CN105604581A - Hoisting and rotating type installation equipment of tunnel ditch cable groove combination template and construction method of hoisting and rotating type installation equipment - Google Patents

Hoisting and rotating type installation equipment of tunnel ditch cable groove combination template and construction method of hoisting and rotating type installation equipment Download PDF

Info

Publication number
CN105604581A
CN105604581A CN201610167463.6A CN201610167463A CN105604581A CN 105604581 A CN105604581 A CN 105604581A CN 201610167463 A CN201610167463 A CN 201610167463A CN 105604581 A CN105604581 A CN 105604581A
Authority
CN
China
Prior art keywords
template
side form
ditch
cable trough
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610167463.6A
Other languages
Chinese (zh)
Other versions
CN105604581B (en
Inventor
郑孝福
戴润军
胡必飞
戴斌
徐赞
王艳波
王超
邵维赛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Tunnel Group Erchu Co Ltd
Original Assignee
China Railway Tunnel Group Erchu Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Tunnel Group Erchu Co Ltd filed Critical China Railway Tunnel Group Erchu Co Ltd
Priority to CN201610167463.6A priority Critical patent/CN105604581B/en
Publication of CN105604581A publication Critical patent/CN105604581A/en
Application granted granted Critical
Publication of CN105604581B publication Critical patent/CN105604581B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/102Removable shuttering; Bearing or supporting devices therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/40Devices or apparatus specially adapted for handling or placing units of linings or supporting units for tunnels or galleries

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention relates to the technical field of tunnel ditch cable groove equipment, and particularly relates to hoisting and rotating type installation equipment of a tunnel ditch cable groove combination template and a construction method of the hoisting and rotating type installation equipment. According to the hoisting and rotating type installation equipment of the tunnel ditch cable groove combination template and the construction method of the hoisting and rotating type installation equipment, provided by the invention, when early-stage TBM (Tunnel Boring Machine) tunneling and synchronous lining construction tasks are relatively heavy, a plurality of synchronous lining trolleys in a cave move and the requirements on vertical clearances of tunnels of large part transportation after in-caved detachment of a TBM can be met; and when ditch cable groove construction is carried out until the in-caved detachment of the TBM is finished, and the construction is started to be organized after secondary lining construction is finished, the digging of an in-cave communication channel and subsequent work are synchronously carried out, and in-cave transportation does not need to be stopped, so that the requirements on passing clearances by in-cave rail transportation are met.

Description

Tunnel ditch cable trench gang form hangs rotatable erection unit and construction method thereof
Technical field
The present invention relates to tunnel ditch cable trench equipment technical field, be specifically related to tunnel ditch cable trench gang form and hangRotatable erection unit and construction method thereof.
Background technology
In prior art, ditch cable trench is the important component part in modern tunnel as tunnel appurtenant work, its matter of constructingAmount directly affects the image of tunnel integral construction and moulding, but because on-the-spot practice of construction needs, ditch cable trench is generally at tunnelThe middle and later periods of road construction just starts to perform, and this just causes, and cable trench construction period pressure in ditch is large, construction quality requirement is high,And due to the needs that in hole, follow-up construction is transported, ditch cable trench construction space is often subject to strict restriction. With China blueChongqing railway WEST QINLING tunnel ditch cable trench construction is example, and Lan Yu Railway WEST QINLING Tunnel Engineering total length 28.236km, isThe second long tunnel in China railway construction history is at present also that China TBM construction section maximum, distance are the longestRailway tunnel, adopts drilling and blasting method and TBM driving associating construction, and TBM driving section adopts continuous belt conveyer mucking and secondary liningParallel operations, the stores van transport construction material that 25t diesel locomotive traction marshalling is in column, four rail two-wire rail Transportation Models.But, because of early stage TBM driving, synchronization lining construction task heavier, and be subject in hole 6 synchronization lining trolley travelings, TBMIn hole, tear large part after machine open and transport the requirement to tunnel vertical clearance, ditch cable trench is constructed until the machine of tearing open in TBM hole completes, twoAfter inferior lining construction completes, start organizing construction, during this period in hole, the follow-up work such as service channel excavation is synchronously carried out, and in hole, transportsDefeated cannot interruption, causes that duration pressure is large, ditch cable trench construction must meet hole inner orbit transport wanting current headroomAsk, therefore ditch cable trench construction must have one-time-concreting moulding, formwork is located fast, fast, the operation sky of template turnover ownBetween the feature such as little.
Chinese patent CN204266233U discloses a kind of tunnel ditch cable trough construction template positioner, comprises multipleThe locator card of laying from front to back, multiple described locator cards are all laid in the forming panel top of constructed ditch cable trench; InstituteConstruction ditch cable trench is to be laid in top, coagulation earthen platform and the groove for draining or laying cable, and the quantity of described groove isN, described coagulation earthen platform and multiple described groove are all laid along the direction extending longitudinally of constructed Railway Tunnel, whereinN is positive integer and N >=2; It is fixed that described forming panel comprises that N respectively carries out the combined type of molding construction to N described grooveSection mould plate and the lateral wall of coagulation earthen platform is carried out to the lateral wall typified form of molding construction, N described Combined type sizing templateAll lay along the direction extending longitudinally of constructed Railway Tunnel with lateral wall typified form; The structure of multiple described locator cardsAll identical, described locator card comprises that the crossbeam and the N that together described forming panel top are positioned are individual respectively to described in NThe column that Combined type sizing template bottom positions, described crossbeam is along the transverse width direction cloth of constructed Railway TunnelIf described crossbeam and N described column is all laid on same plane, N described column is installed in crossbeam bottom; InstituteState on forming panel and be provided with and arrange the second screw mandrel of installing for multiple described locator cards respectively, the crossbeams of each described locator card moreAll be arranged on described forming panel top by described the second screw mandrel of a row; Described the second screw mandrel of every row includes N group peace respectivelyBe contained in N the second screw mandrel in described Combined type sizing template, described in every group, the second screw mandrel includes two and is arranged on respectively groupThe second screw mandrel of top, the box-like typified form left and right sides; N in described locator card, described column inserts respectively N instituteStating inner and its bottom of Combined type sizing template props up respectively and withstands on N, described Combined type sizing template bottom. This patent does not haveSolution formwork location in ditch cable trench construction is slow, template is had enough to meet the need slow problem, and can not meet hole inner orbit transport to leading toThe requirement of row headroom and ditch cable trench construction need to have the requirement of one-time-concreting moulding.
Summary of the invention
In order to overcome defect of the prior art, the invention provides tunnel ditch cable trench gang form and hang rotatable installation and establishStandby and construction method, in the time that early stage, TBM driving, synchronization lining construction task were heavier, in hole, 6 synchronization lining chassis are walkedRow, can meet in TBM hole, tear machine open after large part transport the requirement to tunnel vertical clearance, construct until TBM at ditch cable trenchIn hole, tear that machine completes open, Second Lining Construction is while starting organizing construction after completing,, service channel excavates and synchronizes with follow-up work in the hole inCarry out, in hole, transport need not be interrupted, and meets the requirement of hole inner orbit transport to current headroom.
The present invention is achieved through the following technical solutions: tunnel ditch cable trench gang form hangs rotatable erection unit, bagDraw together gang form and for lifting the crane of gang form, described gang form comprises at least two above mould bases that longitudinally arrangeLongeron, described mould bases longeron and the cable trough cover boards template, the first cable trough side form, second that laterally be arranged in parallel in orderCable trough side form, the first ditch side form, the second ditch side form, ditch lid template die plate and be arranged on outside side form be fixedly connected with,Described cable trough cover boards template is with first cable trough side form is adjacent is fixedly connected with, described the second ditch side form and ditch lid template die plateAdjacent being fixedly connected with, the end of each described mould bases longeron is connected with the extensible canopy one end that is provided with position fixing handle, described extensible canopyThe other end be connected with and be provided with cambered surface fixed block, described cambered surface fixed block is provided with extensible canopy fixed handle, described mould bases longeronAbove between the first cable trough side form and the second cable trough side form and between the first ditch side form and the second ditch side form, establishing respectivelyHave mould bases crossbeam, described the first cable trough side form is provided with the first cable trough side form boom hole and slideway, on described mould bases longeron, establishesThere are the second cable trough side form boom hole and slideway, the first ditch side form boom hole and slideway, the second ditch side form boom hole and cunningRoad and knockout pin abutment sleeve, described ditch lid template die plate is provided with ditch lid template die plate boom hole and slideway, described mould bases crossbeamBe provided with several spacing compressor arm fixing holes, described mould bases longeron and the vertical setting mutually of mould bases crossbeam, described mould bases crossbeamUpper several mould bases hangers, between adjacent described mould bases hanger, distance equates, in described knockout pin abutment sleeve, is provided with locationBar and knockout pin, be set with spacing compression sliding hanger rod, institute in the spacing compressor arm sliding sleeve arranging on described mould bases longeronState spacing compression sliding hanger rod and be provided with spacing compression wing plate, described spacing compression wing plate is by spacing compression pin and the first cableGroove side form is connected with the side mould limiting otic placode on the second cable trough side form, described the first cable trough side form and the second cable trough side formOn template suspension rod tighten nut by template and be fixedly connected with clamp nut under template through mould bases longeron respectively, described limitThe top of position compressor arm sliding sleeve is provided with the spacing nut that is fixed for adjusting spacing compression operating grip position, described inThe end of side form and mould bases crossbeam is provided with side form chute, and described side form chute is connected with mould bases longeron by side form set bolt,Described template suspension rod is provided with the Template Location scale connecting by Template Location pin, and described side form is provided with side form boatswain chair and sideMould is fixed otic placode, and the fixing otic placode of described side form is connected with construction abutment wall basis by expansion bolt, described the first cable trough side form,The second cable trough side form, the first ditch side form, the second ditch side form, ditch lid template die plate and be arranged on outside side form on establishThere is the longitudinal connecting bolt of several regularly arranged templates hole to be connected with template;
Described crane comprises the vehicle-mounted counterweight being arranged on car body, crane column and the generator that two covers be arranged in parallel, described carBelow body, be provided with road wheel, described crane column centre position is provided with walking beam, and described walking beam is provided with by electric wire and sends outMotor connects and does the electric hoist of back and forth movement along walking beam direction, and described electric hoist is provided with chain sling hook, described walking beam withThe link downside of crane column is provided with the spring connecting by steady pin, and the end of described walking beam is provided with bulkhead, described inThe top of crane column is provided with fixed head, and described fixed head is connected with connecting plate, and described connecting plate is provided with rotating shaft, described in turnAxle is connected with one end of pull bar, and the other end of described pull bar is fixed on walking beam, described crane column and the opposing side of walking beamTo being provided with the first cross-brace, the centre position of described the first cross-brace is connected with second cross-brace one end, described the second cross-braceThe other end be packed on car body through vehicle-mounted counterweight, the side of described crane column is provided with the 3rd cross-brace, described the 3rd obliqueDagger is fixedly connected with floor.
Further, the end of described spacing compression sliding hanger rod is provided with anti-drop device.
Further, the junction of described the first cable trough side form and the second cable trough side form is provided with anti-overflowing steel plate strip.
Further, described generator bottom is provided with yielding rubber plate with vehicle-mounted counterweight junction.
Further, described generator is gasoline engine generator, and the power of described gasoline engine generator is 8kw.
Further, described crane column is provided with several floors, and the interval between adjacent described floor equates.
Further, described generator is provided with guard rail.
Further, described guard rail is wire mesh cage structures.
The present invention also provides a kind of construction method that uses tunnel ditch cable trench gang form to hang rotatable erection unit, itsBe characterised in that, said method comprising the steps of:
Step 1, to the abutment wall basis basal plane cleaning in tunnel, after the driving tunnel moulding of Tunnel Engineering, carries out the initial stage successivelySupporting, inverted arch prefabricated section are mated formation, inverted arch prefabricated section bottom pea gravel concreten is filled, inverted arch prefabricated section dual-side foundation of wall coagulationThe construction of earthen backfill, abutment wall base concrete, elevation is to designing absolute altitude at the bottom of ditch, the Second Lining Construction ditch cable trench in tunnelConstruction is taking the abutment wall basis that performed and secondary lining concrete surface as basic,
Step 2, measures unwrapping wire, carries out the first unwrapping wire and unwrapping wire for the second time, at abutment wall on the lining cutting side wall of having constructedUpper the 3rd unwrapping wire in basis and the 4th unwrapping wire, wherein, the graticule of the first unwrapping wire is for locating template cambered surface fixed block; The second unwrapping wireGraticule for the high process control of ditch cable trench top of concrete; The graticule of third direction is for the control of template longitudinal register; TheThe graticule of four unwrapping wire is for the expansion bolt location of side mould, and the graticule of the graticule of the first unwrapping wire and the 3rd unwrapping wire is for ditch electricityThe control of cable groove elevation, coordinate and straight degree, it is auxiliary that the graticule of the graticule of the second unwrapping wire and the 4th unwrapping wire has been used for concrete formationHelp quality control;
Step 3. is carried out reinforcement fabrication and installation;
Step 4, carries out earthing or grounding means and drainpipe and installs;
Step 5, carries out template assembling outward at Tunnel, by the template assembly installation in position processing with carry out coarse adjustment, templateAssembly carries out Assembling outside the hole, and the parts that need Site Welding are that Template Location pin, side mould limiting otic placode and spacing compression are slidedSuspension rod positions welding according to position location, after formwork integral has been assembled, prepares to lift into hole to use; Template coarse adjustment bagDraw together after formwork integral lifting puts in place, move forward and backward template and the smooth-going overlap joint of ditch cable trench of having constructed, move left and right template and make oftenGroup 3 position bars of template and knockout pin all drop on the graticule of the 3rd unwrapping wire; Extract extensible canopy out and its end fixing device is embeddedThe interior also closed extensible canopy fixed handle of cambered surface fixed block preformed groove; Horizon rule is placed on to mould bases end face, and rotation adjusted position bar is with de-Tringle declines until horizon rule bubble is all placed in the middle after making mould bases increase, and screw-extensible canopy position fixing handle, realizes formwork integral thickAdjust;
Step 6, carries out accurate adjustment and cleaning to the template through coarse adjustment, and template fine adjusting comprises the first cable trough side form, secondThe template suspension rod of cable trough side form, the first ditch side form, the second position, side form place, ditch all slide into this place's pattern hole outsideSide, realizes template closure, and Template Location scale two ends preformed hole is inserted and lays respectively at the first cable trough side form, the second ditchIn Template Location pin in side form template, make formation of concrete headroom meet ditch cover plate, cable trough cover boards to ditch cable trenchHeadroom; Clamp nut position under clamp nut on adjusting template, template, adjust after template height puts in place, carry out fastening, pointDo not descend the spacing pressure between adjustment mould plate the first cable trough side form, the second cable trough side form, the first ditch side form, the second ditch side formTight bar sliding sleeve, buckles in side mould limiting otic placode preformed groove spacing compression pin, and the fastening spacing nut that is fixed, preventsThe first cable trough side form in template, the second cable trough side form, the first ditch side form, the second ditch side form are in concretingIn process, there is floating or skew; Behind the second side form location, ditch, regulate ditch lid template die Board position to make it and the second ditch sideThe closely connected rear fastening spacing nut that is fixed of mould, slides onto side form to the inside template bottom and builds moulding along side form chuteAbutment wall basis closely connected after, fastening side form set bolt, and expansion bolt is carried out to side form through the fixing otic placode of side form and fix;
Step 7, the template of carrying out between group and group after template fine adjusting completes is longitudinally connected, after moulding groove is smooth-going, to processThe template brushing releasing agent of accurate adjustment;
Step 8, concreting, assembles more than 5 groups in template, carries out concreting work, and concrete transportation is to executingBehind work scene, be directly conveyed in template by shuttle groove;
Step 9, carries out maintenance to the concrete of building, to concrete curing 4h;
Step 10, the concrete after maintenance carries out the demoulding, takes off Template Location scale, unclamps template and tightens nut, templateLower clamp nut and the spacing nut that is fixed, mention template stopping means by spacing compression operating grip, by spacing compressionPin departs from the preformed groove of side mould limiting otic placode; Unclamp the expansion bolt of side form, side form set bolt, the fixing otic placode of side form position,Sleiding form moves laterally, side form and formation of concrete emaciated face from; Tapping template suspension rod make template the first cable trough side form,The second cable trough side form, the first ditch side form, the second ditch side form and ditch lid template die plate the template suspension rod of totally 5 positions, place are completePortion slides into the inner side of this place's pattern hole, and template side and formation of concrete emaciated face drive from, backspin-backstay and knockout pinEntirety mould bases rise, make template bottom surface and formation of concrete emaciated face from; Each side template and formation of concrete emaciated face, from rear, are unclampedExtensible canopy fixed handle, regains extensible canopy, adopts the gantry crane being drawn by diesel locomotive that this group formwork integral is hung and gone to downOne position recycles;
Step 11, concrete carries out, after follow-up maintenance, hanging while turning, crane formwork integral is sling after traveling electric blockClosely connected to template and crane, with chain lock, template and crane column are connected and fixed to electric block and adopt 1 8kW gasoline to send outMotor provides power.
Compared with prior art, superior effect is: the simple in structure and fixation of the present invention, and in ditch cable trench constructionThe features such as energy one-time-concreting moulding, formwork location is fast, fast, the working space of template turnover own is little, are ensureing safe prerequisiteUnder, improve lifting efficiency, shorten the construction period.
Brief description of the drawings
Fig. 1 is the top view of ditch of the present invention cable trench gang form;
Fig. 2 be in Fig. 1 along A-A to structure cutaway view;
Fig. 3 be in Fig. 1 along B-B to structure cutaway view;
Fig. 4 is the structure enlarged drawing of the cable trough side form in Fig. 1;
Fig. 5 is the structure enlarged drawing of the ditch side form in Fig. 1;
Fig. 6 is the structure enlarged drawing of the side form in Fig. 1;
Fig. 7 is the front view of crane described in the present invention;
Fig. 8 be in Fig. 7 along C-C to cutaway view;
Fig. 9 is that tunnel ditch cable trench gang form hangs the on-the-spot view that uses of rotatable erection unit;
Figure 10 is the workflow diagram of construction method of the present invention;
Figure 11 is the schematic diagram of the unwrapping wire position of construction method of the present invention.
Reference numeral is as follows:
1-cambered surface fixed block, 2-extensible canopy fixed handle, 3-extensible canopy, 4-position fixing handle, 5-Template Location scale, 6-templateAlignment pin, 7-backstay and knockout pin, 8-side form chute, 9-side form set bolt, the spacing compressor arm sliding sleeve of 10-, 11-Anti-drop device, the spacing nut that is fixed of 12-, the spacing compression operating grip of 13-, the spacing compression wing plate of 14-, the spacing pressure of 15-Tight pin, 16-side mould limiting otic placode, the spacing compression sliding hanger rod of 17-, 18-mould bases hanger, 19-mould bases longeron, 20-mould bases horizontal strokeBeam, 21-knockout pin abutment sleeve, 22-template tightens nut, clamp nut under 23-template, 24-template suspension rod, 25-electricityCable groove cover plate template, 26-the first cable trough side form, 27-anti-overflowing steel plate strip, 28-the second cable trough side form, 29-the first waterDitch side form, 30-the second ditch side form, 31-ditch lid template die plate, 32-side form boatswain chair, 33-side form, 34-side form is fixed otic placode,The longitudinal connecting bolt of 35-template hole, 36-expansion bolt, the spacing compressor arm fixing hole of 37-, 38-the first cable trough side form suspension rodHole and slideway, 39-the second cable trough side form boom hole and slideway, 40-the first ditch side form boom hole and slideway, 41-the second waterDitch side form boom hole and slideway, 42-ditch lid template die plate boom hole and slideway, 43-car body, the vehicle-mounted counterweight of 44-, 45-craneColumn, 46-floor, 47-the first cross-brace, 48-the 3rd cross-brace, 49-the second cross-brace, 50-walking beam, 51-bulkhead,52-pull bar, 53-fixed head, 54-rotating shaft, 55-connecting plate, 56-spring, 57-steady pin, 58-electric hoist, 59-chain sling,60-generator, 61-guard rail, 62-yielding rubber plate, 63-chain sling hook, 64-road wheel.
Detailed description of the invention
Below in conjunction with accompanying drawing, the specific embodiment of the invention is described in further detail.
As shown in Fig. 1-6, tunnel ditch cable trench gang form provided by the invention hangs rotatable erection unit, comprises combinationTemplate and for lifting the crane of gang form, described gang form, comprises and carries out using positioner, mould after AssemblingRack device and plate device. When mobile, adopt simple and easy loop wheel machine lifting, transport and hang in place, utilize self quick locationDevice is realized Template Location. In the present embodiment, gang form comprises the Combined formwork that some groups of Dan Zuwei 5m are long, every groupTemplate all has independently ditch cable trench, can rapid construction ability, while use separately, do not reduce the use function of this template,When many cover templates are used in conjunction with, more can increase work efficiency. Ditch cable trench combination moving die plate in the present invention, fixingThe mould bases of the cambered surface fixed block 1 on molded secondary lining concrete raises the backstay on whole backstay and knockout pin 7,Realize the quick location of overall mould bases by Template Location scale 5, between each side template and mould bases, enter by template suspension rod 24Row is connected and fixed, and in the hole of template suspension rod 24, outside semi-circular arc shape end face is respectively Template Location position and demoulding position,After Template Location, position by clamp nut, and undertaken laterally, longitudinally by Template Location scale 5, spacing compressor armTemplate Location, prevents that off normal or floating from appearring in template in concreting process. Removable after the about 4h of concrete curingTemplate Location scale 5, unclamp spacing compressor arm; When the demoulding, unclamp tapping template suspension rod 24 backspin location after clamp nutBar and knockout pin 7 demouldings realize fast demoulding. Because the mode of turning of hanging adopting is overlapped moving die plate device without the knot of traveling independentlyStructure, on design height and width, template all reduces to some extent more in the past, therefore can meet construction period conveying track currentActual needs. In the present invention, hang rotatable ditch cable trench gang form, comprise at least two above moulds that longitudinally arrangeFrame longeron 19, described mould bases longeron 19 and the cable trough cover boards template 25, the first cable trough that laterally be arranged in parallel in orderSide form 26, the second cable trough side form 28, the first ditch side form 29, the second ditch side form 30, ditch lid template die plate 31 andThe side form 33 that is arranged on outside is fixedly connected with, and described cable trough cover boards template 25 is adjacent with the first cable trough side form 26 fixingConnect described the second ditch side form 30 and ditch lid template die plate 31 adjacent being fixedly connected with, each described mould bases longeron 19End is connected with extensible canopy 3 one end that are provided with position fixing handle 4, and the other end of described extensible canopy 3 is connected with and is provided with cambered surface and fixesPiece 1, described cambered surface fixed block 1 is provided with extensible canopy fixed handle 2, on described mould bases longeron 19 respectively at the first cable troughBetween side form 26 and the second cable trough side form 28 and between the first ditch side form 29 and the second ditch side form 30, be provided with mould bases horizontal strokeBeam 20, described the first cable trough side form 26 is provided with the first cable trough side form boom hole and slideway 38, described mould bases longeron 19Be provided with the second cable trough side form boom hole and slideway 39, the first ditch side form boom hole and slideway 40, the second ditch side formBoom hole and slideway 41 and knockout pin abutment sleeve 21, described ditch lid template die plate 31 is provided with ditch lid template die plate boom holeAnd slideway 42, described mould bases crossbeam 20 is provided with several spacing compressor arm fixing holes 37, described mould bases longeron 19 and mouldFrame crossbeam 20 is vertical setting mutually, several mould bases hangers 18 on described mould bases crossbeam 20, adjacent described mould bases hangerBetween 18, distance equates, is provided with backstay and knockout pin 7, described mould bases longeron 19 in described knockout pin abutment sleeve 21In the spacing compressor arm sliding sleeve 10 of upper setting, be set with spacing compression sliding hanger rod 17, described spacing compression sliding hanger rod17 are provided with spacing compression wing plate 14, and described spacing compression wing plate 14 is by spacing compression pin 15 and the first cable trough side form26 are connected with the side mould limiting otic placode 16 on the second cable trough side form 28, described the first cable trough side form 26 and the second cableTemplate suspension rod 24 on groove side form 28 tightens fastening screw under nut 22 and template through mould bases longeron 19 by template respectivelyFemale 23 are fixedly connected with, and the top of described spacing compressor arm sliding sleeve 10 is provided with for adjusting spacing compression operating grip 13The spacing nut 12 that is fixed of position, the end of described spacing compression sliding hanger rod 17 is provided with anti-drop device 11, described mouldPlate suspension rod 24 is provided with the Template Location scale 5 connecting by Template Location pin 6. Described side form 33 and mould bases crossbeam 20End be provided with side form chute 8, described side form chute 8 is connected with mould bases longeron 19 by side form set bolt 9. DescribedSide form 33 is provided with side form boatswain chair 32 and the fixing otic placode 34 of side form, and the fixing otic placode 34 of described side form is by expansion bolt 36Be connected with construction abutment wall basis. The junction of described the first cable trough side form 26 and the second cable trough side form 28 is provided with anti-overflowingSteel plate strip 27, described the first cable trough side form 26, the second cable trough side form 28, the first ditch side form 29, the second ditch sideMould 30, ditch lid template die plate 31 and the side form 33 that is arranged on outside are provided with several regularly arranged templates and are longitudinally connectedBolt hole 35 connects. Crane in the present invention, as shown in Figs. 7-9, described crane comprises the car being arranged on car body 43Carry counterweight 44, two and overlap the crane column 45 and the generator 60 that be arranged in parallel, be provided with road wheel 64 below described car body 43,Described crane column 45 centre positions are provided with walking beam 50, and described walking beam 50 is provided with by electric wire 59 and generator 60Connect and do along walking beam 50 directions the electric hoist 58 of back and forth movement, described electric hoist 58 is provided with chain sling hook 63, described inWalking beam 50 is provided with the link downside of crane column 45 spring 56 being connected by steady pin 57, described walking beam 50End be provided with bulkhead 51, the top of described crane column 45 is provided with fixed head 53, described fixed head 53 and connecting plate55 connect, and described connecting plate 55 is provided with rotating shaft 54, and described rotating shaft 54 is connected with one end of pull bar 52, described pull bar52 the other end is fixed on walking beam 50, and described crane column 45 is provided with the first cross-brace with the opposing direction of walking beam 5047, the centre position of described the first cross-brace 47 is connected with second cross-brace 49 one end, described the second cross-brace 49 anotherOne end is packed on car body 43 through vehicle-mounted counterweight 44, and the side of described crane column 45 is provided with the 3rd cross-brace 48, instituteState the 3rd cross-brace 48 and be fixedly connected with floor 46, the bottom of described generator 60 and vehicle-mounted counterweight 44 junctions are provided with and subtractShake rubber slab 62, described generator 60 is gasoline engine generator, and the power of described gasoline engine generator is 8kw, and described crane is verticalPost 45 is provided with several floors 46, and the interval between adjacent described floor 46 is equal, and described generator 60 is provided with anti-Guardrail 61, described guard rail 61 is wire mesh cage structures.
As shown in figure 10, the present invention also provides a kind of use tunnel ditch cable trench gang form to hang rotatable erection unitConstruction method, comprise the following steps:
Step 1, to the abutment wall basis basal plane cleaning in tunnel, after the driving tunnel moulding of Tunnel Engineering, carries out the initial stage successivelySupporting, inverted arch prefabricated section are mated formation, inverted arch prefabricated section bottom pea gravel concreten is filled, inverted arch prefabricated section dual-side foundation of wall coagulationThe construction of earthen backfill, abutment wall base concrete, elevation is to designing absolute altitude at the bottom of ditch, the Second Lining Construction ditch cable trench in tunnelConstruction is taking the abutment wall basis that performed and secondary lining concrete surface as basic,
Step 2, as shown in figure 11, measures in unwrapping wire step, on the lining cutting side wall of having constructed, carries out the first unwrapping wireWith the second unwrapping wire, the 3rd unwrapping wire and the 4th unwrapping wire on abutment wall basis, wherein, the graticule of the first unwrapping wire is for locating template arcFace fixed block 1; The graticule of the second unwrapping wire is for the high process control of ditch cable trench top of concrete; The graticule of third party's line is used forThe control of template longitudinal register; The graticule of the 4th unwrapping wire is located for the expansion bolt 36 of side mould, the graticule of the first unwrapping wire andThe graticule of the 3rd unwrapping wire is for control, the graticule of the second unwrapping wire and the 4th unwrapping wire of ditch cable trench elevation, coordinate and straight degreeGraticule be used for the control of concrete formation quality of assistance;
Step 3. is carried out reinforcement fabrication and installation;
Step 4, carries out earthing or grounding means and drainpipe and installs;
Step 5, to carrying out template assembling outward at Tunnel, by the template installation in position assembling with carry out coarse adjustment, template groupPart carries out Assembling outside the hole, and the parts that need Site Welding will be Template Location pin 6, side mould limiting otic placode 16, spacing compressionSliding hanger rod 17 positions welding according to position location, after formwork integral has been assembled, prepares to lift into hole to use; MouldPlate coarse adjustment moves forward and backward template and the smooth-going overlap joint of ditch cable trench of constructing after comprising that formwork integral lifting puts in place, moves left and rightTemplate all drops on the graticule of the 3rd unwrapping wire 3 position bars of every group of template and knockout pin 7; Extract extensible canopy 3 out and make its terminationFixture embeds in cambered surface fixed block 1 preformed groove and closed extensible canopy fixed handle 2; Horizon rule is placed on to mould bases end face,Rotation adjusted position bar and knockout pin 7 decline until the bubble of horizon rule is all placed in the middle after making mould bases increase, and screw extensible canopy location handHandle 4, realizes formwork integral coarse adjustment;
Step 6, to carrying out accurate adjustment and cleaning through the template of coarse adjustment, template fine adjusting comprises the first cable trough side form 26, theTwo cable trough side forms 28, the first ditch side form 29, the second ditch side form 30 the template suspension rod of totally 4 positions, place all slide intoThe outside of this place's pattern hole, realizes template closure, and Template Location scale 5 two ends preformed holes are inserted and lay respectively at the first cableIn groove side form 26, the second ditch side form 30 templates-Template Location pin 6 in, make formation of concrete headroom meet ditch lidPlate, cable trough cover boards are to ditch cable trench headroom; Clamp nut 23 positions under clamp nut 22 on adjusting template, template,Adjust after template height puts in place, carry out fastening, descend respectively adjustment mould plate the first cable trough side form 26, the second cable trough side form 28,The spacing compressor arm sliding sleeve 10 that the first ditch side form 29, the second ditch side form are 30, buckles into spacing compression pin 15In side mould limiting otic placode 16 preformed grooves, the fastening spacing nut 12 that is fixed, prevent the first cable trough side form 26 in template,The second cable trough side form 28, the first ditch side form 29, the second ditch side form 30 in concreting process, occur floating orSkew; Behind the second ditch side form 30 location, regulate ditch lid template die plate 31 positions to make it closely connected with the second ditch side form 30The rear fastening spacing nut 12 that is fixed, slides onto side form 33 to the inside template bottom and waters and build up along side form chute 8After the abutment wall basis of type is closely connected, fastening side form set bolt 9, and expansion bolt 36 is carried out through the fixing otic placode 34 of side formSide form is fixed;
Step 7, the template of carrying out between group and group after template fine adjusting completes is longitudinally connected, after moulding groove smooth-going, to warpCross the template brushing releasing agent of accurate adjustment;
Step 8, concreting, assembles more than 5 groups in template, carries out concreting work, and concrete transportation is to executingBehind work scene, be directly conveyed in template by shuttle groove;
Step 9, carries out maintenance to the concrete of building, to concrete curing 4h;
Step 10, the concrete after maintenance carries out the demoulding, takes off Template Location scale 5, unclamp template tighten nut 22,Under template, clamp nut 23 and the spacing nut 12 that is fixed, mention the spacing dress of template by spacing compression operating grip 13Put, spacing compression pin 15 is departed to the preformed groove of side mould limiting otic placode 16; Unclamp side form 32 side form set bolt 9,The expansion bolt 36 of the fixing otic placode of side form 34 positions, sleiding form moves laterally, side form and formation of concrete emaciated face from;Tapping template suspension rod 24 makes template the first cable trough side form 26, the second cable trough side form 28, the first ditch side form 29,Two ditch side forms 30 and ditch lid template die plate 31 the template suspension rod 24 of totally 5 positions, place all slide into this place's pattern hole inSide, template side and formation of concrete emaciated face from, backspin-backstay and knockout pin 7 drive overall mould bases to rise, and make templateBottom surface and formation of concrete emaciated face from; Each side template and formation of concrete emaciated face, from rear, are unclamped extensible canopy fixed handle 2, receiveReturn extensible canopy 3, adopt the gantry crane that drawn by diesel locomotive that this group formwork integral is hung and goes to the next position and recycle;
Step 11, concrete carries out, after follow-up maintenance, hanging while turning, crane formwork integral is sling after the electronic calabash of travelingReed 58 is closely connected to template and crane, template and crane column 45 is connected and fixed with chain lock, and electric block adopts 18kW gasoline engine generator provides power.
The present invention is not limited to above-mentioned embodiment, in the situation that not deviating from flesh and blood of the present invention, and art technology peopleAny distortion, improvement, replacement that member can expect all fall into protection scope of the present invention.

Claims (9)

1. tunnel ditch cable trench gang form hangs rotatable erection unit, comprises gang form and for lifting gang formCrane, is characterized in that, described gang form comprises at least two above mould bases longerons (19) that longitudinally arrange, described mould basesLongeron (19) and the cable trough cover boards template (25), the first cable trough side form (26), second that laterally be arranged in parallel in orderCable trough side form (28), the first ditch side form (29), the second ditch side form (30), ditch lid template die plate (31) and settingSide form (33) in outside is fixedly connected with, and described cable trough cover boards template (25) and the first cable trough side form (26) are adjacent solidFixed connection, described the second ditch side form (30) and adjacent being fixedly connected with of ditch lid template die plate (31), each described mould bases is verticalThe end of beam (19) is connected with extensible canopy (3) one end that is provided with position fixing handle (4), the other end of described extensible canopy (3)Be connected with and be provided with cambered surface fixed block (1), described cambered surface fixed block (1) is provided with extensible canopy fixed handle (2), described mould basesOn longeron (19) respectively between the first cable trough side form (26) and the second cable trough side form (28) and the first ditch side form (29)And between the second ditch side form (30), be provided with mould bases crossbeam (20), described the first cable trough side form (26) is provided with the first cable troughSide form boom hole and slideway (38), described mould bases longeron (19) be provided with the second cable trough side form boom hole and slideway (39),The first ditch side form boom hole and slideway (40), the second ditch side form boom hole and slideway (41) and knockout pin abutment sleeve (21),Described ditch lid template die plate (31) is provided with ditch lid template die plate boom hole and slideway (42), on described mould bases crossbeam (20), establishesThere are several spacing compressor arm fixing holes (37), described mould bases longeron (19) and mould bases crossbeam (20) vertical setting mutually,Upper several mould bases hangers (18) of described mould bases crossbeam (20), between adjacent described mould bases hanger (18), distance equates,In described knockout pin abutment sleeve (21), be provided with backstay and knockout pin (7), the upper limit arranging of described mould bases longeron (19)In position compressor arm sliding sleeve (10), be set with spacing compression sliding hanger rod (17), described spacing compression sliding hanger rod (17)Be provided with spacing compression wing plate (14), described spacing compression wing plate (14) is by spacing compression pin (15) and the first cable troughSide form (26) is connected with the side mould limiting otic placode (16) on the second cable trough side form (28), described the first cable trough side form(26) the template suspension rod (24) on and the second cable trough side form (28) passes respectively mould bases longeron (19) by templateClamp nut (22) is fixedly connected with clamp nut under template (23), the top of described spacing compressor arm sliding sleeve (10)Portion is provided with the spacing nut (12) that is fixed for adjusting spacing compression operating grip (13) position, described side form (33)Be provided with side form chute (8) with the end of mould bases crossbeam (20), described side form chute (8) is by side form set bolt (9)Be connected with mould bases longeron (19), described template suspension rod (24) is provided with the Template Location connecting by Template Location pin (6)Scale (5), described side form (33) is provided with side form boatswain chair (32) and the fixing otic placode (34) of side form, and described side form is fixed earPlate (34) is connected with construction abutment wall basis by expansion bolt (36), described the first cable trough side form (26), the second cableGroove side form (28), the first ditch side form (29), the second ditch side form (30), ditch lid template die plate (31) and be arranged on outsideThe side form (33) of side is provided with the longitudinal connecting bolt of several regularly arranged templates hole (35) and is connected with template;
Described crane comprises that the vehicle-mounted counterweight (44), two being arranged on car body (43) overlaps the crane column (45) be arrangeding in parallelAnd generator (60), described car body (43) is provided with road wheel (64) below, and described crane column (45) interposition installsHave walking beam (50), described walking beam (50) is provided with and is connected with generator (60) by electric wire (59) and along walking beam(50) direction is done the electric hoist (58) of back and forth movement, and described electric hoist (58) is provided with chain sling hook (63), described walkingBeam (50) is provided with the spring (56) being connected by steady pin (57), described row with the link downside of crane column (45)The end of walking beam (50) is provided with bulkhead (51), and the top of described crane column (45) is provided with fixed head (53), described inFixed head (53) is connected with connecting plate (55), and described connecting plate (55) is provided with rotating shaft (54), described rotating shaft (54)Be connected with one end of pull bar (52), it is upper that the other end of described pull bar (52) is fixed on walking beam (50), and described crane is verticalPost (45) is provided with the first cross-brace (47), the interposition of described the first cross-brace (47) with the opposing direction of walking beam (50)Put with the second cross-brace (49) one end and be connected, the other end of described the second cross-brace (49) is solid through vehicle-mounted counterweight (44)Be contained in car body (43) upper, the side of described crane column (45) is provided with the 3rd cross-brace (48), described the 3rd cross-brace (48)Be fixedly connected with floor (46).
2. tunnel ditch cable trench gang form hangs rotatable erection unit according to claim 1, it is characterized in that instituteThe end of stating spacing compression sliding hanger rod (17) is provided with anti-drop device (11).
3. tunnel ditch cable trench gang form hangs rotatable erection unit according to claim 1, it is characterized in that instituteThe junction of stating the first cable trough side form (26) and the second cable trough side form (28) is provided with anti-overflowing steel plate strip (27).
4. tunnel ditch cable trench gang form hangs rotatable erection unit according to claim 1, it is characterized in that instituteState generator (60) bottom and be provided with yielding rubber plate (62) with vehicle-mounted counterweight (44) junction.
5. tunnel ditch cable trench gang form hangs rotatable erection unit according to claim 4, it is characterized in that instituteStating generator (60) is gasoline engine generator, and the power of described gasoline engine generator is 8kw.
6. tunnel ditch cable trench gang form hangs rotatable erection unit according to claim 1, it is characterized in that instituteState crane column (45) and be provided with several floors (46), the interval between adjacent described floor (46) equates.
7. tunnel ditch cable trench gang form hangs rotatable erection unit according to claim 1, it is characterized in that instituteState generator (60) and be provided with guard rail (61).
8. tunnel ditch cable trench gang form hangs rotatable erection unit according to claim 7, it is characterized in that instituteState guard rail (61) for wire mesh cage structures.
9. the construction that right to use requires the arbitrary described tunnel ditch cable trench gang form of 1-8 to hang rotatable erection unitMethod, is characterized in that, said method comprising the steps of:
Step 1, to the abutment wall basis basal plane cleaning in tunnel, after the driving tunnel moulding of Tunnel Engineering, the initial stage of carrying out props up successivelyProtect, inverted arch prefabricated section is mated formation, inverted arch prefabricated section bottom pea gravel concreten is filled, inverted arch prefabricated section dual-side foundation of wall concreteThe construction of backfill, abutment wall base concrete, elevation is to designing absolute altitude at the bottom of ditch, and the Second Lining Construction ditch cable trench in tunnel is executedWork is taking the abutment wall basis that performed and secondary lining concrete surface as basic;
Step 2, measures unwrapping wire, carries out the first unwrapping wire and unwrapping wire for the second time, at abutment wall base on the lining cutting side wall of having constructedThe 3rd unwrapping wire and the 4th unwrapping wire on plinth, wherein, the graticule of the first unwrapping wire is for locating template cambered surface fixed block (1); Second putsThe graticule of line is for the high process control of ditch cable trench top of concrete; The graticule of third party's line is for the control of template longitudinal register;The graticule of the 4th unwrapping wire is for the expansion bolt location of side mould (36), and the graticule of the graticule of the first unwrapping wire and the 3rd unwrapping wire is usedIn the control of ditch cable trench elevation, coordinate and straight degree, the graticule of the graticule of the second unwrapping wire and the 4th unwrapping wire has been used for coagulationThe control of earth forming quality of assistance;
Step 3. is carried out reinforcement fabrication and installation;
Step 4, carries out earthing or grounding means and drainpipe and installs;
Step 5, to carrying out template assembling outward at Tunnel, by the template installation in position assembling with carry out coarse adjustment, template assemblyCarry out Assembling outside the hole, the parts of Site Welding are that Template Location pin (6), side mould limiting otic placode (16) and spacing compression are slidingMoving suspension rod (17) positions welding according to position location, after formwork integral has been assembled, prepares to lift into hole to use; MouldPlate coarse adjustment moves forward and backward template and the smooth-going overlap joint of ditch cable trench of constructing after comprising that formwork integral lifting puts in place, moves left and rightTemplate all drops on the graticule of the 3rd unwrapping wire 3 position bars of every group of template and knockout pin (7); Extract extensible canopy (3) out and makeIts end fixing device embeds in cambered surface fixed block (1) preformed groove and closed extensible canopy fixed handle (2); Horizon rule is placed onMould bases end face, rotation adjusted position bar and knockout pin (7) decline until horizon rule bubble is all placed in the middle after making mould bases increase, and screw flexibleBeam position fixing handle (4), realizes formwork integral coarse adjustment;
Step 6, to carrying out accurate adjustment and cleaning through the template of coarse adjustment, template fine adjusting comprise by the first cable trough side form (26),The template suspension rod of the second cable trough side form (28), the first ditch side form (29), the second ditch side form (30) 4 positions, place is wholeSlide into the outside of this place's pattern hole, realize template closure, Template Location scale (5) two ends preformed hole is inserted and laid respectively atIn Template Location pin (6) in the first cable trough side form (26), the second ditch side form (30) template, make formation of concreteHeadroom meets ditch cover plate, cable trough cover boards to ditch cable trench headroom; Under clamp nut (22) on adjusting template, templateClamp nut (23) position, adjust after template height puts in place, carry out fastening, descend respectively adjustment mould plate the first cable trough side form (26),Spacing compressor arm slip cap between the second cable trough side form (28), the first ditch side form (29), the second ditch side form (30)Pipe (10), buckles in side mould limiting otic placode (16) preformed groove spacing compression pin (15), the fastening spacing nut that is fixed(12), prevent the first cable trough side form (26) in template, the second cable trough side form (28), the first ditch side form (29),In concreting process, there is floating or skew in the second ditch side form (30); Behind the second ditch side form (30) location,Regulate ditch lid template die plate (31) position to make it and the closely connected rear fastening spacing nut (12) that is fixed of the second ditch side form (30),By side form (33) along side form chute (8) slide onto to the inside template bottom closely connected with the abutment wall basis of having built moulding after, tightGu side form set bolt (9), and expansion bolt (36) is carried out to side form through the fixing otic placode (34) of side form and fix;
Step 7, the template of carrying out between group and group after template fine adjusting completes is longitudinally connected, after moulding groove smooth-going, to processThe template brushing releasing agent of accurate adjustment;
Step 8, concreting, assembles more than 5 groups in template, carries out concreting work, and concrete transportation is to constructionBehind scene, be directly conveyed in template by shuttle groove;
Step 9, carries out maintenance to the concrete of building, to concrete curing 4h;
Step 10, the concrete after maintenance carries out the demoulding, takes off Template Location scale (5), unclamp template tighten nut (22),Clamp nut under template (23) and the spacing nut (12) that is fixed, mention template by spacing compression operating grip (13)Stopping means, by the preformed groove of spacing compression pin (15) disengaging side mould limiting otic placode (16); Unclamp side form (32), side formThe expansion bolt (36) of the fixing otic placode (34) of set bolt (9), side form position, sleiding form moves laterally, side form withFormation of concrete emaciated face from; Tapping template suspension rod (24) make template the first cable trough side form (26), the second cable trough side form (28),The template suspension rod (24) of the first ditch side form (29), the second ditch side form (30) and ditch lid template die plate (31) 5 positions, placeAll slide into the inner side of this place's pattern hole, template side and formation of concrete emaciated face from, backspin position bar and knockout pin (7) bandMoving overall mould bases rises, by template bottom surface and formation of concrete emaciated face from, each side template and formation of concrete emaciated face be from rear, pineOpen extensible canopy fixed handle (2), regain extensible canopy (3), adopt the gantry crane being drawn by diesel locomotive by whole this group templateBody hangs and goes to the next position and recycle;
Step 11, concrete carries out, after follow-up maintenance, hanging while turning, crane formwork integral is sling after traveling electric block(58) closely connected to template and crane, with chain lock, template and crane column (45) are connected and fixed to electric block and adopt 1Platform 8kW gasoline engine generator provides power.
CN201610167463.6A 2016-03-23 2016-03-23 Tunnel ditch cable trench gang form hangs rotatable installation equipment and its construction method Expired - Fee Related CN105604581B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610167463.6A CN105604581B (en) 2016-03-23 2016-03-23 Tunnel ditch cable trench gang form hangs rotatable installation equipment and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610167463.6A CN105604581B (en) 2016-03-23 2016-03-23 Tunnel ditch cable trench gang form hangs rotatable installation equipment and its construction method

Publications (2)

Publication Number Publication Date
CN105604581A true CN105604581A (en) 2016-05-25
CN105604581B CN105604581B (en) 2018-02-16

Family

ID=55984866

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610167463.6A Expired - Fee Related CN105604581B (en) 2016-03-23 2016-03-23 Tunnel ditch cable trench gang form hangs rotatable installation equipment and its construction method

Country Status (1)

Country Link
CN (1) CN105604581B (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106150523A (en) * 2016-08-08 2016-11-23 中铁建大桥工程局集团第五工程有限公司 A kind of Railway Tunnel ditch cable trench integral mold plate construction
CN107090767A (en) * 2017-06-19 2017-08-25 中铁隧道集团二处有限公司 A kind of Full-hydraulic crawler-type self trestle
CN107663814A (en) * 2017-08-14 2018-02-06 中铁上海工程局集团华海工程有限公司 One kind be used for underground cable lay a railway track construct service channel at transition apparatus and its construction method
CN107725075A (en) * 2017-11-09 2018-02-23 洛阳高飞桥隧机械有限公司 A kind of application method of tunnel ditch cable trough chassis walking lining cutting device
CN108204241A (en) * 2018-01-30 2018-06-26 中铁隧道集团二处有限公司 A kind of double -coil output inverted arch abutment wall concrete placings device and its application method
CN109899088A (en) * 2017-12-08 2019-06-18 中铁二局集团有限公司 It is a kind of for being poured the mobile formwork and pouring procedure of tunnel Central drain
CN110005417A (en) * 2019-04-15 2019-07-12 中铁隧道集团二处有限公司 A kind of device and its installation method poured for rectangle vertical shaft lining concrete
CN113006824A (en) * 2021-03-24 2021-06-22 中铁十二局集团有限公司 Walking double-side combined type long template rapid construction method for tunnel ditch cable trough
CN113047874A (en) * 2021-04-25 2021-06-29 湖南华鑫美好公路环境建设有限公司 Integrated tunnel ditch cable trough moving sliding form system
CN114033430A (en) * 2021-11-15 2022-02-11 中国建筑土木建设有限公司 Automatic change tunnel ditch cable duct construction rack
CN115158375A (en) * 2022-07-15 2022-10-11 中铁上海工程局集团有限公司 Transport vechicle based on mechanized equipment of mating formation of railway auxiliary facilities
CN116479945A (en) * 2023-06-21 2023-07-25 中铁上海工程局集团第三工程有限公司 Cable groove cover plate positioning paving system based on positioning scanning
CN117340599A (en) * 2023-12-05 2024-01-05 河北新铁虎石油机械有限公司 Method for installing hydraulic cylinder of pressurized working machine

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005171549A (en) * 2003-12-09 2005-06-30 Seisuke Okubo Tunnel construction method
CN203730015U (en) * 2014-03-04 2014-07-23 张进军 Groove lining forming device used for highway tunnel integral lining trolley
CN104895582A (en) * 2015-04-20 2015-09-09 中铁二十五局集团第一工程有限公司 Overall template concrete building method for double-track tunnel ditch cable trough
CN204877499U (en) * 2015-07-09 2015-12-16 中铁十二局集团有限公司 Tunnel ditch, whole die carrier of cable duct
CN204899948U (en) * 2015-09-06 2015-12-23 中铁隧道股份有限公司 Cable groove formworking jumbo
CN205445633U (en) * 2016-03-23 2016-08-10 中铁隧道集团二处有限公司 Tunnel ditch cable groove built -up plate hangs commentaries on classics formula erection equipment

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005171549A (en) * 2003-12-09 2005-06-30 Seisuke Okubo Tunnel construction method
CN203730015U (en) * 2014-03-04 2014-07-23 张进军 Groove lining forming device used for highway tunnel integral lining trolley
CN104895582A (en) * 2015-04-20 2015-09-09 中铁二十五局集团第一工程有限公司 Overall template concrete building method for double-track tunnel ditch cable trough
CN204877499U (en) * 2015-07-09 2015-12-16 中铁十二局集团有限公司 Tunnel ditch, whole die carrier of cable duct
CN204899948U (en) * 2015-09-06 2015-12-23 中铁隧道股份有限公司 Cable groove formworking jumbo
CN205445633U (en) * 2016-03-23 2016-08-10 中铁隧道集团二处有限公司 Tunnel ditch cable groove built -up plate hangs commentaries on classics formula erection equipment

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106150523B (en) * 2016-08-08 2018-09-28 中铁建大桥工程局集团第五工程有限公司 A kind of Railway Tunnel ditch cable trench integral mold plate construction
CN106150523A (en) * 2016-08-08 2016-11-23 中铁建大桥工程局集团第五工程有限公司 A kind of Railway Tunnel ditch cable trench integral mold plate construction
CN107090767A (en) * 2017-06-19 2017-08-25 中铁隧道集团二处有限公司 A kind of Full-hydraulic crawler-type self trestle
CN107663814A (en) * 2017-08-14 2018-02-06 中铁上海工程局集团华海工程有限公司 One kind be used for underground cable lay a railway track construct service channel at transition apparatus and its construction method
CN107725075B (en) * 2017-11-09 2024-05-03 洛阳高飞桥隧机械有限公司 Use method of tunnel ditch cable trough trolley walking lining device
CN107725075A (en) * 2017-11-09 2018-02-23 洛阳高飞桥隧机械有限公司 A kind of application method of tunnel ditch cable trough chassis walking lining cutting device
CN109899088A (en) * 2017-12-08 2019-06-18 中铁二局集团有限公司 It is a kind of for being poured the mobile formwork and pouring procedure of tunnel Central drain
CN108204241A (en) * 2018-01-30 2018-06-26 中铁隧道集团二处有限公司 A kind of double -coil output inverted arch abutment wall concrete placings device and its application method
CN110005417A (en) * 2019-04-15 2019-07-12 中铁隧道集团二处有限公司 A kind of device and its installation method poured for rectangle vertical shaft lining concrete
CN113006824A (en) * 2021-03-24 2021-06-22 中铁十二局集团有限公司 Walking double-side combined type long template rapid construction method for tunnel ditch cable trough
CN113006824B (en) * 2021-03-24 2023-06-30 中铁十二局集团有限公司 Tunnel ditch cable trough walking double-side combined type long template rapid construction method
CN113047874A (en) * 2021-04-25 2021-06-29 湖南华鑫美好公路环境建设有限公司 Integrated tunnel ditch cable trough moving sliding form system
CN114033430A (en) * 2021-11-15 2022-02-11 中国建筑土木建设有限公司 Automatic change tunnel ditch cable duct construction rack
CN115158375A (en) * 2022-07-15 2022-10-11 中铁上海工程局集团有限公司 Transport vechicle based on mechanized equipment of mating formation of railway auxiliary facilities
CN115158375B (en) * 2022-07-15 2023-08-15 中铁上海工程局集团有限公司 Transport vechicle based on mechanized paving equipment of railway affiliated facilities
CN116479945A (en) * 2023-06-21 2023-07-25 中铁上海工程局集团第三工程有限公司 Cable groove cover plate positioning paving system based on positioning scanning
CN116479945B (en) * 2023-06-21 2023-08-22 中铁上海工程局集团第三工程有限公司 Cable groove cover plate positioning paving system based on positioning scanning
CN117340599A (en) * 2023-12-05 2024-01-05 河北新铁虎石油机械有限公司 Method for installing hydraulic cylinder of pressurized working machine
CN117340599B (en) * 2023-12-05 2024-01-30 河北新铁虎石油机械有限公司 Method for installing hydraulic cylinder of pressurized working machine

Also Published As

Publication number Publication date
CN105604581B (en) 2018-02-16

Similar Documents

Publication Publication Date Title
CN105604581A (en) Hoisting and rotating type installation equipment of tunnel ditch cable groove combination template and construction method of hoisting and rotating type installation equipment
CN105370298B (en) Loess tunnel once lining hydraulic template trolley
CN205445632U (en) Hang commentaries on classics formula ditch cable groove built -up plate
CN103899335B (en) Synchronize tunneling operation system and the method for inverted arch synchronization lining
CN102146796B (en) Construction technology for inverted arch of two-track tunnel of high-speed railway
CN109505630A (en) Full-hydraulic crawler-type self trestle and construction method
CN109910167A (en) A kind of production technology of prefabricated pile
CN102704949A (en) No-pull rod side wall construction method for underground tunnel and formwork trolley for construction
CN207998785U (en) A kind of driving postposition trestle
CN104612061A (en) Suspended and open type novel hanging basket device and construction method thereof
CN109653771A (en) Tunnel arch two lined steel mould trolley integrated with cable duct side wall
CN107269299A (en) Constructing tunnel integrates chassis
CN205445633U (en) Tunnel ditch cable groove built -up plate hangs commentaries on classics formula erection equipment
CN103982200B (en) Slide rail Mobile steel mould trolley in tunneling boring
CN110778320A (en) Synchronous excavation supporting construction method for three-step inverted arch of weak surrounding rock tunnel
CN109519197A (en) Dual-purpose trolley for slip form primary lining excavation supporting and application thereof
CN203809016U (en) Inverted arch lining trolley and synchronous tunnel operating system
JP2019120115A (en) Method of constructing tunnel lining structure
CN108049303A (en) A kind of driving postposition trestle and installation, method of adjustment
CN109355983A (en) A kind of trackless construction method of city rail
CN117027824A (en) Deep and long frozen inclined shaft digging and building parallel operation construction method
CN109356603B (en) Rear supporting trailer suspension device of tunnel boring machine and construction method thereof
CN107882578B (en) A kind of reinforced concrete lined tunnel single stope dual stage vehicle lining cutting continuous placing technology
CN204002842U (en) In full section, slide rail moves steel form carrier
CN106586922B (en) A kind of lifting device being laid with monorail crane applied to coal mine tunneling machine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Zheng Xiaofu

Inventor after: Gui Lingsheng

Inventor after: Dai Runjun

Inventor after: Hu Bifei

Inventor after: Dai Bin

Inventor after: Xu Zan

Inventor after: Wang Yanbo

Inventor after: Wang Chao

Inventor after: Shao Weisai

Inventor after: Wang Muhua

Inventor before: Zheng Xiaofu

Inventor before: Dai Runjun

Inventor before: Hu Bifei

Inventor before: Dai Bin

Inventor before: Xu Zan

Inventor before: Wang Yanbo

Inventor before: Wang Chao

Inventor before: Shao Weisai

CB03 Change of inventor or designer information
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Zheng Xiaofu

Inventor after: Gui Lisheng

Inventor after: Li Zhijun

Inventor after: Dai Runjun

Inventor after: Hu Bifei

Inventor after: Dai Bin

Inventor after: Xu Zan

Inventor after: Wang Yanbo

Inventor after: Wang Chao

Inventor after: Shao Weisai

Inventor after: Wang Muhua

Inventor before: Zheng Xiaofu

Inventor before: Gui Lingsheng

Inventor before: Dai Runjun

Inventor before: Hu Bifei

Inventor before: Dai Bin

Inventor before: Xu Zan

Inventor before: Wang Yanbo

Inventor before: Wang Chao

Inventor before: Shao Weisai

Inventor before: Wang Muhua

CB03 Change of inventor or designer information
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180216

Termination date: 20210323

CF01 Termination of patent right due to non-payment of annual fee