CN105625482B - Pattern and its application on underground engineering sole plate - Google Patents

Pattern and its application on underground engineering sole plate Download PDF

Info

Publication number
CN105625482B
CN105625482B CN201610160376.8A CN201610160376A CN105625482B CN 105625482 B CN105625482 B CN 105625482B CN 201610160376 A CN201610160376 A CN 201610160376A CN 105625482 B CN105625482 B CN 105625482B
Authority
CN
China
Prior art keywords
sole plate
sleeve pipe
pattern
described sleeve
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610160376.8A
Other languages
Chinese (zh)
Other versions
CN105625482A (en
Inventor
顾国荣
郭星宇
王克文
杨砚宗
王恺敏
张晓晖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Changkai Geotechnical Engineering Co Ltd
Original Assignee
Shanghai Changkai Geotechnical Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Changkai Geotechnical Engineering Co Ltd filed Critical Shanghai Changkai Geotechnical Engineering Co Ltd
Priority to CN201610160376.8A priority Critical patent/CN105625482B/en
Publication of CN105625482A publication Critical patent/CN105625482A/en
Application granted granted Critical
Publication of CN105625482B publication Critical patent/CN105625482B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/10Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against soil pressure or hydraulic pressure
    • E02D31/12Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against soil pressure or hydraulic pressure against upward hydraulic pressure

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The invention discloses the pattern on a kind of underground engineering sole plate and its application, it is characterised in that the pattern comprises the following steps:Vertically arranged one sleeve pipe with controlled valve and fixation on the sole plate, apply one through the sole plate up to the through hole in the soil body of lower section in described sleeve pipe, close the controlled valve afterwards;Sluicing decompression or grouting and reinforcing can be carried out below sole plate using the pattern.It is an advantage of the invention that, pattern is simple, by carrying out pore-forming in the sleeve pipe with controlled valve, to prevent generation underground water is prominent after sole plate is drilled from gushing, in addition, the pattern can be applied to carry out the sluicing decompression operation below sole plate and grouting and reinforcing construction.

Description

Pattern and its application on underground engineering sole plate
Technical field
The invention belongs to underground engineering technical field, and in particular to a kind of pattern on underground engineering sole plate and It is applied.
Background technology
Gradually extend at present with construction work to underground, basement is more and more deeper, is less than location in sole plate absolute altitude During the water level elevation of domain, sole plate will be by the buoyancy of underground water.
In structure construction procedure, pressure-bearing drainage sump or spilled water hole are often set on sole plate, prevent knot of constructing Structure deadweight is insufficiently resistant to cause structure integrally to float during buoyancy force of underground water.But open up drainage sump on basement sole plate Or during spilled water hole, due to needing to drill sole plate a large amount of underground water will be caused to gush, in this case, use sand bag mostly Stacking pressure, construction have to carry out in the case of water burst, and greatly inconvenience and difficulty are caused to construction.
In addition, when stratum is reinforced in the presence of cavity needs below sole plate, if being carried out once on sole plate Property perforate, it will a large amount of Sands of tapping are caused, great risk is brought to engineering, and in the case of this Sand Grouting and reinforcing is carried out to foundation soil, after slip casting to return slurry situation extremely serious.
The content of the invention
According to the deficiencies of the prior art described above, It is an object of the present invention to provide on a kind of underground engineering sole plate Pattern and its application, the pattern on sole plate by being fixedly installed after the sleeve pipe with controlled valve to enter again Row through hole opens up, to prevent that the prominent of underground water is gushed below sole plate.
The object of the invention is realized and completed by following technical scheme:
Pattern on a kind of underground engineering sole plate, it is characterised in that the pattern comprises the following steps: Vertically arranged one sleeve pipe with controlled valve and fixation on the sole plate, apply one through described in described sleeve pipe Sole plate closes the controlled valve afterwards up to the through hole in the soil body of lower section.
It is by the method that described sleeve pipe is vertically arranged on the sole plate:It is recessed that one is opened up on the sole plate Groove, the depth of groove are less than the thickness of the sole plate, described sleeve pipe are inserted in the groove and fixed.
The method that the through hole is applied in described sleeve pipe is:The controlled valve is opened, brill is utilized in described sleeve pipe Lever apparatus drills the sole plate until forming through hole in the soil body of lower section;Afterwards by set described in the boring rod set lift-off Pipe, and close the controlled valve.
The controlled valve is located in described sleeve pipe above the position of the sole plate upper surface.
A kind of application for being related to pattern on any above-mentioned underground engineering sole plate, it is characterised in that apply the cloth Hole mode carries out sluicing decompression, comprises the following steps:After applying the completion through hole and closing the controlled valve, described Sleeve upper end muzzle, which connects one, has the chimney filter of filter core;The chimney filter is connected with outlet pipe, opens the switch valve in described sleeve pipe Door, underground water enters described sleeve pipe and the chimney filter through the through hole, and is arranged after chimney filter filtering from the outlet pipe Go out.
A kind of application for being related to pattern on any above-mentioned underground engineering sole plate, it is characterised in that apply the cloth Hole mode carries out grouting and reinforcing, comprises the following steps:After applying the completion through hole and closing the controlled valve, by described in The same slip casting machine connection of upper port of sleeve pipe, opens the controlled valve and slip casting machine, the priming petock silt particle into described sleeve pipe Slurry, the cement mortar enters below the sole plate through the through hole carries out grouting and reinforcing in the soil body, after slip casting to be done Close the controlled valve.
It is an advantage of the invention that pattern is simple, by carrying out pore-forming in the sleeve pipe with controlled valve, to prevent Generation underground water is prominent after sole plate is drilled gushes, in addition, the pattern can be applied to carry out the sluicing below sole plate Decompression operation and grouting and reinforcing construction.
Brief description of the drawings
Fig. 1 is the schematic diagram being arranged at the sleeve pipe with controlled valve in the present invention on sole plate;
Fig. 2 is the construction schematic diagram of the cloth hole on sole plate in the present invention;
Fig. 3 in the present invention using opening up the schematic diagram that through hole carries out sluicing decompression operation;
Fig. 4 opens up the schematic diagram of through hole progress grouting and reinforcing operation to be applied in the present invention.
Embodiment
The feature of the present invention and other correlated characteristics are described in further detail by embodiment below in conjunction with accompanying drawing, with It is easy to the understanding of technical staff of the same trade:
Such as Fig. 1-4, mark 1-16 is respectively in figure:Sole plate 1, groove 2, sleeve pipe 3, controlled valve 4, angle bar 5, screw 6th, cement mortar 7, boring rod set 8, through hole 9, soil layer 10, chimney filter 11, path changing head 12, Grouting Pipe 13, connector 14, feed pipe for mortar 15th, slip casting machine 16.
Embodiment 1:
As shown in Figure 1, 2, 3, in order to overcome in existing basement in spilled water hole Tapping procedures, made due to drilling sole plate The deficiency gushed into a large amount of underground water, present embodiments provide the pattern on a kind of underground engineering sole plate, Yi Jiying The method that sluicing decompression is carried out with the pattern, specifically comprises the following steps:
(1)First, a groove 2 is opened up on the sole plate 1 in basement, the groove 2 is in two-part rank from large to small , it is necessary to illustrate, groove 2 does not drill sole plate 1, certain thickness bottom plate is reserved with sole plate 1 scalariform, with Water is gushed in anti-bottom soil layer 10, and open up depth and account for the thickness of sole plate 1 1/2-the 3/4 of groove 2;
(2)Afterwards, choosing one has the sleeve pipe 3 of controlled valve 4, and the lower port of sleeve pipe 3 is inserted into the inner bottom part of groove 2, but It is not passed through sole plate 1;After being inserted into, sleeve pipe 3 is fixedly connected between groove 2 using angle bar 5, i.e. the one of angle bar 5 Side plate is fixed with the sidewall weld of sleeve pipe 3, and another side plate is then screwed by screw 6 with the epimere bottom plate of groove 2 and is connected;Sleeve pipe Above the surface of sole plate 1, controlled valve 4 should be arranged at the top of sleeve pipe 3 in order to which staff is opened it on 3 tops Closed operation;
(3)Sleeve pipe 3 is fixed in order to further spacing, priming petock in the space between the outer wall of sleeve pipe 3 and groove 2 Cement mortar 7;
(4)After the cement mortar 7 of foregoing perfusion solidifies and reaches some strength, the controlled valve 4 in sleeve pipe 3 is opened, Then a boring rod set 8 is deeply opened up into through hole 9 to the inner bottom part of sleeve pipe 3, and using the boring rod set 8, i.e. drill sole plate 1 up in soil layer 10 below, forming through hole 9(Spilled water hole);
(5)After treating through hole construction, the underground water in soil layer 10 will produce it is prominent emerge in large numbers as, it is therefore desirable to above carry rapidly Boring rod set 8 disengages it from sleeve pipe 3, and closing switch valve 4 immediately;
(6)Chimney filter 11 is socketed in the upper port of sleeve pipe 3, the external discharge pipe line again of chimney filter 11, wherein, it is provided with chimney filter 11 Filter element device, anti-filter can be carried out to the silt particle in underground water and other physical particles, prevent silt particle to be lost in;
(7)When underground water hydraulic pressure is higher, the controlled valve 4 in sleeve pipe 3 is opened, in the lower section soil layer 10 of sole plate 1 Underground water is discharged through sleeve pipe 3, and the underground water of discharge can be carried out the silt particle of entrained with underground water when by chimney filter 11 Anti-filter, to prevent the loss of silt particle in soil layer 10, avoid causing geology to endanger.
It should be noted that the sleeve pipe 3 in the present embodiment also can be in the case where not opening up groove 2, directly by its lower end Mouth is fixedly installed on the upper surface of sole plate 1, is fixed by angle bar 5 and screw 6, and by the lower port of sleeve pipe 3 and sole plate 1 Gap between upper surface is sealed.
The beneficial effect that sluicing decompression is carried out using the pattern in the present embodiment is:By dividing on sole plate Walk perforate and the sleeve pipe with controlled valve is simultaneously set, with being capable of closing switch valve rapidly after perforate, you can reaching can be suitable Sharp perforate and can prevents the purpose that underground water is gushed.
Embodiment 2:
As shown in Fig. 1,2,4, in order to overcome in existing basement during grouting and reinforcing, caused due to drilling sole plate The deficiency that a large amount of underground water are gushed, and returned during grouting and reinforcing and starch serious deficiency, one kind is present embodiments provided in underground work Pattern on journey sole plate, and the method for application pattern progress grouting and reinforcing, specifically comprise the following steps:
(1)First, a groove 2 is opened up on the sole plate 1 in basement, the groove 2 is in two-part rank from large to small , it is necessary to illustrate, groove 2 does not drill sole plate 1, certain thickness bottom plate is reserved with sole plate 1 scalariform, with Water is gushed in anti-bottom soil layer 10, and open up depth and account for the thickness of sole plate 1 1/2-the 3/4 of groove 2;
(2)Afterwards, choosing one has the sleeve pipe 3 of controlled valve 4, and the lower port of sleeve pipe 3 is inserted into the inner bottom part of groove 2, but It is not passed through sole plate 1;After being inserted into, sleeve pipe 3 is fixedly connected between groove 2 using angle bar 5, i.e. the one of angle bar 5 Side plate is fixed with the sidewall weld of sleeve pipe 3, and another side plate is then screwed by screw 6 with the epimere bottom plate of groove 2 and is connected;Sleeve pipe Above the surface of sole plate 1, controlled valve 4 should be arranged at the top of sleeve pipe 3 in order to which staff is opened it on 3 tops Closed operation;
(3)Sleeve pipe 3 is fixed in order to further spacing, priming petock in the space between the outer wall of sleeve pipe 3 and groove 2 Cement mortar 7;
(4)After the cement mortar 7 of foregoing perfusion solidifies and reaches some strength, the controlled valve 4 in sleeve pipe 3 is opened, Then a boring rod set 8 is deeply opened up into through hole 9 to the inner bottom part of sleeve pipe 3, and using the boring rod set 8, i.e. drill sole plate 1 up in soil layer 10 below, forming through hole 9(Injected hole);
(5)After treating through hole construction, the underground water in soil layer 10 will produce it is prominent emerge in large numbers as, it is therefore desirable to above carry rapidly Boring rod set 8 disengages it from sleeve pipe 3, and closing switch valve 4 immediately;
(6)The upper port of sleeve pipe 3 is set to be connected by path changing head 12 with Grouting Pipe 13, and the other end of Grouting Pipe 13 then passes through Connector 14 is connected with feed pipe for mortar 15, and feed pipe for mortar 15 connects slip casting machine 16, wherein, slip casting machine 16 may be disposed in basement Ground is may be disposed at, slip casing by pressure is carried out for soil layer 10 into through hole 9 and below;
(7)The controlled valve 4 in sleeve pipe 3 is opened, pressure note is carried out into the through hole 9 of the lower section of sleeve pipe 3 by slip casting machine 16 Slurry, cement mortar is set to be filled under pressure in cavity or space in the lower section soil layer 10 of sole plate 1, so as to pass through note Caiquejee's section strengthening stratum, it is ensured that the safety of basement sole plate 1;After completing grouting and reinforcing, closing switch valve 4, slip casting machine 16 stop carrying out slip casing by pressure.

Claims (6)

1. the pattern on a kind of underground engineering sole plate, it is characterised in that the pattern comprises the following steps: Vertically arranged one sleeve pipe with controlled valve and fixation, one is applied in described sleeve pipe and runs through the base on the sole plate Plinth bottom plate closes the controlled valve afterwards up to the through hole in the soil body of lower section.
2. the pattern on a kind of underground engineering sole plate according to claim 1, it is characterised in that by the set The method that pipe is vertically arranged on the sole plate is:A groove is opened up on the sole plate, the depth of groove is small In the thickness of the sole plate, described sleeve pipe is inserted in the groove and fixed.
3. the pattern on a kind of underground engineering sole plate according to claim 1, it is characterised in that in the set The method that the through hole is applied in pipe is:The controlled valve is opened, boring rod set is utilized in described sleeve pipe by the basis Bottom plate is drilled until forming through hole in the soil body of lower section;Afterwards by the boring rod set lift-off described sleeve pipe, and close the switch Valve.
4. the pattern on a kind of underground engineering sole plate according to claim 1, it is characterised in that the switch Valve is located in described sleeve pipe above the position of the sole plate upper surface.
A kind of 5. application for being related to pattern on any underground engineering sole plates of claim 1-4, it is characterised in that Sluicing decompression is carried out using the pattern, is comprised the following steps:Wait to apply and complete the through hole and close the switch valve Behind the door, there is the chimney filter of filter core in described sleeve pipe upper port socket one;The chimney filter is connected with outlet pipe, opens described sleeve pipe In controlled valve, underground water enters described sleeve pipe and the chimney filter through the through hole, and from institute after chimney filter filtering State outlet pipe discharge.
A kind of 6. application for being related to pattern on any underground engineering sole plates of claim 1-4, it is characterised in that Grouting and reinforcing is carried out using the pattern, is comprised the following steps:Wait to apply and complete the through hole and close the switch valve Behind the door, the same slip casting machine of the upper port of described sleeve pipe is connected, the controlled valve and slip casting machine is opened, into described sleeve pipe Cement injection mortar, the cement mortar enters below the sole plate through the through hole carries out grouting and reinforcing in the soil body, treats The controlled valve is closed after completing slip casting.
CN201610160376.8A 2016-03-21 2016-03-21 Pattern and its application on underground engineering sole plate Active CN105625482B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610160376.8A CN105625482B (en) 2016-03-21 2016-03-21 Pattern and its application on underground engineering sole plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610160376.8A CN105625482B (en) 2016-03-21 2016-03-21 Pattern and its application on underground engineering sole plate

Publications (2)

Publication Number Publication Date
CN105625482A CN105625482A (en) 2016-06-01
CN105625482B true CN105625482B (en) 2017-11-21

Family

ID=56040792

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610160376.8A Active CN105625482B (en) 2016-03-21 2016-03-21 Pattern and its application on underground engineering sole plate

Country Status (1)

Country Link
CN (1) CN105625482B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108867653A (en) * 2018-07-31 2018-11-23 济南轨道交通集团有限公司 A kind of pore type soil layer Foundation Pit Pouring quick treatment device and method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0813465A (en) * 1994-06-29 1996-01-16 Nittoc Constr Co Ltd Drainage boring method
CN102002959A (en) * 2010-12-21 2011-04-06 上海广联建设发展有限公司 Draining device of underground structure foundation and layout method thereof
CN202073107U (en) * 2011-05-10 2011-12-14 中天建设集团有限公司天津分公司 Enclosed construction of dewatering well
CN202164591U (en) * 2011-06-14 2012-03-14 深圳市工勘岩土技术股份有限公司 Water-draining pressure relief device
CN103343543A (en) * 2013-07-09 2013-10-09 中国一冶集团有限公司 Foundation pit dewatering well pressure-reduction-type plugging method
CN103806473A (en) * 2014-03-12 2014-05-21 中国建筑西南勘察设计研究院有限公司 Water release and pressure relief anti-floating structure
CN104711994A (en) * 2015-01-27 2015-06-17 江苏省华建建设股份有限公司 Foundation pit deep well rainfall and plugging construction method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0813465A (en) * 1994-06-29 1996-01-16 Nittoc Constr Co Ltd Drainage boring method
CN102002959A (en) * 2010-12-21 2011-04-06 上海广联建设发展有限公司 Draining device of underground structure foundation and layout method thereof
CN202073107U (en) * 2011-05-10 2011-12-14 中天建设集团有限公司天津分公司 Enclosed construction of dewatering well
CN202164591U (en) * 2011-06-14 2012-03-14 深圳市工勘岩土技术股份有限公司 Water-draining pressure relief device
CN103343543A (en) * 2013-07-09 2013-10-09 中国一冶集团有限公司 Foundation pit dewatering well pressure-reduction-type plugging method
CN103806473A (en) * 2014-03-12 2014-05-21 中国建筑西南勘察设计研究院有限公司 Water release and pressure relief anti-floating structure
CN104711994A (en) * 2015-01-27 2015-06-17 江苏省华建建设股份有限公司 Foundation pit deep well rainfall and plugging construction method

Also Published As

Publication number Publication date
CN105625482A (en) 2016-06-01

Similar Documents

Publication Publication Date Title
CN100510274C (en) Construction method of enclosing level rotary-jet pile hole-mouth using double-liquid slip jection method
CN102926770A (en) Underground draining and grouting process in thin bedrock and thick loose sand layer rich water areas
CN102587361A (en) Polymer material grouted wedge precast pile technique
CN101644048B (en) Slurry injection technique of sleeve valve tube of cloth bag
CN106761835A (en) A kind of Karst Tunnel leak segmenting slip casting construction method
CN207145003U (en) Disposably and permanently stop grouting plug for goaf grouting filling
CN105040775A (en) Deep-layer pressure-bearing artesian well plugging system and method
CN107513995A (en) A kind of bridge struction pile post grouting construction method
CN107747312A (en) A kind of method of sand and gravel stratum well cementing construction
CN103031847B (en) Reducing overlap joint combined type orifice pipe grouting method
CN107653889A (en) A kind of shaped steel pressure is poured water the construction method of soil curtain support pile
CN104164873B (en) Prestressed pipe pile and construction method thereof
CN105926624A (en) Non-return type collecting hole grouting device and construction method thereof
CN105484266B (en) The grouting equipment and its construction method of a kind of multifunctional information
CN106088092B (en) Pile pile piling process occurs refusing the solution of hammer situation
CN105625482B (en) Pattern and its application on underground engineering sole plate
CN105134069B (en) One kind is related to gas vertical and passes through the anti-well method construction technology in strong rich water rock stratum
CN108677959A (en) A kind of grouting tube and grouting construction method suitable for mortar depositing construction under the conditions of limited space
CN101251020A (en) Subsection hole-drilling repeatedly slip-casting method
CN105625481B (en) A kind of underground engineering sluicing hole construction method
CN105735331B (en) A kind of underground engineering construction method for grouting reinforcement
CN105298443B (en) Oil pipe blowout, gaslift and pressure break connection make method under oil pipe float valve and insufficient balance well completion
CN110453672A (en) Loose shallow earthing two fluid grouting reinforcement means
CN115262657B (en) Plugging method for water burst channel after foundation pit recharging
CN207109745U (en) Contain high water head plugging structure in a kind of dam foundation water delivery bottom

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant