CN105631597A - Construction method for transformer substation three-dimensional visual platform - Google Patents
Construction method for transformer substation three-dimensional visual platform Download PDFInfo
- Publication number
- CN105631597A CN105631597A CN201511012838.3A CN201511012838A CN105631597A CN 105631597 A CN105631597 A CN 105631597A CN 201511012838 A CN201511012838 A CN 201511012838A CN 105631597 A CN105631597 A CN 105631597A
- Authority
- CN
- China
- Prior art keywords
- data
- platform
- visual
- situation
- analysis
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000000007 visual effect Effects 0.000 title claims abstract description 31
- 238000010276 construction Methods 0.000 title claims abstract description 14
- 238000004458 analytical method Methods 0.000 claims abstract description 28
- 238000012800 visualization Methods 0.000 claims abstract description 22
- 230000007613 environmental effect Effects 0.000 claims abstract description 19
- 230000010354 integration Effects 0.000 claims abstract description 14
- 238000004519 manufacturing process Methods 0.000 claims abstract description 14
- 238000005516 engineering process Methods 0.000 claims abstract description 9
- 238000013075 data extraction Methods 0.000 claims abstract description 5
- 238000012502 risk assessment Methods 0.000 claims abstract description 5
- 230000008447 perception Effects 0.000 claims description 26
- 238000000034 method Methods 0.000 claims description 17
- 238000006243 chemical reaction Methods 0.000 claims description 6
- 238000011161 development Methods 0.000 claims description 6
- 238000007794 visualization technique Methods 0.000 claims description 4
- 238000013499 data model Methods 0.000 claims description 3
- 238000000605 extraction Methods 0.000 claims description 3
- 230000003993 interaction Effects 0.000 claims description 3
- 238000006116 polymerization reaction Methods 0.000 claims description 3
- 238000013524 data verification Methods 0.000 claims description 2
- 238000012545 processing Methods 0.000 claims description 2
- 238000012795 verification Methods 0.000 claims description 2
- 238000010219 correlation analysis Methods 0.000 abstract 1
- 238000007781 pre-processing Methods 0.000 abstract 1
- 238000007726 management method Methods 0.000 description 6
- 238000002203 pretreatment Methods 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/30—Information retrieval; Database structures therefor; File system structures therefor of unstructured textual data
- G06F16/35—Clustering; Classification
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Theoretical Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- General Physics & Mathematics (AREA)
- Physics & Mathematics (AREA)
- Tourism & Hospitality (AREA)
- Health & Medical Sciences (AREA)
- Marketing (AREA)
- General Business, Economics & Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Water Supply & Treatment (AREA)
- Quality & Reliability (AREA)
- Educational Administration (AREA)
- Development Economics (AREA)
- Operations Research (AREA)
- Public Health (AREA)
- Game Theory and Decision Science (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Data Mining & Analysis (AREA)
- Databases & Information Systems (AREA)
- General Engineering & Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention provides a construction method for a transformer substation three-dimensional visual platform. Firstly situation awareness demand analysis is performed according to the objective of power grid safety risk assessment; then data preprocessing and data integration are performed in turn according to the result of situation awareness demand analysis; a knowledge correlation analysis engine between environmental factors and production factors is established and then knowledge data extraction is performed so that statistical integrated KPI data of the space and time dimensions are obtained; chart visual displaying of environmental data, the statistical integrated KPI data and knowledge data is performed by adopting the visualization technology; and situation awareness and visual views interact so that situation visualization is realized, and a power grid visual awareness model is established.
Description
Technical field
The present invention is specifically related to the construction process of a kind of substation three-dimensional visualization platform.
Background technology
Distribution network, directly towards industrial enterprise and power consumer, is the important step carrying out end treatment, and its level of automation and level of management directly affect power supply reliability and quality of power supply. User, to improving constantly that power supply service level requires, has higher requirement to distribution network management. Visualized management is an important component part of distribution network management, it makes distribution network management more directly perceived, more convenient operation, it is to increase the distribution network efficiency of management.
Summary of the invention
It is an object of the invention to for the deficiencies in the prior art, it is provided that the construction process of a kind of substation three-dimensional visualization platform, the construction process of this substation's three-dimensional visualization platform can solve the problem well.
For reaching above-mentioned requirements, the technical scheme that the present invention takes is: the construction process providing a kind of substation three-dimensional visualization platform, and the construction process of this substation's three-dimensional visualization platform comprises the steps:
A, carrying out situation perception demand analysis according to the target of power grid security risk assessment, described situation perception demand analysis comprises collects the environmental element of perception needed for target and the data of production factors; B, result according to situation perception demand analysis carry out data prediction and data integration successively, described data prediction comprises based on data prediction technology extraction raw data, carries out data cleansing and Data Format Transform, described data integration comprises and carries out data according to environmental element and production factors based on data integration technology storing classifiedly and data deduplication process and data relation analysis, and the described result according to situation perception demand analysis adopts the mode of data interface collection or database access or instrument collection to carry out several pre-treatment and data integration successively; C, the knowledge connection analysis engine set up between environmental element and the data of production factors, and then carry out knowledge data extraction, obtain the comprehensive KPI data of statistics on room and time dimension degree; D, adopt visualization technique by environmental data, add up comprehensive KPI data and knowledge data carry out the visual presentation of chart; E, by mutual to situation perception and visualization view, it is achieved situation is visual, sets up power grid visualization sensor model; Described situation is visual be environmental data is visual, production data is visual and it is visual to add up comprehensive KPI data, and then formed trending situation perception index.
F, employing SG-CIM model are as the information model of distribution network information interaction, and determine mutual specification according to different information types;
G, setting up visual platform, described visual platform has three-decker: data active layer, it is provided that the raw data of distribution network, by the data object of system by the classification of master data dimension degree, and according to SG-CIM unified data model interface specification, data are encapsulated, pushes to platform layer; Platform layer, comprise shared convergence platform, mobile operating platform and GIS platform, share convergence platform and data polymerization is provided, carry out aggregate objects analysis and drawing out, and corresponding share service is provided, GIS platform carries out data construct and provides external service, and mobile operating platform provides the service of mobile operating; Application and development layer, the information pushed according to GIS platform and mobile operating platform, carries out all kinds of senior application and development.
The construction process of this substation's three-dimensional visualization platform first carries out situation perception demand analysis according to the target of power grid security risk assessment, result according to situation perception demand analysis carries out data prediction and data integration successively again, set up the knowledge connection analysis engine between environmental element and the data of production factors, and then carry out knowledge data extraction, obtain the comprehensive KPI data of statistics on room and time dimension degree, adopt visualization technique by environmental data, add up comprehensive KPI data and knowledge data carry out the visual presentation of chart, by mutual to situation perception and visualization view, realize situation visual, set up power grid visualization sensor model.
Accompanying drawing explanation
Accompanying drawing described herein is used to provide further understanding of the present application, form the part of the application, use identical reference label to represent same or similar part in the drawings, the schematic description and description of the application, for explaining the application, does not form the improper restriction to the application. In the accompanying drawings:
Fig. 1 schematically shows the schematic diagram of the construction process of the substation's three-dimensional visualization platform according to the application's embodiment.
Embodiment
For making the object of the application, technical scheme and advantage clearly, below in conjunction with drawings and the specific embodiments, the application is described in further detail.
In the following description, quoting of " embodiment ", " embodiment ", " example ", " example " etc. is shown that the embodiment of so description or example can comprise special characteristic, structure, characteristic, character, element or limit, but not each embodiment or example must comprise special characteristic, structure, characteristic, character, element or limit. In addition, reuse phrase " according to the application embodiment " although it is possible to refer to for identical embodiment, but also not necessarily refers to for identical embodiment.
For the purpose of simple, eliminate in below describing and well known to a person skilled in the art some technology feature.
An embodiment according to the application, it is provided that the construction process of a kind of substation three-dimensional visualization platform, as shown in Figure 1, comprises the steps:
A, carrying out situation perception demand analysis according to the target of power grid security risk assessment, described situation perception demand analysis comprises collects the environmental element of perception needed for target and the data of production factors; B, result according to situation perception demand analysis carry out data prediction and data integration successively, described data prediction comprises based on data prediction technology extraction raw data, carries out data cleansing and Data Format Transform, described data integration comprises and carries out data according to environmental element and production factors based on data integration technology storing classifiedly and data deduplication process and data relation analysis, and the described result according to situation perception demand analysis adopts the mode of data interface collection or database access or instrument collection to carry out several pre-treatment and data integration successively; C, the knowledge connection analysis engine set up between environmental element and the data of production factors, and then carry out knowledge data extraction, obtain the comprehensive KPI data of statistics on room and time dimension degree; D, adopt visualization technique by environmental data, add up comprehensive KPI data and knowledge data carry out the visual presentation of chart; E, by mutual to situation perception and visualization view, it is achieved situation is visual, sets up power grid visualization sensor model; Described situation is visual be environmental data is visual, production data is visual and it is visual to add up comprehensive KPI data, and then formed trending situation perception index.
F, employing SG-CIM model are as the information model of distribution network information interaction, and determine mutual specification according to different information types;
G, setting up visual platform, described visual platform has three-decker: data active layer, it is provided that the raw data of distribution network, by the data object of system by the classification of master data dimension degree, and according to SG-CIM unified data model interface specification, data are encapsulated, pushes to platform layer; Platform layer, comprise shared convergence platform, mobile operating platform and GIS platform, share convergence platform and data polymerization is provided, carry out aggregate objects analysis and drawing out, and corresponding share service is provided, GIS platform carries out data construct and provides external service, and mobile operating platform provides the service of mobile operating; Application and development layer, the information pushed according to GIS platform and mobile operating platform, carries out all kinds of senior application and development.
An embodiment according to the application, the data cleansing of the construction process of this substation's three-dimensional visualization platform carries out data verification based on database SQL, comprise whether zero data School Affairs whether mistake form verification, data cleansing complete after by data stored in volatile data base; Described Data Format Transform is that according to situation perception desired data structure, the data putting into volatile data base after having cleaned are carried out format conversion, and the content of described format conversion comprises date format analysis processing, decimal process and ranks conversion.
The above embodiment only represents several enforcement modes of the present invention, and it describes comparatively concrete and detailed, but can not be interpreted as limitation of the scope of the invention. , it is also possible to make some distortion and improvement, it should be appreciated that for the person of ordinary skill of the art, without departing from the inventive concept of the premise these all belong to protection domain of the present invention. Therefore protection scope of the present invention should be as the criterion with described claim.
Claims (2)
1. the construction process of substation's three-dimensional visualization platform, it is characterised in that, comprise the steps:
A, carrying out situation perception demand analysis according to the target of power grid security risk assessment, described situation perception demand analysis comprises collects the environmental element of perception needed for target and the data of production factors;
B, result according to situation perception demand analysis carry out data prediction and data integration successively, described data prediction comprises based on data prediction technology extraction raw data, carries out data cleansing and Data Format Transform, described data integration comprises and carries out data according to environmental element and production factors based on data integration technology storing classifiedly and data deduplication process and data relation analysis, and the described result according to situation perception demand analysis adopts the mode of data interface collection or database access or instrument collection to carry out data prediction and data integration successively;
C, the knowledge connection analysis engine set up between environmental element and the data of production factors, and then carry out knowledge data extraction, obtain the comprehensive KPI data of statistics on room and time dimension degree;
D, adopt visualization technique by environmental data, add up comprehensive KPI data and knowledge data carry out the visual presentation of chart;
E, by mutual to situation perception and visualization view, it is achieved situation is visual, sets up power grid visualization sensor model; Described situation is visual be environmental data is visual, production data is visual and it is visual to add up comprehensive KPI data, and then formed trending situation perception index;
F, employing SG-CIM model are as the information model of distribution network information interaction, and determine mutual specification according to different information types;
G, setting up visual platform, described visual platform has three-decker: data active layer, it is provided that the raw data of distribution network, by the data object of system by the classification of master data dimension degree, and according to SG-CIM unified data model interface specification, data are encapsulated, pushes to platform layer; Platform layer, comprise shared convergence platform, mobile operating platform and GIS platform, share convergence platform and data polymerization is provided, carry out aggregate objects analysis and drawing out, and corresponding share service is provided, GIS platform carries out data construct and provides external service, and mobile operating platform provides the service of mobile operating; Application and development layer, the information pushed according to GIS platform and mobile operating platform, carries out all kinds of senior application and development.
2. the construction process of substation according to claim 1 three-dimensional visualization platform, it is characterized in that: described data cleansing carries out data verification based on database SQL, comprise whether zero data School Affairs whether mistake form verification, data cleansing complete after by data stored in volatile data base; Described Data Format Transform is that according to situation perception desired data structure, the data putting into volatile data base after having cleaned are carried out format conversion, and the content of described format conversion comprises date format analysis processing, decimal process and ranks conversion.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201511012838.3A CN105631597A (en) | 2015-12-31 | 2015-12-31 | Construction method for transformer substation three-dimensional visual platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201511012838.3A CN105631597A (en) | 2015-12-31 | 2015-12-31 | Construction method for transformer substation three-dimensional visual platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105631597A true CN105631597A (en) | 2016-06-01 |
Family
ID=56046502
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201511012838.3A Pending CN105631597A (en) | 2015-12-31 | 2015-12-31 | Construction method for transformer substation three-dimensional visual platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105631597A (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106844493A (en) * | 2016-12-26 | 2017-06-13 | 中国科学院自动化研究所 | Space time information towards body is excavated and visual presentation method |
CN106846174A (en) * | 2017-01-10 | 2017-06-13 | 中国南方电网有限责任公司电网技术研究中心 | Method and device for power distribution network situation perception based on data fusion |
CN109493118A (en) * | 2018-10-17 | 2019-03-19 | 国家电网有限公司 | A kind of power grid enterprises' market competitiveness Visual evaluation model building method and system |
CN109947867A (en) * | 2019-03-21 | 2019-06-28 | 国网湖南省电力有限公司 | Electric Power Network Planning data fusion method based on function support dimension |
CN109977128A (en) * | 2019-03-21 | 2019-07-05 | 国网湖南省电力有限公司 | Electric Power Network Planning data fusion method based on tense dimension |
CN110956692A (en) * | 2019-11-26 | 2020-04-03 | 云南电网有限责任公司玉溪供电局 | Method for combining three-dimensional scene visualization based on power supply reliability data analysis |
CN112070400A (en) * | 2020-09-09 | 2020-12-11 | 广东电力信息科技有限公司 | Method and device for evaluating security situation of power grid database |
CN112181952A (en) * | 2020-11-30 | 2021-01-05 | 中国电力科学研究院有限公司 | Method, system, device and storage medium for constructing data model |
CN113742357A (en) * | 2021-08-25 | 2021-12-03 | 国核电力规划设计研究院有限公司 | Method and system for automatically collecting and associating cross-platform design data |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1998000812A1 (en) * | 1996-06-28 | 1998-01-08 | Gakkohojin Ritsumeikan | Server space forming method and apparatus |
CN104008442A (en) * | 2014-05-07 | 2014-08-27 | 南京工程学院 | Power distribution network visual platform construction method based on SG-CIM |
CN104239998A (en) * | 2013-06-20 | 2014-12-24 | 国家电网公司 | Implementation method of smart power grid resource real-time operating state three-dimensional visualization display system |
CN104680260A (en) * | 2015-03-17 | 2015-06-03 | 云南电力调度控制中心 | Method and system for establishing power grid visualized perceptual model |
-
2015
- 2015-12-31 CN CN201511012838.3A patent/CN105631597A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1998000812A1 (en) * | 1996-06-28 | 1998-01-08 | Gakkohojin Ritsumeikan | Server space forming method and apparatus |
CN104239998A (en) * | 2013-06-20 | 2014-12-24 | 国家电网公司 | Implementation method of smart power grid resource real-time operating state three-dimensional visualization display system |
CN104008442A (en) * | 2014-05-07 | 2014-08-27 | 南京工程学院 | Power distribution network visual platform construction method based on SG-CIM |
CN104680260A (en) * | 2015-03-17 | 2015-06-03 | 云南电力调度控制中心 | Method and system for establishing power grid visualized perceptual model |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106844493A (en) * | 2016-12-26 | 2017-06-13 | 中国科学院自动化研究所 | Space time information towards body is excavated and visual presentation method |
CN106846174A (en) * | 2017-01-10 | 2017-06-13 | 中国南方电网有限责任公司电网技术研究中心 | Method and device for power distribution network situation perception based on data fusion |
CN109493118A (en) * | 2018-10-17 | 2019-03-19 | 国家电网有限公司 | A kind of power grid enterprises' market competitiveness Visual evaluation model building method and system |
CN109947867A (en) * | 2019-03-21 | 2019-06-28 | 国网湖南省电力有限公司 | Electric Power Network Planning data fusion method based on function support dimension |
CN109977128A (en) * | 2019-03-21 | 2019-07-05 | 国网湖南省电力有限公司 | Electric Power Network Planning data fusion method based on tense dimension |
CN109977128B (en) * | 2019-03-21 | 2022-03-01 | 国网湖南省电力有限公司 | Power grid planning data fusion method based on temporal dimension |
CN110956692A (en) * | 2019-11-26 | 2020-04-03 | 云南电网有限责任公司玉溪供电局 | Method for combining three-dimensional scene visualization based on power supply reliability data analysis |
CN112070400A (en) * | 2020-09-09 | 2020-12-11 | 广东电力信息科技有限公司 | Method and device for evaluating security situation of power grid database |
CN112181952A (en) * | 2020-11-30 | 2021-01-05 | 中国电力科学研究院有限公司 | Method, system, device and storage medium for constructing data model |
CN113742357A (en) * | 2021-08-25 | 2021-12-03 | 国核电力规划设计研究院有限公司 | Method and system for automatically collecting and associating cross-platform design data |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105631597A (en) | Construction method for transformer substation three-dimensional visual platform | |
CN104573231B (en) | Wisdom building system and method based on BIM | |
CN108446396B (en) | Power data processing method based on improved CIM model | |
CN107730394A (en) | The polynary isomeric data fusion method of panorama power network based on big data | |
CN111159365B (en) | Implementation method, system and storage medium of scheduling model ontology intelligent question-answering system | |
CN103970887A (en) | Information stream display system and method based on GIS distribution network graphs | |
CN103605020B (en) | The treatment process of a kind of power quality data and device | |
CN103234549B (en) | A kind of differential data generation method for upgrading map | |
CN106227846A (en) | Electric network information methods of exhibiting real-time and device | |
CN104134173A (en) | Main and distribution network graph/model/data integrated system based on remote retrieval and information interaction | |
CN105427041A (en) | Standardized maintenance method for reconstruction and extension information point table of running substation | |
CN102426525A (en) | Panoramic modeling method of multi-application system | |
CN108717356B (en) | Metering holographic visual display method and device | |
CN111737364B (en) | Safe multi-party data fusion and federal sharing method, device, equipment and medium | |
CN104102790A (en) | GIS (Geographic Information System)-based automatic diagram forming system and method of power supply diagram | |
CN103093007A (en) | Power transmission iron tower three-dimensional virtual assembly method | |
CN104682560A (en) | Graphical verifying method for power distribution network model transaction | |
CN105930170A (en) | SCD file semantic version management method based on comparison analysis results | |
CN104660957A (en) | A transformer substation monitoring picture remote browsing method | |
CN104881739B (en) | Data consistency verification method is matched somebody with somebody by a kind of battalion based on IEC61970/61968 CIM standards | |
CN102495916A (en) | Multi-application-system panoramic modeling method based on object matching | |
CN104104146A (en) | Large power grid transformation equipment online monitoring data model establishing method | |
KR20200082051A (en) | System for managing ontology data of power grid | |
CN104484734A (en) | Low-carbon city energy optimized configuration data center architecture | |
CN105740296B (en) | Intelligent substation data subscription method based on access model |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160601 |