CN105544596A - Assembling type open caisson protective casing for deep foundation pit field tower crane foundation construction - Google Patents

Assembling type open caisson protective casing for deep foundation pit field tower crane foundation construction Download PDF

Info

Publication number
CN105544596A
CN105544596A CN201610106950.1A CN201610106950A CN105544596A CN 105544596 A CN105544596 A CN 105544596A CN 201610106950 A CN201610106950 A CN 201610106950A CN 105544596 A CN105544596 A CN 105544596A
Authority
CN
China
Prior art keywords
arc
junction plate
protective casing
open caisson
casing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610106950.1A
Other languages
Chinese (zh)
Other versions
CN105544596B (en
Inventor
彭宝安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Qiankun Road And Bridge Engineering Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610106950.1A priority Critical patent/CN105544596B/en
Publication of CN105544596A publication Critical patent/CN105544596A/en
Application granted granted Critical
Publication of CN105544596B publication Critical patent/CN105544596B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/44Foundations for machines, engines or ordnance
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D23/00Caissons; Construction or placing of caissons
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/18Foundations formed by making use of caissons
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

The invention provides an assembling type open caisson protective casing for deep foundation pit field tower crane foundation construction. The assembling type open caisson protective casing is mainly used for tower crane foundation construction of constructional engineering. The assembling type open caisson protective casing is mainly composed of arc-shaped plates, connecting plates and horizontal supporting beams. Bolts penetrate through connecting holes B of the connecting plates and connecting holes C of the arc-shaped plates, and nuts are tightened, so that two arc-shaped plates are connected, similarly the third arc-shaped plate is connected, and the three arc-shaped plates are connected to form one open caisson protective casing section; the lower ends of the arc-shaped plates of the former protective casing section is inserted into connecting grooves in the upper ends of the arc-shaped plates of the next protective casing section, and then the upper protective casing section and the lower protective casing section are connected. Bolts penetrate through bolt holes in the ends of the horizontal supporting beams and penetrate through connecting holes A of supporting beam connecting plates, the bolts are tightened by nuts, the first horizontal supporting beam is connected with the connecting plates, the other two horizontal supporting beams are connected with the connecting plates in the same way, and a horizontal supporting system of the protective casing is formed by the three horizontal supporting beams. Thus, standard knots of the protective casing are obtained, and the other protective casing sections are installed in the same way.

Description

The pin-connected panel open caisson casing of a kind of deep foundation ditch place tower crane construction
Technical field
the present invention is mainly used in the tower crane construction of construction work, also can be used for small-sized open caisson construction, belongs to building engineering construction field.
Background technology
At building engineering field, when general construction highrise building and annex, first to need to construct before deep pit digging tower crane, again tower crane is installed, to provide vertical transport and horizontal transport in follow-up deep pit digging and brace summer work progress, this situation ubiquity in modern construction engineering.General tower crane form of construction work is castinplace pile of first constructing, then is connected with filling pile head at natural ground level right position construction tower crane, forms the foundational system of tower crane, reaches absolutely, then install tower crane until tower crane concrete strength.In follow-up Deep Excavation, the castinplace pile supporting tower crane can expose outside soil layer, and construction equipment, particularly excavator may collide castinplace pile, obviously there is potential safety hazard; After building underground engineering construction completes dismounting tower crane, need again to remove tower crane and castinplace pile, time-consuming, extremely uneconomical.
Summary of the invention
the invention solves the problems referred to above, it utilizes open caisson construction principle, first 3 arc (1) combinations are mounted to a joint open caisson casing, often saving in casing merogenesis excavation, merogenesis sinking casing also installs next joint casing, until casing lower end sinks down into below deep foundation ditch floor, and tower crane of constructing in open caisson casing, be actually and current tower crane is moved to below deep foundation ditch floor by ground, avoid filling pile construction; When tower crane concrete strength reaches absolutely, in open caisson casing, merogenesis installs tower crane tower body until go out outside open caisson casing, continues outward to install tower crane tower body to whole tower crane installation at open caisson casing; When deep pit digging thereafter, open caisson casing can protect again tower crane tower body not collided by excavator, eliminates potential safety hazard; When building underground engineering construction is complete need dismantle tower crane time, only need dismantle tower crane and open caisson casing, tower crane is then embedded in below deep foundation ditch floor, and the open caisson casing of dismounting can also reuse, and saves a large amount of operating expenses.
the current tower crane of China generally adopts long 6 meters, the square foundation of wide 6 meters, certainly other base form is also had, for the ease of versatility of the present invention, tower crane of the present invention can be designed to the circular foundation of diameter 7 meters, open caisson casing is designed to the cylinder of diameter 7 meters equally, as the template of circular tower crane, can save foundation forms expense; Install for the ease of transport, the present invention is mounted to often to save open caisson casing by the combination of 3 arcs (1), often save open caisson casing height about about 2 meters, so the every sheet arc length about 7 meters of arc of the present invention (1), height 2 meters, thickness about 20 millimeters (thickness need be determined by design), weight about 2 tons, meet the requirement of urban road transport completely, the whole component of the present invention all can be mass, and can reduce manufacturing cost.
the present invention often saves open caisson casing and is connected to form by 3 arcs (1) and junction plate (2), adds 3 horizontal shore (3) composition horizontal struts systems, can form triangular support, reasonable stress, save material; In addition, the horizontal support that 3 horizontal shores (3) form, does not affect the installation of inter-chamber tower tower crane body.Certainly, open caisson casing also can be made up of 1,2 or multi-disc arc (1), does not affect essentiality content of the present invention.
the present invention is primarily of arc (1), junction plate (2), horizontal shore (3) composition; There is multiple connecting hole C(11 at arc (1) two ends); Junction plate (2) has multiple connecting hole B(7); Brace summer junction plate (8) is welded on junction plate (2), and brace summer junction plate (8) is with connecting hole A(4); Link slot (9) is welded on the upper end of arc (1), installs waterstop (10) in groove; Bolt (5) is through the connecting hole B(7 of junction plate (2)), the connecting hole C(11 of arc (1)) and tightening nuts (6) two panels arc (1) is connected, use the same method the 3rd arc (1) connection, three arcs (1) are connected to form a joint open caisson casing; The lower end of the arc (1) of a upper joint casing is inserted in next link slot (9) saving arc (1) upper end of casing and completes the connection saving casing up and down; There is bolt hole at horizontal shore (3) two ends, bolt is passed the bolt hole of horizontal shore (3) termination also through the connecting hole A(4 of brace summer junction plate (8)), tight a bolt connecting of first horizontal shore (3) and junction plate (2) with nut, use the same method and all the other two horizontal shores (3) to be connected with junction plate (2), three horizontal shores (3) form the horizontal struts system of casings; Need to illustrate: when junction plate (2) is connected with arc (1), between two plates, sealing rod is installed, prevents Groundwater infiltration; Bolt (5), nut (6) are all provided with water stop spacer with the contact surface of arc (1), junction plate (2), prevent Groundwater infiltration.
Accompanying drawing explanation
description of reference numerals: 1-arc, 2-junction plate, 3-horizontal shore, 4-connecting hole A, 5-bolt, 6-nut, 7-connecting hole B, 8-brace summer junction plate, 9-link slot, 10-waterstop, 11-connecting hole C.
fig. 1 is top view of the present invention.
fig. 2 is the drawing that arc of the present invention (1) is connected with junction plate (2).
fig. 3 is the elevation of junction plate of the present invention (2).
fig. 4 is that arc of the present invention (1) connects drawing up and down.
fig. 5 is the splicing part elevation figure of the adjacent two panels arc (1) of the present invention.
Detailed description of the invention
below in conjunction with accompanying drawing, the specific embodiment of the present invention is described.
see Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, first place, smooth open caisson position, lifting two panels arc (1), between junction plate (2) and the surface of arc (1), rubber fastening band is installed, by the connecting hole B(7 of bolt (5) through junction plate (2)), the connecting hole C(11 of arc (1)) and nut of screwing on (6) two panels arc (1) is connected, lift the 3rd arc (1) again, use the same method and be connected to form first segment open caisson casing with previous two panels arc (1), the earthwork in excavation open caisson, open caisson casing is sunk, after sinking to a joint casing height, waterstop (10) is arranged in the link slot (9) of first segment open caisson casing, again the lower end of second section casing arc (1) is inserted in the link slot (9) of first segment casing arc (1) upper end, the earthwork of second section height will be excavated and the second section casing that sinks in casing after 3 arcs (1) connections, use the same method and successively Section of three casing is installed, earth excavation and sinking casing are until casing lower end sinks down into design elevation, build bottom concrete, form the sealing hoistway of a safety.After open caisson drops to certain altitude, earth lateral pressure, by increasing, needs in heavy casing, install horizontal shore (3), and horizontal shore (3) two ends bolt is by connecting hole A(4) be connected to form horizontal struts system with junction plate (2); Certainly, for the sake of security, after well sinking completes, whole horizontal shores (3) should be installed; Finally, tower crane of constructing in open caisson, installs tower crane.When follow-up deep pit digging, open caisson casing can expose outside soil layer completely, and tower crane tower body can be protected not collided by excavator for casing or other facility collide, and eliminates potential safety hazard.When building underground engineering construction is complete need dismantle tower crane time, first need dismantle tower crane, more from top to bottom dismantle the horizontal shore (3) and arc (1) that often save casing successively, until all dismantled.

Claims (1)

1. a pin-connected panel open caisson casing for deep foundation ditch place tower crane construction, is characterized in that: it is primarily of arc (1), junction plate (2), horizontal shore (3) composition; There is multiple connecting hole C(11 at arc (1) two ends); Junction plate (2) has multiple connecting hole B(7); Brace summer junction plate (8) is welded on junction plate (2), and brace summer junction plate (8) is with connecting hole A(4); Link slot (9) is welded on the upper end of arc (1), installs waterstop (10) in groove; Bolt (5) is through the connecting hole B(7 of junction plate (2)), the connecting hole C(11 of arc (1)) and tightening nuts (6) two panels arc (1) is connected, use the same method the 3rd arc (1) connection, three arcs (1) are connected to form a joint open caisson casing; The lower end of the arc (1) of a upper joint casing is inserted in next link slot (9) saving arc (1) upper end of casing and completes the connection saving casing up and down; There is bolt hole at horizontal shore (3) two ends, bolt is passed the bolt hole of horizontal shore (3) termination also through the connecting hole A(4 of brace summer junction plate (8)), tight a bolt connecting of first horizontal shore (3) and junction plate (2) with nut, use the same method and all the other two horizontal shores (3) to be connected with junction plate (2), three horizontal shores (3) form the horizontal struts system of casings; Need to illustrate: when junction plate (2) is connected with arc (1), between two plates, sealing rod is installed; Bolt (5), nut (6) are all provided with water stop spacer with the contact surface of arc (1), junction plate (2).
CN201610106950.1A 2016-02-28 2016-02-28 Assembling type open caisson protective casing for deep foundation pit field tower crane foundation construction Expired - Fee Related CN105544596B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610106950.1A CN105544596B (en) 2016-02-28 2016-02-28 Assembling type open caisson protective casing for deep foundation pit field tower crane foundation construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610106950.1A CN105544596B (en) 2016-02-28 2016-02-28 Assembling type open caisson protective casing for deep foundation pit field tower crane foundation construction

Publications (2)

Publication Number Publication Date
CN105544596A true CN105544596A (en) 2016-05-04
CN105544596B CN105544596B (en) 2017-04-26

Family

ID=55824116

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610106950.1A Expired - Fee Related CN105544596B (en) 2016-02-28 2016-02-28 Assembling type open caisson protective casing for deep foundation pit field tower crane foundation construction

Country Status (1)

Country Link
CN (1) CN105544596B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108677872A (en) * 2018-06-13 2018-10-19 中铁十六局集团第三工程有限公司 The changeover portion template sealing component and construction method that binder assembles in a kind of suitable water

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201180270Y (en) * 2008-04-10 2009-01-14 中交第二公路工程局有限公司 Assembled arcuated plugging plate
CN203684216U (en) * 2013-12-13 2014-07-02 中国一冶集团有限公司 Spliced pile casing for cast-in-situ bored pile
CN203684217U (en) * 2013-12-20 2014-07-02 中国一冶集团有限公司 Assembly-type pile casing for pile foundation construction
KR101420702B1 (en) * 2013-05-24 2014-07-22 용호건설(주) Casing assembly cinbined flange and sheet pile building method using thereof
CN204370415U (en) * 2014-10-23 2015-06-03 中国二十冶集团有限公司 Artificial rock drilling protection combination steel pile casting at the bottom of hole
KR101571648B1 (en) * 2015-04-07 2015-11-24 백진명 Retaining wall construction method using precast pile attached wale supporting member

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201180270Y (en) * 2008-04-10 2009-01-14 中交第二公路工程局有限公司 Assembled arcuated plugging plate
KR101420702B1 (en) * 2013-05-24 2014-07-22 용호건설(주) Casing assembly cinbined flange and sheet pile building method using thereof
CN203684216U (en) * 2013-12-13 2014-07-02 中国一冶集团有限公司 Spliced pile casing for cast-in-situ bored pile
CN203684217U (en) * 2013-12-20 2014-07-02 中国一冶集团有限公司 Assembly-type pile casing for pile foundation construction
CN204370415U (en) * 2014-10-23 2015-06-03 中国二十冶集团有限公司 Artificial rock drilling protection combination steel pile casting at the bottom of hole
KR101571648B1 (en) * 2015-04-07 2015-11-24 백진명 Retaining wall construction method using precast pile attached wale supporting member

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108677872A (en) * 2018-06-13 2018-10-19 中铁十六局集团第三工程有限公司 The changeover portion template sealing component and construction method that binder assembles in a kind of suitable water
CN108677872B (en) * 2018-06-13 2024-06-11 中铁十六局集团第三工程有限公司 Transition section template water stop assembly suitable for assembly of underwater tie beam and construction method

Also Published As

Publication number Publication date
CN105544596B (en) 2017-04-26

Similar Documents

Publication Publication Date Title
KR20210130725A (en) Reinforcement device and method for local freezing reinforcement in deep pits in gravel strata containing large amounts of water
CN100564700C (en) The job practices of lattice type steel column tower crane pedestal
CN205776249U (en) A kind of combined inner supporting structure
CN105155569A (en) Construction device and method for offshore wind turbine foundation with piling performed later
CN102434717B (en) Construction method of joist steel pipe-jacking work pit
CN103938634B (en) A kind of deep foundation pit supporting structure and construction method
CN103114595A (en) Support method and device of support pile preformed core-soil double-buttress inclined inner-strut foundation ditch
CN104264683B (en) Building concave shape ultra-deep foundation pit subregion supporting method is protected for three around literary composition
CN205024712U (en) Combined tower crane foundation
CN103572770B (en) A kind of stake case hydraulic structures and construction method thereof
CN203716046U (en) Steel trestle for earthwork transportation of foundation pit
CN203654309U (en) Pile-caisson hydraulic structure
CN103615253B (en) Shield cutter service work well suspension device and equipment
CN102220764B (en) Construction method of deep foundation pit bracing system
CN203655298U (en) Supporting device and equipment for maintenance working well of cutter head of shield tunneling machine
CN110984168B (en) Combined foundation pit supporting pile structure
CN209941754U (en) High-voltage power pipe culvert in-situ protection structure
CN209923935U (en) Co-location combined pile wall supporting structure in upper-soft and lower-hard stratum
CN204851265U (en) Bearing structure in work well under high water pressure condition
CN105544596A (en) Assembling type open caisson protective casing for deep foundation pit field tower crane foundation construction
CN204059341U (en) Bamboo joint type mortar pile
CN211498875U (en) Foundation pit supporting system
CN108005119A (en) The integrated concrete pipe gallery in braced wall corridor and its installation method
CN103215965A (en) Laminate type high-rise platform pile tower crane foundation and construction method
CN205421274U (en) Braced system is gone along with sb. to guard him to circulated use, pin -connected panel all steel foundation ditch

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20160804

Address after: 430064, Wuhan, Hubei province Hongshan District lion mountain street, school 84, 73, 7, 2 room

Applicant after: WUHAN CHUANGXIAN PATENTED TECHNOLOGY SERVICES CO.,LTD.

Address before: 430064 Wuhan Institute of education, Hongshan 712 District, Hubei, China

Applicant before: Peng Baoan

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20161012

Address after: Room 2, building 457, Huangpu Road, Huangdao, Shandong, Qingdao, 266555, China

Applicant after: QINGDAO LANTIAN CHUANGXIAN TECHNOLOGY SERVICE CO.,LTD.

Address before: 430064, Wuhan, Hubei province Hongshan District lion mountain street, school 84, 73, 7, 2 room

Applicant before: WUHAN CHUANGXIAN PATENTED TECHNOLOGY SERVICES CO.,LTD.

CB03 Change of inventor or designer information

Inventor after: Zhang Wei

Inventor after: Peng Baoan

Inventor before: Peng Baoan

COR Change of bibliographic data
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20190813

Address after: 453300 Enterprise Service Center of Industrial Agglomeration Area at the Intersection of Fengqiu County Industrial Road and Industrial Third Road, Xinxiang City, Henan Province

Patentee after: HENAN QIANKUN ROAD AND BRIDGE ENGINEERING Co.,Ltd.

Address before: Room 2, building 457, Huangpu Road, Huangdao, Shandong, Qingdao, 266555, China

Patentee before: QINGDAO LANTIAN CHUANGXIAN TECHNOLOGY SERVICE CO.,LTD.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170426

CF01 Termination of patent right due to non-payment of annual fee