CN105507152A - 建筑高墩自提升步履式模板施工方法 - Google Patents
建筑高墩自提升步履式模板施工方法 Download PDFInfo
- Publication number
- CN105507152A CN105507152A CN201510843804.2A CN201510843804A CN105507152A CN 105507152 A CN105507152 A CN 105507152A CN 201510843804 A CN201510843804 A CN 201510843804A CN 105507152 A CN105507152 A CN 105507152A
- Authority
- CN
- China
- Prior art keywords
- template
- mould
- liner
- oil cylinder
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/02—Piers; Abutments ; Protecting same against drifting ice
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
本发明提供一种建筑高墩自提升步履式模板施工方法,包括场地平整,测量放样及定位,利用自提升步履式模板装置,在浇筑完成墩身一节混凝土并绑扎钢筋后,安装内衬模,利用液压提升***同步提升步履式模板装置,提升到预定位置后,上外模架与下外模架均夹紧内衬模,接着刷脱模剂、浇筑混凝土、绑扎钢筋并安装内衬模,通过如此反复作业,直到完成该墩柱施工。使用本发明方法进行建筑高墩施工,利于内衬模的安装,节省作业时间,大幅提高施工进度,无需等待混凝土形成强度便可进行模架提升,施工进度每天可达5米以上。
Description
技术领域
本发明涉及一种建筑高墩施工方法,具体涉及一种建筑高墩自提升步履式模板施工方法。
背景技术
目前,全国每年大约有2.3万公里高速公路开工或在建,其中,有约1.1万公里为在西部地区建设。而西部地区多为深山区或山岭重丘区,地面起伏大,山体陡峭、沟壑冲槽分布广泛,这对高速公路的建设带来了诸多困难。特别是为了跨越深山峡谷,需建筑桥墩来支撑桥面板。传统的高墩施工,主要采用翻模、爬模、滑模等施工方法,而使用这些方法施工,或因施工进度慢,或因外观质量差,或因施工安全度低等原因,已渐渐不能适应现代的施工要求。
如公开号为CN103147403A的中国发明专利公开了一种桥梁高墩辊模施工方法,使用辊模装置,在墩身一节混凝土浇筑完成后,利用辊模电脑控制提升***,精确提升模板,提升过程中外框架在内衬模外表面向上滚动,确保内衬模与砼面保持静止,提升到指定位置后,在外框架内侧重新安装内衬模、涂刷脱模剂、绑扎钢筋、浇筑混凝土,接着再次提升模板,如此往复作业,直到该墩柱施工完成。
根据现有技术可知,内衬模板通过滚动方式提升,但内衬模板易在混凝土侧压力作用下产生变形;主模架既需要在内衬模表面上滚动,又需要利用主模架对内衬模施加一定夹紧力以抵消混凝土的侧压力,使得主模架与内衬模的配合尺寸要求很高,一旦尺寸偏差,易造成内衬模板移动,混凝土外观质量下降严重;主模架与内衬模为紧配合,造成调整高墩中心线困难,一旦出现偏差需要调整,易造成支撑杆弯曲变形甚至折断;而且主模架既需要在内衬模表面上滚动,又需要利用主模架对内衬模施加一定夹紧力以抵消混凝土的侧压力,使得主模架与内衬模的配合尺寸要求很高,一旦尺寸偏差,易造成内衬模板移动,使得混凝土外观质量下降严重。
在施工周期上,现有技术中的翻模、爬模约3至4天一个工作流程,平均每天浇筑混凝土高度为1-1.2米,辊模施工每天约4米,而现代化施工往往要求每天5米左右的施工进度。
发明内容
本发明提供一种建筑高墩自提升步履式模板施工方法,以解决现有技术中滚动提升模板方法易造成内衬模板移动以及提升效率低下的缺陷。
为实现上述技术目的,达到上述技术效果,本发明通过以下技术方案实现:
一种建筑高墩自提升步履式模板施工方法,其特征是:场地平整,测量放样及定位,安装自提升步履式模板装置,利用自提升步履式模板装置,在绑扎第一节钢筋后,安装第一节内衬模,将混凝土浇筑到内衬模围成的范围内,利用液压提升***同步提升步履式模板装置;绑扎下一节钢筋并安装下一节内衬模;模板***提升,提升过程中,上外模架与下外模架交替运动,上夹紧模板与下夹紧模板交替夹紧内衬模,确保内衬模在模架提升过程中与砼面静止不动;提升到预定位置后,上外模架与下外模架均夹紧内衬模,接着刷脱模剂、浇筑混凝土、在无需等待混凝土形成强度下便提升模架,通过如此反复作业,直到完成该墩柱施工。
其具体施工方法步骤如下:
步骤a.场地平整:平整场地并用混凝土硬化;
步骤b.测量放样及定位:测量放样,支撑杆5定位并固定;
步骤c.安装自提升步履式模板装置:自提升步履式模板装置包括液压提升***和模架***,液压提升***包括爬升机1、液压泵站2、控制***3、油管4、上夹持油缸(13.1,13.2,13.3,…,13.n)、下夹持油缸(14.1,14.2,14.3,…,14.n)和顶升油缸(15.1,15.2,15.3,…,15.n),上夹持油缸、下夹持油缸和顶升油缸的个数根据实际施工面积确定;模架***包括支撑杆5、连接架6、内衬模7、吊杆8、下外模架9、下夹紧模板10、上夹紧模板11和上外模架12;
液压提升***固定在模架***的支撑杆5上,连接架6通过吊杆8将液压提升***与模架***连接起来,将装置所有载荷转移至支撑杆5上,然后将自提升步履式模板施工装置调好水平,绑扎第一节混凝土钢筋16a,安装第一节内衬模板7,利用上夹持油缸(13.1,13.2,13.3,…,13.n)、下夹持油缸(14.1,14.2,14.3,…,14.n)分别将上夹紧模板11和下夹紧模板10夹紧内衬模7并施加一定压紧力,将混凝土浇筑到内衬模围成的范围内,振捣密实;
步骤d.绑扎下一节钢筋并安装下一节内衬模:绑扎下一节钢筋16b、安装下一节内衬模7b;
步骤e.模板***提升:首先利用下夹持油缸(14.1,14.2,14.3,…,14.n)将下夹紧模板10打开;
然后利用液压提升***将下外模架9提升至预定高度,利用下夹持油缸(14.1,14.2,14.3,…,14.n)下夹紧模板10夹紧;
其次利用上夹持油缸(13.1,13.2,13.3,…,13.n)将上夹紧模板11打开;
利用顶升油缸(15.1,15.2,15.3,…,15.n)将上外模架12顶升至预定高度,最后利用上夹持油缸(13.1,13.2,13.3,…,13.n)将上夹紧模板11夹紧;
步骤f.浇筑混凝土:在内衬模7的内表面涂上脱模剂,将混凝土浇筑到内衬模围成的范围内,振捣密实;
重复步骤d、步骤e、步骤f直到完成该墩柱施工。
本发明的优点:
1.使用本方法进行建筑高墩施工,通过模板***提升,可以使上夹紧模板、下夹紧模板打开和夹紧,利于内衬模的安装,节省作业时间,提高施工进度;
2.上夹紧模板、下夹紧模交替夹紧内衬模,无需等待混凝土形成强度便可进行模架提升,显著提高施工效率,施工进度每天可达5米以上,是翻模、爬模施工进度的4-5倍,滑模、辊模施工的1.2-1.5倍;
3.提升过程中,上外模架、下外模架交替运动,上夹紧模板、下夹紧模板交替夹紧内衬模,确保内衬模在模架提升过程中与砼面静止不动,得到较好的外观质量;
4.模架提升时模板与桥墩非接触,更容易纠正模架的偏移和扭转,桥梁中心得到更有效的控制;
5.模架提升时模板与桥墩非接触,所需要的提升力大大降低,液压提升***的额定提升力可大大减少,设备制造成本明显降低。
附图说明
图1为本发明结构组成示意图。
图2为本发明结构俯视图。
图3为本发明工作(绑扎钢筋、安装第一节内衬模板、浇筑第一节混凝土)原理图。
图4为本发明工作(绑扎下一节钢筋、安装下一节内衬模)原理图。
图5为本发明工作(下夹紧模板打开)原理图。
图6为本发明工作(下外模架提升、下夹紧模板夹紧)原理图。
图7为本发明工作(上夹紧模板打开)原理图。
图8为本发明工作(上外模架顶升、上夹紧模板夹紧)原理图。
图9为本发明工作(浇筑混凝土)原理图。
图中:1为爬升机,2为液压泵站,3为控制***,4为油管,5为支撑杆,6为连接架,(7,7b)为内衬模,8为吊杆,9为下外模架,10为下夹紧模板,11为上夹紧模板,12为上外模架,(13.1,13.2,13.3,…,13.n)为上夹持油缸,(14.1,14.2,14.3,…,14.n)为下夹持油缸,(15.1,15.2,15.3,…,15.n)为顶升油缸,(16a,16b)为钢筋。
具体实施方式
其具体施工步骤如下:
步骤a.场地平整:平整场地并用混凝土硬化;
步骤b.测量放样及定位:测量放样,支撑杆5定位并固定;
步骤c.如图1所示,安装自提升步履式模板装置:自提升步履式模板装置包括液压提升***和模架***,液压提升***包括爬升机1、液压泵站2、控制***3、油管4、上夹持油缸(13.1,13.2,13.3,…,13.n)、下夹持油缸(14.1,14.2,14.3,…,14.n)和顶升油缸(15.1,15.2,15.3,…,15.n),上夹持油缸、下夹持油缸和顶升油缸的个数根据实际施工面积确定,如图2所示;模架***包括支撑杆5、连接架6、内衬模7、吊杆8、下外模架9、下夹紧模板10、上夹紧模板11和上外模架12;
液压提升***固定在模架***的支撑杆5上,连接架6通过吊杆8将液压提升***与模架***连接起来,将装置所有载荷转移至支撑杆5上,然后将自提升步履式模板施工装置调好水平,绑扎第一节混凝土钢筋16a,安装第一节内衬模板7,利用上夹持油缸(13.1,13.2,13.3,…,13.n)、下夹持油缸(14.1,14.2,14.3,…,14.n)分别将上夹紧模板11和下夹紧模板10夹紧内衬模7并施加一定压紧力,将混凝土浇筑到内衬模围成的范围内,振捣密实,如图3所示;
步骤d.绑扎钢筋并安装内衬模:绑扎下一节钢筋16b、安装下一节内衬模7b,如图4所示;
步骤e.模板***提升:首先利用下夹持油缸(14.1,14.2,14.3,…,14.n)将下夹紧模板10打开,如图5所示;
然后利用液压提升***将下外模架9提升至预定高度,利用下夹持油缸(14.1,14.2,14.3,…,14.n)下夹紧模板10夹紧,如图6所示;
其次利用上夹持油缸(13.1,13.2,13.3,…,13.n)将上夹紧模板11打开,如图7所示;
利用顶升油缸(15.1,15.2,15.3,…,15.n)将上外模架12顶升至预定高度,最后利用上夹持油缸(13.1,13.2,13.3,…,13.n)将上夹紧模板11夹紧,如图8所示;
步骤f.浇筑混凝土:在内衬模7的内表面涂上脱模剂,将混凝土浇筑到内衬模围成的范围内,振捣密实,如图9所示;
重复步骤d、步骤e、步骤f直到完成该墩柱施工。
该建筑高墩自提升步履式模板施工一个流程所用时间如下表:
常规的翻模、爬模约3至4天一个工作流程,平均每天浇筑混凝土高度为1-1.2米,辊模施工每天4米,本发明涉及的建筑高墩自提升步履式模板施工每天可完成9-10个工作循环,混凝土浇筑高度可达每天5米。
Claims (2)
1.一种建筑高墩自提升步履式模板施工方法,其特征是:场地平整,测量放样及定位,安装自提升步履式模板装置,利用自提升步履式模板装置,在绑扎第一节钢筋后,安装第一节内衬模,将混凝土浇筑到内衬模围成的范围内,利用液压提升***同步提升步履式模板装置;绑扎下一节钢筋并安装下一节内衬模;模板***提升,提升过程中,上外模架与下外模架交替运动,上夹紧模板与下夹紧模板交替夹紧内衬模,确保内衬模在模架提升过程中与砼面静止不动;提升到预定位置后,上外模架与下外模架均夹紧内衬模,接着刷脱模剂、浇筑混凝土、在无需等待混凝土形成强度下便提升模架,通过如此反复作业,直到完成该墩柱施工。
2.如权利要求1所述的建筑高墩自提升步履式模板施工方法,其特征是具体施工方法步骤如下:
步骤a.场地平整:平整场地并用混凝土硬化;
步骤b.测量放样及定位:测量放样,支撑杆5定位并固定;
步骤c.安装自提升步履式模板装置:自提升步履式模板装置包括液压提升***和模架***,液压提升***包括爬升机1、液压泵站2、控制***3、油管4、上夹持油缸(13.1,13.2,13.3,…,13.n)、下夹持油缸(14.1,14.2,14.3,…,14.n)和顶升油缸(15.1,15.2,15.3,…,15.n),上夹持油缸、下夹持油缸和顶升油缸的个数根据实际施工面积确定;模架***包括支撑杆5、连接架6、内衬模7、吊杆8、下外模架9、下夹紧模板10、上夹紧模板11和上外模架12;液压提升***固定在模架***的支撑杆5上,连接架6通过吊杆8将液压提升***与模架***连接起来,将装置所有载荷转移至支撑杆5上,然后将自提升步履式模板施工装置调好水平,绑扎第一节混凝土钢筋16a,安装第一节内衬模板7,利用上夹持油缸(13.1,13.2,13.3,…,13.n)、下夹持油缸(14.1,14.2,14.3,…,14.n)分别将上夹紧模板11和下夹紧模板10夹紧内衬模7并施加一定压紧力,将混凝土浇筑到内衬模围成的范围内,振捣密实;
步骤d.绑扎下一节钢筋并安装下一节内衬模:绑扎下一节钢筋16b、安装下一节内衬模7b;
步骤e.模板***提升:首先利用下夹持油缸(14.1,14.2,14.3,…,14.n)将下夹紧模板10打开;然后利用液压提升***将下外模架9提升至预定高度,利用下夹持油缸(14.1,14.2,14.3,…,14.n)下夹紧模板10夹紧;其次利用上夹持油缸(13.1,13.2,13.3,…,13.n)将上夹紧模板11打开;利用顶升油缸(15.1,15.2,15.3,…,15.n)将上外模架12顶升至预定高度,最后利用上夹持油缸(13.1,13.2,13.3,…,13.n)将上夹紧模板11夹紧;
步骤f.浇筑混凝土:在内衬模7的内表面涂上脱模剂,将混凝土浇筑到内衬模围成的范围内,振捣密实;
重复步骤d、步骤e、步骤f直到完成该墩柱施工。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510843804.2A CN105507152B (zh) | 2015-11-26 | 2015-11-26 | 一种建筑高墩自提升步履式模板施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510843804.2A CN105507152B (zh) | 2015-11-26 | 2015-11-26 | 一种建筑高墩自提升步履式模板施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105507152A true CN105507152A (zh) | 2016-04-20 |
CN105507152B CN105507152B (zh) | 2017-08-25 |
Family
ID=55715430
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510843804.2A Active CN105507152B (zh) | 2015-11-26 | 2015-11-26 | 一种建筑高墩自提升步履式模板施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105507152B (zh) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105839542A (zh) * | 2016-05-04 | 2016-08-10 | 中国十九冶集团有限公司 | 桥梁高墩自升外架翻模装置 |
CN105926449A (zh) * | 2016-05-04 | 2016-09-07 | 中国十九冶集团有限公司 | 桥梁高墩翻模模板的拆卸方法 |
CN106087772A (zh) * | 2016-08-24 | 2016-11-09 | 中交三公局第三工程有限公司 | 桥梁高墩外滑内翻施工装置及方法 |
CN108316657A (zh) * | 2018-05-08 | 2018-07-24 | 许明达 | 一种自提升式高楼建设装置及其提升方法 |
CN108532940A (zh) * | 2018-04-19 | 2018-09-14 | 中铁七局集团第四工程有限公司 | 高墩无支架翻模施工方法 |
CN109610320A (zh) * | 2018-11-13 | 2019-04-12 | 柳州煜乾机械装备股份公司 | 一种带起重机滑模施工装置及施工方法 |
CN110080118A (zh) * | 2019-06-04 | 2019-08-02 | 中交一公局第一工程有限公司 | 用于滑模施工的垂直运输自升***及其施工方法 |
CN112431395A (zh) * | 2020-12-11 | 2021-03-02 | 余北京 | 建筑工程用钢构脚手架 |
CN113062222A (zh) * | 2021-03-17 | 2021-07-02 | 中交一公局集团有限公司 | 桥梁高墩辊模改进施工装置及方法 |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1082019A (ja) * | 1996-09-06 | 1998-03-31 | Taisei Corp | 橋脚の構築方法 |
CN2660028Y (zh) * | 2003-09-18 | 2004-12-01 | 山东省路桥集团有限公司 | 液压自升爬模 |
CN1912314A (zh) * | 2006-08-28 | 2007-02-14 | 杨秋利 | 自动液压爬升模板 |
JP2011032814A (ja) * | 2009-08-05 | 2011-02-17 | Ohbayashi Corp | 自昇式型枠装置及びそれを用いた堰板の盛替え方法 |
CN102345381A (zh) * | 2011-10-12 | 2012-02-08 | 四川路桥建设股份有限公司 | 液压爬模***及爬模施工方法 |
CN103046473A (zh) * | 2013-01-15 | 2013-04-17 | 中国土木工程集团有限公司 | 双肢空心高墩模侧液压顶升爬模及双肢空心高墩施工方法 |
CN103147403A (zh) * | 2013-03-29 | 2013-06-12 | 中交一公局第四工程有限公司 | 桥梁高墩辊模施工方法 |
CN103938856A (zh) * | 2014-04-09 | 2014-07-23 | 中国化学工程第十三建设有限公司 | 一种塔状构筑物无支撑杆滑模施工操作平台及施工方法 |
-
2015
- 2015-11-26 CN CN201510843804.2A patent/CN105507152B/zh active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1082019A (ja) * | 1996-09-06 | 1998-03-31 | Taisei Corp | 橋脚の構築方法 |
CN2660028Y (zh) * | 2003-09-18 | 2004-12-01 | 山东省路桥集团有限公司 | 液压自升爬模 |
CN1912314A (zh) * | 2006-08-28 | 2007-02-14 | 杨秋利 | 自动液压爬升模板 |
JP2011032814A (ja) * | 2009-08-05 | 2011-02-17 | Ohbayashi Corp | 自昇式型枠装置及びそれを用いた堰板の盛替え方法 |
CN102345381A (zh) * | 2011-10-12 | 2012-02-08 | 四川路桥建设股份有限公司 | 液压爬模***及爬模施工方法 |
CN103046473A (zh) * | 2013-01-15 | 2013-04-17 | 中国土木工程集团有限公司 | 双肢空心高墩模侧液压顶升爬模及双肢空心高墩施工方法 |
CN103147403A (zh) * | 2013-03-29 | 2013-06-12 | 中交一公局第四工程有限公司 | 桥梁高墩辊模施工方法 |
CN103938856A (zh) * | 2014-04-09 | 2014-07-23 | 中国化学工程第十三建设有限公司 | 一种塔状构筑物无支撑杆滑模施工操作平台及施工方法 |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105926449A (zh) * | 2016-05-04 | 2016-09-07 | 中国十九冶集团有限公司 | 桥梁高墩翻模模板的拆卸方法 |
CN105839542A (zh) * | 2016-05-04 | 2016-08-10 | 中国十九冶集团有限公司 | 桥梁高墩自升外架翻模装置 |
CN106087772A (zh) * | 2016-08-24 | 2016-11-09 | 中交三公局第三工程有限公司 | 桥梁高墩外滑内翻施工装置及方法 |
CN106087772B (zh) * | 2016-08-24 | 2017-12-29 | 中交三公局第三工程有限公司 | 桥梁高墩外滑内翻施工装置及方法 |
CN108532940B (zh) * | 2018-04-19 | 2020-04-14 | 中铁七局集团第四工程有限公司 | 高墩无支架翻模施工方法 |
CN108532940A (zh) * | 2018-04-19 | 2018-09-14 | 中铁七局集团第四工程有限公司 | 高墩无支架翻模施工方法 |
CN108316657A (zh) * | 2018-05-08 | 2018-07-24 | 许明达 | 一种自提升式高楼建设装置及其提升方法 |
CN108316657B (zh) * | 2018-05-08 | 2024-02-02 | 许明达 | 一种自提升式高楼建设装置及其提升方法 |
CN109610320A (zh) * | 2018-11-13 | 2019-04-12 | 柳州煜乾机械装备股份公司 | 一种带起重机滑模施工装置及施工方法 |
CN110080118A (zh) * | 2019-06-04 | 2019-08-02 | 中交一公局第一工程有限公司 | 用于滑模施工的垂直运输自升***及其施工方法 |
CN112431395A (zh) * | 2020-12-11 | 2021-03-02 | 余北京 | 建筑工程用钢构脚手架 |
CN112431395B (zh) * | 2020-12-11 | 2022-10-14 | 武汉港工建筑工程有限公司 | 建筑工程用钢构脚手架 |
CN113062222A (zh) * | 2021-03-17 | 2021-07-02 | 中交一公局集团有限公司 | 桥梁高墩辊模改进施工装置及方法 |
Also Published As
Publication number | Publication date |
---|---|
CN105507152B (zh) | 2017-08-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105507152A (zh) | 建筑高墩自提升步履式模板施工方法 | |
CN102230315B (zh) | 多层建筑的预制构件及其半预制构筑方法 | |
KR101153430B1 (ko) | 곡선거더 제작용 이동식 거푸집, 이를 이용하여 제작된 거더와 거더교 시공방법 | |
CN104790676A (zh) | 一种预制墙板安装的快速调平、找正装置及其方法 | |
CN105507157B (zh) | 变曲率环形劲芯现浇混凝土梁施工方法 | |
CN107663951A (zh) | 叠合板与墙板一体浇筑的支撑体系及施工工艺 | |
CN106193589B (zh) | 混凝土超高重型梁及叠合板组合结构支撑方法 | |
CN106065681A (zh) | 一种基于bim技术的整体装配式建筑中叠合板现浇板带施工方法 | |
CN101793006A (zh) | 一种支架现浇连续梁快速施工的施工方法 | |
CN101922141B (zh) | 一种支座垫石结构和施工方法 | |
CN110700105B (zh) | 高墩墩柱与系梁同步施工方法及所用模板 | |
CN105714966A (zh) | 带有标高调节装置的倒置叠合板及施工方法 | |
CN108914780A (zh) | 一种桥梁薄壁高墩液压滑模施工方法 | |
CN202324606U (zh) | 一种u型承力座 | |
CN110374113B (zh) | 适用于钢管支撑基坑快速换撑方法及活动接头 | |
CN205557336U (zh) | 建筑高墩自提升步履式模板装置 | |
CN109797969B (zh) | 后浇带工具式超前吊模***的施工方法 | |
CN107806015B (zh) | 一种装配式桥梁翼缘板砼浇筑模板体系及施工方法 | |
CN106884532A (zh) | 阶梯式弧形看台现浇装饰板的模板支撑体系及构建方法 | |
CN114263275B (zh) | 高层装配式钢结构-核心筒同层施工工法 | |
CN105839786A (zh) | 气承膜建筑混凝土锚栓预埋结构及其施工方法 | |
CN107191201A (zh) | 隧道中隔墙施工模板及其施工装置 | |
CN206969985U (zh) | 多节段预制梁的吊装辅助平衡工具 | |
CN115198926B (zh) | 一种框架结构装配式墙-梁连接构造及其施工方法 | |
CN205348505U (zh) | 带有标高调节装置的倒置叠合板 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |