CN105603969B CN201610052756.XA CN201610052756A CN105603969B CN 105603969 B CN105603969 B CN 105603969B CN 201610052756 A CN201610052756 A CN 201610052756A CN 105603969 B CN105603969 B CN 105603969B
Authority
CN
China
Prior art keywords
pile
strip
pile cutoff
cutoff
coil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610052756.XA
Other languages
Chinese (zh)
Other versions
CN105603969A (en
Inventor
***
田青超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baoshan Iron and Steel Co Ltd
Original Assignee
Baoshan Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baoshan Iron and Steel Co Ltd filed Critical Baoshan Iron and Steel Co Ltd
Priority to CN201610052756.XA priority Critical patent/CN105603969B/en
Publication of CN105603969A publication Critical patent/CN105603969A/en
Application granted granted Critical
Publication of CN105603969B publication Critical patent/CN105603969B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/30Prefabricated piles made of concrete or reinforced concrete or made of steel and concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

Remaining prefabricated concrete pipe pile regeneration connection method is blocked, is comprised the following steps:1) take one section to block remaining concrete tubular pile as the first pile cutoff and lie in processing space on the ground;2) take the conduct connection coil of strip of one section of not yet steel pipes with straight of welding fabrication to be enclosed on the first pile cutoff to block on the outside of end face;3) annular charges are arranged circumferentially in be connected the blocking on end face of the first pile cutoff, the longitudinal length of charges is less than the radial thickness of the first pile cutoff, and its annular overall diameter is not more than the overall diameter of the first pile cutoff;4) take another section to block remaining concrete tubular pile as the second pile cutoff and lie in processing space on the ground, the second pile cutoff truncation surface one end to be connected is enclosed in connection coil of strip, charges are held out against;5) connection coil of strip is tightened up and coats first, second pile cutoff, then welded coil of strip straight weld, the coil of strip is processed into steel pipe;It is final that first, second pile cutoff is connected to become a section regeneration concrete pile tube using steel pipe and charges.

Description

Block remaining prefabricated concrete pipe pile regeneration connection method
Technical field
The present invention relates to pile foundation engineering technique, more particularly to block remaining prefabricated concrete pipe pile regeneration connection method.
Background technology
Existing to block remaining prefabricated concrete pipe pile mostly as waste disposal, so both waste of materials can also be made Into environmental pollution.
The content of the invention
Remaining prefabricated concrete pipe pile regeneration connection method is blocked it is an object of the invention to provide one kind, solves to block Remaining prefabricated concrete pipe pile waste disposal problem, and open up the application market of high strength steel or steel pipe.
To reach above-mentioned purpose, the technical scheme is that:
Remaining prefabricated concrete pipe pile regeneration connection method is blocked, is comprised the following steps:
1) take one section to block remaining concrete tubular pile as the first pile cutoff and lie in processing space on the ground;
2) one section of not yet steel pipes with straight of welding fabrication is taken as connection coil of strip to be enclosed on the truncated end of first pile cutoff The outside in face, the longitudinal length of the connection coil of strip is more than the overall diameter of first pile cutoff, and it is enclosed on the outside of first pile cutoff Longitudinal length be more than the first pile cutoff outer radius, its ring length do not closed up not less than first pile cutoff ring week Long, connection coil of strip thickness is more than 3mm;
3) in be connected the blocking on end face of first pile cutoff there is plasticity the initial stage that is arranged circumferentially and the later stage can hardens Charges, form annular charges;The longitudinal length of charges is less than the radial thickness of the first pile cutoff, and its annular overall diameter is not More than the overall diameter of first pile cutoff;
4) take another section to block remaining concrete tubular pile as the second pile cutoff and lie in processing space on the ground, by the second pile cutoff End face one end of blocking to be connected is enclosed in the connection coil of strip, holds out against charges, connection coil of strip is enclosed on the outside of the second pile cutoff Longitudinal length is more than the outer radius of the second pile cutoff;
5) connection coil of strip is tightened up and coats the first pile cutoff and the second pile cutoff, coil of strip straight weld is then welded to connect, by this Connection coil of strip is processed into steel pipe;Finally using steel pipe and the charges of after-hardening, the first pile cutoff and the second pile cutoff are connected into For a section regeneration concrete pile tube.
Further, step 5) tighten up connection coil of strip and will connect coil of strip using arc shaped pincers and tighten up and coat the first pile cutoff and second Pile cutoff.
Also, step 5) tighten up connection coil of strip use it is described connection coil of strip two connection end lateral surfaces on spiral shell is respectively welded Mother, connection coil of strip is connected with after being enclosed on the first pile cutoff and the second pile cutoff, and connection coil of strip is tightened up and the first pile cutoff is coated With the second pile cutoff, straight weld is then welded, connection coil of strip is processed into steel pipe;Then the spiral shell being welded on connection coil of strip is removed It is female.
It is preferred that, the charges are pea gravel concreten, resin concrete or sulphide mastic.
Beneficial effects of the present invention:
1) present invention solves the problems, such as to block remaining prefabricated concrete pipe pile waste disposal.
2) application market of present invention developing high strength steel or steel pipe.
3) present invention can provide reliable pipe of concrete pile material.
Brief description of the drawings
Fig. 1~Fig. 5 is concrete tubular pile pile cutoff of the present invention regeneration connection process schematic diagram.
Then coil of strip is tightened up using instrument (arc shaped pincers) for the present invention and coat pile cutoff by Fig. 6 welds schematic diagram.
Then coil of strip is tightened up using instrument (nuts/bolts) for the present invention and coat pile cutoff by Fig. 7 welds schematic diagram.
Embodiment
With reference to embodiment and accompanying drawing, the present invention will be further described.
Embodiment 1
Referring to Fig. 1~Fig. 6, the present invention blocks remaining prefabricated concrete pipe pile regeneration connection method, comprises the following steps:
1) one section is taken to block remaining concrete tubular pile -- the first pile cutoff 1 lies in processing space on the ground, the length of pile cutoff 1 6.2m, overall diameter 600mm, interior diameter 380mm, thickness 110mm;
2) take what the connection coil of strip 2 of one section of not yet steel pipes with straight of welding fabrication was enclosed on the first pile cutoff 1 to block end face one end Outside, the longitudinal length of connection coil of strip 2 is 700mm, and its longitudinal length for being enclosed on the outside of the first pile cutoff 1 is 330mm, and it is not closed The ring length held together is 2000mm, and its thickness is 10mm;
3) fill to be connected the blocking on end face of the first pile cutoff 1 has plasticity an initial stage that is arranged circumferentially and the later stage can harden Thing 3 (pea gravel concreten) is filled out, annular charges are formed;The longitudinal length 40mm of charges 3, its annular overall diameter 580mm are interior straight Footpath 390mm;
4) another section is taken to block remaining concrete tubular pile -- the second pile cutoff 4 lies in processing space on the ground, the length of pile cutoff 4 5.6m, overall diameter 600mm, interior diameter 380mm, thickness 110mm.The end face one end of blocking to be connected of pile cutoff 4 is enclosed on connection steel In volume 2, charges 3 (pea gravel concreten) are held out against, the longitudinal length that connection coil of strip 2 is enclosed on the outside of the second pile cutoff 4 is 330mm;
5) coil of strip 2 will be connected using arc shaped pincers 6 to tighten up and coat the first pile cutoff 1 and the second pile cutoff 4, straight weldering is then welded Seam, steel pipe is processed into by connection coil of strip 2;
6) arc shaped pincers 6 are removed, using the charges 3 of steel pipe and after-hardening, the first pile cutoff 1 and the second pile cutoff 4 are connected Regeneration concrete pile tube as a section length 12.2m.
Embodiment 2
Referring to Fig. 1~Fig. 5, Fig. 7, the present invention blocks remaining prefabricated concrete pipe pile regeneration connection method, including as follows Step:
1) one section is taken to block remaining concrete tubular pile -- the first pile cutoff 1 lies in processing space on the ground, the length of pile cutoff 1 6.2m, overall diameter 600mm, interior diameter 380mm, thickness 110mm;
2) take what the connection coil of strip 2 of one section of not yet steel pipes with straight of welding fabrication was enclosed on the first pile cutoff 1 to block end face one end Outside, the longitudinal length of connection coil of strip 2 is 700mm, and its longitudinal length for being enclosed on the outside of pile cutoff 1 is 330mm, what it did not closed up Ring length is 1884mm, and its thickness is 8mm;
3) being set in be connected the blocking on end face of the first pile cutoff 1 has plasticity and annular that the later stage can harden is filled an initial stage Fill out thing 3 (sulphide mastic), the longitudinal length 40mm of charges 3, its annular overall diameter 580mm, interior diameter 390mm;
4) another section is taken to block remaining concrete tubular pile -- the second pile cutoff 4 lies in processing space on the ground, the length of pile cutoff 4 5.6m, overall diameter 600mm, interior diameter 380mm, thickness 110mm;Second pile cutoff 4 end face one end of blocking to be connected is enclosed on company Connect in coil of strip 2, hold out against charges 3 (sulphide mastic), the longitudinal length that connection coil of strip 2 is enclosed on the outside of the second pile cutoff 4 is 330mm;
5) coil of strip 2 will be connected using the nut 7,7 ' of bolt 8 and temporary weld on connection coil of strip 2 to tighten up and coat the One pile cutoff 1 and the second pile cutoff 4, then weld straight weld, and connection coil of strip 2 is processed into steel pipe;
6) nut 7,7 ' being welded on connection coil of strip 2 is removed, using the charges 3 of steel pipe and after-hardening, by first The pile cutoff 4 of pile cutoff 1 and second is connected to become the regeneration concrete pile tube of a section length 12.2m.
The present invention can solve the problems, such as to block remaining prefabricated concrete pipe pile waste disposal, be conducive to environmental protection.This hair It is bright to provide reliable pipe of concrete pile material for soft clay area pile foundation engineering.

Claims (4)

1. remaining prefabricated concrete pipe pile regeneration connection method is blocked, it is characterized in that, comprise the following steps:
1) take one section to block remaining concrete tubular pile as the first pile cutoff and lie in processing space on the ground;
2) steel pipes with straight of one section of not yet welding fabrication, which is taken, as what connection coil of strip was enclosed on first pile cutoff blocks the outer of end face Side, the longitudinal length of the connection coil of strip is more than the overall diameter of first pile cutoff, and it is enclosed on the longitudinal direction on the outside of first pile cutoff Length is more than the outer radius of the first pile cutoff, and its ring length do not closed up is not less than the ring girth of first pile cutoff, connection Coil of strip thickness is more than 3mm;
3) fill to be connected the blocking on end face of first pile cutoff has plasticity an initial stage that is arranged circumferentially and the later stage can harden Thing is filled out, the longitudinal length of charges is less than the radial thickness of the first pile cutoff, and its annular overall diameter is not more than first pile cutoff Overall diameter;
4) take another section to block remaining concrete tubular pile as the second pile cutoff and lie in processing space on the ground, the second pile cutoff is waited to connect The end face one end of blocking connect is enclosed in the connection coil of strip, holds out against charges, connection coil of strip is enclosed on the longitudinal direction on the outside of the second pile cutoff Length is more than the outer radius of the second pile cutoff;
5) connection coil of strip is tightened up and coats the first pile cutoff and the second pile cutoff, be then welded to connect coil of strip straight weld, this is connected Coil of strip is processed into steel pipe;Finally using steel pipe and the charges of after-hardening, the first pile cutoff and the second pile cutoff are connected to become one Save regeneration concrete pile tube.
2. remaining prefabricated concrete pipe pile regeneration connection method is blocked as claimed in claim 1, it is characterized in that, step 5) receive It is close to connect coil of strip and will connect coil of strip using arc shaped pincers and tightens up and coat the first pile cutoff and the second pile cutoff.
3. remaining prefabricated concrete pipe pile regeneration connection method is blocked as claimed in claim 1, it is characterized in that, step 5) receive It is close to connect coil of strip and use and is respectively welded nut on two connection end lateral surfaces of the connection coil of strip, connection coil of strip is enclosed on first It is connected with after in section and the second pile cutoff, connection coil of strip is tightened up and the first pile cutoff and the second pile cutoff is coated, then welds straight Weld seam, steel pipe is processed into by connection coil of strip;Then the nut being welded on connection coil of strip is removed.
4. remaining prefabricated concrete pipe pile regeneration connection method is blocked as claimed in claim 1, it is characterized in that, the filling Thing is pea gravel concreten, resin concrete or sulphide mastic.
CN201610052756.XA 2016-01-26 2016-01-26 Block remaining prefabricated concrete pipe pile regeneration connection method Active CN105603969B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610052756.XA CN105603969B (en) 2016-01-26 2016-01-26 Block remaining prefabricated concrete pipe pile regeneration connection method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610052756.XA CN105603969B (en) 2016-01-26 2016-01-26 Block remaining prefabricated concrete pipe pile regeneration connection method

Publications (2)

Publication Number Publication Date
CN105603969A CN105603969A (en) 2016-05-25
CN105603969B true CN105603969B (en) 2017-10-31

Family

ID=55984276

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610052756.XA Active CN105603969B (en) 2016-01-26 2016-01-26 Block remaining prefabricated concrete pipe pile regeneration connection method

Country Status (1)

Country Link
CN (1) CN105603969B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201817810U (en) * 2010-09-21 2011-05-04 中国二十冶集团有限公司 Anti-corrosion device for tubular pile connecting joints in corrosive soil layers or underground water environments
CN202227334U (en) * 2011-10-09 2012-05-23 中建七局第三建筑有限公司 Socket type steel pipe pile joint
CN203270556U (en) * 2013-05-23 2013-11-06 福州第七建筑工程有限公司 Reinforced structure at tubular pile joint
CN104060606A (en) * 2014-07-01 2014-09-24 国鼎(南通)管桩有限公司 Combined splicing tubular pile and pile splicing method
CN104343117A (en) * 2013-07-31 2015-02-11 天津永生鑫和管桩有限公司 Concrete pipe pile connector

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004250984A (en) * 2003-02-20 2004-09-09 Sumitomo Mitsui Construction Co Ltd Cast-in-place steel pipe reinforced concrete pile

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201817810U (en) * 2010-09-21 2011-05-04 中国二十冶集团有限公司 Anti-corrosion device for tubular pile connecting joints in corrosive soil layers or underground water environments
CN202227334U (en) * 2011-10-09 2012-05-23 中建七局第三建筑有限公司 Socket type steel pipe pile joint
CN203270556U (en) * 2013-05-23 2013-11-06 福州第七建筑工程有限公司 Reinforced structure at tubular pile joint
CN104343117A (en) * 2013-07-31 2015-02-11 天津永生鑫和管桩有限公司 Concrete pipe pile connector
CN104060606A (en) * 2014-07-01 2014-09-24 国鼎(南通)管桩有限公司 Combined splicing tubular pile and pile splicing method

Also Published As

Publication number Publication date
CN105603969A (en) 2016-05-25

Similar Documents

Publication Publication Date Title
CN107654748B (en) Plastic pipe socket type metal pipe with port reinforced ring lining and manufacturing method
CN107119673A (en) A kind of steel reinforcement cage support meanss for being applicable piles with different footpath
CN104314240A (en) Grouting anchor type rebar connection sleeve and manufacturing method thereof
EP2493649A1 (en) Explosive cladding of at least two metal pipes arranged within each other
CN105603969B (en) Block remaining prefabricated concrete pipe pile regeneration connection method
CN102032416B (en) Steel-pipe-insertion local strengthening trenchless repair method for drainage pipeline with large pipe diameter
CN107476572A (en) A kind of Split bolt sleeve device for building
CN207333976U (en) Novel flexible water-proof sleeve pipe
US20140117663A1 (en) Pipe connection to form a liquid tight seal and method of forming the same
CN205857182U (en) A kind of end-protecting device for steel-pipe pile construction
CN108131494B (en) A kind of construction method that steel pipe is connect with concrete prefabricated pipe
CN206289879U (en) A kind of inorfil muscle for overlapping
CN211398995U (en) Water-carrying reinforcing device for steel branch pipe of pressure water delivery pipeline
CN204174937U (en) The construction equipment of recyclable wire rope draw ring
CN207194452U (en) Underground chamber outer wall wall pipeline hole waterproof embedding pipe fittingses device
CN203628077U (en) Bell and spigot joint and bell and spigot pipe fitting connecting device
CN201795209U (en) Reinforcing three-way valve
CN107435330A (en) A kind of recovery type bar reinforcement anchor pole and recovery method
CN209638561U (en) A kind of corrugated steel pipe Combined concrete push pipe
KR101281507B1 (en) Tube for inhibiting corrosion of pipe connecting portion
CN103438290B (en) The running water pipe of liner thin-wall stainless steel and making method
CN115234027B (en) Reinforced concrete column connecting structure of double-layer steel sleeve
CN207298135U (en) Steel plastic composite structure bellows
CN104164970A (en) Construction method and device for recycled steel wire rope pull ring
CN215948411U (en) Outer interface shutoff forming device is contained to steel circular pipe

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant