CN105581534A - Slide rail assembly and mounting device thereof - Google Patents

Slide rail assembly and mounting device thereof Download PDF

Info

Publication number
CN105581534A
CN105581534A CN201410572967.7A CN201410572967A CN105581534A CN 105581534 A CN105581534 A CN 105581534A CN 201410572967 A CN201410572967 A CN 201410572967A CN 105581534 A CN105581534 A CN 105581534A
Authority
CN
China
Prior art keywords
rail
erecting device
slide rail
carrier
rail assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410572967.7A
Other languages
Chinese (zh)
Inventor
梁秀江
陈庚金
王俊强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
King Slide Works Co Ltd
King Slide Technology Co Ltd
Original Assignee
King Slide Works Co Ltd
King Slide Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by King Slide Works Co Ltd, King Slide Technology Co Ltd filed Critical King Slide Works Co Ltd
Priority to CN201410572967.7A priority Critical patent/CN105581534A/en
Publication of CN105581534A publication Critical patent/CN105581534A/en
Pending legal-status Critical Current

Links

Landscapes

  • Drawers Of Furniture (AREA)

Abstract

The invention relates to a slide rail assembly. The slide rail assembly comprises a first rail, a second rail and a mounting device, wherein the second rail can longitudinally make displacement movably relative to the first rail, and comprises a release hole and a baffle wall; the mounting device is mounted to the second rail, and comprises an elastic piece and a clamp part, and the clamp part is connected with the elastic piece, corresponds to the release hole of the second rail, and is baffled by the baffle wall.

Description

Slide rail assembly and erecting device thereof
Technical field
The present invention relates to a kind of slide rail, refer to that especially a kind of rail part of slide rail assembly can be used with an erecting deviceIn a carrier, and this erecting device can be disassembled from rail part rapidly.
Background technology
Generally speaking, slide rail assembly comprises one first rail and one second rail conventionally, longitudinally phase of this second railTo this first rail activity displacement, this second rail can be in order to install and carrying one carrier, makes this carrier can be withThis second rail activity displacement and relatively this first rail be drawn out or fold.
But, slide rail assembly on the market and erecting device thereof of a great variety, therefore, in this product diversificationEnvironment under, how to provide a kind of simple in structure and can be mounted to rapidly the rail part of slide rail assembly, make to holdLoading also can be mounted to the product of rail part rapidly, obviously become important issue very important on market itOne.
Summary of the invention
The object of the present invention is to provide a kind of slide rail assembly to comprise an erecting device, this erecting device can be easilyBe mounted to a rail part of slide rail assembly, or disassembled rapidly from this rail part.
Slide rail assembly according to an aspect of the present invention, comprises one first rail and one second rail, and this second rail can be indulgedTo ground, this first rail activity displacement relatively, is characterized in, described the second rail also comprises a liberation port and a barricade,Described slide rail assembly also comprises an erecting device and is mounted to this second rail, and this erecting device comprises an elastic component and oneBlocking part, this blocking part connects this elastic component, and this blocking part corresponds to the liberation port of this second rail and is hindered by this barricadeGear.
Wherein, this second rail also comprises a buckle portion, and this buckle portion is in order to be fixed on an object object.
Slide rail assembly according to a further aspect of the invention, is applicable to a carrier, this slide rail assembly comprise one first rail,And one second rail, longitudinally this first rail activity displacement relatively of this second rail, this second rail bearing carries this carrier,Be characterized in, this carrier comprises a location division, and this second rail comprises a liberation port, and described slide rail assembly also comprisesOne erecting device is mounted to this second rail, and this erecting device comprises an elastic component and a blocking part, and this blocking part connectsThis elastic component, this blocking part corresponds to the liberation port of this second rail and the clip location division at this carrier.
Wherein, this second rail also comprises a buckle portion and a catching groove, and this carrier also comprises a contact site, this contact siteBe mounted to this catching groove and fixed by this buckle portion.
Wherein, this erecting device also comprises a buffer part, and this buffer part is used to this carrier and is installed on this second railTime, this buffer part Dan Di Arrived is in a position of this carrier.
Erecting device according to an aspect of the present invention, is applicable to be mounted to a rail part of a slide rail assembly, is characterized in,Described rail part comprises a liberation port and a barricade, and described erecting device comprises an elastic component and a blocking part, this clipPortion connects this elastic component, and this blocking part corresponds to the liberation port of this rail part and stopped by this barricade.
Wherein, this erecting device also comprises an operating portion, and this operating portion connects this elastic component.
Wherein, this rail part also comprises a window, and this erecting device also comprises a flexible portion and is installed on this window; This railPart also comprises a stopper, and this stopper is positioned at adjacent this window, and the flexible portion of this erecting device also comprises one recessed section, shouldRecessed section is stuck in this stopper accordingly.
Wherein, this rail part also comprises at least one support portion, and this erecting device also comprises the relying part Zhi Shao mono-Arrived, and this at leastYi Arrived Kao Bu Arrived leans against this at least one support portion.
Brief description of the drawings
For further illustrate confirm above-mentioned purpose of the present invention, design feature and effect, below with reference to accompanying drawing to thisInvention is described in detail, wherein:
Fig. 1 shows the stereogram that the slide rail assembly of one embodiment of the invention comprises erecting device.
Fig. 2 shows the exploded view of the slide rail assembly of one embodiment of the invention.
The rail part of the slide rail assembly of Fig. 3 A demonstration one embodiment of the invention and the decomposing schematic representation of erecting device.
Fig. 3 B demonstration rail part of slide rail assembly of one embodiment of the invention and the decomposition at another visual angle of erecting device are shownIntention.
Fig. 4 A is the rail part of slide rail assembly and the assembly operation schematic diagram of erecting device of one embodiment of the invention(1).
Fig. 4 B is the rail part of slide rail assembly and the assembly operation schematic diagram of erecting device of one embodiment of the invention(2), in order to show the elastic component of erecting device to be operated towards a direction elastic displacement.
Fig. 4 C is the rail part of slide rail assembly and the assembly operation schematic diagram of erecting device of one embodiment of the invention(3), in order to show that erecting device enters the installing port of rail part.
Fig. 4 D is the rail part of slide rail assembly and the assembly operation schematic diagram of erecting device of one embodiment of the invention(4), in order to show that erecting device enters the installing port of rail part and the blocking part of elastic component and is installed on accordingly rail partLiberation port.
Fig. 5 A is that the rail part of slide rail assembly at another visual angle of one embodiment of the invention and the assembly operation of erecting device showIntention (one).
Fig. 5 B is that the rail part of slide rail assembly at another visual angle of one embodiment of the invention and the assembly operation of erecting device showIntention (two), level while guarantor in order to show the flexible portion of erecting device slightly to be pushed by rail part.
Fig. 5 C is that the rail part of slide rail assembly at another visual angle of one embodiment of the invention and the assembly operation of erecting device showIntention (three), in order to show that erecting device is installed in the installing port of rail part, and the Ao Duan Arrived of flexible portion is in rail partStopper.
Fig. 6 A shows the rail part of slide rail assembly and the assembling schematic perspective view of erecting device of one embodiment of the invention.
The operation that the erecting device of Fig. 6 B demonstration one embodiment of the invention can be pulled by solution from the rail part of slide rail assembly is shownIntention.
Fig. 7 shows that the slide rail assembly of one embodiment of the invention can be in order to carry the schematic perspective view of a carrier.
Fig. 8 shows that the slide rail assembly of one embodiment of the invention can install a carrier with buckle portion and erecting deviceDecomposing schematic representation.
Fig. 9 A is the rail part of slide rail assembly and the assembly operation schematic diagram () of carrier of one embodiment of the invention.
Fig. 9 B is the rail part of slide rail assembly and the assembly operation schematic diagram (two) of carrier of one embodiment of the invention,In order to show that a position of carrier is mounted to the buckle portion of rail part.
Fig. 9 C is the rail part of slide rail assembly and the assembly operation schematic diagram (three) of carrier of one embodiment of the invention,In order to show that carrier is installed in the erecting device of slide rail assembly, and the Huan Chong Bu Arrived of erecting device is in carrierOne position.
Detailed description of the invention
Fig. 1 and Fig. 2 show the slide rail assembly 20 of one embodiment of the invention comprise one first rail 22, one second rail 24,One the 3rd rail 26 is corresponding and can be arranged on actively between this first rail 22 and this second rail 24 the 3rd rail26 in order to extend the stroke of longitudinally-moving displacement of these the second rail 24 relative these the first rails 22. One erecting device 28Be mounted to a rail part of slide rail assembly 20. In this, be mounted to the end of this second rail 24 with this erecting device 28Position is example, but is not limited to this.
Fig. 3 A and Fig. 3 B show this erecting device 28 of one embodiment of the invention can discharge be assembled to this secondRail 24. Preferably, this second rail 24 comprises one first wall 30, one second wall 32, a connection wall 34. This is years oldTwo wall 32 positions are this first wall 30 relatively, is connected to these connection wall 34 extensions this first wall 30 and this second wallBetween 32. This first wall 30, this second wall 32 and this connection wall 34 common definition one installing ports 36; One releasesPut mouthfuls 38 and one window 40 both be positioned at separately an appropriate location of this second rail 24. For example, this liberation port 38Can be positioned at contiguous this first wall 30, this window 40 can be positioned at this connection wall 34, but is not limited to this. One gearPortion 42 is positioned at adjacent this window 40; At least one support portion 44 is connected in this first wall 30 and this second wall 32One of them and bend towards this installing port 36, be all connected with this first wall 30 and this second wall 32 in thisOne support portion 44 is example. In a preferred embodiment, this erecting device 28 comprises an installed part 46 can be by rightAnswer the installing port 36, the elastic component 48 that are mounted to this second rail 24 to be flexibly connected in this installed part 46; OneBlocking part 50 is connected in an appropriate location of this elastic component 48, and in this embodiment, this blocking part 50 is connected inOne side of this elastic component 48, but be not limited to this; One operating portion 52 connects this elastic component 48, in this, and this behaviourDoing portion 52 is generally perpendicularly to connect this elastic component 48; One end of one flexible portion 54 is connected in adjacent this installed part46 middle part, makes this flexible portion 54 from these installed part 46 perks, and this flexible portion 54 can be pacified accordinglyBe loaded on the window 40 of this second rail 24, this flexible portion 54 comprise one recessed section 56 can by Ka Arrived accordingly thisThe stopper 42 of two rails 24; Lean against one of them support portion 44 of this second rail 24 Zhi Shao mono-Arrived relying part 58 Neng Gou Arrived,Accordingly, contribute to this erecting device 28 to be installed on the steadiness of this second rail 24; And one buffer part 60 flexiblyConnect this installed part 46.
As shown in Fig. 4 A to Fig. 4 D, in the time that this erecting device 28 is mounted to this second rail 24 by wish, an operatorCan apply a strength F and press this elastic component 48 and make this elastic component 48 store elastic force, make this elastic component 48 towardsThe direction elastic displacement of this installed part 46, accordingly, this erecting device 28 can enter towards a first direction D1Enter to the installing port 36 of this second rail 24, and after being released with the elastic force of this elastic component 48, be connected in thisThe blocking part 50 of elastic component 48 can stretch out the outer and clip of this liberation port 38 accordingly at adjacent this second rail 24A barricade 39 of liberation port 38, this blocking part 50 is stopped by this barricade 39 and is installed on this second rail 24Liberation port 38.
On the other hand, Fig. 5 A to Fig. 5 C shows that this erecting device 28 is mounted in the process of this second rail 24 notState with visual angle presents. After the aforementioned elastic parts 48 of this erecting device 28 or operating portion 52 are pressed, shouldErecting device 28 enters in the process of this installing port 36 towards this first direction D1, the flexible portion of this erecting device 2854 are slightly pushed (as Fig. 5 B) and can keep level by a position of this second rail 24, and in this erecting device28 enter this installing port 36 interior rear (as Fig. 5 C) completely, and the flexible portion 54 of this erecting device 28 is installed on accordinglyThe window 40 of this second rail 24. Wherein, with recessed section of 56 Arrived of this flexible portion 54 in the gear of this second rail 24Portion 42, can not exceed to this window 40 while making this flexible portion 54 be installed on this window 40. With this flexible portion54 with and recessed section 56, the stable degree while making this erecting device 28 be installed on this second rail 24 can be furtherPromote.
As Fig. 6 A and Fig. 6 B show that respectively this erecting device 28 is mounted to the state of this second rail 24, and willThe state that this erecting device 28 is pulled from these the second rail 24 solutions. When operator's wish by this erecting device 28 from this secondWhen rail 24 disassembles, operator can apply external force F1 and press the operating portion 52 of this erecting device 28, makes thisThe blocking part 50 of erecting device 28 is from the disengaging of pulling of barricade 39 solutions of this liberation port 38; On the other hand, operator's energyEnough apply the flexible portion 54 that another external force F2 presses this erecting device 28, make this flexible portion 54 from this window 40The solution disengaging of pulling. Accordingly, this erecting device 28 can be from this second rail 24 toward a second direction (contrary aforesaid theOne direction D1) be removed.
As shown in Fig. 7 and Fig. 8, it is (right that the second rail 24 of this slide rail assembly 20 can be used in installation one carrier 62Resemble object) and in order to carry this carrier 62. Wherein, Fig. 7 shows that a pair of slide rail assembly 20 can carry jointlyThis carrier 62, and the second rail 24 of each slide rail assembly 20 and the 3rd rail 26 longitudinally relative this firstRail 22 activity displacements and relatively this first rail 22 in one extension launch state. Particularly, Fig. 8 shows oftenThe second rail 24 of one slide rail assembly 20 also comprises a buckle portion 64 and a catching groove 66. On the other hand, this carrierEach side of 62 comprises that a contact site 68 can be mounted to the catching groove 66 of this second rail 24 accordingly and by this buckle portion64 is fixing; And one location division 70 can be installed on accordingly the blocking part 50 of this erecting device 28.
Shown in Fig. 9 A to Fig. 9 C, in the time that this carrier 62 is mounted to this second rail 24 by wish, operator can be byThis carrier 62 is installed on the buckle portion 64 of this second rail 24 accordingly towards a direction D; On the other hand, when this holdsLoading 62 is installed and is positioned after this second rail 24, and the corresponding clip of blocking part 50 of this erecting device 28 is in this carryingThe location division 70 of thing 62. And install and be positioned after this second rail 24 when this carrier 62, this erecting device 28Buffer part 60 Dan Di Arrived in a position of this carrier 62, to provide cushioning effect in this carrier 62,Or, when the entire length of this carrier 62 relatively the entire length of this second rail 24 compared with short and make tool between the twoWhile having an admissible error, the ability with this buffer part 60 with elastic shrinkage can make up this admissible error, makesThis carrier 62 can be mounted to this second rail 24 smoothly.
According to above explanation, one of known feature of the present invention is: the rail part of slide rail assembly fills with an installationPut and can be used to a carrier, and this erecting device can be disassembled from rail part rapidly.
Although the present invention describes with reference to current specific embodiment, ordinary skill people in the artMember will be appreciated that, above embodiment is only for the present invention is described, in the situation that does not depart from spirit of the present inventionAlso can make down variation and the amendment of various equivalences, therefore, need only within the scope of connotation of the present invention above-mentionedVariation, the modification of embodiment all will drop in the scope of the application's claims.

Claims (10)

1. a slide rail assembly, comprises one first rail and one second rail, and described the second rail can longitudinally relatively shouldThe first rail activity displacement, is characterized in that, described the second rail also comprises a liberation port and a barricade, and described slide rail is totalOne-tenth also comprises an erecting device and is mounted to this second rail, and described erecting device comprises an elastic component and a blocking part, shouldBlocking part connects this elastic component, and this blocking part corresponds to the liberation port of this second rail and stopped by this barricade.
2. slide rail assembly according to claim 1, is characterized in that, described the second rail also comprises in order to solidDue to a buckle portion of an object object.
3. a slide rail assembly, is applicable to a carrier, and described slide rail assembly comprises one first rail and one second rail,Longitudinally this first rail activity displacement relatively of described the second rail, this second rail bearing carries this carrier, and its feature existsIn, described carrier comprises a location division, and this second rail comprises a liberation port, and described slide rail assembly also comprises a peaceAssembling device is mounted to this second rail, and described erecting device comprises an elastic component and a blocking part, and this blocking part connects shouldElastic component, this blocking part corresponds to the liberation port of this second rail and the clip location division at this carrier.
4. slide rail assembly according to claim 3, is characterized in that, described the second rail also comprises a buckle portionAnd a catching groove, this carrier also comprises a contact site, and this contact site is mounted to this catching groove and is fixed by this buckle portion.
5. slide rail assembly according to claim 4, is characterized in that, described erecting device also comprises one and delaysRush portion, when this buffer part is used to this carrier and is installed on this second rail, this buffer part Dan Di Arrived is in this carrierA position.
6. an erecting device, is applicable to be mounted to a rail part of a slide rail assembly, it is characterized in that described railPart comprises a liberation port and a barricade, and described erecting device comprises:
One elastic component; And
One blocking part, connects described elastic component, and described blocking part corresponds to the liberation port of this rail part and by this gearWall stops.
7. erecting device according to claim 6, is characterized in that, also comprises an operating portion and connects this bulletProperty part.
8. erecting device according to claim 6, is characterized in that, described rail part also comprises a window,This erecting device also comprises a flexible portion and is installed on this window.
9. erecting device according to claim 8, is characterized in that, described rail part also comprises a stopper,This stopper is positioned at adjacent this window, and the flexible portion of this erecting device also comprises one recessed section, and this recessed section is stuck in this accordinglyStopper.
10. erecting device according to claim 6, is characterized in that, described rail part also comprises at least oneSupport part, this erecting device also comprises the relying part Zhi Shao mono-Arrived, and this leans against this at least one support portion Zhi Shao mono-Arrived Kao Bu Arrived.
CN201410572967.7A 2014-10-23 2014-10-23 Slide rail assembly and mounting device thereof Pending CN105581534A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410572967.7A CN105581534A (en) 2014-10-23 2014-10-23 Slide rail assembly and mounting device thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410572967.7A CN105581534A (en) 2014-10-23 2014-10-23 Slide rail assembly and mounting device thereof

Publications (1)

Publication Number Publication Date
CN105581534A true CN105581534A (en) 2016-05-18

Family

ID=55921737

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410572967.7A Pending CN105581534A (en) 2014-10-23 2014-10-23 Slide rail assembly and mounting device thereof

Country Status (1)

Country Link
CN (1) CN105581534A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106510252A (en) * 2016-12-22 2017-03-22 华帝股份有限公司 Low-cost guide rail buckle of easily installing and removing

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040245898A1 (en) * 2003-06-05 2004-12-09 Juergen Amann Pull-out guide for drawers
CN102669967A (en) * 2012-05-23 2012-09-19 伍志勇 Adjustable stabilization mechanism for slide rail
CN202515038U (en) * 2012-02-17 2012-11-07 佳饰美国际事业有限公司 Quickly-disassembled shelving stretching device
CN203302662U (en) * 2013-05-25 2013-11-27 陈明开 Drawer guide rail rapid disassembling and assembling structure

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040245898A1 (en) * 2003-06-05 2004-12-09 Juergen Amann Pull-out guide for drawers
CN202515038U (en) * 2012-02-17 2012-11-07 佳饰美国际事业有限公司 Quickly-disassembled shelving stretching device
CN102669967A (en) * 2012-05-23 2012-09-19 伍志勇 Adjustable stabilization mechanism for slide rail
CN203302662U (en) * 2013-05-25 2013-11-27 陈明开 Drawer guide rail rapid disassembling and assembling structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106510252A (en) * 2016-12-22 2017-03-22 华帝股份有限公司 Low-cost guide rail buckle of easily installing and removing
CN106510252B (en) * 2016-12-22 2018-12-07 华帝股份有限公司 Low-cost guide rail buckle of easily installing and removing

Similar Documents

Publication Publication Date Title
US20160198855A1 (en) Slide rail assembly and mounting device thereof
US9474182B1 (en) Slide rail assembly
EP3292789B1 (en) Slide rail assembly
EP3143901A1 (en) Slide rail assembly
BR112012032014A2 (en) panel coupling assembly
WO2016116925A3 (en) Adapter
BR112017026661A2 (en) connection set for an integrated safety harness
WO2012075190A3 (en) Electronic display mount with extreme tilt feature
US20180177295A1 (en) Slide rail assembly
BR112016024284A2 (en) machine cab that has improved operator visibility
EP2870896A3 (en) Commodity shelving system
WO2014140609A3 (en) Downhole shifting tool
NO20091453L (en) Kabelgjennomforinger
US9635942B2 (en) Slide rail assembly
EP3440961B1 (en) Slide rail assembly and rail kit thereof
CN105433616B (en) Sliding rail assembly
EP2764796B1 (en) Slide rail assembly and rack system
WO2014174092A3 (en) Hydraulic fluid container with blocking device
BR112017017329A2 (en) ? connector module for duct connection?
CN104172757B (en) Fixture, slide rail assembly and fixture thereof
CN105581534A (en) Slide rail assembly and mounting device thereof
EP3041328B1 (en) Slide rail assembly
EP1964999B1 (en) Retractable awning
WO2008104157A3 (en) Plug-in connector
EP3076774A1 (en) Slide rail assembly

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160518