CN105608640A - Power grid equipment data acquisition method and system - Google Patents

Power grid equipment data acquisition method and system Download PDF

Info

Publication number
CN105608640A
CN105608640A CN201610065300.7A CN201610065300A CN105608640A CN 105608640 A CN105608640 A CN 105608640A CN 201610065300 A CN201610065300 A CN 201610065300A CN 105608640 A CN105608640 A CN 105608640A
Authority
CN
China
Prior art keywords
data
grid equipment
collecting
recording
stock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610065300.7A
Other languages
Chinese (zh)
Inventor
王鹏
陈首洪
叶燕彬
沈俊杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XIAMEN GREAT POWER GEO INFORMATION TECHNOLOGY Co Ltd
State Grid Corp of China SGCC
Original Assignee
XIAMEN GREAT POWER GEO INFORMATION TECHNOLOGY Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XIAMEN GREAT POWER GEO INFORMATION TECHNOLOGY Co Ltd, State Grid Corp of China SGCC filed Critical XIAMEN GREAT POWER GEO INFORMATION TECHNOLOGY Co Ltd
Priority to CN201610065300.7A priority Critical patent/CN105608640A/en
Publication of CN105608640A publication Critical patent/CN105608640A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Information Retrieval, Db Structures And Fs Structures Therefor (AREA)

Abstract

The invention discloses a power grid equipment data acquisition method and system. The method comprises the following steps: obtaining storage data from a service system, querying and analyzing the storage data to obtain storage problem data; according to the storage problem data, generating an acquiring and recording task; an acquiring and recording terminal obtaining the acquiring and recording task; according to the acquiring and recording task, acquiring and recording data of power grid equipment to be acquired to obtain acquiring and recording data; and according to the acquiring and recording, updating the storage data. According to the invention, the storage problem data is obtained by analyzing the storage data and is taken as a basis for acquiring and recording, such that the acquiring and recording data amount can be greatly reduced, data with information errors or logic errors can be accurately re-acquired, and the data acquisition efficiency is improved; and the acquiring and recording data is uploaded to the service system such that the acquiring and recording data can be conveniently managed.

Description

Grid equipment collecting method and system thereof
Technical field
The present invention relates to data collecting field, relate in particular to a kind of grid equipment collecting method and system thereof.
Background technology
Along with scientific and technological development, electric power becomes people's one of requisite resource of living. For betterProvide and managing power resource, need to gather grid equipment data.
Traditional electric power data acquisition pattern, is to hold drawing to carry out scene plotting to scene, and this process comprisesInquire on-the-spot route, manual record data, manually the data of record carried out to interior industry arrangement etc., like thisDrop into after necessary resource, the result often producing is that collecting efficiency is low, data need to repeatedly be processed,Data error is large, meanwhile, because the information content of power equipment is too huge, gathers whole power equipment dataJust need to drop into a large amount of human and material resources, financial resources; And because the personnel's of collecting and recording marketing is general with fortune inspection separationRead difference, each circuit-switched data does not connect after importing system into mutually.
In the patent publication that is 201310438016.6 at application number, propose a kind of based on mobile deviceElectric power GIS collecting method, comprise step: from the data directory of power grid GIS platform, obtain and compriseThe collection operation bag of grid graph data and device attribute data; Gather power equipment attribute data, according to electricityNet graph data is at ground chart display power equipment and attribute data thereof; Use GPS to gather power equipment spaceData are are also marked and drawed the spatial data of described power equipment on map; By the spatial data of described power equipment andAttribute data is synchronized under the data directory of power grid GIS platform as collection result data. The method has realizedTo the collection of electric power GIS data, but do not realize the collection to electric power data completely, and collection operation bag canGraph data and the attribute data that can comprise all grid equipments, collection capacity is excessive.
Summary of the invention
Technical problem to be solved by this invention is: a kind of grid equipment collecting method and system thereof are provided,Realize the Quick Acquisition to grid equipment data.
In order to solve the problems of the technologies described above, the technical solution used in the present invention is: a kind of grid equipment data acquisitionDiversity method, comprises
From operation system, obtain data on stock;
Data on stock described in query analysis, obtains storage problem data;
According to described storage problem data, generate the task of collecting and recording;
Collect and record terminal and obtain the task of collecting and recording;
According to the described task of collecting and recording, treat the data of adopting grid equipment and collect and record, obtain collecting and recording data;
According to described in collect and record data on stock described in Data Update.
The invention still further relates to a kind of grid equipment data collecting system, comprise
The first acquisition module, for obtaining data on stock from operation system;
First obtains module, for data on stock described in query analysis, obtains storage problem data;
The first generation module, for according to described storage problem data, generates the task of collecting and recording;
The second acquisition module, obtains for collecting and recording terminal the task of collecting and recording;
Collect and record module, collect and record task for described in basis, treat the data of adopting grid equipment and collect and record,To collecting and recording data;
More new module, for collecting and recording data on stock described in Data Update described in foundation.
Beneficial effect of the present invention is: data on stock analysis is obtained to storage problem data, and will depositAmount problem data, as the foundation of collecting and recording, can greatly reduce and collect and record data volume, exactly to information errors or patrolCollect wrong data and carry out Resurvey, improved the efficiency of data acquisition; To collect and record data upload to businessIn system, can manage collecting and recording data easily.
Brief description of the drawings
Fig. 1 is the flow chart of a kind of grid equipment collecting method of the present invention;
Fig. 2 is the method flow diagram of the embodiment of the present invention one;
Fig. 3 is that the integrated separation label of the embodiment of the present invention one is puted up position view;
Fig. 4 is the structural representation of a kind of grid equipment data collecting system of the present invention;
Fig. 5 is the system architecture schematic diagram of the embodiment of the present invention two.
Label declaration:
1, the first acquisition module; 2, first obtain module; 3, the first generation module; 4, second obtain mouldPiece; 5, collect and record module; 6, new module more; 7, upper transmission module; 8, checking module; 9, correcting module;10, the second generation module; 11, the 3rd acquisition module;
21, query unit; 22, analytic unit; 23, obtain unit;
51, the first acquiring unit; 52, updating block; 53, second acquisition unit; 54, the 3rd obtain listUnit; 55, name unit; 56, the 4th acquiring unit; 57, the 5th acquiring unit; 58, associative cell;59, the 6th acquiring unit.
Detailed description of the invention
By describing technology contents of the present invention in detail, being realized object and effect, below in conjunction with embodiment alsoCoordinate accompanying drawing to be explained in detail.
The design of most critical of the present invention is: according to storage problem data, grid equipment data gathered,Obtain and collect and record data, and upgrade in time, exactly data on stock according to collecting and recording data realization.
Refer to Fig. 1, a kind of grid equipment collecting method, comprises
From operation system, obtain data on stock;
Data on stock described in query analysis, obtains storage problem data;
According to described storage problem data, generate the task of collecting and recording;
Collect and record terminal and obtain the task of collecting and recording;
According to the described task of collecting and recording, treat the data of adopting grid equipment and collect and record, obtain collecting and recording data;
According to described in collect and record data on stock described in Data Update.
From foregoing description, beneficial effect of the present invention is: using storage problem data as complying with of collecting and recordingAccording to, greatly reduce and collected and recorded data volume, exactly the data of information errors or logic error are adopted againCollection, has improved the efficiency of data acquisition.
Further, described " data on stock described in query analysis obtains storage problem data " is specially:
Inquire about by Database field, described data on stock is selected, obtain incomplete data on stock;
By spatial data topological analysis, obtain incorrect data on stock;
According to described incomplete data on stock and incorrect data on stock, obtain storage problem data.
Seen from the above description, inquire about by Database field, can find out incomplete data, by skyBetween data topology analysis, the data that can locate errors.
Further, described " according to the described task of collecting and recording, treat the data of adopting grid equipment and collect and record,Obtain collecting and recording data " be specially:
Obtain the spatial positional information of grid equipment to be adopted;
Topological relation to grid equipment described to be adopted and existing grid equipment upgrades;
The attribute information of grid equipment to be adopted described in obtaining;
The pictorial information of grid equipment to be adopted described in obtaining;
According to described spatial positional information and attribute information, described pictorial information is named;
The numbering of grid equipment to be adopted described in obtaining;
The numbering of the ammeter described in obtaining in grid equipment to be adopted;
According to described in the numbering of grid equipment to be adopted and the numbering of ammeter, will described in grid equipment to be adopted and described inAmmeter carries out association, the incidence relation of grid equipment to be adopted described in obtaining.
Further, described " according to the described task of collecting and recording, treat the data of adopting grid equipment and collect and record,Obtain collecting and recording data " afterwards, further comprise: grid equipment to be adopted and user's incidence relation described in obtaining.
Seen from the above description, realize the comprehensive collection to grid equipment data by collecting and recording terminal, can be more completeImprove operation system face, and automatically gather, greatly improved and collected and recorded efficiency.
Further, described " according to described in collect and record data on stock described in Data Update " before, further bagDraw together: collect and record data inspection to described, obtain the imperfect and incorrect data of collecting and recording; To described not completeWhole and incorrectly collect and record data correction.
Seen from the above description,, by checking and revise collecting and recording data, can improve the standard of collecting and recording dataReally property.
Further, described " data on stock described in query analysis obtains storage problem data " afterwards, entersOne step comprises: according to normal data on stock, generate auxiliary data; Collect and record terminal and obtain described auxiliary data.
Further, described " according to the described task of collecting and recording, treat the data of adopting grid equipment and collect and record,Obtain collecting and recording data " be specially: collect and record terminal according to described in collect and record task and described auxiliary data, treat and adoptThe data of grid equipment are collected and recorded, and obtain collecting and recording data.
Seen from the above description, by using normal data on stock as auxiliary data, collect and record can in processAuxiliary field data is collected and recorded, and improves the accuracy of collecting and recording data.
The invention allows for a kind of grid equipment data collecting system, comprise
The first acquisition module, for obtaining data on stock from operation system;
First obtains module, for data on stock described in query analysis, obtains storage problem data;
The first generation module, for according to described storage problem data, generates the task of collecting and recording;
The second acquisition module, obtains for collecting and recording terminal the task of collecting and recording;
Collect and record module, collect and record task for described in basis, treat the data of adopting grid equipment and collect and record,To collecting and recording data;
More new module, for collecting and recording data on stock described in Data Update described in foundation.
Further, described first obtain module and comprise
Query unit, for inquiring about by Database field, selects described data on stock, obtains notComplete data on stock;
Analytic unit, for by spatial data topological analysis, obtains incorrect data on stock;
Obtain unit, for according to described incomplete data on stock and incorrect data on stock, depositedAmount problem data.
Further, described in, collecting and recording module comprises
The first acquiring unit, for obtaining the spatial positional information of grid equipment to be adopted;
Updating block, for upgrading the topological relation of grid equipment described to be adopted and existing grid equipment;
Second acquisition unit, for the attribute information of grid equipment to be adopted described in obtaining;
The 3rd acquiring unit, for the pictorial information of grid equipment to be adopted described in obtaining;
Name unit, for according to described spatial positional information and attribute information, carries out described pictorial informationName;
The 4th acquiring unit, for the numbering of grid equipment to be adopted described in obtaining;
The 5th acquiring unit, for the numbering of the ammeter in grid equipment to be adopted described in obtaining;
Associative cell, for the numbering of grid equipment to be adopted described in foundation and the numbering of ammeter, waits to adopt described in inciting somebody to actionIt is associated that grid equipment and described ammeter carry out, the incidence relation of grid equipment to be adopted described in obtaining.
Embodiment mono-
Please refer to Fig. 1-2, embodiments of the invention one are: a kind of grid equipment collecting method, the methodBased on comprising operation system, management tool and collecting and recording overall system function structure, operation system and the pipe of terminalGrooming tool communication connection, management tool with collect and record terminal communication and be connected. Operation system is used for providing data acquisition and recordingStorage basic data source, data source systems comprise power grid GIS platform, sales service application system,PMS1.0/PMS2.0; Operation system also comprises unstructured data platform. Power grid GIS platform provides fundamentallyReason data and storage electrical network spatial data; Sales service application system provides storage user data;PMS1.0/PMS2.0 provides storage power network resources data; Unstructured data platform is collected and recorded software for storageThe unstructured data such as photo, track of uploading. Management tool, for management and control data acquisition and recording procedure quality, props upHold data on stock obtain, collect and record task generate and distribute, collect and record process management and control, collect and record quality of achievement verify andAchievement is warehouse-in in batches. Collect and record terminal for the operation of data acquisition and recording indoor and field integration, support field apparatus spacePositional information is collected and recorded, the maintenance of machine account attribute, photograph taking and topological relation are safeguarded.
Described method comprises the steps:
S1: management tool obtains data on stock from operation system; Utilize the data pick-up function of management tool,According to login user unit one belongs to, the affiliated data on stock of safeguarding that teams and groups' Automatic Extraction is relevant, respectively from electrical networkIn PMS1.0/PMS2.0 and power grid GIS platform, derive storage fortune inspection data, from sales service application systemDerive storage marketing data, the data on stock of fortune inspection and marketing is stored in management tool database jointly.
S2: data on stock described in query analysis, obtains storage problem data; Application management instrument is deposited describedAmount data are inquired about screening, inquire about figure disappearance, machine account disappearance, device attribute by Database fieldThe data such as complete, equipment photo disappearance are screened, and obtain incomplete data on stock; Simultaneously to storage numberAccording to carrying out spatial data topological analysis, by illogical the spatial positional information occurring in data on stock, feeder lineInformation ownership is wrong, the electrical equipment of isolated island, type error, logicality mistake etc. are carded to issue list,Obtain incorrect data on stock; According to incomplete data on stock and incorrect data on stock, depositedAmount problem data.
S3: using storage problem data as object to be adopted, automatically generated data is collected and recorded task; Alternatively, rightBe added to and collect and record the software of collecting and recording in terminal as vector base map in normal data on stock, for auxiliary existingField data is collected and recorded. There is no the situation of data on stock for the scope of collecting and recording, generate and adopt with the form of idle task bagRecord task.
S4: collect and record terminal and obtain the task of collecting and recording; Task by management tool issues function, and appointment is collected and recordedTask is published to be collected and recorded in task pool, collects and records software in the time of login, obtains inter-related task data, by task bagBe synchronized to and collect and record in terminal, collect and record software and automatically load and collect and record grid equipment to be adopted in task, other associated electricalNet equipment, peripheral map, grid equipment data comprise the numbers such as the locus, machine account attribute, photo of storageAccording to, so that field operation reference.
S5: according to the described task of collecting and recording, treat the data of adopting grid equipment and collect and record, obtain comprising spacePositional information, topological connection relation, attribute information, pictorial information and incidence relation etc. are collected and recorded data; SpecificallyFor:
In conjunction with collecting and recording task, for 1:2000 and above map vector or sub-meter grade image data has covered and existingThe good region of gesture, can preferentially adopt the graphic plot function of collecting and recording terminal, the space that obtains equipment to be adoptedPositional information; Do not meet above-mentioned condition for map datum, based on collect and record terminal hi-Fix module andCollect and record function, obtain the spatial positional information of grid equipment;
When data field data is collected and recorded, according to the topological logic rule of grid equipment, soft based on collecting and recordingFigure maintenance function in part, synchronously carries out the topological connection relation of grid equipment to be adopted and existing grid equipmentMaintenance work, when operation, builds the topological relation at station-line-change-family at the scene;
The attribute dimension protective function providing by collecting and recording software, can revise the wrong community of data on stock,The attribute of newly added equipment is carried out to choosing fast to be filled out; The requirement of collecting and recording according to field apparatus photo, utilizes and collects and records endThe camera function of end is treated and is adopted grid equipment and synchronously take, and collects and records software according to photo naming rule, exampleAs according to device type, place implementor name, belonging positions etc., comparison film is named automatically;
Collect and record terminal scanning after adopting the numbering of grid equipment, the bar code of scanning ammeter, obtains ammeter numbering,According to described in the numbering of grid equipment to be adopted and the numbering of ammeter, ammeter and grid equipment to be adopted are carried out associated,The incidence relation of grid equipment to be adopted described in obtaining;
Alternatively, to complex circuit, the adjacent intersection in platform district, situation that data is incomplete, can utilize the identification of platform districtInstrument is carried out family and is become the census operations of relation in the situation that not having a power failure, described in obtaining grid equipment to be adopted andUser's incidence relation.
S6: according to unified standard criterion, to collecting and recording data inspection, and to imperfect and incorrectCollect and record data correction.
S7: collect and record after data checks passes through, by the data synchronizing function of management tool, will collect and record data oneKey formula is uploaded in the database of each large operation system. The spatial positional information of the grid equipment of wherein collecting and recording andTopological connection relation one is keyed in storehouse to power grid GIS platform; By the marketing device attribute information of collecting and recording and picture letterBreath one is keyed in storehouse to sales service application system and corresponding unstructured data platform; By the fortune of collecting and recordingInspection device attribute information and pictorial information one are keyed in storehouse to PMS1.0/PMS2.0 and corresponding destructuring numberIn platform.
S8: according to the described data of collecting and recording, described data on stock is upgraded, revise described storage problem numberAccording to.
Alternatively, in the time that fortune inspection, the Marketing Major work of collecting and recording are not synchronously carried out, according to " who first adopts, whose subsidesMark " principle, fortune inspection and the integrated separation of Marketing Major are carried out to labeling. The rear specialty of carrying out is collected and recorded workPersonnel, by collecting and recording the landmark identification module scanning label of terminal, complete data and are collecting with the expert data of first adoptingBecome separation automatic butt. In gatherer process, equipment is carried out to label and put up points two kinds, a kind ofly demarcate for property rightPoint label, the connection identifier data that this label articulates as fortune inspection side and Marketing-side image data, put up boundaryAfter some label, fortune inspection and marketing can be carried out the work separately, needn't reach the spot simultaneously; One is equipment markSign, use the landmark identification module of collecting and recording terminal to carry out facility information and automatically bind with the label of putting up. LabelPut up position as shown in Figure 3.
Integrated separation label adopts the following principle of putting up:
For mesohigh separation, when central high-tension overhead line is used shaft tower as separation, label is puted upAt shaft tower; When public line cable, cable branch box etc. are during as separation, label is posted in to feeder pillar;In the time that special circuit is used transformer station's outgoing line interval as separation, label is posted in to transformer station outlet; WhenSpecial circuit during as separation, is posted in looped network by label with the outgoing line interval such as ring main unit or cable branch boxThe box-type equipment such as cabinet or cable branch box.
For low pressure separation, when low pressure shaft tower is during as separation, label is posted in to shaft tower; Work as low pressureFeeder pillar during as separation, is posted in feeder pillar by label.
Embodiment bis-
Please refer to Fig. 4-5, embodiments of the invention two are a kind of grid equipment data collecting system, comprise
The first acquisition module 1, for obtaining data on stock from operation system;
First obtains module 2, for data on stock described in query analysis, obtains storage problem data;
The first generation module 3, for according to described storage problem data, generates the task of collecting and recording;
The second acquisition module 4, obtains for collecting and recording terminal the task of collecting and recording;
Collect and record module 5, collect and record task for described in basis, treat the data of adopting grid equipment and collect and record,To collecting and recording data;
More new module 6, for collecting and recording data on stock described in Data Update described in foundation.
Described first obtains module 2 comprises
Query unit 21, for inquiring about by Database field, selects described data on stock, obtainsIncomplete data on stock;
Analytic unit 22, for by spatial data topological analysis, obtains incorrect data on stock;
Obtain unit 23, for according to described incomplete data on stock and incorrect data on stock, obtainStorage problem data.
The described module 5 of collecting and recording comprises
The first acquiring unit 51, for obtaining the spatial positional information of grid equipment to be adopted;
Updating block 52, for carrying out more the topological relation of grid equipment described to be adopted and existing grid equipmentNewly;
Second acquisition unit 53, for the attribute information of grid equipment to be adopted described in obtaining;
The 3rd acquiring unit 54, for the pictorial information of grid equipment to be adopted described in obtaining;
Name unit 55, for according to described spatial positional information and attribute information, enters described pictorial informationRow name;
The 4th acquiring unit 56, for the numbering of grid equipment to be adopted described in obtaining;
The 5th acquiring unit 57, for the numbering of the ammeter in grid equipment to be adopted described in obtaining;
Associative cell 58, for the numbering of grid equipment to be adopted described in foundation and the numbering of ammeter, treats described in inciting somebody to actionAdopt grid equipment and described ammeter carry out associated, the incidence relation of grid equipment to be adopted described in obtaining.
Also comprise the 6th acquiring unit 59, for grid equipment to be adopted described in obtaining and user's incidence relation.
This system also comprises
Upper transmission module 7 is collected and recorded data upload to operation system described in inciting somebody to action;
Checking module 8, for collecting and recording data inspection to described, obtains the imperfect and incorrect number of collecting and recordingAccording to;
Correcting module 9, for to described imperfect and incorrectly collect and record data correction.
This system also comprises
The second generation module 10, for according to normal data on stock, generates auxiliary data;
The 3rd acquisition module 11, obtains described auxiliary data for collecting and recording terminal;
Described collect and record module specifically for collect and record terminal according to described in collect and record task and described auxiliary data, treatAdopt the data of grid equipment and collect and record, obtain collecting and recording data.
In sum, a kind of grid equipment collecting method provided by the invention and system thereof, to storage numberObtain storage problem data and using storage problem data as the foundation of collecting and recording, can greatly reduce according to analyzingCollect and record data volume, exactly the data of information errors or logic error are carried out to Resurvey, improved dataThe efficiency gathering; Automatically gather by collecting and recording terminal, further improved and collected and recorded efficiency; By to collecting and recordingData check and revise, and further improve the accuracy of collecting and recording data; To collect and record data upload to businessIn system, can manage collecting and recording data easily.
The foregoing is only embodiments of the invention, not thereby limit the scope of the claims of the present invention, every profitThe equivalents of doing by description of the present invention and accompanying drawing content, or be directly or indirectly used in relevant technologyField, is all in like manner included in scope of patent protection of the present invention.

Claims (10)

1. a grid equipment collecting method, is characterized in that: comprise
From operation system, obtain data on stock;
Data on stock described in query analysis, obtains storage problem data;
According to described storage problem data, generate the task of collecting and recording;
Collect and record terminal and obtain the task of collecting and recording;
According to the described task of collecting and recording, treat the data of adopting grid equipment and collect and record, obtain collecting and recording data;
According to described in collect and record data on stock described in Data Update.
2. a kind of grid equipment collecting method according to claim 1, is characterized in that: described in" data on stock described in query analysis obtains storage problem data " is specially:
Inquire about by Database field, described data on stock is selected, obtain incomplete data on stock;
By spatial data topological analysis, obtain incorrect data on stock;
According to described incomplete data on stock and incorrect data on stock, obtain storage problem data.
3. a kind of grid equipment collecting method according to claim 1, is characterized in that: described in" according to the described task of collecting and recording, treat the data of adopting grid equipment and collect and record, obtain collecting and recording data " concreteFor:
Obtain the spatial positional information of grid equipment to be adopted;
Topological relation to grid equipment described to be adopted and existing grid equipment upgrades;
The attribute information of grid equipment to be adopted described in obtaining;
The pictorial information of grid equipment to be adopted described in obtaining;
According to described spatial positional information and attribute information, described pictorial information is named;
The numbering of grid equipment to be adopted described in obtaining;
The numbering of the ammeter described in obtaining in grid equipment to be adopted;
According to described in the numbering of grid equipment to be adopted and the numbering of ammeter, will described in grid equipment to be adopted and described inAmmeter carries out association, the incidence relation of grid equipment to be adopted described in obtaining.
4. a kind of grid equipment collecting method according to claim 1, is characterized in that: described in" according to the described task of collecting and recording, treat the data of adopting grid equipment and collect and record, obtain collecting and recording data " afterwards,Further comprise: grid equipment to be adopted and user's incidence relation described in obtaining.
5. a kind of grid equipment collecting method according to claim 1, is characterized in that: described in" according to described in collect and record data on stock described in Data Update " before, further comprise: to the described data of collecting and recordingCheck, obtain the imperfect and incorrect data of collecting and recording; To the described imperfect and incorrect number of collecting and recordingAccording to revising.
6. a kind of grid equipment collecting method according to claim 1, is characterized in that: described in" data on stock described in query analysis obtains storage problem data " afterwards, further comprises: according to normallyData on stock, generate auxiliary data; Collect and record terminal and obtain described auxiliary data.
7. a kind of grid equipment collecting method according to claim 6, is characterized in that: described in" according to the described task of collecting and recording, treat the data of adopting grid equipment and collect and record, obtain collecting and recording data " concreteFor: collect and record terminal according to described in collect and record task and described auxiliary data, treat the data of adopting grid equipment and carry outCollect and record, obtain collecting and recording data.
8. a grid equipment data collecting system, is characterized in that: comprise
The first acquisition module, for obtaining data on stock from operation system;
First obtains module, for data on stock described in query analysis, obtains storage problem data;
The first generation module, for according to described storage problem data, generates the task of collecting and recording;
The second acquisition module, obtains for collecting and recording terminal the task of collecting and recording;
Collect and record module, collect and record task for described in basis, treat the data of adopting grid equipment and collect and record,To collecting and recording data;
More new module, for collecting and recording data on stock described in Data Update described in foundation.
9. a kind of grid equipment data collecting system according to claim 8, is characterized in that: described inFirst obtains module comprises
Query unit, for inquiring about by Database field, selects described data on stock, obtains notComplete data on stock;
Analytic unit, for by spatial data topological analysis, obtains incorrect data on stock;
Obtain unit, for according to described incomplete data on stock and incorrect data on stock, depositedAmount problem data.
10. a kind of grid equipment data collecting system according to claim 8, is characterized in that: instituteState and collect and record module and comprise
The first acquiring unit, for obtaining the spatial positional information of grid equipment to be adopted;
Updating block, for upgrading the topological relation of grid equipment described to be adopted and existing grid equipment;
Second acquisition unit, for the attribute information of grid equipment to be adopted described in obtaining;
The 3rd acquiring unit, for the pictorial information of grid equipment to be adopted described in obtaining;
Name unit, for according to described spatial positional information and attribute information, carries out described pictorial informationName;
The 4th acquiring unit, for the numbering of grid equipment to be adopted described in obtaining;
The 5th acquiring unit, for the numbering of the ammeter in grid equipment to be adopted described in obtaining;
Associative cell, for the numbering of grid equipment to be adopted described in foundation and the numbering of ammeter, waits to adopt described in inciting somebody to actionIt is associated that grid equipment and described ammeter carry out, the incidence relation of grid equipment to be adopted described in obtaining.
CN201610065300.7A 2016-01-29 2016-01-29 Power grid equipment data acquisition method and system Pending CN105608640A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610065300.7A CN105608640A (en) 2016-01-29 2016-01-29 Power grid equipment data acquisition method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610065300.7A CN105608640A (en) 2016-01-29 2016-01-29 Power grid equipment data acquisition method and system

Publications (1)

Publication Number Publication Date
CN105608640A true CN105608640A (en) 2016-05-25

Family

ID=55988558

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610065300.7A Pending CN105608640A (en) 2016-01-29 2016-01-29 Power grid equipment data acquisition method and system

Country Status (1)

Country Link
CN (1) CN105608640A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106227730A (en) * 2016-07-05 2016-12-14 长沙威克电力技术科技有限公司 Power grid GIS data acquisition and recording system and collect and record method
CN106708984A (en) * 2016-12-09 2017-05-24 国网北京市电力公司 Method, apparatus and system for acquiring basic data of cable channel
CN106845766A (en) * 2016-12-14 2017-06-13 国网北京市电力公司 Information collecting method
CN108171399A (en) * 2017-12-06 2018-06-15 国家电网公司 Method and terminal device are collected and recorded in battalion's auxiliary tone
CN108229816A (en) * 2017-12-30 2018-06-29 国网浙江省电力公司杭州供电公司 Management method is matched by the battalion of Internet of Things networking based on distributed management
CN109034585A (en) * 2018-07-18 2018-12-18 国网湖北省电力有限公司 Become relationship distinguished number and system based on the family Tai Qu in power information and geographical location
CN110095694A (en) * 2019-05-30 2019-08-06 广东电网有限责任公司 A kind of area's low-voltage circuit monitors system

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104618133A (en) * 2014-12-18 2015-05-13 东北大学 Power grid voltage quality monitoring data collecting method and system
CN105186683A (en) * 2015-06-05 2015-12-23 国家电网公司 Synchronization method for equipment data transaction in electric power marketing and distributing services

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104618133A (en) * 2014-12-18 2015-05-13 东北大学 Power grid voltage quality monitoring data collecting method and system
CN105186683A (en) * 2015-06-05 2015-12-23 国家电网公司 Synchronization method for equipment data transaction in electric power marketing and distributing services

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106227730A (en) * 2016-07-05 2016-12-14 长沙威克电力技术科技有限公司 Power grid GIS data acquisition and recording system and collect and record method
CN106708984A (en) * 2016-12-09 2017-05-24 国网北京市电力公司 Method, apparatus and system for acquiring basic data of cable channel
CN106845766A (en) * 2016-12-14 2017-06-13 国网北京市电力公司 Information collecting method
CN108171399A (en) * 2017-12-06 2018-06-15 国家电网公司 Method and terminal device are collected and recorded in battalion's auxiliary tone
CN108229816A (en) * 2017-12-30 2018-06-29 国网浙江省电力公司杭州供电公司 Management method is matched by the battalion of Internet of Things networking based on distributed management
CN109034585A (en) * 2018-07-18 2018-12-18 国网湖北省电力有限公司 Become relationship distinguished number and system based on the family Tai Qu in power information and geographical location
CN109034585B (en) * 2018-07-18 2021-06-08 国网湖北省电力有限公司 Electricity utilization information and geographical position-based transformer area user variable relation discrimination algorithm and system
CN110095694A (en) * 2019-05-30 2019-08-06 广东电网有限责任公司 A kind of area's low-voltage circuit monitors system

Similar Documents

Publication Publication Date Title
CN105608640A (en) Power grid equipment data acquisition method and system
CN104376081A (en) Data application processing system, handhold terminal and on-site checking data processing system
CN101257694A (en) Mobile communication network managing intelligent sending method based on information support system
CN106708984A (en) Method, apparatus and system for acquiring basic data of cable channel
CN102609520B (en) Method for exporting model data of substation by filtering
CN106251092A (en) Field operation managing and control system based on operation template
CN111612646A (en) Networked intelligent secondary operation and maintenance system
CN110648422A (en) Standardized inspection method, system and platform
CN109710696A (en) The System and method for the mobile operation of unusual fluctuation is verified for power equipment
CN112639824B (en) Intelligent maintenance method and device for optical fiber network
CN107844320A (en) State's net software version information management system and implementation method
CN105469323A (en) Handheld terminal for checking power supply service and method of checking power supply service
WO2017141225A2 (en) Method for diagnosing/managing new renewable energy facility using mobile terminal and system therefor
CN112232635A (en) Wisdom water affairs data middling platform based on distributing type cloud framework
CN112528742A (en) State checking method and device for transformer substation pressure plate
CN103593228B (en) The test instrunment program control order emulator of a kind of practicality and using method thereof
CN105259896B (en) A kind of method for diagnosing faults based on power dispatch data network
CN107124035B (en) Method and device for processing station area identification information
CN105354681A (en) Method for automatically studying, judging and correcting acquisition file of marketing acquisition interface data
CN112288171A (en) Data processing method, device and system
CN115858714B (en) Unmanned aerial vehicle collected GIS data automatic modeling management system and method
CN105049462A (en) Monitoring center cooperative work subsystem based on Geographic Information System (GIS) and working method thereof
CN106204343A (en) A kind of construction quality control system and method based on mobile terminal
CN104112183A (en) Plug-and-play intelligent scheduling model management system and management method of intelligent substation
CN116796950A (en) Online review system and method for power distribution network project capable of being researched

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160525