to CN201511012838.3A priority Critical patent/CN105631597A/en
Publication of CN105631597A publication Critical patent/CN105631597A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/30Information retrieval; Database structures therefor; File system structures therefor of unstructured textual data
    • G06F16/35Clustering; Classification
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Theoretical Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Health & Medical Sciences (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Water Supply & Treatment (AREA)
  • Quality & Reliability (AREA)
  • Educational Administration (AREA)
  • Development Economics (AREA)
  • Operations Research (AREA)
  • Public Health (AREA)
  • Game Theory and Decision Science (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Data Mining & Analysis (AREA)
  • Databases & Information Systems (AREA)
  • General Engineering & Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a construction method for a transformer substation three-dimensional visual platform. Firstly situation awareness demand analysis is performed according to the objective of power grid safety risk assessment; then data preprocessing and data integration are performed in turn according to the result of situation awareness demand analysis; a knowledge correlation analysis engine between environmental factors and production factors is established and then knowledge data extraction is performed so that statistical integrated KPI data of the space and time dimensions are obtained; chart visual displaying of environmental data, the statistical integrated KPI data and knowledge data is performed by adopting the visualization technology; and situation awareness and visual views interact so that situation visualization is realized, and a power grid visual awareness model is established.

Description

The construction process of substation's three-dimensional visualization platform
Technical field
The present invention is specifically related to the construction process of a kind of substation three-dimensional visualization platform.
Background technology
Distribution network, directly towards industrial enterprise and power consumer, is the important step carrying out end treatment, and its level of automation and level of management directly affect power supply reliability and quality of power supply. User, to improving constantly that power supply service level requires, has higher requirement to distribution network management. Visualized management is an important component part of distribution network management, it makes distribution network management more directly perceived, more convenient operation, it is to increase the distribution network efficiency of management.
Summary of the invention
It is an object of the invention to for the deficiencies in the prior art, it is provided that the construction process of a kind of substation three-dimensional visualization platform, the construction process of this substation's three-dimensional visualization platform can solve the problem well.
For reaching above-mentioned requirements, the technical scheme that the present invention takes is: the construction process providing a kind of substation three-dimensional visualization platform, and the construction process of this substation's three-dimensional visualization platform comprises the steps:
A, carrying out situation perception demand analysis according to the target of power grid security risk assessment, described situation perception demand analysis comprises collects the environmental element of perception needed for target and the data of production factors; B, result according to situation perception demand analysis carry out data prediction and data integration successively, described data prediction comprises based on data prediction technology extraction raw data, carries out data cleansing and Data Format Transform, described data integration comprises and carries out data according to environmental element and production factors based on data integration technology storing classifiedly and data deduplication process and data relation analysis, and the described result according to situation perception demand analysis adopts the mode of data interface collection or database access or instrument collection to carry out several pre-treatment and data integration successively; C, the knowledge connection analysis engine set up between environmental element and the data of production factors, and then carry out knowledge data extraction, obtain the comprehensive KPI data of statistics on room and time dimension degree; D, adopt visualization technique by environmental data, add up comprehensive KPI data and knowledge data carry out the visual presentation of chart; E, by mutual to situation perception and visualization view, it is achieved situation is visual, sets up power grid visualization sensor model; Described situation is visual be environmental data is visual, production data is visual and it is visual to add up comprehensive KPI data, and then formed trending situation perception index.
F, employing SG-CIM model are as the information model of distribution network information interaction, and determine mutual specification according to different information types;
G, setting up visual platform, described visual platform has three-decker: data active layer, it is provided that the raw data of distribution network, by the data object of system by the classification of master data dimension degree, and according to SG-CIM unified data model interface specification, data are encapsulated, pushes to platform layer; Platform layer, comprise shared convergence platform, mobile operating platform and GIS platform, share convergence platform and data polymerization is provided, carry out aggregate objects analysis and drawing out, and corresponding share service is provided, GIS platform carries out data construct and provides external service, and mobile operating platform provides the service of mobile operating; Application and development layer, the information pushed according to GIS platform and mobile operating platform, carries out all kinds of senior application and development.
The construction process of this substation's three-dimensional visualization platform first carries out situation perception demand analysis according to the target of power grid security risk assessment, result according to situation perception demand analysis carries out data prediction and data integration successively again, set up the knowledge connection analysis engine between environmental element and the data of production factors, and then carry out knowledge data extraction, obtain the comprehensive KPI data of statistics on room and time dimension degree, adopt visualization technique by environmental data, add up comprehensive KPI data and knowledge data carry out the visual presentation of chart, by mutual to situation perception and visualization view, realize situation visual, set up power grid visualization sensor model.
Accompanying drawing explanation
Accompanying drawing described herein is used to provide further understanding of the present application, form the part of the application, use identical reference label to represent same or similar part in the drawings, the schematic description and description of the application, for explaining the application, does not form the improper restriction to the application. In the accompanying drawings:
Fig. 1 schematically shows the schematic diagram of the construction process of the substation's three-dimensional visualization platform according to the application's embodiment.
Embodiment
For making the object of the application, technical scheme and advantage clearly, below in conjunction with drawings and the specific embodiments, the application is described in further detail.
In the following description, quoting of " embodiment ", " embodiment ", " example ", " example " etc. is shown that the embodiment of so description or example can comprise special characteristic, structure, characteristic, character, element or limit, but not each embodiment or example must comprise special characteristic, structure, characteristic, character, element or limit. In addition, reuse phrase " according to the application embodiment " although it is possible to refer to for identical embodiment, but also not necessarily refers to for identical embodiment.
For the purpose of simple, eliminate in below describing and well known to a person skilled in the art some technology feature.
An embodiment according to the application, it is provided that the construction process of a kind of substation three-dimensional visualization platform, as shown in Figure 1, comprises the steps:
A, carrying out situation perception demand analysis according to the target of power grid security risk assessment, described situation perception demand analysis comprises collects the environmental element of perception needed for target and the data of production factors; B, result according to situation perception demand analysis carry out data prediction and data integration successively, described data prediction comprises based on data prediction technology extraction raw data, carries out data cleansing and Data Format Transform, described data integration comprises and carries out data according to environmental element and production factors based on data integration technology storing classifiedly and data deduplication process and data relation analysis, and the described result according to situation perception demand analysis adopts the mode of data interface collection or database access or instrument collection to carry out several pre-treatment and data integration successively; C, the knowledge connection analysis engine set up between environmental element and the data of production factors, and then carry out knowledge data extraction, obtain the comprehensive KPI data of statistics on room and time dimension degree; D, adopt visualization technique by environmental data, add up comprehensive KPI data and knowledge data carry out the visual presentation of chart; E, by mutual to situation perception and visualization view, it is achieved situation is visual, sets up power grid visualization sensor model; Described situation is visual be environmental data is visual, production data is visual and it is visual to add up comprehensive KPI data, and then formed trending situation perception index.
F, employing SG-CIM model are as the information model of distribution network information interaction, and determine mutual specification according to different information types;
G, setting up visual platform, described visual platform has three-decker: data active layer, it is provided that the raw data of distribution network, by the data object of system by the classification of master data dimension degree, and according to SG-CIM unified data model interface specification, data are encapsulated, pushes to platform layer; Platform layer, comprise shared convergence platform, mobile operating platform and GIS platform, share convergence platform and data polymerization is provided, carry out aggregate objects analysis and drawing out, and corresponding share service is provided, GIS platform carries out data construct and provides external service, and mobile operating platform provides the service of mobile operating; Application and development layer, the information pushed according to GIS platform and mobile operating platform, carries out all kinds of senior application and development.
An embodiment according to the application, the data cleansing of the construction process of this substation's three-dimensional visualization platform carries out data verification based on database SQL, comprise whether zero data School Affairs whether mistake form verification, data cleansing complete after by data stored in volatile data base; Described Data Format Transform is that according to situation perception desired data structure, the data putting into volatile data base after having cleaned are carried out format conversion, and the content of described format conversion comprises date format analysis processing, decimal process and ranks conversion.
The above embodiment only represents several enforcement modes of the present invention, and it describes comparatively concrete and detailed, but can not be interpreted as limitation of the scope of the invention. , it is also possible to make some distortion and improvement, it should be appreciated that for the person of ordinary skill of the art, without departing from the inventive concept of the premise these all belong to protection domain of the present invention. Therefore protection scope of the present invention should be as the criterion with described claim.

Claims (2)

1. the construction process of substation's three-dimensional visualization platform, it is characterised in that, comprise the steps:
A, carrying out situation perception demand analysis according to the target of power grid security risk assessment, described situation perception demand analysis comprises collects the environmental element of perception needed for target and the data of production factors;
B, result according to situation perception demand analysis carry out data prediction and data integration successively, described data prediction comprises based on data prediction technology extraction raw data, carries out data cleansing and Data Format Transform, described data integration comprises and carries out data according to environmental element and production factors based on data integration technology storing classifiedly and data deduplication process and data relation analysis, and the described result according to situation perception demand analysis adopts the mode of data interface collection or database access or instrument collection to carry out data prediction and data integration successively;
C, the knowledge connection analysis engine set up between environmental element and the data of production factors, and then carry out knowledge data extraction, obtain the comprehensive KPI data of statistics on room and time dimension degree;
D, adopt visualization technique by environmental data, add up comprehensive KPI data and knowledge data carry out the visual presentation of chart;
E, by mutual to situation perception and visualization view, it is achieved situation is visual, sets up power grid visualization sensor model; Described situation is visual be environmental data is visual, production data is visual and it is visual to add up comprehensive KPI data, and then formed trending situation perception index;
F, employing SG-CIM model are as the information model of distribution network information interaction, and determine mutual specification according to different information types;
G, setting up visual platform, described visual platform has three-decker: data active layer, it is provided that the raw data of distribution network, by the data object of system by the classification of master data dimension degree, and according to SG-CIM unified data model interface specification, data are encapsulated, pushes to platform layer; Platform layer, comprise shared convergence platform, mobile operating platform and GIS platform, share convergence platform and data polymerization is provided, carry out aggregate objects analysis and drawing out, and corresponding share service is provided, GIS platform carries out data construct and provides external service, and mobile operating platform provides the service of mobile operating; Application and development layer, the information pushed according to GIS platform and mobile operating platform, carries out all kinds of senior application and development.
2. the construction process of substation according to claim 1 three-dimensional visualization platform, it is characterized in that: described data cleansing carries out data verification based on database SQL, comprise whether zero data School Affairs whether mistake form verification, data cleansing complete after by data stored in volatile data base; Described Data Format Transform is that according to situation perception desired data structure, the data putting into volatile data base after having cleaned are carried out format conversion, and the content of described format conversion comprises date format analysis processing, decimal process and ranks conversion.
CN201511012838.3A 2015-12-31 2015-12-31 Construction method for transformer substation three-dimensional visual platform Pending CN105631597A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201511012838.3A CN105631597A (en) 2015-12-31 2015-12-31 Construction method for transformer substation three-dimensional visual platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201511012838.3A CN105631597A (en) 2015-12-31 2015-12-31 Construction method for transformer substation three-dimensional visual platform

Publications (1)

Publication Number Publication Date
CN105631597A true CN105631597A (en) 2016-06-01

Family

ID=56046502

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201511012838.3A Pending CN105631597A (en) 2015-12-31 2015-12-31 Construction method for transformer substation three-dimensional visual platform

Country Status (1)

Country Link
CN (1) CN105631597A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106844493A (en) * 2016-12-26 2017-06-13 中国科学院自动化研究所 Space time information towards body is excavated and visual presentation method
CN106846174A (en) * 2017-01-10 2017-06-13 中国南方电网有限责任公司电网技术研究中心 Method and device for power distribution network situation perception based on data fusion
CN109493118A (en) * 2018-10-17 2019-03-19 国家电网有限公司 A kind of power grid enterprises' market competitiveness Visual evaluation model building method and system
CN109947867A (en) * 2019-03-21 2019-06-28 国网湖南省电力有限公司 Electric Power Network Planning data fusion method based on function support dimension
CN109977128A (en) * 2019-03-21 2019-07-05 国网湖南省电力有限公司 Electric Power Network Planning data fusion method based on tense dimension
CN110956692A (en) * 2019-11-26 2020-04-03 云南电网有限责任公司玉溪供电局 Method for combining three-dimensional scene visualization based on power supply reliability data analysis
CN112070400A (en) * 2020-09-09 2020-12-11 广东电力信息科技有限公司 Method and device for evaluating security situation of power grid database
CN112181952A (en) * 2020-11-30 2021-01-05 中国电力科学研究院有限公司 Method, system, device and storage medium for constructing data model
CN113742357A (en) * 2021-08-25 2021-12-03 国核电力规划设计研究院有限公司 Method and system for automatically collecting and associating cross-platform design data

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1998000812A1 (en) * 1996-06-28 1998-01-08 Gakkohojin Ritsumeikan Server space forming method and apparatus
CN104008442A (en) * 2014-05-07 2014-08-27 南京工程学院 Power distribution network visual platform construction method based on SG-CIM
CN104239998A (en) * 2013-06-20 2014-12-24 国家电网公司 Implementation method of smart power grid resource real-time operating state three-dimensional visualization display system
CN104680260A (en) * 2015-03-17 2015-06-03 云南电力调度控制中心 Method and system for establishing power grid visualized perceptual model

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1998000812A1 (en) * 1996-06-28 1998-01-08 Gakkohojin Ritsumeikan Server space forming method and apparatus
CN104239998A (en) * 2013-06-20 2014-12-24 国家电网公司 Implementation method of smart power grid resource real-time operating state three-dimensional visualization display system
CN104008442A (en) * 2014-05-07 2014-08-27 南京工程学院 Power distribution network visual platform construction method based on SG-CIM
CN104680260A (en) * 2015-03-17 2015-06-03 云南电力调度控制中心 Method and system for establishing power grid visualized perceptual model

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106844493A (en) * 2016-12-26 2017-06-13 中国科学院自动化研究所 Space time information towards body is excavated and visual presentation method
CN106846174A (en) * 2017-01-10 2017-06-13 中国南方电网有限责任公司电网技术研究中心 Method and device for power distribution network situation perception based on data fusion
CN109493118A (en) * 2018-10-17 2019-03-19 国家电网有限公司 A kind of power grid enterprises' market competitiveness Visual evaluation model building method and system
CN109947867A (en) * 2019-03-21 2019-06-28 国网湖南省电力有限公司 Electric Power Network Planning data fusion method based on function support dimension
CN109977128A (en) * 2019-03-21 2019-07-05 国网湖南省电力有限公司 Electric Power Network Planning data fusion method based on tense dimension
CN109977128B (en) * 2019-03-21 2022-03-01 国网湖南省电力有限公司 Power grid planning data fusion method based on temporal dimension
CN110956692A (en) * 2019-11-26 2020-04-03 云南电网有限责任公司玉溪供电局 Method for combining three-dimensional scene visualization based on power supply reliability data analysis
CN112070400A (en) * 2020-09-09 2020-12-11 广东电力信息科技有限公司 Method and device for evaluating security situation of power grid database
CN112181952A (en) * 2020-11-30 2021-01-05 中国电力科学研究院有限公司 Method, system, device and storage medium for constructing data model
CN113742357A (en) * 2021-08-25 2021-12-03 国核电力规划设计研究院有限公司 Method and system for automatically collecting and associating cross-platform design data

Similar Documents

Publication Publication Date Title
CN105631597A (en) Construction method for transformer substation three-dimensional visual platform
CN104573231B (en) Wisdom building system and method based on BIM
CN108446396B (en) Power data processing method based on improved CIM model
CN107730394A (en) The polynary isomeric data fusion method of panorama power network based on big data
CN111159365B (en) Implementation method, system and storage medium of scheduling model ontology intelligent question-answering system
CN103970887A (en) Information stream display system and method based on GIS distribution network graphs
CN103605020B (en) The treatment process of a kind of power quality data and device
CN103234549B (en) A kind of differential data generation method for upgrading map
CN106227846A (en) Electric network information methods of exhibiting real-time and device
CN104134173A (en) Main and distribution network graph/model/data integrated system based on remote retrieval and information interaction
CN105427041A (en) Standardized maintenance method for reconstruction and extension information point table of running substation
CN102426525A (en) Panoramic modeling method of multi-application system
CN108717356B (en) Metering holographic visual display method and device
CN111737364B (en) Safe multi-party data fusion and federal sharing method, device, equipment and medium
CN104102790A (en) GIS (Geographic Information System)-based automatic diagram forming system and method of power supply diagram
CN103093007A (en) Power transmission iron tower three-dimensional virtual assembly method
CN104682560A (en) Graphical verifying method for power distribution network model transaction
CN105930170A (en) SCD file semantic version management method based on comparison analysis results
CN104660957A (en) A transformer substation monitoring picture remote browsing method
CN104881739B (en) Data consistency verification method is matched somebody with somebody by a kind of battalion based on IEC61970/61968 CIM standards
CN102495916A (en) Multi-application-system panoramic modeling method based on object matching
CN104104146A (en) Large power grid transformation equipment online monitoring data model establishing method
KR20200082051A (en) System for managing ontology data of power grid
CN104484734A (en) Low-carbon city energy optimized configuration data center architecture
CN105740296B (en) Intelligent substation data subscription method based on access model

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160601