CN105569048A - Method for accelerating foundation ditch construction process - Google Patents

Method for accelerating foundation ditch construction process Download PDF

Info

Publication number
CN105569048A
CN105569048A CN201410556320.5A CN201410556320A CN105569048A CN 105569048 A CN105569048 A CN 105569048A CN 201410556320 A CN201410556320 A CN 201410556320A CN 105569048 A CN105569048 A CN 105569048A
Authority
CN
China
Prior art keywords
construction
foundation ditch
module
bottom plates
whole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410556320.5A
Other languages
Chinese (zh)
Inventor
朱礼生
梁森
张明
刘亮华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Bureau First Construction Engineering Co Ltd
Original Assignee
China Construction Fourth Bureau First Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Bureau First Construction Engineering Co Ltd filed Critical China Construction Fourth Bureau First Construction Engineering Co Ltd
Priority to CN201410556320.5A priority Critical patent/CN105569048A/en
Publication of CN105569048A publication Critical patent/CN105569048A/en
Pending legal-status Critical Current

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The invention discloses a method for accelerating the foundation ditch construction process. According to the method, a whole foundation ditch is divided into a plurality of modules; earth cutting and bottom plate construction of the middle module of the foundation ditch are firstly performed while support pile construction on the periphery of the foundation ditch is carried out; then earth cutting and bottom plate construction of other modules around the middle of the foundation ditch are gradually completed with the foundation ditch middle module as the center; and after the support pile construction on the periphery of the foundation ditch is finished, earth cutting and bottom plate construction are overall carried out until construction of the whole foundation ditch is completed. The method is capable of greatly accelerating the foundation ditch construction process, so that the construction process of a whole project is accelerated, the turnover rate of staff, equipment and materials is increased, materials can be saved, the construction period can be shortened, and the cost can be reduced.

Description

A kind of method accelerating foundation pit construction progress
Technical field
the present invention relates to a kind of method accelerating foundation pit construction progress, belong to foundation pit construction technical field.
Background technology
tradition foundation ditch construction method first after foundation ditch surrounding has all beaten soldier pile, carries out shoveling effect again, finally carries out construction of bottom plates.The construction of soldier pile is according to foundation ditch size generally at about 1-3 month, and excavation and construction generally needs 1-2 month, adds construction of bottom plates, and total construction period approximately needs 3-6 month, and construction speed is slow, cannot improve all transfer efficients of manpower, equipment and material.
Summary of the invention
the object of the invention is to, a kind of method accelerating foundation pit construction progress is provided.While carrying out soldier pile construction to foundation ditch, first can carry out cutting the earth and construction of bottom plates in subrange, be conducive to forming continuous productive process, accelerate construction speed greatly.
technical scheme of the present invention:
accelerate a method for foundation pit construction progress, the method is that whole foundation ditch is divided into some modules; Shoveling and the construction of bottom plates of foundation ditch bicycle middle module is first done while soldier pile construction is carried out to foundation ditch surrounding; Then centered by foundation ditch bicycle middle module, progressively complete shoveling and the construction of bottom plates of other module around in the middle part of foundation ditch; After the soldier pile construction of foundation ditch surrounding, then carry out cutting the earth and construction of bottom plates, until complete the construction of whole foundation ditch comprehensively.
in preceding method, the division of described module divides according to the unit of building and function, takes into account the supply capacity of equipment and material simultaneously, is beneficial to form continuous productive process gradually at middle part.
compared with prior art, the present invention adopts sub-module construction method, can accelerate the construction speed of foundation ditch greatly, thus accelerate the construction speed of whole engineering, improve the turnover rate of personnel, equipment, material, material, reduction of erection time can be saved, reduce costs.
Accompanying drawing explanation
fig. 1 is the schematic diagram of the embodiment of the present invention.
Detailed description of the invention
below in conjunction with drawings and Examples, the present invention is described in further detail, but not as any limitation of the invention.
accelerate a method for foundation pit construction progress, the method is that whole foundation ditch is divided into some modules; Shoveling and the construction of bottom plates of foundation ditch bicycle middle module is first done while soldier pile construction is carried out to foundation ditch surrounding; Then centered by foundation ditch bicycle middle module, progressively complete shoveling and the construction of bottom plates of other module around in the middle part of foundation ditch; After the soldier pile construction of foundation ditch surrounding, then carry out cutting the earth and construction of bottom plates, until complete the construction of whole foundation ditch comprehensively.The division of described module divides according to the unit of building and function, takes into account the supply capacity of equipment and material simultaneously, is beneficial to form continuous productive process gradually at middle part.
Embodiment
fig. 1 is the schematic diagram of this routine foundation ditch, and the small circle in Fig. 1 around foundation ditch represents soldier pile, is divided into 10 modules in foundation ditch, wherein: 1. module is positioned at foundation ditch medium position; Module 2. ~ be 5. positioned at module 1. around, and not to be connected with margin of foundation pit; Module 6. ~ 10. margin of foundation pit.The Main Basis of Module Division divides according to the 26S Proteasome Structure and Function of building, should consider the equilibrium of each module area as much as possible, accomplish that size is consistent as much as possible during division.But the requirement of building structure and function must be paid the utmost attention to, and the uniformity of module area need not be pursued.When carrying out foundation pit construction, in order to accelerating construction progress, soldier pile and the constructure scheme that foundation ditch is cut the earth and construction of bottom plates carries out simultaneously can be considered.Because the construction period of soldier pile is longer, can soldier pile construction period be carried out, carry out module shoveling 1. and construction of bottom plates simultaneously.Because 1. module is positioned at the middle part of foundation ditch, so the construction of soldier pile can't be affected when carrying out module shoveling 1. and construction of bottom plates.After module construction of bottom plates 1., the construction of possible soldier pile does not also complete, and at this moment can continue to carry out the module construction 3. or 4. 1. adjacent with module again.First can assemble manpower and first concentrate module shoveling work 3., when 3. module digs to desired depth, part manpower can proceed module construction of bottom plates 3., another part people adjusts and goes module 4. to continue to cut the earth, so just define continuous productive process gradually, the waste causing people's force-summing device can be avoided.Complete module construction 2. and 5. successively, after completing module construction 2. and 5., soldier pile that may be all has been constructed complete, at this moment can fully under wayly complete module 6. ~ construction 10..If after completing module construction 2. and 5., also all construction is complete for soldier pile, first can arrange to construct near the module of the soldier pile section of completing, then complete the construction of all modules gradually.
adopt constructure scheme of the present invention, effectively can shorten the engineering time of foundation ditch, reach raising efficiency of construction, thus accelerate the construction speed of whole engineering, improve the turnover rate of personnel, equipment, material, material, reduction of erection time can be saved, reduce costs.

Claims (2)

1. accelerate a method for foundation pit construction progress, it is characterized in that: the method is that whole foundation ditch is divided into some modules; Shoveling and the construction of bottom plates of foundation ditch bicycle middle module is first done while soldier pile construction is carried out to foundation ditch surrounding; Then centered by foundation ditch bicycle middle module, progressively complete shoveling and the construction of bottom plates of other module around in the middle part of foundation ditch; After the soldier pile construction of foundation ditch surrounding, then carry out cutting the earth and construction of bottom plates, until complete the construction of whole foundation ditch comprehensively.
2. method according to claim 1, is characterized in that: the division of described module divides according to the unit of building and function, takes into account the supply capacity of equipment and material simultaneously, is beneficial to form continuous productive process gradually at middle part.
CN201410556320.5A 2014-10-20 2014-10-20 Method for accelerating foundation ditch construction process Pending CN105569048A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410556320.5A CN105569048A (en) 2014-10-20 2014-10-20 Method for accelerating foundation ditch construction process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410556320.5A CN105569048A (en) 2014-10-20 2014-10-20 Method for accelerating foundation ditch construction process

Publications (1)

Publication Number Publication Date
CN105569048A true CN105569048A (en) 2016-05-11

Family

ID=55879635

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410556320.5A Pending CN105569048A (en) 2014-10-20 2014-10-20 Method for accelerating foundation ditch construction process

Country Status (1)

Country Link
CN (1) CN105569048A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1191258A (en) * 1997-02-21 1998-08-26 同济大学 Time-space effect method for excavation of foundation pit
JP3669247B2 (en) * 2000-02-17 2005-07-06 大成建設株式会社 Anchor anchor method for soft sandy ground
CN1786353A (en) * 2005-12-05 2006-06-14 黄威力 Construction method of setting site for pile base and structure in foundition pit
CN101408025A (en) * 2008-11-11 2009-04-15 广州市设计院 Pit construction method by using major structure as bearing point
CN101418571A (en) * 2008-10-15 2009-04-29 上海市第二市政工程有限公司 Middle plate construction method of wide pit top-down construction
CN102660955A (en) * 2012-05-17 2012-09-12 上海强劲地基工程股份有限公司 Quick construction method for foundation pit slope support

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1191258A (en) * 1997-02-21 1998-08-26 同济大学 Time-space effect method for excavation of foundation pit
JP3669247B2 (en) * 2000-02-17 2005-07-06 大成建設株式会社 Anchor anchor method for soft sandy ground
CN1786353A (en) * 2005-12-05 2006-06-14 黄威力 Construction method of setting site for pile base and structure in foundition pit
CN101418571A (en) * 2008-10-15 2009-04-29 上海市第二市政工程有限公司 Middle plate construction method of wide pit top-down construction
CN101408025A (en) * 2008-11-11 2009-04-15 广州市设计院 Pit construction method by using major structure as bearing point
CN102660955A (en) * 2012-05-17 2012-09-12 上海强劲地基工程股份有限公司 Quick construction method for foundation pit slope support

Similar Documents

Publication Publication Date Title
CN205975584U (en) Foundation pile for hydraulic engineering
CN103967029B (en) Breast wall type well sinking device and construction method thereof
MX2017016059A (en) System and method for establishing a multi-well foundation comprising an alignment template for suction foundation units.
CN105926630B (en) A kind of annular support replacement and jump storehouse construction method for accelerating deep big Underground Construction
CN202809637U (en) Fan basis embedded in rock foundation
CN105569048A (en) Method for accelerating foundation ditch construction process
CN102465534B (en) The construction method of adjacent double ditches
CN204002927U (en) The incrusted processing structure of a kind of shield structure
CN106088195B (en) A kind of small-sized solar water conservancy arranges silt device
CN204456135U (en) Basement side bar for controlling deformation of deep excavation strengthens structure
CN203716974U (en) Material dividing device for deep vertical well concrete pouring
CN102934589A (en) Three-dimensional agriculture planting frame
CN203922510U (en) A kind of simple and easy cable machine that is arranged in slope
CN207193941U (en) A kind of civil engineering groundwork bracing means
CN109296382B (en) Large-span underground cavern horizontal-diagonal four-fork excavation supporting method
CN102071692A (en) Construction method for performing bottom plate support replacement on foundation pit by using annular plate
CN204185841U (en) Ground board-plugging device
CN211254162U (en) Rapid unearthing system for ultra-deep foundation pit
CN104328773B (en) Entirety built by sea work accommodation platform
CN204213469U (en) A kind of pipe jacking equipment
CN218104115U (en) Municipal construction digging device
CN107882161A (en) A kind of pressure break soft pot and its construction method
CN103953016A (en) Channel slope-changing power generation method
CN202585468U (en) Grooved EVA of solar cell module
CN203699942U (en) Water flow orienting device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160511