CN105544606A - Construction method for assembled prefabricated comprehensive pipe rack - Google Patents

Construction method for assembled prefabricated comprehensive pipe rack Download PDF

Info

Publication number
CN105544606A
CN105544606A CN201610084261.5A CN201610084261A CN105544606A CN 105544606 A CN105544606 A CN 105544606A CN 201610084261 A CN201610084261 A CN 201610084261A CN 105544606 A CN105544606 A CN 105544606A
Authority
CN
China
Prior art keywords
prefabricated
piping lane
pipe gallery
pipe rack
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610084261.5A
Other languages
Chinese (zh)
Inventor
仝利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Runguo Science And Technology Development Co Ltd
Original Assignee
Qingdao Runguo Science And Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Runguo Science And Technology Development Co Ltd filed Critical Qingdao Runguo Science And Technology Development Co Ltd
Priority to CN201610084261.5A priority Critical patent/CN105544606A/en
Publication of CN105544606A publication Critical patent/CN105544606A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/10Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention relates to a construction method for an assembled prefabricated comprehensive pipe rack and belongs to the field of construction of assembled prefabricated comprehensive pipe racks. The method comprises the steps that positioning and setting-out of the assembled prefabricated comprehensive pipe rack are conducted; a first pipe rack bottom plate is installed; a first pipe rack side plate and a first vertical plate are installed; a top plate is installed; after a first section of the assembled prefabricated comprehensive pipe rack is installed, the steps are cycled in sequence to complete installation of the pipe rack section of a certain length, and earthwork backfilling is conducted; hoisting equipment is located at the installed pipe rack section and above the top plate subjected to earthwork backfilling, and prefabricated components for a next pipe rack section are assembled; prefabricated pipe rack component conveying equipment walks on the installed pipe rack top plate to convey required components back and forth; the steps are cycled in sequence to complete installation of all components of the pipe rack in one construction period. The installed pipe rack top plate is used as a temporary conveying and hoisting passage, there is no need to build a temporary road, the construction period is short, comprehensive cost is low, and the construction method is particularly suitable for a construction site improper for building a temporary road in a downtown.

Description

A kind of prefabricated pipe gallery construction method
Technical field
The present invention relates to the construction method of prefabricated pipe gallery, especially a kind of prefabricated pipe gallery crane gear utilizes piping lane top board to do the construction method of passage.
Background technology
Pipe gallery builds a underground pipe gallery under town road, included by laying in the municipal pipeline convergence unions such as draining, heating power, combustion gas, electric power, communication, broadcasting and TV, and the facilities such as special access hole, dog-house are set, unified implementation management, save pipeline self independently structure and soil excavation, can the utilizing space resources of active set reduction.Its advantage is: once excavate, and concentrates construction, avoids same section and repeats excavation; Greatly facilitate maintenance and the maintenance of the urban operating mechanisms such as electric power, communication, combustion gas, water supply and draining, reduce the maintenance cost of expense and the utilities pipeline repeatedly overhauled on road surface, maintain the integrality on road surface and the durability of all kinds of pipeline; Decrease the roofbolt of road and the manhole, room etc. of various pipeline, the graceful view in city; Pipe gallery gut line compact and reasonable arrangement, effectively make use of the space under road, has saved urban land.The General Office of the State Council in 2014 issues " instruction about strengthening City Buried Pipeline implementation management " (Office of the State Council is sent out (2014) No. 27), clearly propose to move forward steadily the construction of Urban Underground pipe gallery, carry out underground pipe gallery pilot project in multiple big and medium-sized cities.
No matter existing pipe gallery is monolithic pipe gallery or pin-connected panel pipe gallery, all need to lift with Large-scale Hoisting equipment when installing, therefore a large amount of spaces can be taken, considerable influence is produced to road, some construction site needs to build temporary road, cause the construction period long, integrated cost is high, but some construction site does not especially possess the condition of building temporary road in urban district.
Summary of the invention
A kind of prefabricated pipe gallery crane gear is the object of the present invention is to provide to utilize piping lane top board to do the mounting method of passage, to solve the problem proposed in above-mentioned background technology.
For achieving the above object, the invention provides following technical scheme:
A kind of prefabricated pipe gallery construction method, it is characterized in that: a kind of prefabricated pipe gallery crane gear utilizes piping lane top board to do the construction method of passage, and it is constructed according to following steps: (1) prefabricated pipe gallery line setting; (2) the prefabricated piping lane base plate of first segment is installed; (3) the prefabricated piping lane side plate of first segment, riser are installed, mounting of roof plate; (4) the prefabricated pipe gallery of first segment to have circulated the installation of certain length piping lane that the vehicle that meets crane gear and the prefabricated piping lane component of transport travels successively according to above step after installing; (5) backfilling of earthwork; (6) crane gear be located in piping lane is installed top board on, carry out prefabricated component assembling of next pipe joint corridor; (7) prefabricated piping lane component conveying equipment walks in required component of round transporting on mounted piping lane top board; (8) circulate successively according to above step whole for the piping lane of construction section Components installation completed.
All assemblings of wherein said a kind of prefabricated pipe gallery, erection work make use of the top board of the prefabricated piping lane of installation as hoisting and hanging, component conveying passage.
Wherein said tyre crane, crawler crane, straddle truck etc. all be suitable for installing prefabricated piping lane crane gear operated in by temporary road and install on piping lane pad top board.
The base plate of wherein said prefabricated pipe gallery is transported in crane gear working range and the base plate carrying out the prefabricated pipe gallery of first segment is installed.
Wherein said tyre crane, all crane gears be applicable to such as crawler crane, straddle truck are located on mounted prefabricated pipe gallery top board prefabricated units, carry out next pipe joint corridor base plate prefabricated unit and install.
Wherein said prefabricated piping lane component conveying equipment walks on mounted piping lane top board, the prefabricated piping lane component needed for round transport lifting.
Compared with prior art, advantage of the present invention is: the present invention adopts mounted piping lane top board as interim transporting and hoisting passage, do not need to build temporary road, the construction period is short, integrated cost is low, is specially adapted to do not possess the construction site building temporary road in urban district.
Accompanying drawing explanation
Fig. 1 is bed course placement positioning line schematic diagram
Fig. 2 is crane gear schematic diagram in place
Fig. 3 is for installing first segment piping lane base plate schematic diagram
Fig. 4 is first segment piping lane side plate scheme of installation
Fig. 5 is first segment piping lane riser scheme of installation
Fig. 6 is first segment piping lane mounting of roof plate schematic diagram
Fig. 7 is that first segment piping lane installs design sketch
Fig. 8 is the piping lane design sketch of the certain length installing completion
Fig. 9 is that crane gear and piping lane component conveying equipment travel schematic diagram on the top board installing piping lane
Figure 10 is that crane gear is hung oneself at piping lane lamp plate and loaded the component schematic diagram of a pipe joint corridor
Figure 11 is that a prefabricated pipe gallery of construction section installs design sketch
Figure 12 is pipe gallery construction method flow chart;
In figure, 1, position line, 2, hanging device example, 3, piping lane base plate, 4, base plate install, 5, side plate install, 6, riser install, 7, mounting of roof plate, 8, a pipe joint corridor of installation, 9, the piping lane of installation certain length, 10, crane gear and haulage device travel on piping lane top board, 11, install next pipe joint corridor, 12 install the pipe gallery completed
Detailed description of the invention
In order to clearly demonstrate skill of the present invention point, below by detailed description of the invention, and in conjunction with its accompanying drawing, the present invention will be described in detail.
See the construction of Fig. 1 concrete cushion, prefabricated pipe gallery line setting.
See Fig. 2 tyre crane, all crane gears be applicable to such as crawler crane, straddle truck are in place, and the base plate of prefabricated pipe gallery is transported in crane gear working range.
Base plate prefabricated units see the prefabricated pipe gallery of Fig. 3 first segment are installed.
Side plate see the prefabricated pipe gallery of Fig. 4 first segment is installed.
Riser see the prefabricated pipe gallery of Fig. 5 first segment is installed.
See the mounting of roof plate of the prefabricated pipe gallery of Fig. 6 first segment.
Install see the prefabricated pipe gallery of Fig. 7 first segment.
The pipe gallery of certain length is installed according to above step successively see Fig. 8.
See Fig. 9 tyre crane, all crane gears be applicable to such as crawler crane, straddle truck and piping lane component conveying equipment are located on the piping lane top board of installation.
See Figure 10, Figure 11 tyre crane, the installation of next pipe joint corridor is carried out, until the prefabricated pipe gallery of a construction section installs on the piping lane top board that all crane gears be applicable to such as crawler crane, straddle truck and piping lane component conveying equipment are located in installation.
Be pipe gallery construction method flow process see Figure 12
Above-mentioned detailed description of the invention can not as limiting the scope of the invention, and for those skilled in the art, any alternate modification make embodiment of the present invention or conversion all drop in protection scope of the present invention.
The present invention does not describe part in detail, is the known technology of those skilled in the art of the present technique.

Claims (6)

1. a prefabricated pipe gallery construction method, it is characterized in that: a kind of prefabricated pipe gallery crane gear utilizes piping lane top board to do the construction method of passage, and it is constructed according to following steps: (1) prefabricated pipe gallery line setting; (2) the prefabricated piping lane base plate of first segment is installed; (3) the prefabricated piping lane side plate of first segment, riser are installed, mounting of roof plate; (4) the prefabricated pipe gallery of first segment to have circulated the installation of certain length piping lane that the vehicle that meets crane gear and the prefabricated piping lane component of transport travels successively according to above step after installing; (5) backfilling of earthwork; (6) crane gear be located in piping lane is installed top board on, carry out prefabricated component assembling of next pipe joint corridor; (7) prefabricated piping lane component conveying equipment walks in required component of round transporting on mounted piping lane top board; (8) circulate successively according to above step whole for the piping lane of construction section Components installation completed.
2. the prefabricated pipe gallery construction method of one according to claim 1, is characterized in that: all assemblings of a kind of prefabricated pipe gallery, erection work make use of the top board of the prefabricated piping lane of installation as hoisting and hanging, component conveying passage.
3. the prefabricated pipe gallery construction method of one according to claim 1, it is characterized in that: tyre crane, crawler crane, straddle truck etc. all be suitable for installing prefabricated piping lane crane gear operated in by temporary road and install on piping lane pad top board.
4. the prefabricated pipe gallery construction method of one according to claim 1, is characterized in that: the base plate of prefabricated pipe gallery is transported in crane gear working range and the base plate carrying out the prefabricated pipe gallery of first segment is installed.
5. the prefabricated pipe gallery construction method of one according to claim 1, it is characterized in that: tyre crane, all crane gears be applicable to such as crawler crane, straddle truck are located on mounted prefabricated pipe gallery top board prefabricated units, carry out next pipe joint corridor base plate prefabricated unit and install.
6. the prefabricated pipe gallery construction method of one according to claim 1, is characterized in that: prefabricated piping lane component conveying equipment walks on mounted piping lane top board, the prefabricated piping lane component needed for round transport lifting.
CN201610084261.5A 2016-02-06 2016-02-06 Construction method for assembled prefabricated comprehensive pipe rack Pending CN105544606A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610084261.5A CN105544606A (en) 2016-02-06 2016-02-06 Construction method for assembled prefabricated comprehensive pipe rack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610084261.5A CN105544606A (en) 2016-02-06 2016-02-06 Construction method for assembled prefabricated comprehensive pipe rack

Publications (1)

Publication Number Publication Date
CN105544606A true CN105544606A (en) 2016-05-04

Family

ID=55824126

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610084261.5A Pending CN105544606A (en) 2016-02-06 2016-02-06 Construction method for assembled prefabricated comprehensive pipe rack

Country Status (1)

Country Link
CN (1) CN105544606A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106638687A (en) * 2016-11-16 2017-05-10 吉林省天祥建筑材料有限公司 Foundation-aid accurate and quick assembly technique for prefabricated assembly of comprehensive pipe rack
CN107268376A (en) * 2017-08-11 2017-10-20 上海市城市建设设计研究总院(集团)有限公司 The precast assembly pavement structure integrated with pipe gallery
CN109811793A (en) * 2019-03-22 2019-05-28 中冶京诚工程技术有限公司 Prefabricated pipe saves mobile factory and prefabricated tube coupling production method
CN109881707A (en) * 2019-03-20 2019-06-14 中国十七冶集团有限公司 A kind of assembled piping lane foundation pit structure and its construction method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106638687A (en) * 2016-11-16 2017-05-10 吉林省天祥建筑材料有限公司 Foundation-aid accurate and quick assembly technique for prefabricated assembly of comprehensive pipe rack
CN106638687B (en) * 2016-11-16 2018-12-14 吉林省天祥建筑材料有限公司 A kind of accurate quick-assembling technique of precast assembly pipe gallery
CN107268376A (en) * 2017-08-11 2017-10-20 上海市城市建设设计研究总院(集团)有限公司 The precast assembly pavement structure integrated with pipe gallery
CN109881707A (en) * 2019-03-20 2019-06-14 中国十七冶集团有限公司 A kind of assembled piping lane foundation pit structure and its construction method
CN109811793A (en) * 2019-03-22 2019-05-28 中冶京诚工程技术有限公司 Prefabricated pipe saves mobile factory and prefabricated tube coupling production method
CN109811793B (en) * 2019-03-22 2024-02-06 中冶京诚工程技术有限公司 Mobile factory for prefabricating pipe joints and prefabricating pipe joint production method

Similar Documents

Publication Publication Date Title
CN105544606A (en) Construction method for assembled prefabricated comprehensive pipe rack
CN204898721U (en) Steel construction city utility tunnel
CN105544605A (en) Modular assembly type comprehensive pipe gallery
CN105756087A (en) Assembling-type anchoring structure for adjacent plates of prefabricated comprehensive pipe rack
CN206090610U (en) Utility tunnel system
CN105401593A (en) Assembly type square underground pipe gallery
CN114508867A (en) Photovoltaic-pumped storage-geothermal combined development and utilization system for abandoned coal mine and construction method
CN205776342U (en) A kind of prefabricated pipe gallery tube coupling attachment structure
CN105507346A (en) Prefabricated underground pipe gallery
CN105672351A (en) Construction method of buckling connection type prefabricated ribbed bar concrete comprehensive pipe rack structure
CN105625469A (en) Construction method for assembly type prefabricated comprehensive pipe gallery
CN105569075A (en) Assembled prefabricated comprehensive pipe rack guide positioning device
CN105735353A (en) Prefabricated comprehensive pipe gallery
CN104455889A (en) Integrated underground pipe gallery with compensation device
CN205296229U (en) Sewer manhole in utility tunnel
CN205954678U (en) Prefabricated utility tunnel hoisting point structure of assembled
CN105484291A (en) Unilaterally-expanded comprehensive pipe gallery joint structure
CN105569074A (en) Assembly type prefabricated comprehensive pipe rack pipe joint connecting structure
CN211057848U (en) Circular utility tunnel extensible structure of individual layer
CN216897881U (en) Photovoltaic-pumped storage-geothermal combined development and utilization system for abandoned coal mine
RU83280U1 (en) PIT DRILLING RIG
CN113482046A (en) Pipe gallery segment installation construction system and method
CN105971017A (en) Supporting type pipe rack structure
CN204098066U (en) The square underground pipe gallery of assembling
CN202220345U (en) Drain pipe system below community driveway

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160504

WD01 Invention patent application deemed withdrawn after publication