CN105604336A - Steel column installation positioning device and installation positioning method - Google Patents
Steel column installation positioning device and installation positioning method Download PDFInfo
- Publication number
- CN105604336A CN105604336A CN201610049321.XA CN201610049321A CN105604336A CN 105604336 A CN105604336 A CN 105604336A CN 201610049321 A CN201610049321 A CN 201610049321A CN 105604336 A CN105604336 A CN 105604336A
- Authority
- CN
- China
- Prior art keywords
- steel column
- rim
- positioning device
- connecting rod
- leg
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 84
- 239000010959 steel Substances 0.000 title claims abstract description 84
- 238000009434 installation Methods 0.000 title claims abstract description 15
- 238000000034 method Methods 0.000 title claims abstract description 7
- 230000015572 biosynthetic process Effects 0.000 claims 1
- 238000004164 analytical calibration Methods 0.000 abstract description 2
- 238000009435 building construction Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000003044 adaptive effect Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- UAJUXJSXCLUTNU-UHFFFAOYSA-N pranlukast Chemical compound C=1C=C(OCCCCC=2C=CC=CC=2)C=CC=1C(=O)NC(C=1)=CC=C(C(C=2)=O)C=1OC=2C=1N=NNN=1 UAJUXJSXCLUTNU-UHFFFAOYSA-N 0.000 description 1
- 229960004583 pranlukast Drugs 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/18—Adjusting tools; Templates
- E04G21/1841—Means for positioning building parts or elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention relates to a steel column installation positioning device and a steel column installation positioning method. Use this device to carry out the steel column installation, can be earlier with the firm installation of this device on the rim of a cup basis, get into the steel column hoist and mount subsequently in the rim of a cup basis, adjust the setting element of this device, let the location ejector pin promote the steel column and remove to accurate position, the vertical state of cooperation instrument calibration, at last to pouring concrete in the rim of a cup basis, treat that the concrete solidifies, can remove this positioner. Compared with the traditional implementation mode, the position of the steel column can be adjusted more conveniently and accurately; when the preferable mode of the connecting sleeve is adopted, the connecting rod can be matched with different steel columns by changing the closed loop of the connecting rod.
Description
Technical field
The present invention relates to the realm of building construction, it is a kind of for by the dress that packs rim of a cup basis into accurate, vertical steel column that concrete isPut, and corresponding steel column installation method.
Background technology
At the realm of building construction, vertical steel column is installed on ground, need first construction in the ground to form rim of a cup basis, then useCrane is sling steel column, by workman's auxiliary operation, allows steel column end insert in rim of a cup basis, last cast concrete, concreteAfter solidifying, realize steel column and fix.
Because steel column can shake in the time lifting, accurately vertical with maintenance in order to ensure steel column installation site, need to be by several worksPeople promotes, adjusts steel column position from different directions, and with firm wedge, steel column is stuck in rim of a cup basis immediately. Such mode of operation,Accuracy is low, and wastes time and energy.
Summary of the invention
Technical problem to be solved by this invention is: a kind of steel column mounting and positioning device is provided and adopts this device to carry out steel column installationMethod, steel column is entered behind rim of a cup basis by lifting, can facilitate and carry out accurately position adjustments.
The technical solution adopted for the present invention to solve the technical problems is:
Steel column mounting and positioning device, comprises at least three legs, and described leg is provided with Connection Block, and the Connection Block of all legs is logicalCross connecting rod order and be connected, and form and be positioned at conplane closed loop, also comprise the keeper being arranged in described closed loop, described inKeeper comprises positioning mandril and the positioning seat of threaded engagement, and the screw thread precession direction of positioning mandril is pointed in described closed loop.
Further, comprise four described legs, described connecting rod is connected to form the closed loop of rectangle, and rectangle four edges placeConnecting rod is provided with described keeper.
Further, described leg is for having externally threaded rod member, and what described Connection Block activity coordinated is set in leg outside, instituteState the position that leg is positioned at Connection Block bottom and be also provided with leveling nut.
Further, described leg lower end is provided with position fixing apparatus.
Further, described position fixing apparatus is the sharp-pointed portion of leg lower end.
Further, in described closed loop, the connecting rod between adjacent leg links together by adapter sleeve, described connecting rod and companyFemale connector threaded engagement.
Further, described positioning seat is fixedly installed on adapter sleeve.
Steel column installation and locating method, comprises following steps in sequence: build rim of a cup basis; Aforesaid steel column is installed to locationDevice, stable is arranged on rim of a cup basis, and the closed loop that allows described connecting rod be linked to be is corresponding with the opening on rim of a cup basis; With risingThe equipment of the hanging steel column to be installed of slinging, and allow one end of steel column extend in the opening on described closed loop and rim of a cup basis; With calibrationInstrument detects the position of steel column and vertical state, and regulates described keeper, makes positioning mandril push against, promote steel column,Until steel column position and vertically state reach requirement; To the gap-fill concrete on steel column and rim of a cup basis, treat concrete setting,Remove described steel column mounting and positioning device.
The invention has the beneficial effects as follows: use this steel column mounting and positioning device to carry out steel column installation, can be first that this device is firmBe arranged on rim of a cup basis, subsequently steel column lifting entered in rim of a cup basis, regulate the keeper of this device, allow positioning mandril push awayMoving steel column moves to accurate location, coordinates the vertical state of instrument calibration, and cast concrete in the most backward rim of a cup basis, treats concreteSolidify, can withdraw this positioner. With respect to traditional embodiment, the more convenient steel column that regulates accurately of energy; Adopt adapter sleeveOptimal way time, can also by change connecting rod form closed loop, come adaptive different steel column.
Brief description of the drawings
Fig. 1 is the schematic diagram of steel column mounting and positioning device of the present invention;
Schematic diagram when Fig. 2 is steel column mounting and positioning device use of the present invention;
In figure, Reference numeral is: leg 1, Connection Block 11, position fixing apparatus 12, leveling nut 13, connecting rod 2, connectionCover 3, keeper 4, rim of a cup basis 51, steel column 52.
Detailed description of the invention
Below in conjunction with drawings and Examples, the present invention is further described:
Steel column mounting and positioning device, comprises at least three legs 1, and described leg 1 is provided with Connection Block 11, all legs 1Connection Block 11 is connected by connecting rod 2 orders, and forms and be positioned at conplane closed loop, also comprises and being arranged in described closed loopKeeper 4, described keeper 4 comprises positioning mandril and the positioning seat of threaded engagement, and the screw thread precession direction of positioning mandril refers toIn described closed loop.
As shown in Figure 1, 2, leg 1 is for being supported on rim of a cup basis 51, and leg 1 quantity is according to the opening on rim of a cup basis 51Determine with the cross sectional shape of steel column 52, the Connection Block 11 of all legs 1 is connected to form closed loop, example by connecting rod 2 ordersAs, leg 1 is three, and connecting rod 2 orders are connected to form triangle closed loop, and being applicable to cross section is triangle, or circularSteel column. Also can be that leg 1 is four, connecting rod 2 orders be connected to form rectangle closed loop, can be at rectangle four edgesThe connecting rod 2 at place is provided with keeper 4, from four direction all around, steel column 52 positions is adjusted.
Connection Block 11 can be to be fixedly installed on leg 1, can be to be also flexibly connected with leg 1, for example, can be described inLeg 1 is for having externally threaded rod member, and what described Connection Block 11 activities coordinated is set in leg 1 outside, and described leg 1 is positioned atThe position of Connection Block 11 bottoms is also provided with leveling nut 13.
As shown in Figure 1, by rotating the leveling nut 13 on each leg 1, can adjust the level height of Connection Block 11,Make the height of all connecting rods 2 consistent, all keepers 4 are highly consistent, are convenient to accurate adjustment.
Keeper 4 comprises positioning mandril and the positioning seat of threaded engagement, precession positioning mandril, positioning mandril promote steel column 52 toThis direction moves. Keeper 4 on multiple connecting rods 2 cooperatively interacts, and can allow steel column 52 move to any direction in planeMoving, can be also to adjust positioning mandril position, utilize positioning mandril as location criteria, promote steel column 52 by workman and move to standardReally position.
Steel column installation and locating method of the present invention, is to adopt positioner of the present invention to assist steel column location and installation, comprisesFollowing steps in sequence: build rim of a cup basis 51; By steel column mounting and positioning device of the present invention, the stable rim of a cup that is arranged onOn basis 51, and the closed loop that allows described connecting rod 2 be linked to be is corresponding with the aperture position on rim of a cup basis 51; Sling with lifting applianceSteel column 52 to be installed, and allow one end of steel column 52 extend in the opening on described closed loop and rim of a cup basis 51; By calibration workTool detects the position of steel column 52 and vertical state, and regulates described keeper 4, makes positioning mandril push against, promote steel column52, until steel column 52 positions and vertically state reach requirement; Gap-fill concrete to steel column 52 with rim of a cup basis 51, treatsConcrete setting, removes described steel column mounting and positioning device.
Concrete, as shown in Figure 2: can be first to build rim of a cup basis 51 on ground, by stable this steel column mounting and positioning deviceBe arranged on the upper of rim of a cup basis 51, the closed loop that allows connecting rod 2 be linked to be is corresponding with the aperture position on rim of a cup basis 51, slings subsequentlySteel column 52, allows one end of steel column 52 extend in the opening on closed loop that connecting rod 2 is linked to be and rim of a cup basis 51, uses truing toolFor example ruler, plumb aligner position and the vertical state to steel column 52 detects, if there is deviation, fixed by precession or back-outPosition push rod, promotes steel column 52 and advances or retreat, until steel column 52 positions and vertically state reach requirement, now to steel column 52 withThe gap-fill concrete on rim of a cup basis 51, removes steel column mounting and positioning device after concrete setting, steel column 52 installations.
Install for small-sized steel column, leg 1 is placed on rim of a cup basis, can start steel column collimation and adjust, for Large SteelPost, because steel column inertia is large, need to, by firm leg 1 being arranged on rim of a cup basis, preferably, can be described leg 1Lower end is provided with position fixing apparatus 12. Can be for example that leg 1 lower end is provided with fixture or pawl tool, utilize fixture, pawl tool to incite somebody to actionLeg 1 is fixed on rim of a cup basis. Preferably, can be also the sharp-pointed portion that described position fixing apparatus 12 is leg 1 lower end.
As shown in Figure 1, utilizing sharp-pointed portion, increase the stability of leg 1 on basis, when it uses, can be also first at cupOn mouth basis, find the anchor point of leg 1, in anchor point boring, then sharp-pointed portion is inserted in the hole, position is fully fixing.
The set-up mode of connecting rod 2, can be the Connection Block 11 that the two ends of a connecting rod 2 connect respectively two legs 1, excellentChoosing, for making this device can adapt to the steel column of different cross section size, can be in described closed loop, the connecting rod that adjacent leg is 12 link together by adapter sleeve 3, described connecting rod 2 and adapter sleeve 3 threaded engagement.
As shown in Figure 1, by turn adapter sleeve 3, change adapter sleeve 3 positions, can change the spacing of adjacent two legs 1,The steel column that meets different cross section size is installed.
As required, can be that 1 of adjacent two leg are provided with many group connecting rods 2 and adapter sleeves 3, example as shown in Figure 1,Can be, between the Connection Block 11 of adjacent two legs 1, to set gradually: connecting rod 2, adapter sleeve 3, connecting rod 2; AlsoCan be between the Connection Block 11 of adjacent two legs 1, set gradually: connecting rod 2, adapter sleeve 3, connecting rod 2, connectionCover 3, connecting rod 2, adapter sleeve 3, connecting rod 2.
Further, the positioning seat of described keeper 4 can be to be fixedly installed on adapter sleeve 3, adjusts the position of adapter sleeve 3,Can change the position of keeper 4.
Claims (8)
1. steel column mounting and positioning device, is characterized in that, comprises at least three legs (1), described leg (1) company of being provided withJoint chair (11), the Connection Block (11) of all legs (1) is connected by connecting rod (2) order, and formation is positioned at same planeClosed loop, also comprise the keeper (4) being arranged in described closed loop, described keeper (4) comprises the positioning mandril of threaded engagementAnd positioning seat, and the screw thread precession direction of positioning mandril is pointed in described closed loop.
2. steel column mounting and positioning device as claimed in claim 1, is characterized in that, comprises four described legs (1), described inConnecting rod (2) is connected to form the closed loop of rectangle, and the connecting rod (2) at rectangle four edges place is provided with described keeper (4).
3. steel column mounting and positioning device as claimed in claim 2, is characterized in that, described leg (1) is for having external screw threadRod member, described Connection Block (11) is movable coordinate be set in leg (1) outside, described leg (1) is positioned at Connection Block (11)The position of bottom is also provided with leveling nut (13).
4. steel column mounting and positioning device as claimed in claim 1, is characterized in that, described leg (1) lower end is provided with positionPut fixture (12).
5. steel column mounting and positioning device as claimed in claim 4, is characterized in that, described position fixing apparatus (12) is for propping upThe sharp-pointed portion of pin (1) lower end.
6. steel column mounting and positioning device as claimed in claim 1, is characterized in that, in described closed loop, and adjacent leg (1)Between connecting rod (2) link together by adapter sleeve (3), described connecting rod (2) and adapter sleeve (3) threaded engagement.
7. steel column mounting and positioning device as claimed in claim 6, is characterized in that, described positioning seat is fixedly installed on adapter sleeve(3) on.
8. steel column installation and locating method, is characterized in that, comprises following steps in sequence: build rim of a cup basis (51);By the steel column mounting and positioning device as described in any one claim in claim 1~7, the stable rim of a cup basis that is arranged on(51) upper, and the closed loop that allows described connecting rod (2) be linked to be is corresponding with the opening of rim of a cup basis (51); Sling with lifting applianceSteel column (52) to be installed, and allow one end of steel column (52) extend in the opening of described closed loop and rim of a cup basis (51);With truing tool to the position of steel column (52) and vertically state detect, and regulate described keeper (4), make positioning mandrilPush against, promote steel column (52), until steel column (52) position and vertically state reach requirement; To steel column (52) and rim of a cup basis(51) gap-fill concrete, treats concrete setting, removes described steel column mounting and positioning device.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610049321.XA CN105604336A (en) | 2016-01-25 | 2016-01-25 | Steel column installation positioning device and installation positioning method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610049321.XA CN105604336A (en) | 2016-01-25 | 2016-01-25 | Steel column installation positioning device and installation positioning method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105604336A true CN105604336A (en) | 2016-05-25 |
Family
ID=55984634
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610049321.XA Pending CN105604336A (en) | 2016-01-25 | 2016-01-25 | Steel column installation positioning device and installation positioning method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105604336A (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106592989A (en) * | 2016-12-23 | 2017-04-26 | 中国建筑第八工程局有限公司 | Positioning and installing device of tower crane embedded part and installing method thereof |
WO2019024807A1 (en) * | 2017-08-04 | 2019-02-07 | 北京华商陆海科技有限公司 | Construction device and house |
CN110331862A (en) * | 2019-06-18 | 2019-10-15 | 中国一冶集团有限公司 | A kind of construction layout tool and component construction layout method |
CN110409481A (en) * | 2019-08-08 | 2019-11-05 | 中冶天工集团天津有限公司 | A kind of rim of a cup formula concrete foundation pit column fixed device and its installation method |
CN111502298A (en) * | 2020-04-10 | 2020-08-07 | 中国一冶集团有限公司 | Steel column hoisting welding rapid positioning device |
CN112282391A (en) * | 2020-10-24 | 2021-01-29 | 北京弘洁建设集团有限公司 | Row junction box positioning die and construction method |
CN115198888A (en) * | 2022-08-01 | 2022-10-18 | 北京建工集团有限责任公司 | Positioning device and positioning method for steel column embedded bottom plate |
CN115492310A (en) * | 2022-10-31 | 2022-12-20 | 中国十九冶集团有限公司 | Steel reinforcement cage expansion device and construction method for installing box steel column in steel reinforcement cage |
Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2608270A1 (en) * | 1986-12-16 | 1988-06-17 | Fabris Marcel | Marker with telescopic elements and its application for masonry |
JPH0713416B2 (en) * | 1992-03-30 | 1995-02-15 | 大和ハウス工業株式会社 | Anchor frame positioning tool |
EP0803621A1 (en) * | 1996-04-26 | 1997-10-29 | Bouwbedrijf Marchetta, besloten vennootschap met beperkte aansprakelijkheid | Element for positioning one or more profiles or the like when bricklaying walls |
CN202577305U (en) * | 2012-05-23 | 2012-12-05 | 中国建筑第八工程局有限公司 | Steel column positioner |
CN202658909U (en) * | 2012-06-25 | 2013-01-09 | 中建一局钢结构工程有限公司 | Steel column positioning rack based on reverse-building method |
CN202706582U (en) * | 2012-09-06 | 2013-01-30 | 安徽富煌钢构股份有限公司 | Installation elevation adjusting device for base steel column of cup rabbet |
EP2559828A2 (en) * | 2011-08-16 | 2013-02-20 | Mark Wells | Holding apparatus and method of use thereof |
CN202850507U (en) * | 2012-09-03 | 2013-04-03 | 湖北中南勘察基础工程有限公司 | Locating verticality adjusting device for top-down method pile foundation construction steel upright |
CN203034474U (en) * | 2013-01-18 | 2013-07-03 | 中建五局工业设备安装有限公司 | Locating device used in steel structure embedded bolt group |
CN103603506A (en) * | 2013-09-23 | 2014-02-26 | 云南建工基础工程有限责任公司 | Inner-support and reverse-construction-technique column perpendicularity controller |
CN204024091U (en) * | 2014-08-19 | 2014-12-17 | 山东莱钢建设有限公司 | A kind of Construction of Steel Structure steel column installation adjusting device |
CN104234074A (en) * | 2014-08-22 | 2014-12-24 | 本溪钢铁(集团)第三建筑工程有限公司 | Positioning device for pre-embedded anchoring bolt |
-
2016
- 2016-01-25 CN CN201610049321.XA patent/CN105604336A/en active Pending
Patent Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2608270A1 (en) * | 1986-12-16 | 1988-06-17 | Fabris Marcel | Marker with telescopic elements and its application for masonry |
JPH0713416B2 (en) * | 1992-03-30 | 1995-02-15 | 大和ハウス工業株式会社 | Anchor frame positioning tool |
EP0803621A1 (en) * | 1996-04-26 | 1997-10-29 | Bouwbedrijf Marchetta, besloten vennootschap met beperkte aansprakelijkheid | Element for positioning one or more profiles or the like when bricklaying walls |
EP2559828A2 (en) * | 2011-08-16 | 2013-02-20 | Mark Wells | Holding apparatus and method of use thereof |
CN202577305U (en) * | 2012-05-23 | 2012-12-05 | 中国建筑第八工程局有限公司 | Steel column positioner |
CN202658909U (en) * | 2012-06-25 | 2013-01-09 | 中建一局钢结构工程有限公司 | Steel column positioning rack based on reverse-building method |
CN202850507U (en) * | 2012-09-03 | 2013-04-03 | 湖北中南勘察基础工程有限公司 | Locating verticality adjusting device for top-down method pile foundation construction steel upright |
CN202706582U (en) * | 2012-09-06 | 2013-01-30 | 安徽富煌钢构股份有限公司 | Installation elevation adjusting device for base steel column of cup rabbet |
CN203034474U (en) * | 2013-01-18 | 2013-07-03 | 中建五局工业设备安装有限公司 | Locating device used in steel structure embedded bolt group |
CN103603506A (en) * | 2013-09-23 | 2014-02-26 | 云南建工基础工程有限责任公司 | Inner-support and reverse-construction-technique column perpendicularity controller |
CN204024091U (en) * | 2014-08-19 | 2014-12-17 | 山东莱钢建设有限公司 | A kind of Construction of Steel Structure steel column installation adjusting device |
CN104234074A (en) * | 2014-08-22 | 2014-12-24 | 本溪钢铁(集团)第三建筑工程有限公司 | Positioning device for pre-embedded anchoring bolt |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106592989A (en) * | 2016-12-23 | 2017-04-26 | 中国建筑第八工程局有限公司 | Positioning and installing device of tower crane embedded part and installing method thereof |
CN106592989B (en) * | 2016-12-23 | 2019-06-14 | 中国建筑第八工程局有限公司 | A kind of tower crane built-in fitting positioning installation apparatus and its installation method |
WO2019024807A1 (en) * | 2017-08-04 | 2019-02-07 | 北京华商陆海科技有限公司 | Construction device and house |
EP3663485A4 (en) * | 2017-08-04 | 2021-07-21 | Beijing Huashang Luhai Technology Co., Ltd. | Construction device and house |
CN110331862A (en) * | 2019-06-18 | 2019-10-15 | 中国一冶集团有限公司 | A kind of construction layout tool and component construction layout method |
CN110409481A (en) * | 2019-08-08 | 2019-11-05 | 中冶天工集团天津有限公司 | A kind of rim of a cup formula concrete foundation pit column fixed device and its installation method |
CN111502298A (en) * | 2020-04-10 | 2020-08-07 | 中国一冶集团有限公司 | Steel column hoisting welding rapid positioning device |
CN112282391A (en) * | 2020-10-24 | 2021-01-29 | 北京弘洁建设集团有限公司 | Row junction box positioning die and construction method |
CN112282391B (en) * | 2020-10-24 | 2022-06-28 | 北京弘洁建设集团有限公司 | Row junction box positioning die and construction method |
CN115198888A (en) * | 2022-08-01 | 2022-10-18 | 北京建工集团有限责任公司 | Positioning device and positioning method for steel column embedded bottom plate |
CN115198888B (en) * | 2022-08-01 | 2023-08-29 | 北京建工集团有限责任公司 | Positioning device and positioning method for steel column embedded bottom plate |
CN115492310A (en) * | 2022-10-31 | 2022-12-20 | 中国十九冶集团有限公司 | Steel reinforcement cage expansion device and construction method for installing box steel column in steel reinforcement cage |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105604336A (en) | Steel column installation positioning device and installation positioning method | |
CN205330189U (en) | Steel column locating rack | |
CN209636847U (en) | Adjustable tower crane basis built-in fitting accurate positioning instrument | |
CN203783165U (en) | Multi-directional accurate adjusting device for embedded part | |
CN103696373A (en) | Construction method for adjustable triangular bracket | |
CN110387825A (en) | A kind of construction method of prefabricated stand column quick device to hole and pose adjustment | |
CN107227864B (en) | Prefabricated assembled horizontal member efficient tool formula support system and construction method | |
CN203625921U (en) | Precision control device for pre-embedded mounting of foundation bolts | |
CN104675179B (en) | Jack up head tower installation hanger device and head tower construction method | |
CN107882056A (en) | A kind of foundation bolt positioning device and installation method | |
CN202000727U (en) | Steel tube upright column adjusting base | |
CN205934960U (en) | Foundation bolt positioning device | |
CN104831832A (en) | Assembly type shearing wall structure and mounting method thereof | |
CN210151723U (en) | Pile foundation steel reinforcement cage elevation positioner | |
CN204702442U (en) | A kind of leveling equipment of tower crane base | |
CN204434076U (en) | Lifting hook capable of adjusting attitude of shield machine component in underground hoisting process of shield machine | |
CN207267793U (en) | A kind of placing device of tower crane leg | |
CN204917062U (en) | A supporting legs mechanism for but, transfer chain height -adjusting | |
CN205343431U (en) | Prefabricated wall body grout sleeve strip solid matter exposes accurate positioning die of reinforcing bar | |
CN109201971A (en) | For making the positioning device and its construction method of pile foundation steel bar cage | |
CN108360825A (en) | A kind of foundation bolt location centralizing device and application method | |
CN203755170U (en) | Assistant installation tool of steel tower combination section of cable-stayed bridge | |
CN113882692A (en) | Steel column positioning device and positioning method thereof | |
CN209686496U (en) | Positioning pin, counterweight location structure and excavator | |
CN206512611U (en) | A kind of empty rail bridge pier of suspension type, which is installed, uses ground frock |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160525 |
|
RJ01 | Rejection of invention patent application after publication |