CN105610089B - A kind of pin removal applied to insulator R pins - Google Patents

A kind of pin removal applied to insulator R pins Download PDF

Info

Publication number
CN105610089B
CN105610089B CN201610114896.5A CN201610114896A CN105610089B CN 105610089 B CN105610089 B CN 105610089B CN 201610114896 A CN201610114896 A CN 201610114896A CN 105610089 B CN105610089 B CN 105610089B
Authority
CN
China
Prior art keywords
cylinder
connecting rod
pin
handheld division
pins
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610114896.5A
Other languages
Chinese (zh)
Other versions
CN105610089A (en
Inventor
李卫胜
宋维庭
周远远
宋维洋
洪军
李继强
刘西营
梁红军
王成全
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Jining Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Jining Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Jining Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201610114896.5A priority Critical patent/CN105610089B/en
Publication of CN105610089A publication Critical patent/CN105610089A/en
Application granted granted Critical
Publication of CN105610089B publication Critical patent/CN105610089B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables

Landscapes

  • Insulators (AREA)

Abstract

The invention discloses a kind of pin removal applied to insulator R pins, including Handheld Division, the Handheld Division and one end of connecting rod connect, the other end of connecting rod is connected with operating portion, the operating portion includes parallel the first cylinder and the second cylinder, first cylinder and the second cylinder are connected with connecting rod, and the other end of the first cylinder and the second cylinder with described connecting rod is mutually perpendicular to.By the setting of the first cylinder and the second cylinder and connecting rod and Handheld Division, lever construction is formed, write off is carried out using lever principle, solves the problem for being difficult to clamp and wasting time and energy when original pin pulling clamp is pulled pin.The connecting rod of pin removal is arranged to the J-type structure with arc, to the power for exactly outwards pulling out R pins provided at the first cylinder, while R pins can be pulled out to provide bigger power at the first cylinder.

Description

A kind of pin removal applied to insulator R pins
Technical field
The invention belongs to power transmission lines overhauling technical field of operation, is related to a kind of pin removal applied to insulator R pins, tool Saying for body is a kind of device for being used to carry out the R pins in insulator bowl head write off.
Background technology
The connecting portion of electric transmission line isolator is sold usually using R, and the R pins 7 in insulator bowl first 9 carry out write off When, as shown in figure 1, because the round mouth 8 of R pins 7 is smaller, the jaw diameter of traditional pin pulling clamp 6 is due to the diameter of round mouth 8 than R pin 7 Greatly, so it is clamped it is difficult to be put in R pins 7, can only clamp outside it, and the outside of R pins 7 is shiny surface, with tradition Pin pulling clamp 6 clamp after be easy to slip;Be steel structure additionally, due to R pins 7, clamp must use behind the outside of R pins 7 it is very big Strength could be taken out, and this work of write off is carried out in high-altitude, be difficult to make power during actual write off, Write off is caused to fail.
The content of the invention
The purpose of the present invention is to overcome above-mentioned the deficiencies in the prior art, there is provided a kind of pulling pin applied to insulator R pins Device, cleverly solves the shortcomings that being difficult to clamp and waste time and energy when original pin pulling clamp is pulled pin.
To achieve the above object, the present invention uses following technical proposals:
One end of a kind of pin removal applied to insulator R pins, including Handheld Division, the Handheld Division and connecting rod connects, The other end of connecting rod is connected with operating portion, and the operating portion includes parallel the first cylinder and the second cylinder, the first cylinder It is connected with the second cylinder with connecting rod, and the other end of the first cylinder and the second cylinder with described connecting rod mutually hangs down Directly.
First cylinder and the second cylinder are cylinder;First cylinder is inserted in R pin round mouths, the second cylinder compresses Outside insulator bowl head, the second cylinder is fulcrum, and Handheld Division is force position, can be simply and easily by R using lever principle Pin takes out.
Preferably, the connecting rod is J-type structure;Connecting rod is arranged to the structure with arc, enters using lever principle During row write off, to the power for exactly outwards pulling out R pins provided at the first cylinder, while can be bigger to be provided at the first cylinder Power to R pin pull out.
The rectilinear end of the J-type structure and Handheld Division are affixed, and the camber line end of J-type structure and operating portion are affixed.
The diameter dimension of first cylinder is less than the diameter dimension of R pin round mouths;It is convenient that first cylinder is inserted into R pin round mouths In.
The diameter dimension of second cylinder is more than the diameter dimension of the first cylinder;The second cylinder is set to provide foot as fulcrum Enough support forces.
Preferably, the diameter dimension of second cylinder is 1.5 times of the diameter dimension of the first cylinder;Second cylinder it is straight Footpath is too small, is not enough to provide required support force, and diameter is excessive, easily causes the waste of resource.
Preferably, the Handheld Division is slab construction, and slab construction is provided with circular hole;Slab construction can be used for beaing thing Body, set circular hole the pin removal can be hung on worker safety with hook on, be convenient for carrying.
The slab construction is mutually perpendicular to the plane where J-type structure;Facilitate staff when in use to Handheld Division Exerted a force.
Preferably, rectilinear end of the axis direction of first cylinder and the second cylinder with J-type structure is mutually perpendicular to;This Sample, which is set, makes whole pin pulling device structure make the process of pulling pin the most laborsaving smooth with optimal lever form is synthesized.
The present invention operation principle be:
In use, the first cylinder is placed in R pin round mouths, the second cylinder is then pressed on outside insulator bowl head, with second Cylinder is fulcrum, and Handheld Division is force position, and the first cylinder is stress point, sells R using lever principle and takes out.Connecting rod is set The structure with arc is set to, makes more to meet ergonomics to the force of pin removal, it is easier to R is sold and taken out.
Beneficial effects of the present invention are:
The pin removal of the present invention forms lever by the setting of the first cylinder and the second cylinder and connecting rod and Handheld Division Structure, write off is carried out using lever principle, solve the problem for being difficult to clamp and wasting time and energy when original pin pulling clamp is pulled pin.
The connecting rod of the pin removal of the present invention is arranged to the J-type structure with arc, is exactly to offer at the first cylinder The power of R pins is outwards pulled out, while R pins can be pulled out to provide bigger power at the first cylinder.
The Handheld Division of pin removal of the present invention is arranged to slab construction, and circular hole is set thereon, and slab construction can be used for Beat object, set circular hole the pin removal can be hung on worker safety with hook on, be convenient for carrying.
Brief description of the drawings
Fig. 1 is the schematic diagram of pulling pin of pin pulling clamp traditional in background of invention;
Fig. 2 is the structural representation for the pin removal that the present invention is applied to insulator R pins;
Fig. 3 is the top view of pin removal;
Fig. 4 is pin removal use state diagram;
In figure, 1 is Handheld Division, and 2 be connecting rod, and 3 be the first cylinder, and 4 be the second cylinder, and 5 be circular hole, and 6 pull out to be traditional Pin pliers, 7 be that R sells, and 8 be round mouth, and 9 be insulator bowl head.
Embodiment
The present invention is further described with reference to the accompanying drawings and examples.
As shown in Fig. 2 the pin removal applied to insulator R pins, is made up of 4 parts, including Handheld Division 1, connecting rod 2, the One cylinder 3 and the second cylinder 4, the first cylinder 3 and the second cylinder 4, which are parallel to each other, forms operating portion, Handheld Division 1 and connecting rod 2 One end is connected, and the other end of connecting rod 2 is connected with operating portion, and the first cylinder 3 and the second cylinder 4 are connected with connecting rod 2.
Handheld Division 1 is slab construction, and slab construction is provided with circular hole 5;It is convenient for carrying provided with circular hole 5, work people can be hung on On the hook of member's safety belt, and Handheld Division 1 is made by thicker band iron, can play a part of that object can be beaten.
As shown in figure 3, connecting rod 2 is J-type structure;The rectilinear end of J-type structure and Handheld Division 1 are affixed, the camber line of J-type structure End is affixed with operating portion, i.e. the camber line end of J-type structure and the first cylinder 3 and the second cylinder 4 is affixed.The flat board knot of Handheld Division 1 Structure is mutually perpendicular to the plane where J-type structure.
First cylinder 3 and the second cylinder 4 are cylinder;The diameter phase of round mouth 8 of the diameter dimension of first cylinder 3 and R pins 7 Matching and the diameter dimension of slightly smaller than R pin round mouths;The diameter dimension of second cylinder 4 is the 1.5 of the diameter dimension of the first cylinder 3 Times.
End of the axis direction of first cylinder 3 and the second cylinder 4 with the camber line end of J-type structure is mutually perpendicular to, and the Rectilinear end of the axis direction of one cylinder 3 and the second cylinder 4 with J-type structure is mutually perpendicular to.
As shown in figure 4, this pin removal is when in use, one end of the first cylinder 3 is inserted into the round mouth of R pins 7, by second Cylinder 4 is padded on insulator bowl first 9, and staff presses Handheld Division 1, using lever effect (fulcrum is the second cylinder 4, by Force is the first cylinder 3, and the force position of people is Handheld Division 1) easily R pins 7 can be extracted., need to be also when replacing insulator finishes During former R pins, only the slab construction (because being made of thicker band iron) of Handheld Division 1 need to be utilized to tap and can recover.
Although above-mentioned the embodiment of the present invention is described with reference to accompanying drawing, model not is protected to the present invention The limitation enclosed, one of ordinary skill in the art should be understood that on the basis of technical scheme those skilled in the art are not Need to pay various modifications or deformation that creative work can make still within protection scope of the present invention.

Claims (5)

1. a kind of pin removal applied to insulator R pins, it is characterized in that, including Handheld Division, the one of the Handheld Division and connecting rod End connection, the other end of connecting rod are connected with operating portion, and the operating portion includes parallel the first cylinder and the second cylinder, the One cylinder and the second cylinder are connected with connecting rod, and the other end phase of the first cylinder and the second cylinder with described connecting rod It is mutually vertical;
The connecting rod is J-type structure;The rectilinear end of the J-type structure and Handheld Division are affixed, camber line end and the operation of J-type structure Portion is affixed;Rectilinear end of the axis direction of first cylinder and the second cylinder with J-type structure is mutually perpendicular to;
First cylinder and the second cylinder are cylinder;The diameter dimension of first cylinder is less than the diameter of R pin round mouths Size.
2. pin removal as claimed in claim 1, it is characterized in that, the diameter dimension of second cylinder is more than the straight of the first cylinder Footpath size.
3. pin removal as claimed in claim 2, it is characterized in that, the diameter dimension of second cylinder is the diameter of the first cylinder 1.5 times of size.
4. pin removal as claimed in claim 1, it is characterized in that, the Handheld Division is slab construction, and slab construction is provided with circle Hole.
5. pin removal as claimed in claim 4, it is characterized in that, the slab construction is mutually hung down with the plane where J-type structure Directly.
CN201610114896.5A 2016-03-01 2016-03-01 A kind of pin removal applied to insulator R pins Active CN105610089B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610114896.5A CN105610089B (en) 2016-03-01 2016-03-01 A kind of pin removal applied to insulator R pins

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610114896.5A CN105610089B (en) 2016-03-01 2016-03-01 A kind of pin removal applied to insulator R pins

Publications (2)

Publication Number Publication Date
CN105610089A CN105610089A (en) 2016-05-25
CN105610089B true CN105610089B (en) 2017-12-29

Family

ID=55989733

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610114896.5A Active CN105610089B (en) 2016-03-01 2016-03-01 A kind of pin removal applied to insulator R pins

Country Status (1)

Country Link
CN (1) CN105610089B (en)

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4546949B2 (en) * 2006-12-04 2010-09-22 北陸電力株式会社 Insulator attachment method, insulator removal method and split pin attachment used therefor
CN202062339U (en) * 2011-05-30 2011-12-07 重庆市电力公司万州供电局 Novel pin remover
JP2015061371A (en) * 2013-09-18 2015-03-30 中国電力株式会社 Common part of tool for indirect hot-line work and tool for indirect hot-line work
CN203747292U (en) * 2014-03-11 2014-07-30 国家电网公司 Novel insulator pin puller
CN105305295A (en) * 2014-06-23 2016-02-03 国家电网公司 Special tool for pulling and inserting R type spring pin from insulator
CN104511879B (en) * 2014-11-27 2017-11-14 国家电网公司 A kind of powered plug device of glass insulator R pins
CN205355687U (en) * 2016-03-01 2016-06-29 国网山东省电力公司济宁供电公司 Be applied to pin removal of insulator R round pin

Also Published As

Publication number Publication date
CN105610089A (en) 2016-05-25

Similar Documents

Publication Publication Date Title
CN206595637U (en) A kind of cable distribution fixing-line device
CN202016705U (en) Brick clamp
CN105610089B (en) A kind of pin removal applied to insulator R pins
CN205355687U (en) Be applied to pin removal of insulator R round pin
CN201180371Y (en) Steel pipe fast chucking buckle
CN203301098U (en) Automatic hanging buckle of cable caution label
CN103612219A (en) Needle clamp
CN207858739U (en) Multi-purpose pin removal
CN206585272U (en) 10kV live line work insulating support bars
CN204103363U (en) Carbon fiber composite core wire conductor clamp
CN206857703U (en) For the Log Grapple on woodland lumber carrier
CN203221468U (en) Clamping pincer with hammerheads
CN205219029U (en) Follow closely nail puller absolutely
CN104300426A (en) Conductor clamp used for carbon fiber composite core wires
CN209298380U (en) A kind of laborsaving intermediate potential insulation lapping bar
CN202079578U (en) Pipe wrench
CN206899123U (en) A kind of erecting device of M types locking pin
CN207110630U (en) UHV transmission line Guywire tower bracing wire tight servicing unit eventually
CN108347009B (en) Clamping device for power line stay wire choke ring
CN205339011U (en) Medical tongue pulling clamp
CN204577996U (en) Drag steel wire device
CN209466194U (en) Tire-mold steel disc withdrawing device
CN102871737A (en) Oral orthodontic pliers with improved clamping portion
CN102871736A (en) Multifunctional oral orthodontic pliers
CN203863553U (en) Insulator wire back bending stabilizing clamp

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Li Weisheng

Inventor after: Song Weiting

Inventor after: Zhou Yuanyuan

Inventor after: Song Weiyang

Inventor after: Hong Jun

Inventor after: Li Jiqiang

Inventor after: Liu Xiying

Inventor after: Liang Hongjun

Inventor after: Wang Chengquan

Inventor before: Song Weiting

Inventor before: Zhou Yuanyuan

Inventor before: Song Weiyang

Inventor before: Hong Jun

Inventor before: Li Jiqiang

Inventor before: Liu Xiying

Inventor before: Liang Hongjun

Inventor before: Wang Chengquan

GR01 Patent grant
GR01 Patent grant