CN105525928A - Construction method of sealing ring of duct piece wall of shield inclined shaft - Google Patents
Construction method of sealing ring of duct piece wall of shield inclined shaft Download PDFInfo
- Publication number
- CN105525928A CN105525928A CN201410522534.0A CN201410522534A CN105525928A CN 105525928 A CN105525928 A CN 105525928A CN 201410522534 A CN201410522534 A CN 201410522534A CN 105525928 A CN105525928 A CN 105525928A
- Authority
- CN
- China
- Prior art keywords
- air bag
- jurisdiction
- sealing ring
- section
- shield
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The invention relates to a construction method of a sealing ring of the duct piece wall of a shield inclined shaft. The method is completed according to the following steps of 1, making the sealing ring: installing two annular air bags at the two sides of a duct piece grouting hole, forming an inflating hole communicated to the inner side of a duct piece in each annular air bag, installing two protection plates on each air bag, and overlapping the protection plates in the shield tail sealing brush sliding direction; 2, after the duct piece is dragged out from the shield tail, inflating the two air bags so that the air bags are tightly extruded with the surrounding rock, and a sealed space is formed between the two air bags; 3, injecting cement-water glass dual-liquid slurry into the sealed space between the two air bags to form the sealing ring, and exhausting air in the air bags after dual-liquid slurry solidification; and 4, installing one sealing ring at a certain distance, and then performing single-liquid slurry filling between the two sealing rings. The sealing ring can be used for the slurry backfilling of single-liquid slurry and the like under the great-slope and flowering water conditions. In addition, the construction method has the advantages that the operation is simple; the construction efficiency is high; and the cost is low, and the like.
Description
Technical field:
The invention belongs to a kind of construction techniques, particularly the construction method of shutoff ring after the wall of a kind of shield structure inclined shaft section of jurisdiction.
Background technology:
At present, shield-tunneling construction has been very general at engineering fields such as traffic, municipal administration, water power, and along with maturation and the development of shield technique, this construction method is applied to coal mine inclined shaft construction gradually.
Shield structure coal mine inclined shaft due to its gradient comparatively large, section of jurisdiction wall rear slurry very easily runs off along the gradient toward Tu Cang, and it is large to fill difficulty after wall.Common cement-sodium silicate double liquid shutoff ring is under the gradient and dynamic regimen condition, and plugging effect is undesirable.
Summary of the invention:
Object of the present invention is just to provide the construction method of shutoff ring after the wall of a kind of shield structure inclined shaft section of jurisdiction, and the method can solve slurries losing issue, for filling full providing safeguard after the wall of section of jurisdiction.
As above conceive, technical scheme of the present invention is: the construction method of shutoff ring after the wall of a kind of shield structure inclined shaft section of jurisdiction, is characterized in that: complete according to the following step:
1. shutoff ring is made: arrange bipassage ring to air bag in injected hole both sides, section of jurisdiction, hoop air bag leaves air-filled pore and lead to inside section of jurisdiction, each air bag is arranged twice guard shield, guard shield overlaps along tail sealing brush line of travel;
2., after tail shield is hauled out in section of jurisdiction, by twice airbag aeration, make it and country rock jam-packed, thus form one seal cavity between twice air bag;
3. inject cement-sodium silicate double liquid toward the seal cavity between twice air bag, form one shutoff ring, after dual slurry is solidified, by gas emptying in air bag;
4. one above-mentioned shutoff ring be set at a certain distance, between twice shutoff ring, then carry out single liquid slurry fill.
Above-mentioned guard shield is connected with section of jurisdiction connecting bolt.
The present invention has following advantage and good effect:
1, the present invention arranges bipassage ring to air bag in injected hole both sides, section of jurisdiction, forms one hoop seal cavity, in this space, inject cement-sodium silicate double liquid after inflation, forms shutoff ring.The slurries such as single liquid slurry backfill after section of jurisdiction wall under utilizing this shutoff ring can realize heavy grade and river channels, efficiently solves the problem of shutoff circulating application work difficulty under dynamic ramp shaped state under water.
2, the present invention is damaged by tail sealing brushing to prevent hoop air bag, and each air bag arranges twice guard shield, and guard shield along tail sealing brush line of travel overlap joint, thus extends the application life of shutoff ring, improves construction quality.
3, the present invention have operation simple and easy, the advantages such as efficiency of construction is high, with low cost.
Accompanying drawing illustrates:
Fig. 1 is the schematic diagram of shutoff ring of the present invention;
Fig. 2 is construction sectional drawing of the present invention.
In figure: 1, section of jurisdiction; 2, injected hole; 3, air-filled pore; 4, air bag; 5, guard shield A; 6, guard shield B; 7, connecting bolt; 8, country rock; 9, dual slurry shutoff ring slip casting space.
Detailed description of the invention:
A construction method for shutoff ring after the wall of shield structure inclined shaft section of jurisdiction, completes according to the following step:
1. shutoff ring is made: in section of jurisdiction injected hole 2 both sides, bipassage ring is set to air bag 4, leaves air-filled pore 3 on the upside of hoop air bag and lead to inside section of jurisdiction.In order to prevent hoop air bag from being damaged by tail sealing brushing, each air bag arranges twice guard shield 5,6, and guard shield is connected with section of jurisdiction connecting bolt 7, and guard shield overlaps along tail sealing brush line of travel; (as shown in Figure 1)
2., after tail shield is hauled out in section of jurisdiction, by air-filled pore 3, air bag 4 is inflated, air bag is expanded and with country rock 8 jam-packed, form one hoop seal cavity 9; (as shown in Figure 2)
3. fill cement-sodium silicate double liquid toward seal cavity 9, form shutoff ring;
4. after cement-sodium silicate shutoff ring solidifies, by air-filled pore 3 by gas emptying in air bag;
A shutoff ring (as 8 ~ 10 rings) is 5. set at a certain distance, single liquid slurry backfill carry out section of jurisdiction wall between two shutoff rings after.
The present invention utilizes air bag temporary sealing, carries out cement-sodium silicate double liquid shutoff circulating application work, effectively solves the dynamic work of a ramp shaped state shutoff circulating application under water difficult problem not easily, operates simple and easy, efficient.
Claims (2)
1. the construction method of shutoff ring after the wall of shield structure inclined shaft section of jurisdiction, is characterized in that: complete according to the following step:
1. shutoff ring is made: arrange bipassage ring to air bag in injected hole both sides, section of jurisdiction, hoop air bag leaves air-filled pore and lead to inside section of jurisdiction, each air bag is arranged twice guard shield, guard shield overlaps along tail sealing brush line of travel;
2., after tail shield is hauled out in section of jurisdiction, by twice airbag aeration, make it and country rock jam-packed, thus form one seal cavity between twice air bag;
3. inject cement-sodium silicate double liquid toward the seal cavity between twice air bag, form one shutoff ring, after dual slurry is solidified, by gas emptying in air bag;
4. one above-mentioned shutoff ring be set at a certain distance, between twice shutoff ring, then carry out single liquid slurry fill.
2. the construction method of shutoff ring after the wall of a kind of shield structure inclined shaft section of jurisdiction according to claim 1, is characterized in that: above-mentioned guard shield is connected with section of jurisdiction connecting bolt.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410522534.0A CN105525928B (en) | 2014-09-30 | 2014-09-30 | Construction method of shield inclined shaft segment wall rear plugging ring |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410522534.0A CN105525928B (en) | 2014-09-30 | 2014-09-30 | Construction method of shield inclined shaft segment wall rear plugging ring |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105525928A true CN105525928A (en) | 2016-04-27 |
CN105525928B CN105525928B (en) | 2019-12-10 |
Family
ID=55768412
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410522534.0A Active CN105525928B (en) | 2014-09-30 | 2014-09-30 | Construction method of shield inclined shaft segment wall rear plugging ring |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105525928B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109736830A (en) * | 2019-01-10 | 2019-05-10 | 中铁建南方建设投资有限公司 | The implementation method of lateral sealing in a kind of TBM tunnel construction |
CN110242331A (en) * | 2019-07-29 | 2019-09-17 | 西南交通大学 | A method of pipe-plate lining ring anti-floating is assisted for the anti-floating system in shield tunnel and using it |
CN110701421A (en) * | 2019-08-29 | 2020-01-17 | 中国二冶集团有限公司 | Method for plugging water source of large-diameter pipeline |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5645375A (en) * | 1995-06-07 | 1997-07-08 | Stephens; Patrick J. | Method and apparatus for grouting of tunnel liners |
CN101672185A (en) * | 2009-10-22 | 2010-03-17 | 上海市第二市政工程有限公司 | Multi-point back synchronous injection method of double circular shield tunnel |
CN102345464A (en) * | 2011-06-21 | 2012-02-08 | 上海隧道工程股份有限公司 | Self-bonding air bag sealing device |
CN102352757A (en) * | 2011-10-28 | 2012-02-15 | 上海市第一市政工程有限公司 | Method for controlling upward floating of pipe piece during shield machine air pushing through mining tunnel |
CN203097906U (en) * | 2013-03-01 | 2013-07-31 | 中国建筑第六工程局有限公司 | Pipe piece structure capable of conducting grouting |
CN203891899U (en) * | 2014-04-04 | 2014-10-22 | 北京城建设计发展集团股份有限公司 | Hollow filling-type rubber gasket |
-
2014
- 2014-09-30 CN CN201410522534.0A patent/CN105525928B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5645375A (en) * | 1995-06-07 | 1997-07-08 | Stephens; Patrick J. | Method and apparatus for grouting of tunnel liners |
CN101672185A (en) * | 2009-10-22 | 2010-03-17 | 上海市第二市政工程有限公司 | Multi-point back synchronous injection method of double circular shield tunnel |
CN102345464A (en) * | 2011-06-21 | 2012-02-08 | 上海隧道工程股份有限公司 | Self-bonding air bag sealing device |
CN102352757A (en) * | 2011-10-28 | 2012-02-15 | 上海市第一市政工程有限公司 | Method for controlling upward floating of pipe piece during shield machine air pushing through mining tunnel |
CN203097906U (en) * | 2013-03-01 | 2013-07-31 | 中国建筑第六工程局有限公司 | Pipe piece structure capable of conducting grouting |
CN203891899U (en) * | 2014-04-04 | 2014-10-22 | 北京城建设计发展集团股份有限公司 | Hollow filling-type rubber gasket |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109736830A (en) * | 2019-01-10 | 2019-05-10 | 中铁建南方建设投资有限公司 | The implementation method of lateral sealing in a kind of TBM tunnel construction |
CN110242331A (en) * | 2019-07-29 | 2019-09-17 | 西南交通大学 | A method of pipe-plate lining ring anti-floating is assisted for the anti-floating system in shield tunnel and using it |
CN110242331B (en) * | 2019-07-29 | 2024-03-26 | 西南交通大学 | Anti-floating device for shield tunnel and method for assisting segment lining ring anti-floating by adopting anti-floating device |
CN110701421A (en) * | 2019-08-29 | 2020-01-17 | 中国二冶集团有限公司 | Method for plugging water source of large-diameter pipeline |
Also Published As
Publication number | Publication date |
---|---|
CN105525928B (en) | 2019-12-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107191197B (en) | Shield segment and construction method thereof in tunnel through mine method by shield air pushing | |
CN201705359U (en) | Tail shield sealed water-proof structure of shield machine | |
CN103993615B (en) | Large-drawdown pipe well plugging structure and construction method thereof | |
CN107939420A (en) | The construction method filled after two backing of bored tunnel assembled | |
CN107605498B (en) | Construction method for horizontal grouting reinforcement structure of end head of shield tunnel in water-rich sandy pebble stratum | |
CN105240048B (en) | A kind of gas filling method based on paste body filling | |
CN103195390A (en) | Mining-coal bed nearly horizontal gas extraction borehole sealing method | |
CN103061782A (en) | Large-section earth pressure balancing rectangular jacking pipe joint of motor vehicle tunnel and method for constructing large-section earth pressure balancing rectangular jacking pipe | |
CN103821539A (en) | Shield tunneling machine shield tail synchronous embedded-type double-liquid grouting device | |
CN102900848A (en) | Shield tunneling machine under pressure warehouse entry air bag sealing device and method | |
CN104164865A (en) | Grouting air cushion plug | |
CN202946188U (en) | Gas extraction drilling hole multiphase medium plugging device | |
CN103410523A (en) | Double-layer water-stopping steel ring for shield starting tunnel portal and mounting method of double-layer water-stopping steel ring | |
CN105525928A (en) | Construction method of sealing ring of duct piece wall of shield inclined shaft | |
CN208845229U (en) | Big cross section rectangular top pipe tunnel portal sealing device | |
CN204532377U (en) | Shutoff ring after the wall of a kind of shield structure inclined shaft section of jurisdiction | |
CN107083963A (en) | A kind of shield tunnel originates sealing device and its application method | |
CN203175569U (en) | Steel tube piece tunnel portal water-proof sealing structure in shield-driven tunnel breakthrough | |
CN102094659A (en) | Shield entry spring hinge plate sealing device | |
CN102889085B (en) | Tunneling construction method for shield tunneling machine | |
CN202544903U (en) | Hole packer | |
CN204960882U (en) | Coal mine underground hydraulic fracturing drilling and hole sealing device | |
CN211397572U (en) | Low gas shield tunnel shield tail seal structure | |
CN203855990U (en) | Big pipe shaft block structure that falls | |
CN105221164B (en) | A kind of sealing tool and assemble method for deep tunnel slip casting reparation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |