CN105549418A - SCD communication debugging system for intelligent substation - Google Patents

SCD communication debugging system for intelligent substation Download PDF

Info

Publication number
CN105549418A
CN105549418A CN201510906423.4A CN201510906423A CN105549418A CN 105549418 A CN105549418 A CN 105549418A CN 201510906423 A CN201510906423 A CN 201510906423A CN 105549418 A CN105549418 A CN 105549418A
Authority
CN
China
Prior art keywords
file
scd
observing
protection
value
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510906423.4A
Other languages
Chinese (zh)
Other versions
CN105549418B (en
Inventor
吴仲超
李建泽
沈卫兵
王欣悦
路坦
孙建连
盛华艳
孙智慧
薛立军
方芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Bengbu Power Supply Co of State Grid Anhui Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Bengbu Power Supply Co of State Grid Anhui Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Bengbu Power Supply Co of State Grid Anhui Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201510906423.4A priority Critical patent/CN105549418B/en
Publication of CN105549418A publication Critical patent/CN105549418A/en
Application granted granted Critical
Publication of CN105549418B publication Critical patent/CN105549418B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B17/00Systems involving the use of models or simulators of said systems
    • G05B17/02Systems involving the use of models or simulators of said systems electric

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Testing And Monitoring For Control Systems (AREA)

Abstract

The invention discloses an SCD communication debugging system for an intelligent substation, and relates to an intelligent substation signal debugging platform. The system is characterized in that the system employs the following steps: determining SCD analysis, determining a communication mode, and determining a result. The system is reasonable in structure, is convenient for transmission, and is convenient to use.

Description

The SCD communication debug system of intelligent substation
Technical field:
The present invention relates to intelligent substation signal debug platform, be specifically related to the SCD communication debug system of intelligent substation.
Background technology:
Current dispatch automated system in operation management or the configuration management be confined to equipment, or lacks effective ladder of management, and main O&M is still dependence manual mode.Although manual management also can safeguard infrastructure and the operation system of automated system, management workload is huge, and can not effectively early warning for various unexpected incidents, considerably increases management difficulty; Simultaneity factor huge but managerial personnel cannot grasp the overall situation, network and operation system is difficult to accurately judge bottleneck, cannot maximizes the efficiency playing automated system; To the management of all automated systems owing to being all labor management, effectively cannot accumulate operation management experience, form fixing knowledge base, just can not reduce the impact of human factor, this brings very large obstruction to formation procedure, systematized management.
Existing industrial computer is all general electric Ethernet interface, design based on computer motherboard, although many network interfaces can be expanded, but intelligent substation is network communication, interface requirement fiber optic Ethernet mouth, and the packet capturing of SV, GOOSE debugging is very high to requirement of real-time, time precision requires to reach Microsecond grade.
Existing computer motherboard can only be applied to common computational grid, although its cpu system is multi-job operation, be not parallel, therefore its hardware configuration and treatment mechanism do not reach the requirement of real-time, and network interface quantity is very few.
Summary of the invention:
Technical matters to be solved by this invention is to overcome existing technological deficiency provides a kind of SCD rational in infrastructure, that transmit intelligent substation convenient, easy to use to communicate debug system.
Technical matters to be solved by this invention adopts following technical scheme to realize:
The SCD communication debug system of intelligent substation, is characterized in that: comprise the following steps,
Step one, determine that SCD analyzes: to SCD file standardization checkout and visual analyzing, check IED line, GOOSE/SMV void end line, extract data set, information point table, definite value point table etc. that MMS communication uses;
Step 2, determine communication form:
I selects wall monitoring, alarm: select SV or GOOSE pattern;
Correlating event can show various types of communication message (GOOSE, SV) between each association IED that native system detects, event and alarm according to sequential, association IED, for the IED occurred in Inputs in SCD file, that is there is the IED that message transmits each other;
II selects station level communication simulation: select that setting simulation, device parameter are shockproof, analog quantity emulation, pressing plate emulation, switching value emulation, event simulation, file emulate;
III determines that station level is debugged: the station level data of main debugging apparatus are device parameter, definite value, remote measurement value, remote signalling value, pressing plate, fault file, event of failure;
Step 3, determination result: carry out real-time analysis by step 2, draw temporal information and warning information;
Described device parameter: the parameter of the intelligent apparatus such as protection, observing and controlling can be called and can be revised it;
Definite value: the definite value that the intelligent apparatus such as protection, observing and controlling, record ripple can be called, and revise its definite value;
Remote measurement value: the remote measurement value that can show the intelligent apparatus such as protection, observing and controlling in real time;
Remote signalling value: the remote signalling value that can show the intelligent apparatus such as protection, observing and controlling in real time;
Pressing plate: the pressing plate that can show the intelligent apparatus such as protection, observing and controlling in real time, and throwing can be carried out move back;
Fault file: the transient fault recorder file that protection, observing and controlling can be called, and transient state, stable state file that fault wave recording device can be called; File calls path and time when can issue difference to call;
Event of failure: can real-time displaying device event of failure report.
Beneficial effect of the present invention is: the FPGA that I this patent adopts parallel mode to receive, and makes process layer message receive markers precision very high, reaches Microsecond grade.
II this patent is made into collecting unit plate collecting part, configures arbitrary extension according to different users.
III this patent shows the connection of empty terminal with patterned way, makes user not be used in the connection of searching empty terminal in complexity, cumbersome xml file.
The MMS communication of the relay protection device of IV this patent simulating realistic, whether the communication being convenient to test the systems such as substation, backstage, oscillograph networking is normal.
Whether the MMS communication that V this patent can test the relay protection device of station level is normal.
Accompanying drawing illustrates:
Fig. 1 is structural representation of the present invention.
Embodiment:
The technological means realized to make the present invention, creation characteristic, reaching object and effect is easy to understand, below in conjunction with concrete diagram, setting forth the present invention further.
As shown in Figure 1, technical matters to be solved by this invention adopts following technical scheme to realize:
The SCD communication debug system of intelligent substation, is characterized in that: comprise the following steps,
Step one, determine that SCD analyzes: to SCD file standardization checkout and visual analyzing, check IED line, GOOSE/SMV void end line, extract data set, information point table, definite value point table etc. that MMS communication uses;
Step 2, determine communication form:
I selects wall monitoring, alarm: select SV or GOOSE pattern;
Correlating event can show various types of communication message (GOOSE, SV) between each association IED that native system detects, event and alarm according to sequential, association IED, for the IED occurred in Inputs in SCD file, that is there is the IED that message transmits each other;
II selects station level communication simulation: select that setting simulation, device parameter are shockproof, analog quantity emulation, pressing plate emulation, switching value emulation, event simulation, file emulate;
III determines that station level is debugged: the station level data of main debugging apparatus are device parameter, definite value, remote measurement value, remote signalling value, pressing plate, fault file, event of failure;
Step 3, determination result: carry out real-time analysis by step 2, draw temporal information and warning information;
Described device parameter: the parameter of the intelligent apparatus such as protection, observing and controlling can be called and can be revised it;
Definite value: the definite value that the intelligent apparatus such as protection, observing and controlling, record ripple can be called, and revise its definite value;
Remote measurement value: the remote measurement value that can show the intelligent apparatus such as protection, observing and controlling in real time;
Remote signalling value: the remote signalling value that can show the intelligent apparatus such as protection, observing and controlling in real time;
Pressing plate: the pressing plate that can show the intelligent apparatus such as protection, observing and controlling in real time, and throwing can be carried out move back;
Fault file: the transient fault recorder file that protection, observing and controlling can be called, and transient state, stable state file that fault wave recording device can be called; File calls path and time when can issue difference to call;
Event of failure: can real-time displaying device event of failure report.
More than show and describe ultimate principle of the present invention and principal character and advantage of the present invention.The technician of the industry should understand; the present invention is not restricted to the described embodiments; what describe in above-described embodiment and instructions just illustrates principle of the present invention; without departing from the spirit and scope of the present invention; the present invention also has various changes and modifications, and these changes and improvements all fall in the claimed scope of the invention.Application claims protection domain is defined by appending claims and equivalent thereof.

Claims (2)

1. the SCD communication debug system of intelligent substation, is characterized in that: comprise the following steps,
Step one, determine that SCD analyzes: to SCD file standardization checkout and visual analyzing, check IED line, GOOSE/SMV void end line, extract data set, information point table, definite value point table etc. that MMS communication uses;
Step 2, determine communication form:
I selects wall monitoring, alarm: select SV or GOOSE pattern;
Correlating event can show various types of communication message (GOOSE, SV) between each association IED that native system detects, event and alarm according to sequential, association IED, for the IED occurred in Inputs in SCD file, that is there is the IED that message transmits each other;
II selects station level communication simulation: select that setting simulation, device parameter are shockproof, analog quantity emulation, pressing plate emulation, switching value emulation, event simulation, file emulate;
III determines that station level is debugged: the station level data of main debugging apparatus are device parameter, definite value, remote measurement value, remote signalling value, pressing plate, fault file, event of failure;
Step 3, determination result: carry out real-time analysis by step 2, draw temporal information and warning information.
2. the SCD communication debug system of intelligent substation according to claim 1, is characterized in that: described device parameter: can call the parameter of the intelligent apparatus such as protection, observing and controlling and can revise it;
Definite value: the definite value that the intelligent apparatus such as protection, observing and controlling, record ripple can be called, and revise its definite value;
Remote measurement value: the remote measurement value that can show the intelligent apparatus such as protection, observing and controlling in real time;
Remote signalling value: the remote signalling value that can show the intelligent apparatus such as protection, observing and controlling in real time;
Pressing plate: the pressing plate that can show the intelligent apparatus such as protection, observing and controlling in real time, and throwing can be carried out move back;
Fault file: the transient fault recorder file that protection, observing and controlling can be called, and transient state, stable state file that fault wave recording device can be called; File calls path and time when can issue difference to call;
Event of failure: can real-time displaying device event of failure report.
CN201510906423.4A 2015-12-07 2015-12-07 The SCD of intelligent substation communicates debugging system Active CN105549418B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510906423.4A CN105549418B (en) 2015-12-07 2015-12-07 The SCD of intelligent substation communicates debugging system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510906423.4A CN105549418B (en) 2015-12-07 2015-12-07 The SCD of intelligent substation communicates debugging system

Publications (2)

Publication Number Publication Date
CN105549418A true CN105549418A (en) 2016-05-04
CN105549418B CN105549418B (en) 2019-01-22

Family

ID=55828668

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510906423.4A Active CN105549418B (en) 2015-12-07 2015-12-07 The SCD of intelligent substation communicates debugging system

Country Status (1)

Country Link
CN (1) CN105549418B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105978152A (en) * 2016-06-21 2016-09-28 国网福建省电力有限公司 Automatic closed loop joint debugging method for telecontrol equipment and regulation and control main station of intelligent substation
CN106982235A (en) * 2017-06-08 2017-07-25 江苏省电力试验研究院有限公司 A kind of power industry control network inbreak detection method and system based on IEC 61850

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102291277A (en) * 2011-08-09 2011-12-21 上海思源弘瑞自动化有限公司 Automatic test system and method for intelligent substation spacing apparatus
CN103200051A (en) * 2013-04-27 2013-07-10 国家电网公司 Intelligent substation message simulation testing and association message analysis system and method
CN103414251A (en) * 2013-08-26 2013-11-27 南京匹瑞电气科技有限公司 Substation network communication simulation system based on IEC 61850
CN103744422A (en) * 2014-01-06 2014-04-23 国家电网公司 Automatic testing method for relay protection device based on IEC61850 standard
CN104935079A (en) * 2015-06-05 2015-09-23 天津送变电工程公司 Station-domain protection system of intelligent transformer station and function debugging method of system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102291277A (en) * 2011-08-09 2011-12-21 上海思源弘瑞自动化有限公司 Automatic test system and method for intelligent substation spacing apparatus
CN103200051A (en) * 2013-04-27 2013-07-10 国家电网公司 Intelligent substation message simulation testing and association message analysis system and method
CN103414251A (en) * 2013-08-26 2013-11-27 南京匹瑞电气科技有限公司 Substation network communication simulation system based on IEC 61850
CN103744422A (en) * 2014-01-06 2014-04-23 国家电网公司 Automatic testing method for relay protection device based on IEC61850 standard
CN104935079A (en) * 2015-06-05 2015-09-23 天津送变电工程公司 Station-domain protection system of intelligent transformer station and function debugging method of system

Non-Patent Citations (8)

* Cited by examiner, † Cited by third party
Title
付国新 等: "智能变电站网络分析与故障录波一体化设计与实现", 《电力自动化设备》 *
孙一民 等: "智能变电站SCD文件管控策略完备性分析", 《电力***自动化》 *
朱林 等: "智能变电站通信网络状态监测信息模型及配置描述", 《电力***自动化》 *
李岩 等: "智能变电站二次调试方法研究", 《东北电力技术》 *
李成鑫: "北川110KV智能变电站监控***调试工作研究与分析", 《四川电力技术》 *
陈其森 等: "《智能变电站自动化***集成测试技术》", 31 August 2015 *
黄树帮 等: "基于IEC61850标准的通用IED仿真***的设计与实现", 《电力***自动化》 *
黄磊超 等: "智能变电站间隔层设备自动测试***研制", 《电力***自动化》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105978152A (en) * 2016-06-21 2016-09-28 国网福建省电力有限公司 Automatic closed loop joint debugging method for telecontrol equipment and regulation and control main station of intelligent substation
CN106982235A (en) * 2017-06-08 2017-07-25 江苏省电力试验研究院有限公司 A kind of power industry control network inbreak detection method and system based on IEC 61850

Also Published As

Publication number Publication date
CN105549418B (en) 2019-01-22

Similar Documents

Publication Publication Date Title
CN103051065B (en) The distributed FA interlock method of testing of a kind of power distribution automation and system
CN103414251B (en) A kind of substation network communication analogue system based on IEC61850
CN103823433B (en) Method for realizing relay protection equipment on-line monitoring by use of communication process analysis
CN106921522B (en) Networking information model detection device of intelligent substation network message recording and analyzing device
CN106327355A (en) Secondary equipment simulation and debugging system for transformer substation reconstruction and expansion project and implementation method
CN107480389A (en) A kind of intelligent alarm test emulation system and method towards scheduling station
WO2015149596A1 (en) Iec61850-based communication simulation method for leakage current on-line monitoring device
CN104868599A (en) Intelligent substation message simulation test and association analysis system, and simulation method
WO2015149595A1 (en) Iec61850-based communication simulation method for insulation on-line monitoring device
CN103235217B (en) Dual protection act consistance monitoring device and monitoring method
CN104539047A (en) Intelligent substation fault diagnosing and positioning method based on multi-factor comparison visualization
CN107819647A (en) Intelligent substation station level network tester
CN113629876A (en) Test system and test method of special inspection module
CN102821010B (en) Simulator for protector
CN105785170A (en) Intelligent transformer substation oriented data flow panoramic displaying device and intelligent transformer substation oriented data flow panoramic displaying method
CN203909606U (en) Test system for distribution automation system
CN203849393U (en) Function and performance detection system of distribution line fault indication integrated apparatus
CN105549418A (en) SCD communication debugging system for intelligent substation
CN104064982B (en) A kind of methods of exhibiting of intelligent substation fault message
CN109586406B (en) Third-generation intelligent substation analog quantity in-situ module test system and application method thereof
CN203178385U (en) Doubling protection action consistency monitoring device
CN116388381A (en) Simulation testing device and method for intelligent substation monitoring system
CN109193616A (en) A kind of substation's telecontrol information distribution acceptance method and system
CN205139323U (en) Distant examination testing system of intelligent substation relay protection
CN104375482A (en) Relay protection device online evaluation method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant