CN105625641B - 一种用于钢筋连接的frp灌浆套筒 - Google Patents
一种用于钢筋连接的frp灌浆套筒 Download PDFInfo
- Publication number
- CN105625641B CN105625641B CN201610086500.0A CN201610086500A CN105625641B CN 105625641 B CN105625641 B CN 105625641B CN 201610086500 A CN201610086500 A CN 201610086500A CN 105625641 B CN105625641 B CN 105625641B
- Authority
- CN
- China
- Prior art keywords
- sleeve body
- sleeve
- frp
- reinforcing bar
- fiber
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C5/00—Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
- E04C5/16—Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
- E04C5/162—Connectors or means for connecting parts for reinforcements
- E04C5/163—Connectors or means for connecting parts for reinforcements the reinforcements running in one single direction
- E04C5/165—Coaxial connection by means of sleeves
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Reinforcement Elements For Buildings (AREA)
- Piles And Underground Anchors (AREA)
- Revetment (AREA)
Abstract
Description
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610086500.0A CN105625641B (zh) | 2016-02-16 | 2016-02-16 | 一种用于钢筋连接的frp灌浆套筒 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610086500.0A CN105625641B (zh) | 2016-02-16 | 2016-02-16 | 一种用于钢筋连接的frp灌浆套筒 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105625641A CN105625641A (zh) | 2016-06-01 |
CN105625641B true CN105625641B (zh) | 2018-06-12 |
Family
ID=56040947
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610086500.0A Active CN105625641B (zh) | 2016-02-16 | 2016-02-16 | 一种用于钢筋连接的frp灌浆套筒 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105625641B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109057166A (zh) * | 2018-08-29 | 2018-12-21 | 同济大学 | 一种卡扣式易定位灌浆套筒结构 |
Families Citing this family (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106812258B (zh) * | 2016-12-29 | 2019-05-14 | 合肥工业大学 | 一种gfrp全灌浆套筒 |
CN106994739A (zh) * | 2017-04-16 | 2017-08-01 | 北京工业大学 | 一种抗腐蚀frp全灌浆套筒及其作法 |
CN108505688B (zh) * | 2018-04-17 | 2024-08-16 | 中冶建工集团有限公司 | 能止回的灌浆套筒装置 |
WO2020002111A1 (en) * | 2018-06-25 | 2020-01-02 | Carbo-Link Ag | Anchor sleeve and anchor system |
CN108978652A (zh) * | 2018-08-06 | 2018-12-11 | 福海环境科技(青岛)有限公司 | 一种锚固结构、锚固结构的加工方法及外锚固体系 |
CN108797898B (zh) * | 2018-08-08 | 2023-09-15 | 西南科技大学 | 用于frp筋的复合式连接器及其组装方法 |
CN109838041A (zh) * | 2019-03-13 | 2019-06-04 | 北京工业大学 | 一种frp纤维交叉缠绕锥形灌浆套筒及其施作方法 |
CN109914700B (zh) * | 2019-04-03 | 2021-05-14 | 广东长海建设工程有限公司 | 装配式建筑用全灌浆套筒及其使用方法 |
CN112177170B (zh) * | 2020-10-20 | 2022-06-03 | 中建一局集团第五建筑有限公司 | 一种装配式建筑中防雷引下线连接结构及其施工方法 |
CN112726964A (zh) * | 2020-12-30 | 2021-04-30 | 西安建筑科技大学 | 一种适用于双并筋并排连接的螺纹灌浆套筒 |
CN114961111A (zh) * | 2022-03-28 | 2022-08-30 | 柳州城市职业学院 | 一种耐腐蚀复合全灌浆套筒及其成型工艺方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2012157133A1 (ja) * | 2011-05-18 | 2012-11-22 | 東拓工業株式会社 | Pc鋼材用シース |
CN104358360A (zh) * | 2014-10-31 | 2015-02-18 | 沈阳建筑大学 | 一种建筑钢筋连接用全灌浆套筒 |
CN204728585U (zh) * | 2015-02-12 | 2015-10-28 | 同济大学 | 预制拼装的钢筋灌浆连接套筒 |
CN205399829U (zh) * | 2016-02-16 | 2016-07-27 | 沈阳建筑大学 | 一种用于钢筋连接的frp灌浆套筒 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20100031607A1 (en) * | 2008-08-11 | 2010-02-11 | Oliva Michael G | Splice System for Fiber-Reinforced Polymer Rebars |
-
2016
- 2016-02-16 CN CN201610086500.0A patent/CN105625641B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2012157133A1 (ja) * | 2011-05-18 | 2012-11-22 | 東拓工業株式会社 | Pc鋼材用シース |
CN104358360A (zh) * | 2014-10-31 | 2015-02-18 | 沈阳建筑大学 | 一种建筑钢筋连接用全灌浆套筒 |
CN204728585U (zh) * | 2015-02-12 | 2015-10-28 | 同济大学 | 预制拼装的钢筋灌浆连接套筒 |
CN205399829U (zh) * | 2016-02-16 | 2016-07-27 | 沈阳建筑大学 | 一种用于钢筋连接的frp灌浆套筒 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109057166A (zh) * | 2018-08-29 | 2018-12-21 | 同济大学 | 一种卡扣式易定位灌浆套筒结构 |
Also Published As
Publication number | Publication date |
---|---|
CN105625641A (zh) | 2016-06-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105625641B (zh) | 一种用于钢筋连接的frp灌浆套筒 | |
CN104775428B (zh) | 复合型预应力锚索结构及其施工方法 | |
CN204112604U (zh) | 带锥尾的注浆钢筋连接件 | |
CN104674808B (zh) | 装配式中空注浆锚杆的施工方法 | |
CN104790394B (zh) | 预制锚头压力型锚索结构及其施工方法 | |
CN101565989B (zh) | 用frp连接管/膨胀水泥同轴连接frp筋的方法 | |
CN202391019U (zh) | 钢筋端部加粗灌浆接头 | |
CN206090861U (zh) | 幕墙安装用便捷式预埋件 | |
CN104514572A (zh) | 杆体连接装置、锚杆及其制作方法 | |
CN108194100A (zh) | 一种裂隙煤岩体准三维预应力加固方法 | |
CN206554832U (zh) | 一种孔内止浆组件及采用该组件的注浆锚索和锚杆 | |
JP7507445B2 (ja) | 大変形、定抵抗及び支持機能を有するグラウト注入用アンカーケーブル | |
CN108677943A (zh) | 多次控制注浆预应力钢锚管锚索组合结构及其施工方法 | |
CN205617661U (zh) | 短套筒灌浆钢筋连接接头及其所具有的连接套筒和承压环 | |
CN1755184A (zh) | 地下管道和检查井的非开挖整体修复方法 | |
CN205399829U (zh) | 一种用于钢筋连接的frp灌浆套筒 | |
CN109024622B (zh) | 一种边坡加固杆件的使用方法 | |
CN106149874A (zh) | 预制装配式混凝土结构钢筋新型连接方法 | |
CN108755677A (zh) | 一种多次控制注浆的预制内锚头锚索结构 | |
RU2296833C2 (ru) | Способ прокладки водопропускной трубы под дорожной насыпью | |
CN208803378U (zh) | 一种uhpc构件灌浆连接构造 | |
CN106480880B (zh) | 可回收式土钉及使用可回收土钉的施工方法 | |
CN214993804U (zh) | 玻纤复合锚杆 | |
CN207829927U (zh) | 一种分段装配式让压中空注浆锚杆 | |
CN206457996U (zh) | 钢筋用半灌浆套筒接头 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20210705 Address after: No.716, 7th floor, building 4, No.99 Guangfu Road, Wuhou District, Chengdu, Sichuan 610000 Patentee after: Chengdu yishenrui Technology Co.,Ltd. Address before: 110168 Liaoning province Shenyang Hunnan Hunnan Road No. 9 Patentee before: SHENYANG JIANZHU University |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20211111 Address after: 030800 Yang Yi Xiang Guo Li Cun, Taigu County, Jinzhong City, Shanxi Province Patentee after: Shanxi Changhong Power Equipment Co., Ltd Address before: 610000 No. 716, floor 7, building 4, No. 99, Guangfu Road, Wuhou District, Chengdu, Sichuan Patentee before: Chengdu yixinrui Technology Co., Ltd |