CN105611637B - The indicating means and terminal of channel transmission state - Google Patents

The indicating means and terminal of channel transmission state Download PDF

Info

Publication number
CN105611637B
CN105611637B CN201610084109.7A CN201610084109A CN105611637B CN 105611637 B CN105611637 B CN 105611637B CN 201610084109 A CN201610084109 A CN 201610084109A CN 105611637 B CN105611637 B CN 105611637B
Authority
CN
China
Prior art keywords
channel
resource position
frequency range
lbt
current subframe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610084109.7A
Other languages
Chinese (zh)
Other versions
CN105611637A (en
Inventor
周明宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baicells Technologies Co Ltd
Original Assignee
Baicells Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baicells Technologies Co Ltd filed Critical Baicells Technologies Co Ltd
Priority to CN201610084109.7A priority Critical patent/CN105611637B/en
Publication of CN105611637A publication Critical patent/CN105611637A/en
Application granted granted Critical
Publication of CN105611637B publication Critical patent/CN105611637B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/04Wireless resource allocation
    • H04W72/044Wireless resource allocation based on the type of the allocated resource
    • H04W72/0453Resources in frequency domain, e.g. a carrier in FDMA
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/12Wireless traffic scheduling
    • H04W72/1263Mapping of traffic onto schedule, e.g. scheduled allocation or multiplexing of flows
    • H04W72/1268Mapping of traffic onto schedule, e.g. scheduled allocation or multiplexing of flows of uplink data flows
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/20Control channels or signalling for resource management
    • H04W72/23Control channels or signalling for resource management in the downlink direction of a wireless link, i.e. towards a terminal
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W74/00Wireless channel access
    • H04W74/08Non-scheduled access, e.g. ALOHA
    • H04W74/0808Non-scheduled access, e.g. ALOHA using carrier sensing, e.g. carrier sense multiple access [CSMA]
    • H04W74/0816Non-scheduled access, e.g. ALOHA using carrier sensing, e.g. carrier sense multiple access [CSMA] with collision avoidance

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The invention discloses indicating means and terminal that a kind of channel sends state.Wherein, this method comprises: obtaining the resource in the second frequency range;The channel for the resource for being scheduled for the first frequency range by the resource instruction in the second frequency range sends state, wherein the first frequency range is that need to first be listened the frequency range for sending out LBT afterwards, and the second frequency range is the frequency range without LBT or the frequency range by LBT occupancy present channel.The present invention, which solves ascending transmission method in the prior art and can not correctly provide channel, sends state, and the technical issues of lead to uplink low efficiency.

Description

The indicating means and terminal of channel transmission state
Technical field
The present invention relates to the communications fields, and the indicating means and terminal of state are sent in particular to a kind of channel.
Background technique
With the continuous development of the prior art, mobile communication is developed to forth generation by the first generation.Wherein, forth generation is mobile The standard of communication system is relatively uniform in the world, is International Organization for standardization 3GPP (The third Generation Partnership Project) formulate long term evolution (Long Term Evolution/Long Term Evolution- Advanced, LTE/LTE-A), downlink is based on orthogonal frequency and mostly directly enters (Orthogonal Frequency Division Multiple Access, OFDMA), uplink is based on single carrier frequency division and mostly directly enters (Single Carrier-Frequency Division Multiple Access, SC-FDMA) access way, according to flexible bandwidth and adaptive modulating-coding Mode has reached downlink peak rates 1Gbps, the high-speed transfer of upstream peak rate 500Mbps.
By the authorization limited frequency spectrum that operator is possessed, therefore, it is desirable to by being expanded using unlicensed spectrum resource The capacity of LTE.Based on demand above-mentioned, 3GPP has formulated LTE in the standard i.e. LAA (Licensed- of unauthorized band operation Assisted Access, the i.e. access of authorization auxiliary).Unauthorized frequency range resource before use, needing to carry out channel-monitoring to keep away Exempt to interfere and collide, when judging that present channel is not occupied by other users, just meeting busy channel, this mechanism are referred to as elder generation (Listen-Before-Talk, LBT) is said after listening.Downlink transmission method is had standardized in the LAA of LTE R13, in LTE Ascending transmission method will be also standardized in eLAA the and MuLTEfire alliance of R14.LBT and downlink transfer are by base in downlink It stands side completion, and downlink data (such as PDSCH, Physical Downlink Shared can be sent at once after LBT success The abbreviation of Channel, i.e. Physical Downlink Shared Channel).It is different from downlink, upstream data (such as PUSCH, Physical The abbreviation of Uplink Shared Channel, i.e. Physical Uplink Shared Channel) and LBT by terminal UE (User Equipment's Abbreviation, i.e. user terminal) it completes, and uplink scheduling authorization signaling (UL grant) is sent before at least 4ms by base station, such as scheme Shown in 1, the UL grant on carrier wave and unauthorized carrier wave is authorized to send at the n-4 moment, is used to indicate unauthorized at the n moment The resource location of PUSCH on carrier wave.
Since the UL grant of eNB (abbreviation of evolved Node B, i.e. base station) is at least before the PUSCH transmission of UE 4ms send, therefore eNB when sending UL grant can not it is expected that UE LBT as a result, not can guarantee UE can scheduling when Upstream data is sent in frequency resource, for example, UE may fail due to LBT, PUSCH can not be sent.For in unauthorized frequency range For the UE for transmitting uplink, 1) the reason of not sending uplink (Discontinuous Transmission, DTX) includes: (E) PDCCH (Physical Downlink Control Channel, i.e. physical down control of traditional transmission UL grant Channel) reception failure;2) before the exclusive UE of unauthorized frequency range sends upstream data on the running time-frequency resource of scheduling, the LBT of UE Do not succeed.In authorized spectrum band, eNB can judge DTX by way of energy measuring, but in unauthorized frequency range, due to other Equipment equally understand the reason of busy channel and cause energy measuring judgement inaccuracy, namely unauthorized frequency range transmission due to The influence of interference and collision, the error probability that will lead to the UL grant transmitted in unauthorized frequency range rises, and then DTX probability Rise, while the competitive properties of unauthorized frequency range will lead to the LBT probability of failure (i.e. LBT is not in the success of scheduled transmission moment) of UE Increase with channel user number and increase, DTX probability can be further increased.
To sum up, eNB can not be identified effectively in the biggish DTX event of unauthorized frequency range probability of happening, that is, UE cannot be distinguished The situation of DTX (terminal does not send uplink) and PUSCH transmission mistake.When eNB to UE since DTX is without the resource of transmission When signal on position is demodulated, CRC (abbreviation of Cyclic Redundancy Check, i.e. cyclic redundancy are inevitably resulted in Bit check) check errors.If eNB is considered PUSCH transmission mistake and is cached, HARQ (Hybrid is initiated Automatic Repeat reQuest, i.e. hybrid automatic repeat-request) when retransmitting, it will lead to and receive the property that merges next time It can decline;If when eNB caching is the signal that other equipment are sent, influence is especially serious when terminal does not send uplink, Therefore ascending HARQ processing can not effectively be carried out.
Channel can not be correctly provided for ascending transmission method in the prior art and sends state, and uplink is caused to be imitated The low problem of rate, currently no effective solution has been proposed.
Summary of the invention
The embodiment of the invention provides indicating means and terminal that a kind of channel sends state, at least to solve the prior art In ascending transmission method can not correctly provide channel and send state, and the technical issues of lead to uplink low efficiency.
According to an aspect of an embodiment of the present invention, a kind of indicating means of channel transmission state, the instruction side are provided Method includes: the resource obtained in the second frequency range;The money of the first frequency range is scheduled for by the resource instruction in second frequency range The channel in source sends state, wherein first frequency range is that need to first be listened the frequency range for sending out LBT afterwards, and second frequency range is not It carries out the frequency range of the LBT or occupies the frequency range of present channel by the LBT.
Further, the channel for the resource for being scheduled for the first frequency range by the resource instruction in the second frequency range sends state It include: terminal according to the channel transmission state in the first resource position that first frequency range is dispatched, in second frequency range The channel, which is transmitted, on the Secondary resource position of the corresponding terminal sends state.
Further, terminal sends state according to the channel in the first resource position that the first frequency range is dispatched, in the second frequency Transmitting the channel on the Secondary resource position of the correspondence terminal of section and sending state includes: according to uplink scheduling authorization UL grant determines the Secondary resource position of Physical Uplink Control Channel PUCCH in second frequency range and described the The first resource position of Physical Uplink Shared Channel PUSCH in one frequency range;State is sent based on the channel to determine whether Data are sent on the first resource position, and are sent the channel on the Secondary resource position and sent state.
Further, state is sent based on the channel to determine whether to send data on the first resource position, and It include: after channel sends terminal described in state instruction and first listens sending the channel on the Secondary resource position to send state When sending out LBT success, data are sent on the first resource position, and LBT success is sent on corresponding Secondary resource position Instruction;When channel send state instruction described in terminal first listen send out afterwards LBT fail when, do not sent on the first resource position Data, and the instruction that transmission LBT fails on corresponding Secondary resource position.
Further, determine that the physical uplink in second frequency range controls letter according to uplink scheduling authorization UL grant The Secondary resource position of road PUCCH and the first resource position of the Physical Uplink Shared Channel PUSCH in first frequency range Setting includes: the PUSCH in the case where UL grant instruction starts to transmit data after the beginning boundary of current subframe First resource position start after the beginning boundary of the current subframe, and terminate in the end boundary of the current subframe, The current subframe has a transmission opportunity;The Secondary resource position of the PUCCH is determined according to the UL grant.
Further, the first resource position of the PUSCH starts after the beginning boundary of the current subframe, and in institute The end boundary for stating current subframe terminates to include: that first orthogonal frequency division multiplexing technology OFDM symbol of the current subframe is used for The first resource position of the LBT, the PUSCH start in second OFDM symbol of the current subframe, described current The last one OFDM symbol of subframe terminates.
Further, determine that the Secondary resource position includes: to indicate from the UL grant according to the UL grant Second OFDM symbol of first time slot start, using the format of PUCCH format 1, at first Time domain code point is carried out using the orthogonal code that code length is 3 in gap, with the time-domain resource of the determination Secondary resource position;From the UL I-th of OFDM symbol of second time slot of grant instruction starts, and carries out time domain code point using the orthogonal code that code length is 5-i, with Determine the time-domain resource of the Secondary resource position, wherein the i is 1 or 2;In the format using PUCCH format 2/3 In the case where, first OFDM symbol is fallen in directly punching.
Further, determine that the physical uplink in second frequency range controls letter according to uplink scheduling authorization UL grant The Secondary resource position of road PUCCH and the first resource position of the Physical Uplink Shared Channel PUSCH in first frequency range Setting includes: the PUSCH in the case where UL grant instruction starts to transmit data before the beginning boundary of current subframe First resource position start in the beginning boundary of the current subframe, and terminate before the end boundary of the current subframe; The Secondary resource position of the PUCCH is determined according to the UL grant.
Further, the first resource position of the PUSCH starts in the beginning boundary of the current subframe, and described End includes: that the last one OFDM symbol of a upper subframe for the current subframe is used for before the end boundary of current subframe LBT, the first resource position is since first OFDM symbol of the current subframe, reciprocal the of the current subframe Two OFDM symbols terminate.
Further, determine that the physical uplink in second frequency range controls letter according to uplink scheduling authorization UL grant The Secondary resource position of road PUCCH and the first resource position of the Physical Uplink Shared Channel PUSCH in first frequency range Setting includes: the PUSCH in the case where UL grant instruction starts to transmit data after the beginning boundary of current subframe First resource position start behind the position for LBT of the current subframe, and in the end boundary of the current subframe Terminate, the current subframe has multiple transmission opportunities;The Secondary resource position of the PUCCH is determined according to the UL grant It sets.
Further, the transmission opportunity is two, wherein the first resource position of the PUSCH is in the current son Start behind the position for LBT of frame include: first time slot of the current subframe first OFDM symbol for LBT, First transmission opportunity is since second OFDM symbol of first time slot of the current subframe, in the current son The last one OFDM symbol of frame terminates;First OFDM symbol of second time slot of the current subframe be used for LBT, second A transmission opportunity is since second OFDM symbol of second time slot of the current subframe, in the current subframe The last one OFDM symbol terminates.
Further, in first OFDM of first time slot that the transmission opportunity is two and the current subframe In the case that symbol is used for LBT, the method also includes: the last one OFDM symbol of first time slot of the current subframe For LBT, second transmission opportunity is since first OFDM symbol of second time slot of the current subframe, in institute The last one OFDM symbol for stating current subframe terminates.
Further, determine that the Secondary resource position of the PUCCH includes: described in first according to the UL grant In transmission opportunity, using the format of PUCCH format 1, from first time slot of UL grant instruction Second OFDM symbol start and use the orthogonal code that code length is 3 to carry out time domain code point, code length is used in second time slot Time domain code point is carried out for 4 orthogonal code, with the time-domain resource of the determination Secondary resource position;In second transmission opportunity In, since second OFDM symbol of second time slot that the UL grant is indicated, carried out using the orthogonal code that code length is 3 Time domain code point, with the time-domain resource of the determination Secondary resource position,.The case where using the format of PUCCH format 2/3 Under, directly first OFDM symbol in first time slot and second time slot is fallen in punching respectively.
Further, state is sent based on the channel to determine whether to send data on the first resource position, and Sent on the Secondary resource position channel send state include: when the terminal first transmission opportunity it It is preceding to send data in first transmission opportunity when sending state based on the channel and determining LBT success, and described the The channel is sent on first of two resource locations and/or second time slot sends state;When the terminal is in first institute When determining LBT failure based on channel transmission state before stating transmission opportunity, do not sent in first transmission opportunity Data, and send the channel on first of the Secondary resource position and/or second time slot and send state.
Further, state is sent based on the channel before first transmission opportunity when the terminal to determine When LBT fails, it includes one of the following that the channel is sent on first time slot of the Secondary resource position and sends state: The prompt of LBT failure is sent on first time slot of the Secondary resource position;In first of the Secondary resource position The prompt of LBT failure is sent in gap, and waits the instruction of next transmission opportunity of the first resource position;Described second Any signal is not sent on first time slot of resource location.
Further, state is sent based on the channel to determine whether to send data on the first resource position, and Sent on the Secondary resource position channel send state include: when the terminal second transmission opportunity it It is preceding to send data in second transmission opportunity when sending state based on the channel and determining LBT success, and described the LBT is sent on second time slot of two resource locations successfully to indicate;When the terminal before second transmission opportunity base When the channel sends state and determines LBT failure, data are not sent in first transmission opportunity, and described second LBT is sent on second time slot of resource location unsuccessfully to indicate.
Further, determine that the physical uplink in second frequency range controls letter according to uplink scheduling authorization UL grant The Secondary resource position of road PUCCH and the first resource position of the Physical Uplink Shared Channel PUSCH in first frequency range Setting includes: the PUSCH in the case where UL grant instruction starts to transmit data before the beginning boundary of current subframe First resource position start in the beginning boundary of the current subframe, and terminate before the end boundary of the current subframe, The current subframe has multiple transmission opportunities;The Secondary resource position of the PUCCH is determined according to the UL grant.
Further, it includes: in second frequency range that the channel is sent on the Secondary resource position and sends state Main plot on Secondary resource position on use single-carrier frequency division multiple access multiplexing transmission mode;In MuLTEfire, in institute State the multiplexing transmission mode that block interleaving frequency division multiple access B-IFDMA is used on the first resource position of the first frequency range.
Further, the method also includes: when the main plot in MuLTEfire is in first frequency range, described Physical Uplink Control Channel PUCCH or enhancing Physical Uplink Control Channel of the secondary cell of first frequency range in the main plot The channel is transmitted on the ePUCCH or sPUCCH of shortening sends state.
Further, it includes: when on main plot that the channel is sent on the Secondary resource position and sends state When PUCCH need to support the channel in multiple secondary cells to send state instruction, by using PUCCH format 2/3, bitmap is used The mode of bitmap indicates that the channel in each secondary cell sends state.
Further, using the format of PUCCH format 2/3, by directly punching first The mode of OFDM symbol vacates a symbol of LBT;Using the format of PUCCH format 2/3, by straight It takes hole and falls the mode of the last one OFDM symbol to vacate a symbol of LBT.
Further, the mode for increasing bitmap bitmap includes one of the following: increasing control message UCI bit number;Increase The CRC mask of UCI;The number of multiple PUCCH is sent by UCI;The UCI is sent in the PUSCH.
Further, determining that it includes: the base when the terminal is accessed that data are sent on the first resource position It stands and passes through the UL grant while to be scheduled to the terminal multiple in the carrier wave in first frequency range, from multiple loads It selects a carrier wave to send the data in wave, and sends the letter on the corresponding second frequency resource location of the carrier wave of selection Road sends state.
Further, selecting a carrier wave to send the data from multiple carrier waves includes: from multiple carrier waves The middle highest carrier wave of selection channel quality sends the data.
According to another aspect of an embodiment of the present invention, a kind of terminal is additionally provided, comprising: acquiring unit, for obtaining the Resource in two frequency ranges;Indicating unit, for being scheduled for the money of the first frequency range by the resource instruction in second frequency range The channel in source sends state, wherein first frequency range is that need to first be listened the frequency range for sending out LBT afterwards, and second frequency range is not It carries out the frequency range of the LBT or occupies the frequency range of present channel by the LBT.
Further, the indicating unit includes: transmission module, for terminal according to dispatched in first frequency range The channel of one resource location sends state, on the Secondary resource position of the correspondence terminal of second frequency range described in transmission Channel sends state.
In embodiments of the present invention, by obtaining the resource in the second frequency range, and pass through the resource instruction in the second frequency range The channel for being scheduled for the resource of the first frequency range sends state, and eNB can be enable accurately to know UE when sending UL grant LBT as a result, thereby may be ensured that UE can send upstream data on the running time-frequency resource of scheduling, avoid DTX to uplink The influence of HARQ performance, and then the efficiency and reliability of uplink are improved, solve uplink side in the prior art Method can not correctly provide channel and send state, and the problem of lead to uplink low efficiency.
Detailed description of the invention
The drawings described herein are used to provide a further understanding of the present invention, constitutes part of this application, this hair Bright illustrative embodiments and their description are used to explain the present invention, and are not constituted improper limitations of the present invention.In the accompanying drawings:
Fig. 1 is the schematic diagram that a kind of data are transmitted according to prior art;
Fig. 2 is the flow chart for the indicating means that a kind of channel according to an embodiment of the present invention sends state;
Fig. 3 is the schematic diagram that a kind of optional instruction channel according to an embodiment of the present invention sends state;
Fig. 4 is the schematic diagram that a kind of optional instruction channel according to an embodiment of the present invention sends state;
Fig. 5 is the schematic diagram that a kind of optional instruction channel according to an embodiment of the present invention sends state;
Fig. 6 is the schematic diagram that a kind of optional instruction channel according to an embodiment of the present invention sends state;
Fig. 7 is the schematic diagram that a kind of optional instruction channel according to an embodiment of the present invention sends state;
Fig. 8 is the schematic diagram that a kind of optional instruction channel according to an embodiment of the present invention sends state;
Fig. 9 is a kind of schematic diagram of terminal according to an embodiment of the present invention.
Specific embodiment
In order to enable those skilled in the art to better understand the solution of the present invention, below in conjunction in the embodiment of the present invention Attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is only The embodiment of a part of the invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill people The model that the present invention protects all should belong in member's every other embodiment obtained without making creative work It encloses.
It should be noted that description and claims of this specification and term " first " in above-mentioned attached drawing, " Two " etc. be to be used to distinguish similar objects, without being used to describe a particular order or precedence order.It should be understood that using in this way Data be interchangeable under appropriate circumstances, so as to the embodiment of the present invention described herein can in addition to illustrating herein or Sequence other than those of description is implemented.In addition, term " includes " and " having " and their any deformation, it is intended that cover Cover it is non-exclusive include, for example, the process, method, system, product or equipment for containing a series of steps or units are not necessarily limited to Step or unit those of is clearly listed, but may include be not clearly listed or for these process, methods, product Or other step or units that equipment is intrinsic.
According to embodiments of the present invention, a kind of embodiment of the indicating means of channel transmission state is provided, needs to illustrate It is that step shown in the flowchart of the accompanying drawings can execute in a computer system such as a set of computer executable instructions, Also, although logical order is shown in flow charts, and it in some cases, can be to be different from sequence execution herein Shown or described step.
Fig. 2 is the flow chart for the indicating means that a kind of channel according to an embodiment of the present invention sends state, as shown in Fig. 2, This method includes can be with following steps:
Step S201 obtains the resource in the second frequency range.
The channel of step S202, the resource for being scheduled for the first frequency range by the resource instruction in the second frequency range send shape State, wherein the first frequency range is that need to first be listened the frequency range for sending out LBT afterwards, and the second frequency range is the frequency range without LBT or passes through The frequency range of LBT occupancy present channel.
Using the embodiment of the present invention, the channel of the resource of the first frequency range is scheduled for by the resource instruction in the second frequency range Transmission state.Through the foregoing embodiment, can enable eNB accurately know when sending UL grant UE LBT as a result, to It can guarantee that UE can send upstream data on the running time-frequency resource of scheduling, avoid influence of the DTX to ascending HARQ performance, into And the efficiency and reliability of uplink are improved, channel can not correctly be provided by solving ascending transmission method in the prior art Transmission state, and the problem of lead to uplink low efficiency.
Specifically, terminal sends state according to the channel for the resource dispatched in the first frequency range, in the correspondence of the second frequency range The channel is transmitted on the transfer resource of the terminal and sends state, it can when eNB sends UL grant, shape is sent by channel State indicates the LBT of UE as a result, in the successful situation of LBT for determining UE, it is ensured that the time-frequency that UE is dispatched in the first frequency range Upstream data is sent in resource.
In the above-described embodiments, indicate that the up channel of unauthorized frequency range in current subframe is sent by authorized spectrum band resource State, namely indicate whether the resource for being scheduled for unauthorized frequency range is successfully transmitted by the resource of authorized spectrum band, it avoids Influence of the DTX to ascending HARQ performance, to improve the efficiency and reliability of uplink.
In the above embodiment of the invention, the resource of the first frequency range is scheduled for by the resource instruction in the second frequency range Channel to send state include: terminal according to the channel transmission state in the first resource position that the first frequency range is dispatched, second Transmission channel sends state on the Secondary resource position of the counterpart terminal of frequency range.
In an alternative embodiment, the first above-mentioned frequency range is that need to first be listened the frequency range for sending out LBT afterwards, can be non- Authorized spectrum band;Second frequency range is the frequency range without LBT or the frequency range by LBT occupancy present channel, can be authorization frequency Section, by the channel that the instruction of resource in the second frequency range is scheduled for the resource of the first frequency range send state include: terminal according to Channel in the first resource position of unauthorized frequency range scheduling sends state, in the Secondary resource position of the counterpart terminal of authorized spectrum band It sets transmission channel and sends state.
In the above embodiment of the invention, terminal is according to the channel transmission in the first resource position that the first frequency range is dispatched State, it includes: to be awarded according to uplink scheduling that transmission channel, which sends state, on the Secondary resource position of the counterpart terminal of the second frequency range Weigh the Secondary resource position of the determining Physical Uplink Control Channel PUCCH in the second frequency range of UL grant and in the first frequency range On Physical Uplink Shared Channel PUSCH first resource position;State is sent based on channel to determine whether in first resource position Transmission data are set, and sends channel on Secondary resource position and sends state.
Optionally, terminal sends state according to the channel in the first resource position that unauthorized frequency range is dispatched, in authorization frequency It includes: to be determined according to uplink scheduling authorization UL grant that transmission channel, which sends state, on the Secondary resource position of the counterpart terminal of section The Secondary resource position of Physical Uplink Control Channel PUCCH in authorized spectrum band and the physical uplink in unauthorized frequency range The first resource position of shared channel PUSCH;State is sent based on channel to determine whether to send data on first resource position, And channel is sent on Secondary resource position and sends state.
Further, it sends state based on channel to determine whether to send data on first resource position, and in the second money Sending channel on source position and sending state includes: when channel transmission state instruction terminal first listens and sends out LBT success afterwards, in the first money Data are sent on source position, and are sent LBT on corresponding Secondary resource position and successfully indicated;When channel sends state instruction Terminal first listen send out afterwards LBT failure when, data are not sent on first resource position, and send on corresponding Secondary resource position The instruction of LBT failure.
Specifically, according to uplink scheduling authorization UL grant (abbreviation of CCE, Control Channel Element, control Channel Elements processed) information instruction correspond to authorized spectrum band main plot on Physical Uplink Control Channel PUCCH (Physical Uplink Control Channel, i.e. physical uplink control channel) resource number (i.e. above-mentioned Secondary resource position Set) and Physical Uplink Shared Channel PUSCH (Physical Uplink Shared in unauthorized secondary cell Channel, i.e. Physical Uplink Shared Channel) resource location (i.e. above-mentioned first resource position).Wherein, above-mentioned uplink tune Degree authorization UL grant can be sent on first resource position or Secondary resource position.
State is sent based on channel to determine whether to send data on first resource position, and is sent out on Secondary resource position It gives channel and is sent to the scheme of state and include:
When channel transmission state instruction UE first listens in the subframe of scheduling sends out LBT success afterwards, then corresponding PUSCH's Data are sent on first resource position, and are sent LBT on the Secondary resource position of corresponding PUCCH and successfully indicated;
When channel transmission state instruction UE first listens in the subframe of scheduling sends out LBT failure afterwards, then corresponding PUSCH's Data are not sent on first resource position, and the instruction of LBT failure is sent on the Secondary resource position of corresponding PUCCH.
It may include: first to listen in the subframe of scheduling when channel sends state instruction terminal that specific channel, which sends state instruction, When hair LBT is failed afterwards, it is no longer attempt to transmit next time;After channel, which sends state instruction terminal, first to be listened in the subframe of scheduling It when hair LBT is failed, continues to attempt to transmit next time, after channel transmission state instruction terminal is first listened in the subframe of scheduling Send out LBT success;And it is first listened in the subframe of scheduling when channel transmission state instruction terminal and sends out LBT three kinds of situations of success afterwards.
Through the foregoing embodiment, define that sending state based on channel determines whether to send number on first resource position According to, and transmission channel sends the scheme of state on Secondary resource position, so as to accurately know LBT as a result, to guarantee In the successful situation of LBT, UE sends data to base station, to improve the efficiency of uplink.
In the above embodiment of the invention, it is determined in the second frequency range according to uplink scheduling authorization UL grant (as authorized Frequency range) on Physical Uplink Control Channel PUCCH Secondary resource position and in the first frequency range (such as unauthorized frequency range) The first resource position of Physical Uplink Shared Channel PUSCH includes: to indicate after the beginning boundary of current subframe in UL grant Start in the case where transmitting data, the first resource position of PUSCH starts after the beginning boundary of current subframe, and in current son The end boundary of frame terminates, and current subframe has a transmission opportunity;The Secondary resource position of PUCCH is determined according to UL grant It sets.
Optionally, the first resource position of PUSCH starts after the beginning boundary of current subframe, and in the knot of current subframe Beam boundary terminate include: current subframe first orthogonal frequency division multiplexing technology OFDM symbol for LBT, the first money of PUSCH Source position starts in second OFDM symbol of current subframe, terminates in the last one OFDM symbol of current subframe.
Further, determine that Secondary resource position includes: first time slot indicated from UL grant according to UL grant Second OFDM symbol start, using the format of PUCCH format 1, code length is used in first time slot Time domain code point is carried out for 3 orthogonal code, to determine the time-domain resource of Secondary resource position;From UL grant indicate second when I-th of OFDM symbol of gap starts, and time domain code point is carried out using the orthogonal code that code length is 5-i, to determine Secondary resource position Time-domain resource, wherein i is 1 or 2;Using the format of PUCCH format 2/3, directly punching falls first OFDM symbol.
Specifically, start the scene of transmission behind current subframe boundary for PUSCH, namely indicated in UL grant In the case that PUSCH starts to transmit data after the beginning boundary of current subframe, UL LBT (uplink LBT) is originated in current subframe Behind boundary, first PUSCH starts after the beginning boundary of current subframe, and terminates in the end boundary of current subframe.Working as In the case that preceding subframe has a transmission opportunity, first OFDM (Orthogonal Frequency of current subframe The abbreviation of Division Multiple, i.e. orthogonal frequency division multiplexing technology) symbol (is specifically as follows in second OFDM for LBT 25 μ s before sign-on), PUSCH transmits data since second OFDM symbol of current subframe, and at the last one OFDM symbol terminates to transmit data.Similar in CA (Carrier Aggregation, i.e. carrier set) according to DL GRANT come The method for determining PUCCH resource position on PCell (Primary cell, i.e. main plot) is awarded here according to uplink scheduling is sent UL GRANT is weighed to determine the PUCCH resource position on PCell.Wherein, the PUCCH on authorized spectrum band PCell is at first Slot (i.e. first time slot) (assuming that use PUCCH format 1 series) since second OFDM symbol is using code length 3 orthogonal code carries out time domain code point, and PUCCH second slot (i.e. second time slot) can from first OFDM symbol or Second OFDM symbol of person or rear three OFDM symbols etc. start, and carry out time domain code point using the orthogonal code that code length is 3 or 4, To determine the Secondary resource position of PUCCH.Using the format of PUCCH format 2/3, directly punching falls first A OFDM symbol.When LBT success, UE sends data in PUSCH, and sends LBT in PUCCH resource and successfully indicate;When LBT loses It loses, UE does not send data in PUSCH, and sends LBT in PUCCH resource and unsuccessfully indicate.
As shown in table 1, the orthogonal code that code length is 2, code length is 3 or code length is 4 can be used and carry out time domain code point.
Table 1
As shown in figure 3, the embodiment is to start the scene of transmission behind current subframe boundary for PUSCH, it is small comprising master Area and secondary cell, two cells all include 4 subframes (subframe 1, subframe 2, subframe 3 and subframe 4), 1 He of subframe in main plot Subframe 4 include two time slots (first time slot and second time slot), and in two time slots black part indicate PUCCH when Domain position, i.e., the Secondary resource position of above-mentioned PUCCH.In the embodiment, carried out using first OFDM symbol of subframe 1 LBT, and data are transmitted since second OFDM symbol, terminate to transmit data in the last one OFDM symbol.When LBT success When, UE sends data in the PUSCH of secondary cell, and sends LBT success in the PUCCH resource of first time slot and second time slot Instruction;When LBT failure, UE does not send data in the PUSCH of secondary cell, and in first time slot and second time slot PUCCH resource sends LBT and unsuccessfully indicates.
It should be noted that LBT state only can be indicated by the PUCCH of second slot, that is, can be only second The PUCCH resource of time slot sends LBT state.As shown in figure 4, the embodiment includes main plot and secondary cell, two cells are all wrapped Containing 4 subframes (subframe 1, subframe 2, subframe 3 and subframe 4), subframe 1 and subframe 4 in main plot include two time slot (first Time slot and second time slot), wherein the part of black indicates the time-domain position of PUCCH in second time slot, i.e., above-mentioned The Secondary resource position of PUCCH.In the embodiment, LBT is carried out using first OFDM symbol of subframe 1, and from second OFDM symbol starts to transmit data, terminates to transmit data in the last one OFDM symbol.Unlike Fig. 3, in the embodiment LBT state is only sent by the PUCCH resource in second slot.When LBT success, UE sends number in the PUSCH of secondary cell According to, and send LBT in the PUCCH resource of second time slot and successfully indicate;When LBT failure, UE is not sent out in the PUSCH of secondary cell Data are sent, and sends LBT in the PUCCH resource of second time slot and unsuccessfully indicates.
Through the foregoing embodiment, it defines in the case where current subframe has a transmission opportunity, passes through authorized spectrum band On resource instruction be scheduled for unauthorized frequency range resource channel send state scheme, so that reaching is sending eNB The purpose that the LBT result of UE can be accurately known when UL grant, improves the efficiency of uplink.
In the above embodiment of the invention, it is determined in the second frequency range according to uplink scheduling authorization UL grant (as authorized Frequency range) on Physical Uplink Control Channel PUCCH Secondary resource position and in the first frequency range (such as unauthorized frequency range) The first resource position of Physical Uplink Shared Channel PUSCH includes: to indicate before the beginning boundary of current subframe in UL grant Start in the case where transmitting data, the first resource position of PUSCH starts in the beginning boundary of current subframe, and in current subframe End boundary before terminate;The Secondary resource position of PUCCH is determined according to UL grant.
Further, the first resource position of PUSCH starts in the beginning boundary of current subframe, and in the knot of current subframe Terminate before beam boundary include: a upper subframe for current subframe the last one OFDM symbol for LBT, first resource position from First OFDM symbol of current subframe starts, and terminates in the penultimate OFDM symbol of current subframe.
Specifically, start the scene of transmission before current subframe boundary for PUSCH, namely indicated in UL grant In the case that PUSCH starts to transmit data before the beginning boundary of current subframe, UL LBT is before current subframe beginning boundary, and the One PUSCH starts in the beginning boundary of current subframe, and terminates before the end boundary of current subframe.Upper the one of current subframe The last one OFDM symbol of a subframe for carrying out LBT (being specifically as follows 25 μ s before current subframe starts), PUSCH from First OFDM symbol of current subframe starts to transmit data, and terminates to transmit in the penultimate OFDM symbol of current subframe Data.Similar existing and SRS (abbreviation of Sounding Reference Signal, i.e. Sounding reference signal) passes simultaneously Using the format of PUCCH format 1/2, directly first OFDM symbol is fallen in punching by PUCCH when defeated, PUCCH Number, to determine the running time-frequency resource of PUCCH resource position on PCell.It is determined on PCell similar in CA according to DL GRANT The method of PUCCH resource position determines the PUCCH resource on PCell here according to uplink scheduling authorization UL GRANT is sent Position, wherein the PUCCH in authorized spectrum band is indicated using existing PUCCH format.
As shown in figure 5, the embodiment is to start the scene of transmission before current subframe boundary for PUSCH, it is small comprising master Area and secondary cell, two cells all include 4 subframes (subframe 1, subframe 2, subframe 3 and subframe 4), 1 He of subframe in main plot Subframe 4 include two time slots (first time slot and second time slot), and in two time slots black part indicate PUCCH when Domain position, i.e., the Secondary resource position of above-mentioned PUCCH.In the embodiment, the last one of a upper subframe for subframe 1 is used OFDM symbol carries out LBT, and data are transmitted since first OFDM symbol of subframe 1, in penultimate OFDM symbol knot Beam transmits data.
In above-mentioned implementation of the invention is shown, determined in the second frequency range according to uplink scheduling authorization UL grant (as authorized Frequency range) on Physical Uplink Control Channel PUCCH Secondary resource position and in the first frequency range (such as unauthorized frequency range) The first resource position of Physical Uplink Shared Channel PUSCH includes: to indicate after the beginning boundary of current subframe in UL grant Starting in the case where transmitting data, the first resource position of PUSCH starts behind the position for LBT of current subframe, and The end boundary of current subframe terminates, and current subframe has multiple transmission opportunities;The second money of PUCCH is determined according to UL grant Source position.
In a kind of optional example in real time, transmission opportunity is two, wherein the first resource position of PUSCH is in current son Start behind the position with LBT of frame include: first time slot of current subframe first OFDM symbol for LBT, first Transmission opportunity is accorded with since second OFDM symbol of first time slot of current subframe in the last one OFDM of current subframe Number terminate;First OFDM symbol of second time slot of current subframe is used for LBT, and second transmission opportunity is from current subframe Second OFDM symbol of second time slot starts, and terminates in the last one OFDM symbol of current subframe.
Further, it is used in first OFDM symbol of first time slot that transmission opportunity is two and current subframe In the case where LBT, this method further include: the last one OFDM symbol of first time slot of current subframe be used for LBT, second Transmission opportunity is accorded with since first OFDM symbol of second time slot of current subframe in the last one OFDM of current subframe Number terminate.
Further, according to UL grant determine PUCCH Secondary resource position include: in first transmission opportunity, Using the format of PUCCH format 1, second OFDM symbol of first time slot indicated from UL grant Start and use the orthogonal code that code length is 3 to carry out time domain code point, when carrying out in second time slot using the orthogonal code that code length is 4 Domain code point, to determine the time-domain resource of Secondary resource position;In second transmission opportunity, from second of UL grant instruction Second OFDM symbol of time slot starts, and time domain code point is carried out using the orthogonal code that code length is 3, to determine Secondary resource position Time-domain resource;Using the format of PUCCH format 2/3, directly first time slot and second is fallen in punching respectively First OFDM symbol in a time slot.
Further, it sends state based on channel to determine whether to send data on first resource position, and in the second money Sending channel on source position and sending state includes: to send state based on channel before first transmission opportunity when terminal to determine When LBT success, data are sent in first transmission opportunity, and in first of Secondary resource position and/or second time slot Upper transmission channel sends state;When terminal, which sends state based on channel before first transmission opportunity, determines LBT failure, no Data are sent in first transmission opportunity, and send channel on first of Secondary resource position and/or second time slot Transmission state.
Further, when sending state based on channel before first transmission opportunity when terminal and determining LBT failure, the Sending channel on first time slot of two resource locations and sending state includes one of the following: in first of Secondary resource position The prompt of LBT failure is sent in gap;The prompt of LBT failure is sent on first time slot of Secondary resource position, and waits the The instruction of next transmission opportunity of one resource location;Any signal is not sent on first time slot of Secondary resource position.
Further, it sends state based on channel to determine whether to send data on first resource position, and in the second money Sending channel on source position and sending state includes: to send state based on channel before second transmission opportunity when terminal to determine LBT success when, data are sent in second transmission opportunity, and on second time slot of Secondary resource position send LBT at Function instruction;When terminal, which sends state based on channel before second transmission opportunity, determines LBT failure, do not transmitted at first Data are sent in chance, and are sent LBT on second time slot of Secondary resource position and unsuccessfully indicated.
Specifically, start transmission behind current subframe boundary for PUSCH and current subframe has multiple transmission opportunities Scene, similar to the method for determining PUCCH resource position on PCell in CA according to DL GRANT, here according to transmission uplink Scheduling authorization UL GRANT determines the resource location of PUCCH on PCell.For example, there are two PUSCH to pass for tool in the same subframe Defeated chance, comprising: 1) first OFDM symbol of first slot (i.e. first time slot) of subframe (specifically can be with for LBT For 25 μ s before second OFDM symbol starts), second from first time slot of subframe of first PUSCH transmission chance OFDM symbol starts to transmit data, and terminates to transmit data in the last one OFDM symbol of subframe;2) second of subframe First OFDM symbol of slot (i.e. second time slot) (is specifically as follows before second OFDM symbol starts for LBT 25 μ s), second PUSCH transmission chance transmits data since second OFDM symbol of second time slot of subframe, and The last one OFDM symbol of subframe terminates to transmit data.Wherein, scheme after being changed for the scheme in 2) can be with Are as follows: the last one OFDM symbol of first slot of subframe (is specifically as follows 25 before second subframe starts for LBT μ s), second PUSCH transmission chance transmits data since first OFDM symbol of second time slot of subframe, and in son The last one OFDM symbol of frame terminates to transmit data.
Wherein, for the case where first PUSCH transmission chance, the PUCCH on authorized spectrum band PCell is at first in 1) Slot since second OFDM symbol (assuming that 1 series of PUCCH format), carries out time domain using the orthogonal code that code length is 3 Code point carries out time domain code point using the orthogonal code that code length is 4 in second slot.For second PUSCH transmission machine in 2) Can the case where, PUCCH on authorized spectrum band PCell is in second slot (assuming that PUCCH since second OFDM symbol 1 series of format), time domain code point is carried out using the orthogonal code that code length is 3, to determine the time-domain resource of PUCCH;It is using In the case where the format of PUCCH format 2/3, directly punch first in first time slot and second time slot respectively OFDM symbol.
When UE LBT success before first PUSCH transmission chance, UE sends number in first PUSCH transmission chance According to, and send LBT on the PUCCH running time-frequency resource on first (or simultaneously in first and second) slot and successfully refer to Show;When LBT's UE fails before first PUSCH transmission chance, UE does not send data in first PUSCH transmission chance, And LBT is sent on the PUCCH running time-frequency resource on first (or simultaneously in first and second) slot and is unsuccessfully indicated.It closes May include following three kinds of situations in sending LBT state on the PUCCH running time-frequency resource in first slot: the first, first The instruction of LBT failure is sent on the PUCCH running time-frequency resource of a slot;Second, on the PUCCH running time-frequency resource of first slot The instruction of LBT failure is sent, and continues to attempt to the instruction of next PUSCH transmission chance;The third, first slot's Any signal is not sent on PUCCH running time-frequency resource.Be specifically chosen which kind of PUCCH indicating mode whether can be supported according to UE it is multiple The ability of PUSCH transmission chance is configured by RRC (Radio Resource Control, i.e. wireless heterogeneous networks).
When UE LBT success before second PUSCH transmission chance, UE sends data in second PUSCH transmission chance, And LBT is sent on the PUCCH running time-frequency resource of second slot and is successfully indicated;When UE before second PUSCH transmission chance LBT When failure, UE does not send data in second PUSCH transmission chance, and sends out on the PUCCH running time-frequency resource of second slot LBT is sent unsuccessfully to indicate.
As shown in fig. 6, the embodiment be for PUSCH start behind current subframe boundary transmission and current subframe have it is more The scene of a transmission opportunity includes main plot and secondary cell, and two cells all include 4 subframes (subframe 1, subframe 2,3 and of subframe Subframe 4), subframe 1 and subframe 4 in main plot include two time slots (first time slot and second time slot), and two time slots The part of middle black indicates the time-domain position of PUCCH, i.e., the Secondary resource position of above-mentioned PUCCH.In the embodiment, son is used First OFDM symbol of first time slot of frame 1 carries out LBT, and first PUSCH transmission chance is opened from second OFDM symbol Begin transmission data, terminates to transmit data in the last one OFDM symbol;It is accorded with using first OFDM of second time slot of subframe 1 Number LBT is carried out, second PUSCH transmission chance transmits data from second OFDH sign-on, in the last one OFDM symbol Terminate transmission data.
Through the foregoing embodiment, define that PUSCH carries out LBT after sub-frame boundary, and subframe has multiple transmission opportunities Scheme, thereby may be ensured that the LBT that can correctly know terminal, to improve the efficiency of uplink.
In the above embodiment of the invention, it is determined in the second frequency range according to uplink scheduling authorization UL grant (as authorized Frequency range) on Physical Uplink Control Channel PUCCH Secondary resource position and in the first frequency range (such as unauthorized frequency range) The first resource position of Physical Uplink Shared Channel PUSCH includes: to indicate before the beginning boundary of current subframe in UL grant Start in the case where transmitting data, the first resource position of PUSCH starts in the beginning boundary of current subframe, and in current subframe End boundary before terminate, current subframe have multiple transmission opportunities;The Secondary resource position of PUCCH is determined according to UL grant It sets.
Specifically, start transmission before current subframe boundary for PUSCH and current subframe has multiple transmission opportunities Scene.There are two PUSCH transmission chances for tool in the same subframe, comprising: 1) first slot of current subframe is (at i.e. first Gap) a upper subframe the last one OFDM symbol for LBT (be specifically as follows current subframe first time slot the One OFDM symbol start before 25 μ s), first from first time slot of current subframe of first PUSCH transmission chance OFDM symbol starts to transmit data, and terminates to transmit data in the penultimate OFDM symbol of current subframe;2) current subframe The last one OFDM symbol of first slot (i.e. second time slot) (be specifically as follows in second time slot for LBT First OFDM symbol start before 25 μ s), first from second time slot of current subframe of second PUSCH transmission chance OFDM symbol starts to transmit data, and terminates to transmit data in the penultimate OFDM symbol of current subframe.Similar in CA The method that PUCCH resource position on PCell is determined according to DL GRANT, here according to transmission uplink scheduling authorization UL GRANT To determine the PUCCH resource position on PCell, wherein the PUCCH in authorized spectrum band is indicated using existing PUCCH format.
As shown in fig. 7, the embodiment be for PUSCH start behind current subframe boundary transmission and current subframe have it is more The scene of a transmission opportunity includes main plot and secondary cell, and two cells all include 4 subframes (subframe 1, subframe 2,3 and of subframe Subframe 4), subframe 1 and subframe 4 in main plot include two time slots (first time slot and second time slot), and two time slots The part of middle black indicates the time-domain position of PUCCH, i.e., the Secondary resource position of above-mentioned PUCCH.In the embodiment, son is used The last one OFDM symbol of a upper subframe for frame 1 carries out LBT, first from subframe 1 of first PUSCH transmission chance OFDM symbol starts to transmit data, terminates to transmit data in penultimate OFDM symbol.Use second time slot of subframe 1 First OFDM symbol carries out LBT, and second PUSCH transmission chance transmits data from second OFDH sign-on, last One OFDM symbol terminates to transmit data.
In this embodiment, specifically the indicating mode of LBT state and above-mentioned PUSCH carry out LBT after sub-frame boundary Mode it is consistent, details are not described herein.
Through the foregoing embodiment, define that PUSCH carries out LBT before sub-frame boundary, and subframe has multiple transmission opportunities Scheme, thereby may be ensured that the LBT that can correctly know terminal, to improve the efficiency of uplink.
In the above embodiment of the invention, it includes: in the second frequency that channel is sent on Secondary resource position and sends state The multiplexing transmission mode of single-carrier frequency division multiple access is used on Secondary resource position on the main plot of section (such as authorized spectrum band);? In MuLTEfire, block interleaving frequency division multiple access B-IFDMA is used on the first resource position of the first frequency range (such as unauthorized frequency range) Multiplexing transmission mode.
Above-mentioned B-IFDMA is Block Interleaved Frequency Division Multiple Access's Abbreviation.
Further, this method further include: when the main plot in MuLTEfire is in unauthorized frequency range, in unauthorized frequency The secondary cell of section is in the Physical Uplink Control Channel PUCCH or enhancing Physical Uplink Control Channel ePUCCH of main plot or shortening The upper transmission channel of sPUCCH sends state.
Specifically, transmission channel sends state and uses single carrier frequency on the PUCCH running time-frequency resource on authorized spectrum band PCell Divide the multiplexing of multiple access SC-FDMA (abbreviation of Single Carrier-Frenquency Division Multiple Access) Mode uses the multiplexing side of B-IFDMA in the PUSCH running time-frequency resource transmitting data of unauthorized frequency range in MuLTEfire Formula.When the PCell in MuLTEfire is in unauthorized frequency range, the uplink LBT state of the SCell of other unauthorized frequency ranges is same It can be transmitted on the PUCCH/ePUCCH of PCell, the start-stop position of the running time-frequency resource about PUCCH can use above-mentioned Method in embodiment, difference are the frequency domain resource method of salary distribution using B-IFDMA multiplex mode, will lead to PUCCH/ EPUCCH is equally spaced on frequency domain to be distributed in whole system bandwidth, for example, it is assumed that the system bandwidth of 20MHz, then include 0-99 100 RB (Resource Block, i.e. resource block), be divided into 10 interleaving blocks of 0-9, n-th of interleaving block include [n:10: 100] 10 RB.As shown in figure 8, each time slot includes 100 comprising slot-0 (i.e. time slot 0) and slot-1 (i.e. time slot 1) Ordinate in RB, Fig. 8 indicates the arrangement of RB, and since RB-n, every 10RB is one interleaving block (interlace) of composition, directly To RB-n+90.
In the above embodiment of the invention, it includes: to work as main plot that channel is sent on Secondary resource position and sends state On PUCCH when the channel in multiple secondary cells need to be supported to send state instruction, by using PUCCH format2/3, use The mode of bitmap bitmap indicates that the channel in each secondary cell sends state, wherein is using PUCCH format's 2/3 In the case where format, a symbol of LBT is vacated by way of directly punching first OFDM symbol;It is using In the case where the format of PUCCH format 2/3, LBT is vacated by way of directly punching the last one OFDM symbol A symbol.
Wherein, the mode for increasing bitmap bitmap includes one of the following: increasing control message UCI bit number;Increase UCI's CRC mask;The number of multiple PUCCH is sent by UCI;UCI is sent in PUSCH.
It specifically, can be by making when the PUCCH on PCell needs support the LBT state instruction on multiple SCell With PUCCH format 2/3, the LBT state on each SCell is indicated using the mode for increasing bitmap bitmap.For UCI The x bit for needing to increase bitmap bitmap in (Uplink Control Information, physical control information) format comes It indicates that the concrete mode when information of multiple SCell includes increasing UCI bit number, increases the CRC mask of UCI, sent by UCI The number of multiple PUCCH sends UCI etc. in PUSCH.
In the above embodiment of the invention, determining that it includes: when terminal is connect that data are sent on first resource position The base station entered passes through UL grant while to be scheduled to terminal multiple in the carrier wave in the first frequency range (such as unauthorized frequency range), from more It selects a carrier wave to send data in a carrier wave, and sends channel hair on the corresponding second frequency resource location of the carrier wave of selection Send state.
It further, include: the selection channel matter from multiple carrier waves from selecting a carrier wave to send data in multiple carrier waves It measures highest carrier wave and sends data.
Specifically, more unauthorized carrier waves of UE are scheduled to simultaneously by UL grant as eNB, carry out multiple unauthorized carrier waves Selection when, UE can send upstream data on the best carrier wave of channel condition, and in the corresponding PUCCH resource of the carrier wave or The corresponding bitmap field of person sends LBT state instruction.
In the above-described embodiments, indicate that the channel access state of unauthorized frequency range is (i.e. above-mentioned by the resource of authorized spectrum band Channel send state), the transmission that can merge interference signal and useful signal progress signal to avoid base station improves uplink The reliability of transmission.
According to another aspect of the present invention, a kind of terminal is additionally provided.As shown in figure 9, the terminal includes: acquiring unit 91, for obtaining the resource in the second frequency range;Indicating unit 93, for being scheduled for the by the resource instruction in the second frequency range The channel of the resource of one frequency range sends state, wherein the first frequency range is that need to first be listened the frequency range for sending out LBT afterwards, and the second frequency range is The frequency range of present channel is occupied without the frequency range of LBT or by LBT.
Using the embodiment of the present invention, the channel of the resource of the first frequency range is scheduled for by the resource instruction in the second frequency range Transmission state.Through the foregoing embodiment, can enable eNB accurately know when sending UL grant UE LBT as a result, to It can guarantee that UE can send upstream data on the running time-frequency resource of scheduling, avoid influence of the DTX to ascending HARQ performance, into And the efficiency and reliability of uplink are improved, channel can not correctly be provided by solving ascending transmission method in the prior art Transmission state, and the problem of lead to uplink low efficiency.
Specifically, terminal sends state according to the channel for the resource dispatched in the first frequency range, in the correspondence of the second frequency range The channel is transmitted on the transfer resource of the terminal and sends state, it can when eNB sends UL grant, shape is sent by channel State indicates the LBT of UE as a result, in the successful situation of LBT for determining UE, it is ensured that the time-frequency that UE is dispatched in the first frequency range Upstream data is sent in resource.
In the above-described embodiments, indicate that the up channel of unauthorized frequency range in current subframe is sent by authorized spectrum band resource State, namely indicate whether the resource for being scheduled for unauthorized frequency range is successfully transmitted by the resource of authorized spectrum band, it avoids Influence of the DTX to ascending HARQ performance, to improve the efficiency and reliability of uplink.
In the above embodiment of the invention, indicating unit includes: transmission module, for terminal according in the first frequency range tune The channel of the first resource position of degree sends state, and transmission channel is sent out on the Secondary resource position of the counterpart terminal of the second frequency range Send state.
In an alternative embodiment, the first above-mentioned frequency range is that need to first be listened the frequency range for sending out LBT afterwards, can be non- Authorized spectrum band;Second frequency range is the frequency range without LBT or the frequency range by LBT occupancy present channel, can be authorization frequency Section, by the channel that the instruction of resource in the second frequency range is scheduled for the resource of the first frequency range send state include: terminal according to Channel in the first resource position of unauthorized frequency range scheduling sends state, in the Secondary resource position of the counterpart terminal of authorized spectrum band It sets transmission channel and sends state.
The serial number of the above embodiments of the invention is only for description, does not represent the advantages or disadvantages of the embodiments.
In the above embodiment of the invention, it all emphasizes particularly on different fields to the description of each embodiment, does not have in some embodiment The part of detailed description, reference can be made to the related descriptions of other embodiments.
In several embodiments provided herein, it should be understood that disclosed technology contents can pass through others Mode is realized.Wherein, the apparatus embodiments described above are merely exemplary, such as the division of the unit, Ke Yiwei A kind of logical function partition, there may be another division manner in actual implementation, for example, multiple units or components can combine or Person is desirably integrated into another system, or some features can be ignored or not executed.Another point, shown or discussed is mutual Between coupling, direct-coupling or communication connection can be through some interfaces, the INDIRECT COUPLING or communication link of unit or module It connects, can be electrical or other forms.
The unit as illustrated by the separation member may or may not be physically separated, aobvious as unit The component shown may or may not be physical unit, it can and it is in one place, or may be distributed over multiple On unit.It can some or all of the units may be selected to achieve the purpose of the solution of this embodiment according to the actual needs.
It, can also be in addition, the functional units in various embodiments of the present invention may be integrated into one processing unit It is that each unit physically exists alone, can also be integrated in one unit with two or more units.Above-mentioned integrated list Member both can take the form of hardware realization, can also realize in the form of software functional units.
If the integrated unit is realized in the form of SFU software functional unit and sells or use as independent product When, it can store in a computer readable storage medium.Based on this understanding, technical solution of the present invention is substantially The all or part of the part that contributes to existing technology or the technical solution can be in the form of software products in other words It embodies, which is stored in a storage medium, including some instructions are used so that a computer Equipment (can for personal computer, server or network equipment etc.) execute each embodiment the method for the present invention whole or Part steps.And storage medium above-mentioned includes: that USB flash disk, read-only memory (ROM, Read-Only Memory), arbitrary access are deposited Reservoir (RAM, Random Access Memory), mobile hard disk, magnetic or disk etc. be various to can store program code Medium.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications are also answered It is considered as protection scope of the present invention.

Claims (23)

1. the indicating means that a kind of channel sends state characterized by comprising
Obtain the resource in the second frequency range;
The channel for the resource for being scheduled for the first frequency range by the resource instruction in second frequency range sends state, wherein institute Stating the first frequency range is that need to first be listened the frequency range for sending out LBT afterwards, and second frequency range is the frequency range without the LBT or passes through The LBT occupies the frequency range of present channel,
The channel for the resource for being scheduled for the first frequency range by the resource instruction in the second frequency range sends state and includes:
Terminal sends state according to the channel in the first resource position that first frequency range is dispatched, in pair of second frequency range It answers and transmits the channel transmission state on the Secondary resource position of the terminal,
Terminal sends state according to the channel in the first resource position that the first frequency range is dispatched, at the correspondence of the second frequency range end The channel transmission state is transmitted on the Secondary resource position at end includes:
Second of the Physical Uplink Control Channel PUCCH in second frequency range is determined according to uplink scheduling authorization UL grant The first resource position of resource location and the Physical Uplink Shared Channel PUSCH in first frequency range;
It sends state based on the channel to determine whether to send data on the first resource position, and in the Secondary resource The channel is sent on position sends state.
2. determining whether the method according to claim 1, wherein sending state based on the channel described the Data are sent on one resource location, and are sent the channel transmission state on the Secondary resource position and included:
When channel send state instruction described in terminal first listen send out afterwards LBT successfully when, send data on the first resource position, And LBT is sent on corresponding Secondary resource position and is successfully indicated;
When channel send state instruction described in terminal first listen send out afterwards LBT fail when, do not send number on the first resource position According to, and the instruction that transmission LBT fails on corresponding Secondary resource position.
3. the method according to claim 1, wherein being determined according to uplink scheduling authorization UL grant described the The Secondary resource position of Physical Uplink Control Channel PUCCH in two frequency ranges and the physical uplink in first frequency range are total to The first resource position for enjoying channel PUSCH includes:
In the case where UL grant instruction starts to transmit data after the beginning boundary of current subframe, the PUSCH's First resource position starts after the beginning boundary of the current subframe, and terminates in the end boundary of the current subframe, institute Current subframe is stated with a transmission opportunity;
The Secondary resource position of the PUCCH is determined according to the UL grant.
4. according to the method described in claim 3, it is characterized in that, the first resource position of the PUSCH is in the current son Start after the beginning boundary of frame, and terminate in the end boundary of the current subframe include:
First orthogonal frequency division multiplexing technology OFDM symbol of the current subframe is used for the LBT, the first money of the PUSCH Source position starts in second OFDM symbol of the current subframe, in the last one OFDM symbol knot of the current subframe Beam.
5. according to the method described in claim 3, it is characterized in that, determining the Secondary resource position according to the UL grant Include:
Since second OFDM symbol of first time slot that the UL grant is indicated, using PUCCH format's 1 In the case where format, time domain code point is carried out using the orthogonal code that code length is 3 in first time slot, with the determination Secondary resource position The time-domain resource set;
Since the UL grant indicate second time slot i-th of OFDM symbol, using code length be 5-i orthogonal code into Row time domain code point, with the time-domain resource of the determination Secondary resource position, wherein the i is 1 or 2;
Using the format of PUCCH format 2/3, directly first OFDM symbol is fallen in punching.
6. the method according to claim 1, wherein being determined according to uplink scheduling authorization UL grant described the The Secondary resource position of Physical Uplink Control Channel PUCCH in two frequency ranges and the physical uplink in first frequency range are total to The first resource position for enjoying channel PUSCH includes:
In the case where UL grant instruction starts to transmit data before the beginning boundary of current subframe, the PUSCH's First resource position starts in the beginning boundary of the current subframe, and terminates before the end boundary of the current subframe;
The Secondary resource position of the PUCCH is determined according to the UL grant.
7. according to the method described in claim 6, it is characterized in that, the first resource position of the PUSCH is in the current son The beginning boundary of frame starts, and end includes: before the end boundary of the current subframe
The last one OFDM symbol of a upper subframe for the current subframe is used for LBT, and the first resource position is from described First OFDM symbol of current subframe starts, and terminates in the penultimate OFDM symbol of the current subframe.
8. the method according to claim 1, wherein being determined according to uplink scheduling authorization UL grant described the The Secondary resource position of Physical Uplink Control Channel PUCCH in two frequency ranges and the physical uplink in first frequency range are total to The first resource position for enjoying channel PUSCH includes:
In the case where UL grant instruction starts to transmit data after the beginning boundary of current subframe, the PUSCH's First resource position starts behind the position for LBT of the current subframe, and in the end boundary knot of the current subframe Beam, the current subframe have multiple transmission opportunities;
The Secondary resource position of the PUCCH is determined according to the UL grant.
9. according to the method described in claim 8, it is characterized in that, the transmission opportunity is two, wherein the PUSCH's First resource position starts behind the position for LBT of the current subframe
First OFDM symbol of first time slot of the current subframe is used for LBT, and first transmission opportunity is from described Second OFDM symbol of first time slot of current subframe starts, in the last one OFDM symbol knot of the current subframe Beam;
First OFDM symbol of second time slot of the current subframe is used for LBT, and second transmission opportunity is from described Second OFDM symbol of second time slot of current subframe starts, in the last one OFDM symbol knot of the current subframe Beam.
10. according to the method described in claim 9, it is characterized in that, being two and the current subframe in the transmission opportunity First time slot first OFDM symbol in the case where LBT, the method also includes:
The last one OFDM symbol of first time slot of the current subframe is used for LBT, and second transmission opportunity is from institute First OFDM symbol for stating second time slot of current subframe starts, in the last one OFDM symbol knot of the current subframe Beam.
11. according to the method described in claim 9, it is characterized in that, determining the second of the PUCCH according to the UL grant Resource location includes:
In first transmission opportunity, using the format of PUCCH format 1, from the UL grant Second OFDM symbol of first time slot indicated starts and uses the orthogonal code that code length is 3 to carry out time domain code point, second Time domain code point is carried out using the orthogonal code that code length is 4 in a time slot, with the time-domain resource of the determination Secondary resource position;
In second transmission opportunity, second OFDM symbol of second time slot indicated from the UL grant is opened Begin, time domain code point is carried out using the orthogonal code that code length is 3, with the time-domain resource of the determination Secondary resource position;
Using the format of PUCCH format 2/3, directly first time slot and second time slot are fallen in punching respectively First interior OFDM symbol.
12. according to the method described in claim 9, determining whether it is characterized in that, sending state based on the channel described Data are sent on first resource position, and are sent the channel transmission state on the Secondary resource position and included:
When the terminal, which sends state based on the channel before first transmission opportunity, determines LBT success, the Data are sent in one transmission opportunity, and are sent on first of the Secondary resource position and/or second time slot The channel sends state;
When the terminal, which sends state based on the channel before first transmission opportunity, determines LBT failure, do not exist Data are sent in first transmission opportunity, and are sent out on first of the Secondary resource position and/or second time slot The channel is sent to send state.
13. according to the method for claim 12, which is characterized in that when the terminal is before first transmission opportunity When determining LBT failure based on channel transmission state, the letter is sent on first time slot of the Secondary resource position It includes one of the following that road, which sends state:
The prompt of LBT failure is sent on first time slot of the Secondary resource position;
The prompt of LBT failure is sent on first time slot of the Secondary resource position, and waits the first resource position Next transmission opportunity instruction;
Any signal is not sent on first time slot of the Secondary resource position.
14. according to the method described in claim 9, determining whether it is characterized in that, sending state based on the channel described Data are sent on first resource position, and are sent the channel transmission state on the Secondary resource position and included:
When the terminal, which sends state based on the channel before second transmission opportunity, determines LBT success, the Data are sent in two transmission opportunities, and are sent LBT on second time slot of the Secondary resource position and successfully indicated;
When the terminal, which sends state based on the channel before second transmission opportunity, determines LBT failure, do not exist Data are sent in first transmission opportunity, and are sent LBT on second time slot of the Secondary resource position and unsuccessfully referred to Show.
15. the method according to claim 1, wherein being determined according to uplink scheduling authorization UL grant described The Secondary resource position of Physical Uplink Control Channel PUCCH in second frequency range and the physical uplink in first frequency range The first resource position of shared channel PUSCH includes:
In the case where UL grant instruction starts to transmit data before the beginning boundary of current subframe, the PUSCH's First resource position starts in the beginning boundary of the current subframe, and terminates before the end boundary of the current subframe, institute Current subframe is stated with multiple transmission opportunities;
The Secondary resource position of the PUCCH is determined according to the UL grant.
16. according to claim 1 to method described in any one of 15, which is characterized in that on the Secondary resource position Sending the channel transmission state includes:
The multiplexing transmission mode of single-carrier frequency division multiple access is used on the Secondary resource position on the main plot of second frequency range;
In MuLTEfire, the answering using block interleaving frequency division multiple access B-IFDMA on the first resource position of first frequency range Use transmission mode.
17. according to the method for claim 16, which is characterized in that the method also includes:
When the main plot in MuLTEfire is in first frequency range, first frequency range secondary cell in the main plot Physical Uplink Control Channel PUCCH or enhancing Physical Uplink Control Channel ePUCCH or shortening sPUCCH on transmit the letter Road sends state.
18. according to claim 1 to method described in any one of 15, which is characterized in that on the Secondary resource position Sending the channel transmission state includes:
When the PUCCH on main plot need to support the channel in multiple secondary cells to send state instruction, by using PUCCH Format 2/3 indicates that the channel in each secondary cell sends state using the mode of bitmap bitmap.
19. according to the method for claim 18, which is characterized in that
It is empty by way of directly punching first OFDM symbol using the format of PUCCH format 2/3 A symbol of LBT out;
Using the format of PUCCH format 2/3, by way of directly punching the last one OFDM symbol Vacate a symbol of LBT.
20. according to the method for claim 18, which is characterized in that the mode for increasing bitmap bitmap includes one of the following:
Increase control message UCI bit number;
Increase the CRC mask of UCI;
The number of multiple PUCCH is sent by UCI;
The UCI is sent in the PUSCH.
21. according to claim 1 to method described in any one of 15, which is characterized in that determining in the first resource Data are sent on position includes:
When the base station that the terminal is accessed pass through the UL grant and meanwhile be scheduled to the terminal it is multiple it is described first frequency When carrier wave in section, a carrier wave is selected to send the data from multiple carrier waves, and in the carrier wave of selection corresponding the The channel is sent on two frequency resource positions sends state.
22. according to the method for claim 21, which is characterized in that select a carrier wave to send institute from multiple carrier waves Stating data includes:
The highest carrier wave of channel quality is selected to send the data from multiple carrier waves.
23. a kind of terminal characterized by comprising
Acquiring unit, for obtaining the resource in the second frequency range;
The channel of indicating unit, the resource for being scheduled for the first frequency range by the resource instruction in second frequency range is sent State, wherein first frequency range is that need to first be listened the frequency range for sending out LBT afterwards, and second frequency range is without the LBT's Frequency range or the frequency range that present channel is occupied by the LBT,
The indicating unit includes:
Transmission module sends state according to the channel in the first resource position that first frequency range is dispatched for terminal, in institute It states and transmits the channel transmission state on the Secondary resource position of the correspondence terminal of the second frequency range,
Wherein, terminal sends state according to the channel in the first resource position that the first frequency range is dispatched, in the correspondence of the second frequency range The channel transmission state is transmitted on the Secondary resource position of the terminal includes:
Second of the Physical Uplink Control Channel PUCCH in second frequency range is determined according to uplink scheduling authorization UL grant The first resource position of resource location and the Physical Uplink Shared Channel PUSCH in first frequency range;
It sends state based on the channel to determine whether to send data on the first resource position, and in the Secondary resource The channel is sent on position sends state.
CN201610084109.7A 2016-02-06 2016-02-06 The indicating means and terminal of channel transmission state Active CN105611637B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610084109.7A CN105611637B (en) 2016-02-06 2016-02-06 The indicating means and terminal of channel transmission state

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610084109.7A CN105611637B (en) 2016-02-06 2016-02-06 The indicating means and terminal of channel transmission state

Publications (2)

Publication Number Publication Date
CN105611637A CN105611637A (en) 2016-05-25
CN105611637B true CN105611637B (en) 2019-05-24

Family

ID=55991096

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610084109.7A Active CN105611637B (en) 2016-02-06 2016-02-06 The indicating means and terminal of channel transmission state

Country Status (1)

Country Link
CN (1) CN105611637B (en)

Families Citing this family (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107438263B (en) * 2016-05-27 2019-11-29 北京佰才邦技术有限公司 A kind of measurement method and terminal of radio link quality
CN114845415A (en) 2016-06-06 2022-08-02 北京三星通信技术研究有限公司 Uplink signal sending method and user equipment
KR102099181B1 (en) 2016-06-30 2020-04-09 엘지전자 주식회사 Method for reporting channel status information in wireless communication system supporting unlicensed band and device supporting same
US11153880B2 (en) * 2016-08-09 2021-10-19 Qualcomm Incorporated Power allocation across multiple carriers using shared and dedicated radio frequency spectrum
CN107888256B (en) * 2016-09-30 2022-12-02 中兴通讯股份有限公司 Data transmission and receiving method, device, base station and terminal
CN106658751B (en) * 2016-12-14 2020-06-02 北京佰才邦技术有限公司 Channel access method and device for multi-antenna equipment
EP3565341A4 (en) * 2017-01-13 2019-12-25 Huawei Technologies Co., Ltd. Channel listening method and device
EP3618333B1 (en) * 2017-05-05 2022-12-21 Huawei Technologies Co., Ltd. Uplink data sending method and apparatus
CN112737753B (en) * 2017-06-09 2022-02-15 华为技术有限公司 Signal transmission method, related equipment and system
CN110169171B (en) * 2017-07-10 2021-10-15 华为技术有限公司 Method and device for transmitting data
JP2019033375A (en) * 2017-08-08 2019-02-28 シャープ株式会社 Communication apparatus and communication method
CN109391421B (en) * 2017-08-11 2022-02-18 华为技术有限公司 Method for transmitting uplink control information, terminal equipment and network equipment
CN110035514B (en) * 2018-01-12 2023-07-14 中兴通讯股份有限公司 Method and device for determining transmission opportunity, storage medium and electronic device
KR20210022634A (en) * 2018-06-20 2021-03-03 광동 오포 모바일 텔레커뮤니케이션즈 코포레이션 리미티드 Wireless communication method, terminal device and network device
CN110740018B (en) * 2018-07-18 2021-12-14 维沃移动通信有限公司 Scheduling method, monitoring method and device on unlicensed frequency band
CN110753398B (en) * 2018-07-24 2022-03-01 上海朗帛通信技术有限公司 Method and device used in user equipment and base station for wireless communication
CN110784874A (en) 2018-07-31 2020-02-11 索尼公司 Electronic device and method for wireless communication, computer-readable storage medium
TWI732302B (en) 2018-09-28 2021-07-01 聯發科技股份有限公司 Methods and electronic apparatus for uplink transmission
WO2020077533A1 (en) * 2018-10-16 2020-04-23 北京小米移动软件有限公司 Information retransmission method and device, base station, and terminal
US20210392684A1 (en) * 2018-11-02 2021-12-16 Nokia Technologies Oy Improving Operation of Cellular Communication Networks on Unlicensed Frequency Bands
US11191063B2 (en) * 2019-01-09 2021-11-30 Mediatek Inc. Multiple physical uplink control channel (PUCCH) resources for an uplink control information (UCI) report
CN111107660B (en) * 2019-01-30 2021-11-23 维沃移动通信有限公司 Information sending method and terminal equipment
CN113455090A (en) * 2019-02-14 2021-09-28 上海诺基亚贝尔股份有限公司 Increasing preamble transmission opportunities for random access in unlicensed frequency bands
CN113678559A (en) * 2019-09-25 2021-11-19 Oppo广东移动通信有限公司 Information processing method and terminal equipment
EP4040888A4 (en) * 2019-11-08 2022-09-14 Huawei Technologies Co., Ltd. Event processing method and apparatus
JP2023505642A (en) * 2019-11-08 2023-02-10 オッポ広東移動通信有限公司 Information transmission method and related products
WO2021139729A1 (en) * 2020-01-10 2021-07-15 FG Innovation Company Limited Methods and apparatuses for handling uplink (re) transmission in nr-u

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015113223A1 (en) * 2014-01-28 2015-08-06 华为技术有限公司 Channel monitoring method and device
WO2015149294A1 (en) * 2014-04-02 2015-10-08 华为技术有限公司 Unlicensed frequency spectrum usage method and base station, and terminal
WO2015165084A1 (en) * 2014-04-30 2015-11-05 华为技术有限公司 Method and device for scheduling unlicensed spectrum, and user equipment (ue)
CN105050189A (en) * 2015-08-10 2015-11-11 上海华为技术有限公司 Wireless resource scheduling method and relevant equipment

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015113223A1 (en) * 2014-01-28 2015-08-06 华为技术有限公司 Channel monitoring method and device
WO2015149294A1 (en) * 2014-04-02 2015-10-08 华为技术有限公司 Unlicensed frequency spectrum usage method and base station, and terminal
WO2015165084A1 (en) * 2014-04-30 2015-11-05 华为技术有限公司 Method and device for scheduling unlicensed spectrum, and user equipment (ue)
CN105050189A (en) * 2015-08-10 2015-11-11 上海华为技术有限公司 Wireless resource scheduling method and relevant equipment

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
Adaptive LBT for Licensed Assisted Access LTE Networks;Rui Yin等;《2015 IEEE Global Communications Conference (GLOBECOM)》;20151210;全文
Enhanced LBT algorithm for LTE-LAA in unlicensed band;Tao Tao等;《2015 IEEE 26th Annual International Symposium on Personal, Indoor, and Mobile Radio Communications (PIMRC)》;20150902;全文
基于非授权频段的LTE技术综述;龚碧梦等;《现代电信科技》;20151025;全文

Also Published As

Publication number Publication date
CN105611637A (en) 2016-05-25

Similar Documents

Publication Publication Date Title
CN105611637B (en) The indicating means and terminal of channel transmission state
US11929833B2 (en) HARQ feedback for unscheduled uplink
US11855782B2 (en) Method and apparatus for transmitting uplink signal
CN108271430B (en) Method and terminal for transmitting uplink signal in unlicensed frequency band
EP3272174B1 (en) A communication device and a method therein for determining a contention window size in a communication network
CN105230107B (en) A kind of random access response method, base station and terminal
CN103299699B (en) Random access method and apparatus of UE in mobile communication system
CN105722234B (en) Method, base station and the terminal of resource are dispatched in unauthorized frequency range
CN110832930B (en) Multiple start positions for uplink transmission on unlicensed spectrum
CN104871448B (en) The method and apparatus for sending down link control information in a wireless communication system
US10904879B2 (en) Rach preamble transmission and multiplexing with data and/or control signals
WO2017076157A1 (en) Data scheduling and transmission method, apparatus, and system
CN109075914A (en) Scheduling to uplink transmission
CN109891790A (en) The method and device thereof of uplink transmission are executed in a wireless communication system
CN116405171A (en) Uplink transmission method, terminal equipment and network equipment
CN103516499B (en) A kind of ACK/NACK number of bits of feedback determines method and device
CN107667496A (en) Support the operating method of communication nodes in authorized frequency bands and the network of unlicensed band
CN109417823A (en) LBT parameter for the uplink in unlicensed spectrum
CN110431902A (en) Multiple starting and ending positions of schedule downlink transmissions in unlicensed spectrum
CN109644087A (en) LBT parameter for the uplink in unlicensed spectrum
CN109891796A (en) It is used to determine whether to send the method and NB wireless device of SR
CN109156023A (en) User terminal and wireless communications method
CN108289331A (en) A kind of ascending transmission method, terminal, network side equipment
EP3316644B1 (en) Transmission device, receiving device and method for uplink data
EP3322239B1 (en) Transmission method and device for physical downlink control channel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: Floors 9 and 10, building 1, zone 1, No. 81, Beiqing Road, Haidian District, Beijing 100085

Patentee after: Beijing baicaibang Technology Co.,Ltd.

Address before: 100085 Beijing Haidian District city information industry base development road 1, 3 tier 3001

Patentee before: Beijing Bai Caibang Technology Co.,Ltd.

CP03 Change of name, title or address