CN105542496B - Uncured rubber-asphalt waterproof material and preparation method thereof - Google Patents

Uncured rubber-asphalt waterproof material and preparation method thereof Download PDF

Info

Publication number
CN105542496B
CN105542496B CN201610125150.4A CN201610125150A CN105542496B CN 105542496 B CN105542496 B CN 105542496B CN 201610125150 A CN201610125150 A CN 201610125150A CN 105542496 B CN105542496 B CN 105542496B
Authority
CN
China
Prior art keywords
parts
asphalt
waterproof material
agent
asphalt waterproof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610125150.4A
Other languages
Chinese (zh)
Other versions
CN105542496A (en
Inventor
翟根旺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Jiaotou Special Materials Technology Co.,Ltd.
Hengshui Hengfeng Yick Road Asphalt Science & Technology Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610125150.4A priority Critical patent/CN105542496B/en
Publication of CN105542496A publication Critical patent/CN105542496A/en
Application granted granted Critical
Publication of CN105542496B publication Critical patent/CN105542496B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C08ORGANIC MACROMOLECULAR COMPOUNDS; THEIR PREPARATION OR CHEMICAL WORKING-UP; COMPOSITIONS BASED THEREON
    • C08LCOMPOSITIONS OF MACROMOLECULAR COMPOUNDS
    • C08L95/00Compositions of bituminous materials, e.g. asphalt, tar, pitch
    • CCHEMISTRY; METALLURGY
    • C08ORGANIC MACROMOLECULAR COMPOUNDS; THEIR PREPARATION OR CHEMICAL WORKING-UP; COMPOSITIONS BASED THEREON
    • C08JWORKING-UP; GENERAL PROCESSES OF COMPOUNDING; AFTER-TREATMENT NOT COVERED BY SUBCLASSES C08B, C08C, C08F, C08G or C08H
    • C08J11/00Recovery or working-up of waste materials
    • C08J11/04Recovery or working-up of waste materials of polymers
    • C08J11/10Recovery or working-up of waste materials of polymers by chemically breaking down the molecular chains of polymers or breaking of crosslinks, e.g. devulcanisation
    • C08J11/18Recovery or working-up of waste materials of polymers by chemically breaking down the molecular chains of polymers or breaking of crosslinks, e.g. devulcanisation by treatment with organic material
    • C08J11/28Recovery or working-up of waste materials of polymers by chemically breaking down the molecular chains of polymers or breaking of crosslinks, e.g. devulcanisation by treatment with organic material by treatment with organic compounds containing nitrogen, sulfur or phosphorus
    • CCHEMISTRY; METALLURGY
    • C08ORGANIC MACROMOLECULAR COMPOUNDS; THEIR PREPARATION OR CHEMICAL WORKING-UP; COMPOSITIONS BASED THEREON
    • C08JWORKING-UP; GENERAL PROCESSES OF COMPOUNDING; AFTER-TREATMENT NOT COVERED BY SUBCLASSES C08B, C08C, C08F, C08G or C08H
    • C08J2317/00Characterised by the use of reclaimed rubber
    • CCHEMISTRY; METALLURGY
    • C08ORGANIC MACROMOLECULAR COMPOUNDS; THEIR PREPARATION OR CHEMICAL WORKING-UP; COMPOSITIONS BASED THEREON
    • C08LCOMPOSITIONS OF MACROMOLECULAR COMPOUNDS
    • C08L2205/00Polymer mixtures characterised by other features
    • C08L2205/03Polymer mixtures characterised by other features containing three or more polymers in a blend
    • C08L2205/035Polymer mixtures characterised by other features containing three or more polymers in a blend containing four or more polymers in a blend
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P20/00Technologies relating to chemical industry
    • Y02P20/50Improvements relating to the production of bulk chemicals
    • Y02P20/52Improvements relating to the production of bulk chemicals using catalysts, e.g. selective catalysts
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/62Plastics recycling; Rubber recycling

Abstract

The invention discloses a kind of uncured rubber-asphalt waterproof material and preparation method thereof, uncured rubber-asphalt waterproof material, include the raw materials of following parts by weight:5 15 parts of 30 70 parts of basic asphalt, 15 40 parts of waste tyre rubber powder, 0.25 1.0 parts of solution sulphur agent, 0.8 4 parts of composite modifier, 0.5 5 parts of softening agent, 0.25 3 parts of crosslinking agent and filler, the wherein particle diameter of waste tyre rubber powder is 20 80 mesh;Preparation method comprises the following steps:Raw material prepares, hot melt, mixture homogenization;Crosslinking agent and filler are finally added into conservation tank successively according to above-mentioned parts by weight, and uncured rubber-asphalt waterproof material is formed after being stirred 15 20 minutes;The present invention by waste tyre rubber powder directly in hard pitch medium by solving the effect of sulphur agent through high cutting homogenizer circulation shear desulfurization, rubber molecule is set to be dispersed in linear structure in asphalt system, then the effect of crosslinking agent is passed through, with forming stable solid netted colloform texture together with filler, properties of product are more stable.

Description

Uncured rubber-asphalt waterproof material and preparation method thereof
Technical field
The present invention relates to waterproof building material technical field, more particularly to a kind of uncured rubber-asphalt waterproof material and its preparation Method.
Background technology
According to incompletely statistics, China's damaged tire yield in 2014 reaches up to ten million tons, and large-scale junked tire is to the mankind Living environment cause serious black pollution.Harmless treatment to junked tire using be social development there is an urgent need to
Transportation industry is used for highway construction and maintenance construction using waste tyre rubber powder as asphalt modifier at present turns into hair Exhibition trend, but it is limited to existing technical merit, or being the simple swelling mixing of rubber powder and pitch, rubber powder is deposited as just filler Used in asphalt system, its performance is not in full use;Modified technique is complicated, and rubber powder needs highly energy-consuming, high dirt The desulfurization process of dye, higher production cost constrain waste tyre rubber powder and used in the large area of highway industry.
In industry and residential construction area, otherwise conventional waterproof material can not meet that structure causes to the needs of deformation quantity Waterproof fails, or cost is high, durability can not meet that the pot life of structure requires.Therefore, it is badly in need of developing a kind of property Valency is than high, good endurance waterproof material.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of uncured rubber-asphalt waterproof material, and waste tyre rubber powder is straight It is connected in hard pitch medium by the effect that solves sulphur agent through high cutting homogenizer circulation shear desulfurization, makes rubber molecule with linear Even structure is dispersed in asphalt system, and then by the effect of crosslinking agent, stable solid netted glue is formed together with filler Body structure, properties of product are more stable.
The technical problems to be solved by the invention are to additionally provide a kind of side for preparing uncured rubber-asphalt waterproof material Method, it can avoid needing complex process caused by first waste tyre rubber powder desulfurization is reused, cost high in conventional produce Shortcoming, while avoid the defects of waste tyre rubber powder can not directly give full play to the miscible caused performance of pitch.
In order to solve the above technical problems, the technical solution used in the present invention is:A kind of uncured rubber-asphalt waterproof material Material, include the raw material of following parts by weight:Basic asphalt 30-70 parts, waste tyre rubber powder 15-40 parts, sulphur agent 0.25-1.0 parts are solved, Composite modifier 0.8-4 parts, softening agent 0.5-5 parts, crosslinking agent 0.25-3 parts and filler 5-15 parts, the wherein grain of waste tyre rubber powder Footpath is 20-80 mesh.
The basic asphalt is bi tumenf orr oad, tar asphalt or crude oil catalytic slurry.
The solution sulphur agent is pentachlorothiophenol or diphenyl disulfide.
The composite modifier be styrene-butadiene block copolymer, PSB, polyethylene, One or more kinds of combinations in polypropylene and its derivative.
The softening agent is one in aromatic naphtha, Petropols and catalytic cracked oil pulp, tall oil, pine tar and coal tar Kind or two or more combinations.
The crosslinking agent is tetramethylthiuram disulfide.
The filler be particle diameter not less than in the carbon blacks of 325 mesh, clay, calcium carbonate, bentonite it is one or two kinds of with On combination.
In order to solve the above technical problems, the present invention also adopts the technical scheme that providing one kind prepares uncured rubber asphalt The method of waterproof material, comprises the following steps:The first step:Raw material prepares, and prepares raw material by following parts by weight according to total amount:Base Plinth pitch 30-70 parts, waste tyre rubber powder 15-40 parts, solve sulphur agent 0.25-1.0 parts, composite modifier 0.8-4 parts, softening agent 0.5- 5 parts, crosslinking agent 0.25-3 parts and filler 5-15 parts, the wherein particle diameter of waste tyre rubber powder is 20-80 mesh;
Second step:Hot melt, basic asphalt is added in the agitator tank with heating function by above-mentioned parts by weight, and progressively 180 DEG C -200 DEG C are warming up to, the waste tyre rubber powders of above-mentioned parts by weight, solution sulphur agent are sequentially added in heating process, compound is changed Property agent and softening agent, after heating-up temperature reaches 180 DEG C -200 DEG C, insulated and stirred 35-50 minutes form colloid;
3rd step:Mixture homogenization, the mixture high cutting homogenizer circulation shear that second step is formed, is sheared to colloid Surface it is smooth without obvious rubber particle when, by colloid be pumped into agitating function conservation tank;
4th step:Crosslinking agent and filler are added into conservation tank successively according to above-mentioned parts by weight, and are stirred 15-20 points Uncured rubber-asphalt waterproof material is formed after clock.
It is using beneficial effect caused by above-mentioned technical proposal:Waste tyre rubber powder in the waterproof material is directly in height Make rubber molecule equal with linear structure through high cutting homogenizer circulation shear desulfurization by the effect that solves sulphur agent in warm pitch medium It is even to be dispersed in asphalt system, then by the effect of crosslinking agent, stable solid netted colloform texture is formed together with filler, Properties of product are more stable, moreover, because increase softening agent so that the product is in uncured state all the time, can be well Adapt to the deformation requirement of structure, good endurance.
It is using beneficial effect caused by above-mentioned technical proposal:The production method by basic asphalt, waste tyre rubber powder, The agent of solution sulphur, composite modifier, softening agent composition are heated to 180 ~ 200 DEG C of stirring insulations and are not less than 40 minutes, through high speed shear Machine shear to colloid surface it is smooth, without obvious rubber grain after, injection band stir reserve tank, metered crosslinking agent, filler Stirring development is not less than 15 minutes, and it can avoid needing caused by first waste tyre rubber powder desulfurization is reused in conventional produce The shortcomings that complex process, high cost, while avoid waste tyre rubber powder and directly can not fully be sent out with the miscible caused performance of pitch The defects of waving.
Embodiment
Technical scheme is clearly and completely described with reference to the embodiment of the present invention, it is clear that described Embodiment be only the present invention part of the embodiment, rather than whole embodiment.Based on the embodiment in the present invention, sheet The every other embodiment that field those of ordinary skill is obtained under the premise of creative work is not made, belongs to the present invention The scope of protection.
Many details are elaborated in the following description to facilitate a thorough understanding of the present invention, still the present invention can be with It is different from other manner described here using other to implement, those skilled in the art can be without prejudice to intension of the present invention In the case of do similar popularization, therefore the present invention is not limited by following public specific embodiment.
The invention discloses a kind of uncured rubber-asphalt waterproof material, include the raw material of following parts by weight:Basis drip Blue or green 30-70 parts, waste tyre rubber powder 15-40 parts, solution sulphur agent 0.25-1.0 parts, composite modifier 0.8-4 parts, softening agent 0.5-5 parts, Crosslinking agent 0.25-3 parts and filler 5-15 parts, the wherein particle diameter of waste tyre rubber powder are 20-80 mesh;The basic asphalt is road stone Oil asphalt, tar asphalt or crude oil catalytic slurry;The solution sulphur agent is pentachlorothiophenol or diphenyl disulfide;It is described compound to change Property agent is styrene-butadiene block copolymer(SBS), PSB(SBR), polyethylene, polypropylene and One or more kinds of combinations in its derivative;The softening agent be aromatic naphtha, Petropols and catalytic cracked oil pulp, One or more kinds of combinations in tall oil, pine tar and coal tar;The crosslinking agent is that the tetramethyl autumn is blue Nurse, the filler are particle diameter not less than one or more kinds of groups in the carbon black of 325 mesh, clay, calcium carbonate, bentonite Close.
For the present invention detailed further, three specific embodiments are enumerated herein, but the invention is not limited in following Embodiment.
Example one:By taking the uncured rubber-asphalt waterproof material 1000kg of the production present invention as an example, every part is 10kg, used Raw material proportioning is:74.5 parts of basic asphalt, 16.5 parts of rubber powder, 0.25 part of solution sulphur agent, 1 part of composite modifier, 1 part of softening agent, friendship Join 0.25 part of agent, 6.5 parts of filler, wherein basic asphalt, which is attached most importance to, hands over 70# asphalt, and rubber powder specification is the mesh damaged tire of bias tire 60 Rubber powder, solution sulphur agent are pentachlorothiophenol, and composite modifier SBS, softening agent is pine tar, and crosslinking agent is that the tetramethyl autumn is blue Nurse, filler are 1250 mesh precipitated calcium carbonates;Following steps are used during specific production:
(1), will be load weighted useless during continuing heating by the metered agitator tank with heating system of hot-melt asphalt Tire glue powder, softening agent, composite modifier, solution sulphur agent put into agitator tank successively, and temperature reaches 180 DEG C and starts timing not less than 40 Minute, during which maximum temperature is no more than 200 DEG C;
(2)It is smooth without obvious rubber to colloid surface by the high cutting homogenizer circulation shear of the mixture in agitator tank Conservation tank or transfer tank with stirring are pumped into during particulate;
(3)Load weighted crosslinking agent, filler are added into colloid stirring to be not less than 15 minutes.
Example two:By taking the uncured rubber-asphalt waterproof material 1000kg of the production present invention as an example, every part is 10 kg, used Raw material proportioning be:63 parts of basic asphalt, 21 parts of waste tyre rubber powder, 0.67 part of solution sulphur agent, 1.26 parts of composite modifier, softening agent 4.2 parts, 1.3 parts of crosslinking agent, 8.53 parts of filler, wherein basic asphalt is 110# asphalt, the selection and preparation of remaining raw material Method is the same as example one.
Example three:By taking the uncured rubber-asphalt waterproof material 1000kg of the production present invention as an example, every part is 10 kg, used Raw material proportioning be:54.4 parts of basic asphalt, 27.2 parts of waste tyre rubber powder, 0.816 part of solution sulphur agent, 0.816 part of composite modifier, 2.86 parts of softening agent, 1.63 parts of crosslinking agent, 12.278 parts of filler, wherein basic asphalt are crude oil catalytic slurry, rubber powder 30 Mesh cross-ply rubber powder, the selection of remaining raw material and preparation method are the same as example one.
The uncured rubber-asphalt waterproof material of the present invention possesses following characteristic:
(1)To the adaptability of malformation:Uncured rubber asphalt material has superior ductility and bonding in itself Property, sub-surface strain cracking and structure, the complicated deformation of privileged sites are can adapt to, waterproof will not be caused because of malformation Layer is damaged.
In work China Democratic National Construction Association field, when complex waterproof layer is formed together with coiled material, uncured rubber asphalt can absorb whole changes Shape stress, the effect that waterproof roll does not almost stress ensure that whole complex waterproof layer keeps integrality for a long time.
(2)Pliability is good, and cohesive force is strong, and self-healing property is good:Can be in humidityBasal planeConstruction, and can be bonded with any foreign matter;Prolong Stretch rateHeight, deformed suitable for basic unit;During construction even if occur waterproof layer breakage also can self-healing, maintain complete waterproof layer.It is resistance to Long property is good, and cohesive force is strong, never solidifies.Solidfied material content is more than 99%.
It is real to above-mentioned typical case in order to be illustrated to the performance of presently disclosed uncured rubber-asphalt waterproof material Example has carried out lot of experiments, according to Ministry of Communications ministry standard JTJ052-2000《Highway engineering Asphalt Mixture Experiment code》Enter Performance detection is gone, as a result as shown in table 1:
Table 1
Experiment proves that the product according to the uncured rubber-asphalt waterproof material producing process of the present invention and formula production is complete Meet traffic ministry standard JT/T 798-2001《Highway engineering waste rubber tyre powder rubber asphalt》Technical requirements, for highway construction Construction of waterproof layer and highway maintenance crushed stone sealing waterproof homework possess good pavement performance.
Lot of experiments is carried out to above-described embodiment according to the JC/T 2216-2014 test methods recommended simultaneously, its result Meet《Uncured rubber asphalt waterproof coating》Generic specifications, referring specifically to table 2.
Table 2
In a word, uncured rubber-asphalt waterproof material provided by the present invention is used to improve highway construction and care field The durability of interlayer waterproof and crushed stone sealing technique, it is a kind of rubber asphalt waterproof coating of high performance-price ratio, for industry and the people Handle operation with buildings waterproof, avoid it is conventional first by the shortcomings that rubber powder desulfurization reuses caused complex process, cost is high, together When avoid waste tyre rubber powder directly with pitch it is miscible caused by performance can not give full play to the defects of.
Present invention also offers a kind of method for preparing uncured rubber-asphalt waterproof material, comprise the following steps:First Step:Raw material prepares, and prepares raw material by following parts by weight according to total amount:Basic asphalt 30-70 parts, waste tyre rubber powder 15-40 parts, Sulphur agent 0.5-1.0 parts, composite modifier 1-4 parts, softening agent 0.5-5 parts, crosslinking agent 0.5-3 parts and filler 5-15 parts are solved, wherein The particle diameter of waste tyre rubber powder is 20-80 mesh;
Second step:Hot melt, basic asphalt is added in the agitator tank with heating function by above-mentioned parts by weight, and progressively 180 DEG C -200 DEG C are warming up to, the waste tyre rubber powders of above-mentioned parts by weight, solution sulphur agent are sequentially added in heating process, compound is changed Property agent and softening agent, after heating-up temperature reaches 180 DEG C -200 DEG C, insulated and stirred 35-50 minutes form colloid;
3rd step:Mixture homogenization, the mixture high cutting homogenizer circulation shear that second step is formed, is sheared to colloid Surface it is smooth without obvious rubber particle when, by colloid be pumped into agitating function conservation tank;
4th step:Crosslinking agent and filler are added into conservation tank successively according to above-mentioned parts by weight, and are stirred 15-20 points Uncured rubber-asphalt waterproof material is formed after clock.
Uncured rubber-asphalt waterproof material is produced using this method, waste tyre rubber powder leads to directly in hard pitch medium The effect of solution sulphur agent is crossed through high cutting homogenizer circulation shear desulfurization, rubber molecule is dispersed in pitch body with linear structure In system.Then by the effect of crosslinking agent, stable solid netted colloform texture is formed together with filler.Using present invention side Method produces uncured rubber-asphalt waterproof material, waste tyre rubber powder desulfurization, scattered, crosslinking integration, process intensification, properties of product It is stable.The special desulfurization process of numerous and diverse shoddy is saved simultaneously, saves energy consumption.

Claims (7)

  1. A kind of 1. method for preparing uncured rubber-asphalt waterproof material, it is characterised in that:The uncured rubber-asphalt waterproof Material includes the raw material of following parts by weight:Basic asphalt 30-70 parts, waste tyre rubber powder 15-40 parts, solution sulphur agent 0.25-1.0 Part, composite modifier 0.8-4 parts, softening agent 0.5-5 parts, crosslinking agent 0.25-3 parts and filler 5-15 parts, wherein waste tyre rubber powder Particle diameter be 20-80 mesh, its preparation method comprises the following steps:
    The first step:Raw material prepares, and prepares raw material by following parts by weight according to total amount:Basic asphalt 30-70 parts, waste tyre rubber powder 15-40 parts, solve sulphur agent 0.25-1.0 parts, composite modifier 0.8-4 parts, softening agent 0.5-5 parts, crosslinking agent 0.25-3 parts and filler The particle diameter of 5-15 parts, wherein waste tyre rubber powder is 20-80 mesh;
    Second step:Hot melt, basic asphalt is added in the agitator tank with heating function by above-mentioned parts by weight, and progressively heated up To 180 DEG C -200 DEG C, waste tyre rubber powder, the agent of solution sulphur, the composite modifier of above-mentioned parts by weight are sequentially added in heating process And softening agent, after heating-up temperature reaches 180 DEG C -200 DEG C, insulated and stirred 35-50 minutes form colloid;
    3rd step:Mixture homogenization, the mixture high cutting homogenizer circulation shear that second step is formed, is sheared to colloid surface It is smooth without obvious rubber particle when, by colloid be pumped into agitating function conservation tank;
    4th step:Crosslinking agent and filler are added into conservation tank successively according to above-mentioned parts by weight, and after being stirred 15-20 minutes Form uncured rubber-asphalt waterproof material.
  2. 2. uncured rubber-asphalt waterproof material according to claim 1, it is characterised in that:The basic asphalt is road Asphalt, tar asphalt or crude oil catalytic slurry.
  3. 3. uncured rubber-asphalt waterproof material according to claim 1, it is characterised in that:The solution sulphur agent is pentachloro- sulphur Phenol or diphenyl disulfide.
  4. 4. uncured rubber-asphalt waterproof material according to claim 1, it is characterised in that:The composite modifier is benzene One kind in ethylene-butadiene block copolymer, PSB, polyethylene, polypropylene and its derivative or The two or more combination of person.
  5. 5. uncured rubber-asphalt waterproof material according to claim 1, it is characterised in that:The softening agent is aromatic hydrocarbons One or more kinds of combinations in oil, Petropols and catalytic cracked oil pulp, tall oil, pine tar and coal tar.
  6. 6. uncured rubber-asphalt waterproof material according to claim 1, it is characterised in that:The crosslinking agent is curing Tetra methylthiuram.
  7. 7. uncured rubber-asphalt waterproof material according to claim 1, it is characterised in that:The filler is that particle diameter is not low One or more kinds of combinations in the carbon black of 325 mesh, clay, calcium carbonate, bentonite.
CN201610125150.4A 2016-03-07 2016-03-07 Uncured rubber-asphalt waterproof material and preparation method thereof Active CN105542496B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610125150.4A CN105542496B (en) 2016-03-07 2016-03-07 Uncured rubber-asphalt waterproof material and preparation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610125150.4A CN105542496B (en) 2016-03-07 2016-03-07 Uncured rubber-asphalt waterproof material and preparation method thereof

Publications (2)

Publication Number Publication Date
CN105542496A CN105542496A (en) 2016-05-04
CN105542496B true CN105542496B (en) 2018-03-09

Family

ID=55822076

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610125150.4A Active CN105542496B (en) 2016-03-07 2016-03-07 Uncured rubber-asphalt waterproof material and preparation method thereof

Country Status (1)

Country Link
CN (1) CN105542496B (en)

Families Citing this family (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106009726A (en) * 2016-06-20 2016-10-12 许昌金欧特沥青股份有限公司 Asphalt modified with odorless rubber powder easy to melt
CN106009725A (en) * 2016-06-20 2016-10-12 许昌金欧特沥青股份有限公司 Odorless waste tire rubber powder modifying agent easy to melt
CN106243748B (en) * 2016-08-04 2018-11-30 江西省交通工程集团有限公司 A kind of modified pitch and preparation method thereof
CN106221250A (en) * 2016-08-15 2016-12-14 安庆越球建筑防水材料有限公司 A kind of rubber modified asphalt waterproof material
CN106633951B (en) * 2016-09-22 2019-04-19 河北冀通路桥建设有限公司 A kind of rubber powder composite modified asphalt composition and its preparation and application
CN106497096A (en) * 2016-10-19 2017-03-15 嘉兴潮源新型建材股份有限公司 Uncured rubber asphalt waterproofing coiled material and preparation method thereof
CN106977968A (en) 2017-05-18 2017-07-25 新疆心路科技有限公司 High adhered modification pitch, road quick patch and preparation method thereof and application method
PL237967B1 (en) * 2017-07-25 2021-06-14 Tadeusz Matynia Polymer-bituminous composition for production of hydro-insulation materials and method for producing that composition
CN109536026A (en) * 2017-08-02 2019-03-29 中国石油化工股份有限公司 Complex waterproof layer and its construction method
CN109536025A (en) * 2017-08-02 2019-03-29 中国石油化工股份有限公司 Uncured rubber asphalt waterproof coating and preparation method thereof
CN109837767B (en) * 2017-11-24 2021-11-30 北京路德永泰环保科技有限公司 Self-adhesive polymer modified asphalt waterproof coiled material and preparation method thereof
CN109971349B (en) * 2017-12-27 2021-10-26 北京路德永泰环保科技有限公司 Non-curing rubber asphalt waterproof coating and preparation method thereof
CN110054903B (en) * 2018-01-18 2021-06-15 北京路德永泰环保科技有限公司 Elastomer modified asphalt waterproof coiled material and preparation method thereof
CN108250964B (en) * 2018-01-24 2020-08-07 河南蓝翎环科防水材料有限公司 Non-curing waterproof adhesive for repairing structural cracks and preparation method thereof
CN110760263A (en) * 2018-07-27 2020-02-07 中国石油化工股份有限公司 Anti-aging non-cured rubber asphalt waterproof coating and preparation method thereof
CN110409513A (en) * 2019-08-06 2019-11-05 东莞市卓宝建筑工程有限公司 A kind of uncured rubber-asphalt coating and the compound construction method of self-adhesive coiled material
CN111548639A (en) * 2020-03-31 2020-08-18 大禹伟业(北京)国际科技有限公司 Non-cured rubber asphalt material
CN112645859A (en) * 2020-12-30 2021-04-13 山东尚舜化工有限公司 Novel method and equipment for improving dispersity of promoter TMTD

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104212187A (en) * 2013-06-05 2014-12-17 中国石油天然气股份有限公司 Rubber asphalt, preparation and application thereof
CN103881401B (en) * 2013-07-23 2016-08-31 华东理工大学 A kind of shoddy modified emulsifying asphalt and preparation method thereof
CN104693820B (en) * 2015-02-12 2018-08-24 天津海泰环保科技发展股份有限公司 It is a kind of can stable storage the particle modified asphalt of compound shoddy and preparation method thereof
CN104693565B (en) * 2015-02-12 2017-08-04 天津海泰环保科技发展股份有限公司 It is a kind of can stable storage compound shoddy particle and preparation method thereof
CN104693817B (en) * 2015-02-12 2017-12-19 天津海泰环保科技发展股份有限公司 It is a kind of can stable storage the particle modified pitch of compound shoddy and preparation method thereof

Also Published As

Publication number Publication date
CN105542496A (en) 2016-05-04

Similar Documents

Publication Publication Date Title
CN105542496B (en) Uncured rubber-asphalt waterproof material and preparation method thereof
CN101921419B (en) High-modulus modifier composite of bituminous mixture and preparation method thereof
CN102924935B (en) Method used for modifying low-temperature coal tar asphalt into paving asphalt
CN106883626A (en) A kind of modified asphalt for road and preparation method
CN105153511A (en) Modified asphalt mixture modifier and preparation method therefor
CN105602264A (en) Method for producing nanometer high-molecular-polymer compound modification asphalt
CN106336545B (en) A kind of hot-mix asphalt mixture seam patch and preparation method thereof slowing down pavement crack
CN103540147A (en) High-strength and anti-stripping elastomer modified asphalt waterproof coiled material and production process
CN102603230B (en) High-concentration rubber powder modified asphalt mixture and preparation method thereof
CN103396669B (en) Microwave desulfurization cracking rubber powder of waste tire composite modified asphalt and preparation method thereof
CN105541181B (en) A kind of rubber powder ground surface material and construction method
CN102093725B (en) Modified road asphalt and preparation method thereof
CN103289105A (en) Method for preparing emulsified rubber asphalt
CN101173070B (en) Method for producing powdered asphalt mixture track-resistant additive
CN107987537A (en) A kind of permeable laying of roadway environment-protecting color cementitious matter and preparation method thereof
CN206635596U (en) A kind of Rubber-Asphalt Pavement structure
CN105130256B (en) A kind of energy-saving type asphalt concrete modifying agent and preparation method thereof
CN105819731A (en) Warm-mix composite anti-rut agent as well as preparation method and application thereof
CN103102698B (en) Inorganic layered compound modified emulsified bitumen and preparation method thereof
CN109504108A (en) A kind of weather-proof modified pitch
CN108102055A (en) Organic-silicon-modified rubber asphalt and its manufacturing process and Integral vertical reaction unit
CN103130470A (en) Warm mix drainage asphalt mixture and preparation method thereof
CN111471309A (en) Asphalt modifier and preparation method thereof, modified asphalt and preparation method thereof
CN103102699B (en) Inorganic layered compound modified emulsified bitumen and preparation method thereof
CN107760045A (en) A kind of compounded rubber powder-modified asphalt and preparation method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Zhai Genwang

Inventor before: Zhai Genwang

Inventor before: Tan Hua

Inventor before: Zhang Hongbo

Inventor before: Lu Peixing

CB03 Change of inventor or designer information
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180428

Address after: 053400 Hebei province Hengshui City Wu Yi County cool cool Town Village Village East (Hengshui road Hing Road construction materials Co., Ltd.)

Patentee after: Hengshui Hengfeng Yick Road Asphalt Science & Technology Co.,Ltd.

Address before: 453004 Xinfei garden, Xinfei garden, Xinxiang City, Henan Province, B5

Patentee before: Zhai Genwang

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230511

Address after: No. 332 Xinshi North Road, Qiaoxi District, Shijiazhuang City, Hebei Province 050090, No. 2717 Wangjiao International

Patentee after: Hebei Jiaotou Special Materials Technology Co.,Ltd.

Patentee after: Hengshui Hengfeng Yick Road Asphalt Science & Technology Co.,Ltd.

Address before: 053400 Hebei province Hengshui City Wu Yi County cool cool Town Village Village East (Hengshui road Hing Road construction materials Co., Ltd.)

Patentee before: Hengshui Hengfeng Yick Road Asphalt Science & Technology Co.,Ltd.

TR01 Transfer of patent right