CN105491114B - Controlled plant switching method, apparatus and system - Google Patents

Controlled plant switching method, apparatus and system Download PDF

Info

Publication number
CN105491114B
CN105491114B CN201510829171.XA CN201510829171A CN105491114B CN 105491114 B CN105491114 B CN 105491114B CN 201510829171 A CN201510829171 A CN 201510829171A CN 105491114 B CN105491114 B CN 105491114B
Authority
CN
China
Prior art keywords
controlled plant
mark
user
manipulation
controlled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510829171.XA
Other languages
Chinese (zh)
Other versions
CN105491114A (en
Inventor
张鹏飞
胡宁
刘铁俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiaomi Inc
Beijing Smartmi Technology Co Ltd
Original Assignee
Xiaomi Inc
Beijing Smartmi Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xiaomi Inc, Beijing Smartmi Technology Co Ltd filed Critical Xiaomi Inc
Priority to CN201510829171.XA priority Critical patent/CN105491114B/en
Publication of CN105491114A publication Critical patent/CN105491114A/en
Application granted granted Critical
Publication of CN105491114B publication Critical patent/CN105491114B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/02Protocols based on web technology, e.g. hypertext transfer protocol [HTTP]
    • H04L67/025Protocols based on web technology, e.g. hypertext transfer protocol [HTTP] for remote control or remote monitoring of applications
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/50Network services
    • H04L67/52Network services specially adapted for the location of the user terminal
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04MTELEPHONIC COMMUNICATION
    • H04M11/00Telephonic communication systems specially adapted for combination with other electrical systems
    • H04M11/007Telephonic communication systems specially adapted for combination with other electrical systems with remote control systems

Landscapes

  • Engineering & Computer Science (AREA)
  • Signal Processing (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Automation & Control Theory (AREA)
  • Selective Calling Equipment (AREA)
  • Telephonic Communication Services (AREA)

Abstract

The disclosure is directed to a kind of controlled plant switching methods, apparatus and system, belong to network technique field.The described method includes: the controlled plant acquisition request that receiving control apparatus is sent;Receive the user current location that the control equipment is sent;Current time is obtained according to the controlled plant acquisition request;N target controlled plant mark is determined according to the user current location and the current time, preset manipulation corresponding relationship, the n is greater than or equal to 1, and the manipulation corresponding relationship is used to record the corresponding relationship that user manipulates time, user manipulation position and controlled plant mark;Controlled plant is sent to the control equipment and obtains response, and it includes that the n target controlled plant identifies that the controlled plant, which obtains response, and the operating steps for solving controlled plant are cumbersome, the lower problem of manipulation efficiency;Simplified operating steps are reached, the effect of manipulation efficiency have been improved, for manipulating controlled plant.

Description

Controlled plant switching method, apparatus and system
Technical field
This disclosure relates to network technique field, in particular to a kind of controlled plant switching method, apparatus and system.
Background technique
With the fast development of information technology, obtained by controlling the technology that equipment manipulates multiple controlled plants It is widely applied, which is the product that modern electronic technology, automatic technology and the communication technology combine, and passes through the technology energy Multiple controlled plants are enough automatically controlled and managed, provide safety and comfort, efficiently convenient living environment and working environment for user. Exemplary, controlled plant can be the electric appliances such as lamps and lanterns, air-conditioning, television set, and control equipment can be mobile phone, and user can be to firmly The air-conditioning in residence was first opened by mobile phone in first 15 minutes, it is suitable to enjoy immediately when user is to residence Environment.
In the related technology, user can first pass through control equipment and send controlled plant acquisition request, server to server After receiving the controlled plant acquisition request, it will include that the list of multiple controlled plants mark is back to control equipment, control Equipment by the list display to user, in order to which user selects to want the controlled plant of manipulation.
Disclosure
In order to solve Related Technical Issues, present disclose provides a kind of controlled plant switching methods, apparatus and system.It is described Technical solution is as follows:
According to the disclosure in a first aspect, provide a kind of controlled plant switching method, this method comprises:
The controlled plant acquisition request that receiving control apparatus is sent;
The user current location that receiving control apparatus is sent;
Current time is obtained according to controlled plant acquisition request;
N target controlled plant mark is determined according to user current location and current time, preset manipulation corresponding relationship, N is greater than or equal to 1, and manipulation corresponding relationship is used to record pair that user manipulates time, user manipulation position and controlled plant mark It should be related to;
Controlled plant is sent to control equipment and obtains response, and it includes n target controlled plant mark that controlled plant, which obtains response, Know.
Optionally, this method further include:
At least one manipulation information that receiving control apparatus is sent, each manipulation information include that controlled plant identifies, is controlled The position and moment that equipment is steered;
Determine that each controlled plant of at least one manipulation information record identifies corresponding user and manipulates time, user's manipulation Position;
Corresponding user, which is identified, according to each controlled plant of at least one manipulation information record manipulates time, user's manipulation Position and controlled plant mark establish manipulation corresponding relationship.
Optionally, it determines that n target is controlled according to user current location and current time, preset manipulation corresponding relationship and sets Standby mark, comprising:
Determine the user for manipulating that the user that current time belongs in corresponding relationship manipulates the time and user current location belongs to Manipulate position;
In manipulation corresponding relationship, user's manipulation time that current time belongs to and the use that user current location belongs to are determined Family manipulates n target controlled plant mark corresponding to position.
Optionally, controlled plant obtains response, comprising: first object list, first object list are provided with m mark Position, m are greater than n, and each of preceding n marker of first object list marker records in n target controlled plant mark Each target controlled plant mark.
Optionally, controlled plant obtains response, comprising: the second object listing, the second object listing are provided with n mark Position, each of n marker marker record each of n target controlled plant mark target controlled plant mark Know.
Optionally, controlled plant obtains response, comprising: the first object of first object controlled plant mark instruction is controlled to be set Standby corresponding equipment interface opens message, and equipment interface opens message for notifying control equipment to show first object controlled plant The equipment operation interface of the first object controlled plant of instruction is identified, first object controlled plant is identified as that n target is controlled to be set For any one in mark.
Optionally, this method further include:
The controlled plant that receiving control apparatus is sent adds information, and controlled plant addition information includes that at least one controlled sets Standby mark.
According to the second aspect of the disclosure, a kind of controlled plant switching method is provided, this method comprises:
Receive controlled plant acquisition instruction;
Controlled plant acquisition request is sent to server according to controlled plant acquisition instruction;
User current location is sent to server;
It receives the controlled plant that server is sent and obtains response, it includes n target controlled plant that controlled plant, which obtains response, Mark, n be greater than or equal to 1, n target controlled plant mark be server according to user current location and current time, preset Manipulation corresponding relationship determine that user manipulates the time to manipulation corresponding relationship, user manipulates position and controlled plant for recording The corresponding relationship of mark.
Optionally, this method further include:
Receive at least one manipulation instruction;
At least one manipulation information is sent to server according at least one manipulation instruction, each manipulation information includes controlled The position and moment that device identification, controlled plant are steered.
Optionally, controlled plant obtains response, comprising: first object list, first object list are provided with m mark Position, m are greater than n, and each of preceding n marker of first object list marker records in n target controlled plant mark Each target controlled plant mark.
Optionally, controlled plant obtains response, comprising: the second object listing, the second object listing are provided with n mark Position, each of n marker marker record each of n target controlled plant mark target controlled plant mark Know.
Optionally, controlled plant obtains response, comprising: the first object of first object controlled plant mark instruction is controlled to be set Standby corresponding equipment interface opens message, method further include:
The first object controlled plant that message shows that first object controlled plant mark indicates is opened according to equipment interface Equipment operation interface, first object controlled plant are identified as any one in n target controlled plant mark.
Optionally, this method further include:
Receive controlled plant addition instruction;
Controlled plant is sent to server according to controlled plant addition instruction and adds information, and controlled plant addition information includes At least one controlled plant mark.
According to the third aspect of the disclosure, a kind of controlled plant switching device is provided, which includes:
First receiving module is configured as the controlled plant acquisition request of receiving control apparatus transmission;
Second receiving module is configured as the user current location of receiving control apparatus transmission;
Module is obtained, is configured as obtaining current time according to controlled plant acquisition request;
First determining module is configured as true according to user current location and current time, preset manipulation corresponding relationship Determine n target controlled plant mark, n is greater than or equal to 1, and manipulation corresponding relationship manipulates time, user's manipulation for recording user The corresponding relationship of position and controlled plant mark;
Sending module is configured as sending controlled plant acquisition response to control equipment, and it includes n that controlled plant, which obtains response, A target controlled plant mark.
Optionally, device further include:
Third receiving module is configured as at least one manipulation information of receiving control apparatus transmission, each manipulation information The position being steered including controlled plant mark, controlled plant and moment;
Second determining module is configured to determine that each controlled plant mark of at least one manipulation information record is corresponding User manipulates the time, user manipulates position;
Module is established, is configured as identifying corresponding user according to each controlled plant of at least one manipulation information record Manipulate the time, user manipulates position and controlled plant mark establishes manipulation corresponding relationship.
Optionally, the first determining module is configured as:
Determine the user for manipulating that the user that current time belongs in corresponding relationship manipulates the time and user current location belongs to Manipulate position;
In manipulation corresponding relationship, user's manipulation time that current time belongs to and the use that user current location belongs to are determined Family manipulates n target controlled plant mark corresponding to position.
Optionally, controlled plant obtains response, comprising: first object list, first object list are provided with m mark Position, m are greater than n, and each of preceding n marker of first object list marker records in n target controlled plant mark Each target controlled plant mark.
Optionally, controlled plant obtains response, comprising: the second object listing, the second object listing are provided with n mark Position, each of n marker marker record each of n target controlled plant mark target controlled plant mark Know.
Optionally, controlled plant obtains response, comprising: the first object of first object controlled plant mark instruction is controlled to be set Standby corresponding equipment interface opens message, and equipment interface opens message for notifying control equipment to show first object controlled plant The equipment operation interface of the first object controlled plant of instruction is identified, first object controlled plant is identified as that n target is controlled to be set For any one in mark.
Optionally, device further include:
4th receiving module is configured as the controlled plant addition information of receiving control apparatus transmission, controlled plant addition Information includes at least one controlled plant mark.
According to the fourth aspect of the disclosure, a kind of controlled plant switching device is provided, which includes:
First receiving module is configured as receiving controlled plant acquisition instruction;
First sending module is configured as being asked according to controlled plant acquisition instruction to server transmission controlled plant acquisition It asks;
Second sending module is configured as sending user current location to server;
Second receiving module is configured as receiving the controlled plant acquisition response that server is sent, and controlled plant, which obtains, to be rung It should include n target controlled plant mark, it is that server is worked as according to user that n, which is greater than or equal to 1, n target controlled plant mark, Front position and current time, preset manipulation corresponding relationship determine that manipulation corresponding relationship manipulates the time for recording user, uses Family manipulates the corresponding relationship of position and controlled plant mark.
Optionally, the device further include:
Third receiving module is configured as receiving at least one manipulation instruction;
Third sending module is configured as sending at least one manipulation letter to server according at least one manipulation instruction Breath, each manipulation information include the position and moment that controlled plant identifies, controlled plant is steered.
Optionally, controlled plant obtains response, comprising: first object list, first object list are provided with m mark Position, m are greater than n, and each of preceding n marker of first object list marker records in n target controlled plant mark Each target controlled plant mark.
Optionally, controlled plant obtains response, comprising: the second object listing, the second object listing are provided with n mark Position, each of n marker marker record each of n target controlled plant mark target controlled plant mark Know.
Optionally, controlled plant obtains response, comprising: the first object of first object controlled plant mark instruction is controlled to be set Standby corresponding equipment interface opens message, the device further include:
Display module is configured as opening message shows the mark instruction of first object controlled plant the according to equipment interface The equipment operation interface of one target controlled plant, first object controlled plant are identified as appointing in n target controlled plant mark Meaning one.
Optionally, the device further include:
4th receiving module is configured as receiving controlled plant addition instruction;
4th sending module is configured as adding instruction according to controlled plant and sending controlled plant to server and add believing Breath, controlled plant addition information include at least one controlled plant mark.
According to the 5th of the disclosure the aspect, a kind of controlled plant switching device is provided, comprising:
Processor;
The memory of executable instruction for storage processor;
Wherein, processor is configured as:
The controlled plant acquisition request that receiving control apparatus is sent;
The user current location that receiving control apparatus is sent;
Current time is obtained according to controlled plant acquisition request;
N target controlled plant mark is determined according to user current location and current time, preset manipulation corresponding relationship, N is greater than or equal to 1, and manipulation corresponding relationship is used to record pair that user manipulates time, user manipulation position and controlled plant mark It should be related to;
Controlled plant is sent to control equipment and obtains response, and it includes n target controlled plant mark that controlled plant, which obtains response, Know.
According to the 6th of the disclosure the aspect, a kind of controlled plant switching device is provided, comprising:
Processor;
The memory of executable instruction for storage processor;
Wherein, processor is configured as:
Receive controlled plant acquisition instruction;
Controlled plant acquisition request is sent to server according to controlled plant acquisition instruction;
User current location is sent to server;
It receives the controlled plant that server is sent and obtains response, it includes n target controlled plant that controlled plant, which obtains response, Mark, n be greater than or equal to 1, n target controlled plant mark be server according to user current location and current time, preset Manipulation corresponding relationship determine that user manipulates the time to manipulation corresponding relationship, user manipulates position and controlled plant for recording The corresponding relationship of mark.
According to the 7th of the disclosure the aspect, a kind of controlled plant switching system is provided, which includes: server, control Equipment and at least one controlled plant,
Server includes any controlled plant switching device of the third aspect;
Controlling equipment includes any controlled plant switching device of fourth aspect.
According to the eighth aspect of the disclosure, a kind of controlled plant switching system is provided, which includes: server, control Equipment and at least one controlled plant,
Server includes the controlled plant switching device of the 5th aspect;
Control equipment includes the controlled plant switching device of the 6th aspect.
The technical solution that the embodiment of the present disclosure provides can include the following benefits:
Server after receiving the controlled plant acquisition request that control equipment is sent, can according to user current location and Current time, preset manipulation corresponding relationship determine n target controlled plant mark, and sending to control equipment includes n mesh The controlled plant for marking controlled plant mark obtains response, and the operating steps for solving controlled plant in the related technology are cumbersome, behaviour The lower problem of efficiency is controlled, simplified operating steps have been reached, improves the effect of manipulation efficiency.
It should be understood that above general description and following detailed description be only it is exemplary and explanatory, not The disclosure can be limited.
Detailed description of the invention
The drawings herein are incorporated into the specification and forms part of this specification, and shows the implementation for meeting the disclosure Example, and together with specification for explaining the principles of this disclosure.
Fig. 1 is the related implementation environment schematic diagram that each embodiment of the disclosure provides;
Fig. 2 is a kind of method flow diagram of controlled plant switching method shown according to an exemplary embodiment;
Fig. 3 is the method flow diagram of another controlled plant switching method shown according to an exemplary embodiment;
Fig. 4-1 is the method flow diagram of another controlled plant switching method shown according to an exemplary embodiment;
Fig. 4-2 is the method flow diagram that target controlled plant mark is determined in Fig. 4-1 illustrated embodiment;
Fig. 4-3 is the schematic diagram of first object list in Fig. 4-1 illustrated embodiment;
Fig. 4-4 is the schematic diagram of the second object listing in Fig. 4-1 illustrated embodiment;
Fig. 4-5 is the schematic diagram of list of controlled devices in the related technology;
Fig. 4-6 is the schematic diagram at equipment operation interface in Fig. 4-1 illustrated embodiment;
Fig. 5-1 is a kind of block diagram of controlled plant switching device shown according to an exemplary embodiment;
Fig. 5-2 is the block diagram of another controlled plant switching device shown according to an exemplary embodiment;
Fig. 5-3 is the block diagram of another controlled plant switching device shown according to an exemplary embodiment;
Fig. 6-1 is a kind of block diagram of the controlled plant switching device shown according to another exemplary embodiment;
Fig. 6-2 is the block diagram of another controlled plant switching device shown according to another exemplary embodiment;
Fig. 6-3 is the block diagram of another the controlled plant switching device shown according to another exemplary embodiment;
Fig. 6-4 is the block diagram of another the controlled plant switching device shown according to another exemplary embodiment;
Fig. 7 is a kind of block diagram of controlled plant switching device shown according to an exemplary embodiment;
Fig. 8 is a kind of block diagram of controlled plant switching device shown according to an exemplary embodiment;
Fig. 9 is a kind of structural schematic diagram of controlled plant switching system shown according to an exemplary embodiment.
Through the above attached drawings, it has been shown that the specific embodiment of the disclosure will be hereinafter described in more detail.These attached drawings It is not intended to limit the scope of this disclosure concept by any means with verbal description, but is by referring to specific embodiments Those skilled in the art illustrate the concept of the disclosure.
Specific embodiment
Example embodiments are described in detail here, and the example is illustrated in the accompanying drawings.Following description is related to When attached drawing, unless otherwise indicated, the same numbers in different drawings indicate the same or similar elements.Following exemplary embodiment Described in embodiment do not represent all implementations consistent with this disclosure.On the contrary, they be only with it is such as appended The example of the consistent device and method of some aspects be described in detail in claims, the disclosure.
Fig. 1 is implementation environment schematic diagram involved in the controlled plant switching method of each embodiment offer of the disclosure, should Implementation environment may include: server 11, control equipment 12 and at least one controlled plant 13.
Server 11 can be a server, or the server cluster consisted of several servers or one A cloud computing service center.Server 11 can establish connection by wireless network or cable network with control equipment 12.
Control equipment 12 can be mobile phone, tablet computer, pocket computer on knee etc..Control equipment 12 can have Infrared emission function, bluetooth connection function and Wireless Fidelity (English: WIreless-Fidelity;Referred to as: WIFI) linkage function At least one of function.
Controlled plant 13 can be television set, air-conditioning, refrigerator, fan, water purifier, video camera, air purifier, machine top Box and router etc..Controlled plant 13 can have infrared receiver function, in bluetooth connection function and WIFI linkage function At least one function.This implementation environment does not restrict the quantity of controlled plant 13.
Server 11, can be according to user's present bit after receiving the controlled plant acquisition request that control equipment 12 is sent It sets and determines that at least one target controlled plant identifies with current time, preset manipulation corresponding relationship, and sent out to control equipment 12 Controlled plant is sent to obtain response, it includes that at least one target controlled plant identifies which, which obtains response,.Manipulation is corresponding to close It is that user manipulates the time, user manipulates position and the corresponding relationship of controlled plant mark for recording.
Fig. 2 is a kind of flow chart of controlled plant switching method shown according to an exemplary embodiment, the present embodiment with The controlled plant switching method is applied to the server 11 in implementation environment shown in Fig. 1 to illustrate.Controlled plant switching Method may include the following steps:
In step 201, the controlled plant acquisition request that receiving control apparatus is sent.
In step 202, the user current location that receiving control apparatus is sent.
In step 203, current time is obtained according to controlled plant acquisition request.
In step 204, n target is determined according to user current location and current time, preset manipulation corresponding relationship Controlled plant mark, n be greater than or equal to 1, the manipulation corresponding relationship for record user manipulate the time, user manipulate position and by Control the corresponding relationship of device identification.
In step 205, controlled plant being sent to control equipment and obtaining response, it includes n which, which obtains response, Target controlled plant mark.
In conclusion the controlled plant switching method that the embodiment of the present disclosure provides, server is receiving control equipment hair After the controlled plant acquisition request sent, it can be determined according to user current location and current time, preset manipulation corresponding relationship Target controlled plant mark, and send the controlled plant identified including target controlled plant to control equipment and obtain response, it solves The operating steps of controlled plant are cumbersome in the related technology, and the lower problem of manipulation efficiency has reached simplified operating steps, mentions The effect of height manipulation efficiency.
Optionally, this method can also include: at least one manipulation information that receiving control apparatus is sent, each manipulation letter Breath includes the position and moment that controlled plant identifies, controlled plant is steered;Determine each of at least one manipulation information record Controlled plant identifies corresponding user and manipulates time, user's manipulation position;According at least one manipulation information record each of by It controls the corresponding user of device identification and manipulates time, user manipulation position and controlled plant mark foundation manipulation corresponding relationship.
Optionally, step 204 may include: determine in manipulation corresponding relationship the user that belongs to of current time manipulate the time and The user that user current location belongs to manipulates position;In manipulation corresponding relationship, when determining user's manipulation that current time belongs to Between and the user that belongs to of user current location manipulate n target controlled plant corresponding to position and identify.
Optionally, controlled plant obtains response, comprising: first object list, first object list are provided with m mark Position, m are greater than n, and each of preceding n marker of first object list marker records in n target controlled plant mark Each target controlled plant mark.
Optionally, controlled plant obtains response, comprising: the second object listing, the second object listing are provided with n mark Position, each of n marker marker record each of n target controlled plant mark target controlled plant mark Know.
Optionally, controlled plant obtains response, comprising: the first object of first object controlled plant mark instruction is controlled to be set Standby corresponding equipment interface opens message, and equipment interface opens message for notifying control equipment to show first object controlled plant The equipment operation interface of the first object controlled plant of instruction is identified, first object controlled plant is identified as that n target is controlled to be set For any one in mark.
Optionally, this method can also include: the controlled plant addition information that receiving control apparatus is sent, and controlled plant adds Adding information includes at least one controlled plant mark.
In conclusion the controlled plant switching method that the embodiment of the present disclosure provides, server is receiving control equipment hair After the controlled plant acquisition request sent, it can be determined according to user current location and current time, preset manipulation corresponding relationship Target controlled plant mark, and send the controlled plant identified including target controlled plant to control equipment and obtain response, it solves The operating steps of controlled plant are cumbersome in the related technology, and the lower problem of manipulation efficiency has reached simplified operating steps, mentions The effect of height manipulation efficiency.
Fig. 3 is a kind of flow chart of controlled plant switching method shown according to an exemplary embodiment, the present embodiment with The controlled plant switching method is applied to the control equipment 12 in implementation environment shown in Fig. 1 to illustrate.The controlled plant is cut The method of changing may include the following steps:
In step 301, controlled plant acquisition instruction is received.
In step 302, controlled plant acquisition request is sent to server according to controlled plant acquisition instruction.
In step 303, user current location is sent to server.
In step 304, it receives the controlled plant that server is sent and obtains response, it includes n which, which obtains response, A target controlled plant mark, n be greater than or equal to 1, n target controlled plant mark be server according to user current location with Current time, preset manipulation corresponding relationship determine that the manipulation corresponding relationship manipulates time, user's manipulation for recording user The corresponding relationship of position and controlled plant mark.
In conclusion the controlled plant switching method that the embodiment of the present disclosure provides, control equipment first receives controlled plant and obtains Instruction fetch sends controlled plant acquisition request to server further according to controlled plant acquisition instruction, and sends user to server Then current location receives the controlled plant including target controlled plant mark that server is sent and obtains response, solves phase The operating steps of controlled plant are cumbersome in the technology of pass, and the lower problem of manipulation efficiency has reached simplified operating steps, improved behaviour Control the effect of efficiency.
Optionally, this method can also include: to receive at least one manipulation instruction;According at least one manipulation instruction to clothes Business device sends at least one manipulation information, each manipulation information include controlled plant mark, the position that is steered of controlled plant and Moment.
Optionally, controlled plant obtains response, comprising: first object list, first object list are provided with m mark Position, m are greater than n, and each of preceding n marker of first object list marker records in n target controlled plant mark Each target controlled plant mark.
Optionally, controlled plant obtains response, comprising: the second object listing, the second object listing are provided with n mark Position, each of n marker marker record each of n target controlled plant mark target controlled plant mark Know.
Optionally, controlled plant obtains response, comprising: the first object of first object controlled plant mark instruction is controlled to be set Standby corresponding equipment interface opens message, this method can also include: according to equipment interface open message show first object by The equipment operation interface of the first object controlled plant of device identification instruction is controlled, first object controlled plant is identified as n target Controlled plant mark in any one.
Optionally, this method can also include: to receive controlled plant addition instruction;It is instructed according to controlled plant addition to clothes Business device sends controlled plant and adds information, and controlled plant addition information includes at least one controlled plant mark.
In conclusion the controlled plant switching method that the embodiment of the present disclosure provides, control equipment first receives controlled plant and obtains Instruction fetch sends controlled plant acquisition request to server further according to controlled plant acquisition instruction, and sends user to server Then current location receives the controlled plant including target controlled plant mark that server is sent and obtains response, solves phase The operating steps of controlled plant are cumbersome in the technology of pass, and the lower problem of manipulation efficiency has reached simplified operating steps, improved behaviour Control the effect of efficiency.
Fig. 4-1 is a kind of flow chart of controlled plant switching method shown according to an exemplary embodiment, the present embodiment It is applied to implementation environment shown in Fig. 1 with the controlled plant switching method to illustrate.The controlled plant switching method can wrap Include the following steps:
In step 401, control equipment receives controlled plant addition instruction.
User can add multiple controlled plants by control equipment.User generates accordingly when adding multiple controlled plants Controlled plant add instruction, control equipment can receive the controlled plant addition instruction.This is mobile phone, tablet computer, on knee Portable computer and desktop computer etc. can manipulate controlled plant and the equipment with positioning function.
In step 402, control equipment sends controlled plant to server according to controlled plant addition instruction and adds information.
Controlled plant addition information includes at least one controlled plant mark.Assuming that user is added to 5 by controlling equipment A controlled plant, this 5 controlled plants are respectively electric cooker, shutter, air-conditioning, refrigerator, television set, and this 5 controlled plants Controlled plant mark be respectively electric cooker D1, shutter D2, air-conditioning D3, refrigerator D4 and television set D5.So control equipment root The controlled plant addition information sent according to controlled plant addition instruction to server includes 5 controlled plant marks: electric cooker D1, Shutter D2, air-conditioning D3, refrigerator D4 and television set D5.Table 1 show each of 5 controlled plants controlled plant title with The corresponding relationship of its controlled plant mark.
Table 1
Controlled plant title Controlled plant mark
Electric cooker Electric cooker D1
Shutter Shutter D2
Air-conditioning Air-conditioning D3
Refrigerator Refrigerator D4
Television set Television set D5
It should be noted that controlled plant mark can also be controlled plant picture, the embodiment of the present disclosure is to controlled plant The particular content of mark is without limitation.
In step 403, control equipment receives at least one manipulation instruction.
When user passes through control equipment manipulation controlled plant each time, a manipulation instruction can be generated, equipment meeting is controlled Receive the operational order.It is exemplary, when user adjusts air-conditioner temperature by control equipment, an adjusting air-conditioner temperature can be generated Manipulation instruction, control equipment can receive the manipulation instruction.When user opens television set by control equipment, one can be generated The manipulation instruction of television set is opened, control equipment can receive the manipulation instruction.
In step 404, control equipment sends at least one manipulation information to server according at least one manipulation instruction.
Each manipulation information includes the position and moment that controlled plant identifies, controlled plant is steered.User is led to each time The operation and behavior for crossing control equipment manipulation controlled plant, all can be reported to server by control equipment.When control equipment receives When to user to the manipulation instruction of controlled plant, manipulation information, the manipulation information can be sent to server according to manipulation instruction May include user manipulation controlled plant controlled plant mark, the position that the controlled plant is manipulated by user and moment behaviour Control information, in this way, server is assured which position user is currently at, which at moment by control equipment to which by Control equipment is manipulated.Since user is different in the probability of different location manipulation controlled plant, as user opens TV in parlor The likelihood ratio user of machine is big in the probability that television set is opened in bedroom, so the position that controlled plant is steered by the embodiment of the present disclosure As a Rule of judgment.
It is exemplary, when first day user passed through the air-conditioning in control equipment opening residence at 15 minutes to before residence When, a manipulation instruction is generated, controls equipment after receiving the manipulation instruction, is sent according to the manipulation instruction to server One manipulation information, the manipulation information may include air-conditioning mark: air-conditioning D3, the position that air-conditioning is opened: apart from 500 meters of residence Position, at the time of air-conditioning is opened: 18:30, in this way, server is assured that user is currently at apart from 500 meters of residence Position at, 18:30 by control equipment open air-conditioning.Likewise, when second day user to residence the first two very When clock opens the air-conditioning in residence by control equipment, the manipulation instruction of an opening air-conditioning is generated, control equipment is receiving After the manipulation instruction, a manipulation information is sent to server according to the manipulation instruction, which may include air-conditioning Mark: air-conditioning D3, the position that air-conditioning is opened: apart from 450 meters of the position in residence, at the time of air-conditioning is opened: 18:10, in this way, Server is assured that user is currently at the position in 450 meters of residence, in the sky that 18:10 is opened by control equipment It adjusts.
In step 405, server determines that each controlled plant of at least one manipulation information record identifies corresponding use Family manipulates the time, user manipulates position.
Since each manipulation information includes the position and moment that controlled plant identifies, controlled plant is steered, so service Device after receiving manipulation information, can determine the controlled plant of manipulation information record identify corresponding user manipulate the time, User manipulates position.By taking the air-conditioning in step 404 as an example, it is assumed that control equipment has sent corresponding 3 behaviour of air-conditioning to server Information is controlled, first manipulation information includes air-conditioning mark: air-conditioning D3, the position that air-conditioning is opened: apart from 500 meters of the position in residence It sets, at the time of air-conditioning is opened: 18:30, second manipulation information include that air-conditioning identifies: air-conditioning D3, the position that air-conditioning is opened: Apart from 450 meters of the position in residence, at the time of air-conditioning is opened: 18:10, third manipulation information include air-conditioning mark: air-conditioning D3, The position that air-conditioning is opened: apart from 399 meters of the position in residence, at the time of air-conditioning is opened: 18:07, server can determine this 3 The corresponding user of air-conditioning D3 of a manipulation information manipulates the time as 18:00 to 18:40, and the corresponding user of air-conditioning D3 manipulates position and is Apart from 350 to 550 meters of the position in residence, it can determine user be usually in 18:00 to 18:40, apart from residence 350 to Air-conditioning is manipulated at 550 meters of position.Likewise, server can also determine remaining controlled plant such as hundred of manipulation information record Leaf window, refrigerator, motor machine etc. identify corresponding user and manipulate time, user's manipulation position.Server can mass data on backstage The position and moment being steered such as controlled plant mark, controlled plant are counted, and understand user to each controlled plant Use habit, in this way, server can be returned according to user current location and current time when user obtains controlled plant again Relevant controlled devices information.
In a step 406, server identifies corresponding use according to each controlled plant of at least one manipulation information record Family manipulates the time, user manipulates position and controlled plant mark establishes manipulation corresponding relationship.
Each controlled plant that server can be determined according to step 405 identifies corresponding user and manipulates time, Yong Hucao It controls position and establishes manipulation corresponding relationship.Table 2 shows a kind of manipulation corresponding relationship of controlled plant.As shown in table 2, user is usual It is that electric cooker D1 is manipulated at the position apart from 1000 to 1500 meters of residence in 17:10 to 17:50, user is usually in 08:15 To 08:35, shutter D2 is manipulated in master bedroom, user is usually to manipulate refrigerator D4 in parlor in 13:20 to 14:30.Actually answer In, different controlled plants identifies corresponding user's manipulation time in table 2 and user manipulates position and can be overlapped, such as First controlled plant identifies corresponding user and manipulates the time as 17:10 to 17:50, and it is apart from residence 1000 that user, which manipulates position, To 1500 meters of position, second controlled plant identifies corresponding user and manipulates the time as 17:30 to 19:20, and user manipulates position It is set to apart from the position in 1400 to 2600 meters of residence.
Table 2
Controlled plant mark User manipulates the time User manipulates position
Electric cooker D1 17:10 to 17:50 Apart from 1000 to 1500 meters of the position in residence
Shutter D2 08:15 to 08:35 Master bedroom
Air-conditioning D3 18:00 to 18:40 Apart from 350 to 550 meters of the position in residence
Refrigerator D4 13:20 to 14:30 Parlor
Television set D5 20:10 to 21:10 Parlor
In step 407, control equipment receives controlled plant acquisition instruction.
When user wants to manipulate some controlled plant by controlling equipment, the controlled plant in control equipment can be clicked Key is obtained, controlled plant acquisition instruction is generated, control equipment can receive the controlled plant acquisition instruction.
In a step 408, control equipment sends controlled plant acquisition request to server according to controlled plant acquisition instruction.
Control equipment can obtain after the controlled plant acquisition instruction for receiving user's generation according to the controlled plant It instructs to server and sends controlled plant acquisition request, request server returns to relevant controlled devices information.
In step 409, control equipment sends user current location to server.
Server, can be according to user current location after receiving the controlled plant acquisition request that control equipment is sent Relevant controlled devices information is returned with current time.User current location can be issued server by control equipment, control equipment Locating module can be set, which is used to determine the position where user.It should be noted that in a first aspect, control Equipment can send controlled plant acquisition request and user current location to server simultaneously, i.e. step 409 can be with step 408 It is performed simultaneously;Second aspect, control equipment can also be sent out after sending controlled plant acquisition request to server to server User current location is sent, i.e. step 409 can execute after step 408;The third aspect, server are receiving control equipment After the controlled plant acquisition request of transmission, position requests are sent to control equipment, request control equipment returns to user's present bit It sets, controls equipment according to the position requests and determine user current location, and send the user current location to server.
In step 410, server obtains current time according to controlled plant acquisition request.
Server, can be according to user current location after receiving the controlled plant acquisition request that control equipment is sent Relevant controlled devices information is returned with current time.User current location can issue server by control equipment.It needs to illustrate , in a first aspect, equipment is controlled when sending controlled plant acquisition request to server, when can send current to server It carves, i.e. control equipment sends controlled plant acquisition request and current time to server simultaneously, that is to say, that step 410 can be with It is performed simultaneously with step 408;Second aspect, control equipment can be after sending controlled plant acquisition request to server, root According to controlled plant acquisition request, current time is determined, and send current time to server, i.e. step 410 can be in step 408 It executes later;The third aspect, server can be after receiving the controlled plant acquisition request that control equipment is sent, to control The request of equipment sending instant, request control equipment return to current time, and control equipment requested to determine current time according to the moment, And the current time is sent to server;Fourth aspect, server can also directly determine current time.
In step 411, server determines n according to user current location and current time, preset manipulation corresponding relationship A target controlled plant mark, n are greater than or equal to 1.
Manipulating corresponding relationship is the corresponding relationship that step 406 is established, when the manipulation corresponding relationship is for recording user's manipulation Between, user manipulate position and controlled plant mark corresponding relationship.Optionally, as shown in the Fig. 4-2, step 411 may include as Under several sub-steps:
In sub-step 4111, the user's manipulation time and user for determining that current time belongs in manipulation corresponding relationship are current The user that position belongs to manipulates position.
Assuming that server is 18:35 according to the current time that controlled plant acquisition request obtains, equipment is controlled to server The user current location of transmission is apart from the position in 410 meters of residence, and by taking table 2 as an example, server can be lived according to 18:35 and distance The two information of 410 meters of position, determining that user that 18:35 belongs to manipulates the time is 18:00 to 18:40, apart from residence 410 It is apart from the position in 350 to 550 meters of residence that the user that belongs to of position of rice, which manipulates position,.
In sub-step 4112, in manipulation corresponding relationship, determine that the user that current time belongs to manipulates time and user The user that current location belongs to manipulates n target controlled plant mark corresponding to position.
The user determined using in sub-step 4111 is 18:00 to 18:40 the manipulation time and user manipulates position and lives as distance For 350 to 550 meters of position, server can determine 18:00 to 18:40 in table 2 and apart from 350 to 550 meters of residence The corresponding target controlled plant in position be identified as D3.
It should be noted that assume in table 2 first controlled plant identify corresponding user manipulate the time be 17:10 extremely 17:50, it is apart from the position in 1000 to 1500 meters of residence that user, which manipulates position, and second controlled plant identifies corresponding user behaviour The control time is 17:30 to 19:20, and it is apart from the position in 1400 to 2600 meters of residence that user, which manipulates position, and what server obtained works as The preceding moment is 17:35, and the user current location that sends to server of control equipment is the position apart from 1450 meters of residence, then taking The user that business device can determine that current time belongs to has 2: 17:10 to 17:50,17:30 to 19:20 the manipulation time, and user works as User that front position belongs to, which manipulates position, 2: position apart from 1000 to 1500 meters of residence, apart from 1400 to 2600 meters of residence Position, therefore, server can determine 2 target controlled plants mark.
In step 412, server sends controlled plant to control equipment and obtains response.
It includes n target controlled plant mark that the controlled plant, which obtains response,.Server sends controlled to control equipment The content that equipment acquisition responds can there are many forms, the embodiment of the present disclosure not to limit this.
It is exemplary, in a first aspect, controlled plant obtains response, it may include: first object list.The first object list Be provided with m marker, m is greater than n, each of preceding n marker of first object list marker n target of record by Control each of device identification target controlled plant mark.By taking table 2 as an example, it is assumed that server is in manipulation corresponding relationship, really 1 target corresponding to user's manipulation position that the user that current time belongs to manipulates the time and user current location belongs to is determined Controlled plant mark: air-conditioning D3, Fig. 4-3 shows the schematic diagram of first object list, as shown in Fig. 4-3, first object column Table is provided with 5 markers, the 1st marker record target controlled plant mark of first object list: air-conditioning D3.The disclosure In embodiment, server can be controlled to each according to the user of prior learning according to user current location and current time The use habit of equipment manipulates corresponding relationship, is preferably the controlled plant that manipulation is most thought in user's selection, user greatly improved Manipulate the efficiency of controlled plant.It should be added that the 2nd to the 5th marker in Fig. 4-3 record remaining controlled set The user that standby mark can also belong to according to current time and current time manipulates the departure degree or user current location of time The departure degree for manipulating position with the user that user current location belongs to is ranked up, as current time belongs to current time The departure degree that user manipulates the time is smaller, which manipulates time corresponding controlled plant mark in first object list Position more before.
It should be added that, it is assumed that server is in manipulation corresponding relationship, it is determined that the user that current time belongs to The user that manipulation time and user current location belong to manipulates 2 target controlled plant marks corresponding to position, then first Each of preceding 2 markers of object listing marker can recorde each of 2 target controlled plant marks mesh Controlled plant mark is marked, the sequencing that the embodiment of the present disclosure identifies this 2 target controlled plants is without limitation.
Second aspect, controlled plant obtain response, may include: the second object listing.Second object listing is provided with n Marker, each of n marker marker record each of n target controlled plant mark target controlled plant Mark.Server obtains to respond to control equipment transmission controlled plant can also be the second target for being provided only with n marker List, i.e. server only return to the controlled plant mark that user most thinks manipulation to control equipment.By taking table 2 as an example, it is assumed that server In manipulation corresponding relationship, it is determined that user's manipulation that the user that current time belongs to manipulates the time and user current location belongs to 1 target controlled plant mark corresponding to position: air-conditioning D3, Fig. 4-4 shows the schematic diagram of the second object listing, such as Fig. 4- Shown in 4, which is provided with 1 marker, this 1 marker record target controlled plant mark: air-conditioning D3.This In open embodiment, server can be according to user current location and current time, according to the user of prior learning to each The use habit of controlled plant manipulates corresponding relationship, is preferably the controlled plant that manipulation is most thought in user's selection, greatly improved The efficiency of user's manipulation controlled plant.
The third aspect, controlled plant obtain response, comprising: the first object of first object controlled plant mark instruction is controlled The corresponding equipment interface of equipment opens message, which opens message for notifying control equipment to show that first object is controlled Device identification instruction first object controlled plant equipment operation interface, first object controlled plant be identified as n target by Control any one in device identification.Server is in addition to that can give control equipment to return to the controlled plant mark that user most thinks manipulation Except corresponding list, controlled the setting that user most thinks the controlled plant mark instruction of manipulation can also be returned directly to control equipment Standby corresponding equipment interface opens message, to make the equipment for controlling the controlled plant that equipment shows controlled plant mark instruction Operation interface, finally, user can directly manipulate the controlled plant for most thinking manipulation by equipment operation interface.Substantially mention High user manipulates the efficiency of controlled plant.
In addition, by taking table 2 as an example, it is assumed that the user that server determines that current time belongs in manipulation corresponding relationship manipulates the time For 17:10 to 17:50, it is master bedroom that the user that user current location belongs to, which manipulates position, and 17:10 to 17:50 it is corresponding by Control device identification is electric cooker D1, and the corresponding controlled plant in master bedroom is identified as shutter D2, then server can be according to phase Pass technology returns to a list of controlled devices, and as illustrated in figures 4-5, which is provided with 5 markers, 5 marks Each of position marker records each of 5 controlled plant marks target controlled plant mark, this 5 controlled plants Mark is arranged at random.
In step 413, control equipment opens message according to equipment interface and shows the mark instruction of first object controlled plant First object controlled plant equipment operation interface.
First object controlled plant is identified as any one in n target controlled plant mark.When controlled plant obtains When response includes that the corresponding equipment interface of first object controlled plant of first object controlled plant mark instruction opens message, control Control equipment can open the first object controlled plant that message shows the mark instruction of first object controlled plant according to equipment interface Equipment operation interface, user can directly by equipment operation interface to most think manipulation controlled plant manipulate.Substantially Improve the efficiency that user manipulates controlled plant.By taking table 2 as an example, it is assumed that server is in manipulation corresponding relationship, it is determined that current 1 target controlled plant corresponding to user's manipulation position that the user that moment belongs to manipulates the time and user current location belongs to Mark: air-conditioning D3, then the equipment operation interface of first object controlled plant can be as Figure 4-Figure 6, the equipment operation of air-conditioning Interface is provided with mode selection button, temperature adjustment key, wind speed selection key, system setting button etc., wherein model selection Key is for selecting automatic, refrigeration, heating isotype, and adjustment key is for adjusting temperature, and wind speed selection key is for selecting wind Fast mode, system setting button is for being arranged system relevant parameter.It is controlled that user can manipulate target at equipment operation interface 46 Equipment.
In conclusion the controlled plant switching method that the embodiment of the present disclosure provides, server is receiving control equipment hair After the controlled plant acquisition request sent, it can be determined according to user current location and current time, preset manipulation corresponding relationship Target controlled plant mark, and send the controlled plant identified including target controlled plant to control equipment and obtain response, it solves The operating steps of controlled plant are cumbersome in the related technology, and the lower problem of manipulation efficiency has reached simplified operating steps, mentions The effect of height manipulation efficiency.
Following is embodiment of the present disclosure, can be used for executing embodiments of the present disclosure.It is real for disclosure device Undisclosed details in example is applied, embodiments of the present disclosure is please referred to.
Fig. 5-1 is a kind of block diagram of controlled plant switching device shown according to an exemplary embodiment, the controlled plant Switching device being implemented in combination with as the server 11 in implementation environment shown in Fig. 1 by software, hardware or both It is some or all of.The controlled plant switching device may include:
First receiving module 501 is configured as the controlled plant acquisition request of receiving control apparatus transmission.
Second receiving module 502 is configured as the user current location of receiving control apparatus transmission.
Module 503 is obtained, is configured as obtaining current time according to controlled plant acquisition request.
First determining module 504 is configured as according to user current location and current time, preset manipulation corresponding relationship Determine n target controlled plant mark, n is greater than or equal to 1, and manipulation corresponding relationship manipulates time, Yong Hucao for recording user Control the corresponding relationship of position and controlled plant mark.
Sending module 505 is configured as sending controlled plant acquisition response to control equipment, and controlled plant obtains response bag Include n target controlled plant mark.
In conclusion the controlled plant switching device that the embodiment of the present disclosure provides, server is receiving control equipment hair After the controlled plant acquisition request sent, it can be determined according to user current location and current time, preset manipulation corresponding relationship Target controlled plant mark, and send the controlled plant identified including target controlled plant to control equipment and obtain response, it solves The operating steps of controlled plant are cumbersome in the related technology, and the lower problem of manipulation efficiency has reached simplified operating steps, mentions The effect of height manipulation efficiency.
Optionally, as shown in Fig. 5-2, which can also include:
Third receiving module 506 is configured as at least one manipulation information of receiving control apparatus transmission, each manipulation letter Breath includes the position and moment that controlled plant identifies, controlled plant is steered.
Second determining module 507 is configured to determine that each controlled plant mark pair of at least one manipulation information record The user answered manipulates the time, user manipulates position.
Module 508 is established, is configured as corresponding according to each controlled plant mark of at least one manipulation information record User manipulates the time, user manipulates position and controlled plant mark establishes manipulation corresponding relationship.
Optionally, the first determining module 504, is configured as: determining the user that current time belongs in manipulation corresponding relationship The user that manipulation time and user current location belong to manipulates position;In manipulation corresponding relationship, determine what current time belonged to N target controlled plant mark corresponding to user's manipulation position that user manipulates the time and user current location belongs to.
Optionally, controlled plant obtains response, comprising: first object list, first object list are provided with m mark Position, m are greater than n, and each of preceding n marker of first object list marker records in n target controlled plant mark Each target controlled plant mark.
Optionally, controlled plant obtains response, comprising: the second object listing, the second object listing are provided with n mark Position, each of n marker marker record each of n target controlled plant mark target controlled plant mark Know.
Optionally, controlled plant obtains response, comprising: the first object of first object controlled plant mark instruction is controlled to be set Standby corresponding equipment interface opens message, and equipment interface opens message for notifying control equipment to show first object controlled plant The equipment operation interface of the first object controlled plant of instruction is identified, first object controlled plant is identified as that n target is controlled to be set For any one in mark.
Optionally, as shown in Fig. 5-3, which can also include:
4th receiving module 509, is configured as the controlled plant addition information of receiving control apparatus transmission, and controlled plant adds Adding information includes at least one controlled plant mark.
In conclusion the controlled plant switching device that the embodiment of the present disclosure provides, server is receiving control equipment hair After the controlled plant acquisition request sent, it can be determined according to user current location and current time, preset manipulation corresponding relationship Target controlled plant mark, and send the controlled plant identified including target controlled plant to control equipment and obtain response, it solves The operating steps of controlled plant are cumbersome in the related technology, and the lower problem of manipulation efficiency has reached simplified operating steps, mentions The effect of height manipulation efficiency.
Fig. 6-1 is a kind of block diagram of controlled plant switching device shown according to an exemplary embodiment, the controlled plant Switching device being implemented in combination with as the control equipment 12 in implementation environment shown in Fig. 1 by software, hardware or both It is some or all of.The controlled plant switching device may include:
First receiving module 601 is configured as receiving controlled plant acquisition instruction.
First sending module 602 is configured as sending controlled plant acquisition to server according to controlled plant acquisition instruction Request.
Second sending module 603 is configured as sending user current location to server.
Second receiving module 604 is configured as receiving the controlled plant acquisition response that server is sent, and controlled plant obtains Response includes n target controlled plant mark, and it is server according to user that n, which is greater than or equal to 1, n target controlled plant mark, Current location and current time, preset manipulation corresponding relationship determine, manipulation corresponding relationship for record user manipulate the time, User manipulates the corresponding relationship of position and controlled plant mark.
In conclusion the controlled plant switching device that the embodiment of the present disclosure provides, control equipment first receives controlled plant and obtains Instruction fetch sends controlled plant acquisition request to server further according to controlled plant acquisition instruction, and sends user to server Then current location receives the controlled plant including target controlled plant mark that server is sent and obtains response, solves phase The operating steps of controlled plant are cumbersome in the technology of pass, and the lower problem of manipulation efficiency has reached simplified operating steps, improved behaviour Control the effect of efficiency.
Optionally, as in fig. 6-2, which can also include:
Third receiving module 605 is configured as receiving at least one manipulation instruction.
Third sending module 606 is configured as sending at least one manipulation to server according at least one manipulation instruction Information, each manipulation information include the position and moment that controlled plant identifies, controlled plant is steered.
Optionally, controlled plant obtains response, comprising: first object list, first object list are provided with m mark Position, m are greater than n, and each of preceding n marker of first object list marker records in n target controlled plant mark Each target controlled plant mark.
Optionally, controlled plant obtains response, comprising: the second object listing, the second object listing are provided with n mark Position, each of n marker marker record each of n target controlled plant mark target controlled plant mark Know.
Optionally, controlled plant obtains response, comprising: the first object of first object controlled plant mark instruction is controlled to be set Standby corresponding equipment interface opens message, and as shown in Fig. 6-3, which can also include:
Display module 607 is configured as opening message display first object controlled plant mark instruction according to equipment interface First object controlled plant equipment operation interface, first object controlled plant is identified as in n target controlled plant mark Any one.
Optionally, as shown in Fig. 6-4, which can also include:
4th receiving module 608 is configured as receiving controlled plant addition instruction.
4th sending module 609 is configured as adding instruction according to controlled plant to server transmission controlled plant addition Information, controlled plant addition information include at least one controlled plant mark.
In conclusion the controlled plant switching device that the embodiment of the present disclosure provides, control equipment first receives controlled plant and obtains Instruction fetch sends controlled plant acquisition request to server further according to controlled plant acquisition instruction, and sends user to server Then current location receives the controlled plant including target controlled plant mark that server is sent and obtains response, solves phase The operating steps of controlled plant are cumbersome in the technology of pass, and the lower problem of manipulation efficiency has reached simplified operating steps, improved behaviour Control the effect of efficiency.
About the device in above-described embodiment, wherein modules execute the concrete mode of operation in related this method Embodiment in be described in detail, no detailed explanation will be given here.
Fig. 7 is a kind of block diagram of controlled plant switching device 700 shown according to an exemplary embodiment.For example, device 700 can be mobile phone, computer, digital broadcasting terminal, messaging device, game console, tablet device, and medical treatment is set It is standby, body-building equipment, personal digital assistant etc..
Referring to Fig. 7, device 700 may include following one or more components: processing component 702, memory 704, power supply Component 706, multimedia component 708, audio component 710, the interface 712 of input/output (I/O), sensor module 714, and Communication component 716.
The integrated operation of the usual control device 700 of processing component 702, such as with display, telephone call, data communication, phase Machine operation and record operate associated operation.Processing component 702 may include that one or more processors 720 refer to execute It enables, to perform all or part of the steps of the methods described above.In addition, processing component 702 may include one or more modules, just Interaction between processing component 702 and other assemblies.For example, processing component 702 may include multi-media module, it is more to facilitate Interaction between media component 708 and processing component 702.
Memory 704 is configured as storing various types of data to support the operation in device 700.These data are shown Example includes the instruction of any application or method for operating on device 700, contact data, and telephone book data disappears Breath, picture, video etc..Memory 704 can be by any kind of volatibility or non-volatile memory device or their group It closes and realizes, such as static random access memory (SRAM), electrically erasable programmable read-only memory (EEPROM) is erasable to compile Journey read-only memory (EPROM), programmable read only memory (PROM), read-only memory (ROM), magnetic memory, flash Device, disk or CD.
Power supply module 706 provides electric power for the various assemblies of device 700.Power supply module 706 may include power management system System, one or more power supplys and other with for device 700 generate, manage, and distribute the associated component of electric power.
Multimedia component 708 includes the screen of one output interface of offer between described device 700 and user.One In a little embodiments, screen may include liquid crystal display (LCD) and touch panel (TP).If screen includes touch panel, screen Curtain may be implemented as touch screen, to receive input signal from the user.Touch panel includes one or more touch sensings Device is to sense the gesture on touch, slide, and touch panel.The touch sensor can not only sense touch or sliding action Boundary, but also detect duration and pressure associated with the touch or slide operation.In some embodiments, more matchmakers Body component 708 includes a front camera and/or rear camera.When device 700 is in operation mode, such as screening-mode or When video mode, front camera and/or rear camera can receive external multi-medium data.Each front camera and Rear camera can be a fixed optical lens system or have focusing and optical zoom capabilities.
Audio component 710 is configured as output and/or input audio signal.For example, audio component 710 includes a Mike Wind (MIC), when device 700 is in operation mode, when such as call mode, recording mode, and voice recognition mode, microphone is matched It is set to reception external audio signal.The received audio signal can be further stored in memory 704 or via communication set Part 716 is sent.In some embodiments, audio component 710 further includes a loudspeaker, is used for output audio signal.
I/O interface 712 provides interface between processing component 702 and peripheral interface module, and above-mentioned peripheral interface module can To be keyboard, click wheel, button etc..These buttons may include, but are not limited to: home button, volume button, start button and lock Determine button.
Sensor module 714 includes one or more sensors, and the state for providing various aspects for device 700 is commented Estimate.For example, sensor module 714 can detecte the state that opens/closes of device 700, and the relative positioning of component, for example, it is described Component is the display and keypad of device 700, and sensor module 714 can be with 700 1 components of detection device 700 or device Position change, the existence or non-existence that user contacts with device 700,700 orientation of device or acceleration/deceleration and device 700 Temperature change.Sensor module 714 may include proximity sensor, be configured to detect without any physical contact Presence of nearby objects.Sensor module 714 can also include optical sensor, such as CMOS or ccd image sensor, at As being used in application.In some embodiments, which can also include acceleration transducer, gyro sensors Device, Magnetic Sensor, pressure sensor or temperature sensor.
Communication component 716 is configured to facilitate the communication of wired or wireless way between device 700 and other equipment.Device 700 can access the wireless network based on communication standard, such as WIFI, 2G or 3G or their combination.In an exemplary implementation In example, communication component 716 receives broadcast singal or broadcast related information from external broadcasting management system via broadcast channel. In one exemplary embodiment, the communication component 716 further includes near-field communication (NFC) module, to promote short range communication.Example Such as, NFC module can be based on radio frequency identification (RFID) technology, Infrared Data Association (IrDA) technology, ultra wide band (UWB) technology, Bluetooth (BT) technology and other technologies are realized.
In the exemplary embodiment, device 700 can be believed by one or more application specific integrated circuit (ASIC), number Number processor (DSP), digital signal processing appts (DSPD), programmable logic device (PLD), field programmable gate array (FPGA), controller, microcontroller, microprocessor or other electronic components are realized, for executing the above method.
In the exemplary embodiment, a kind of non-transitorycomputer readable storage medium including instruction, example are additionally provided It such as include the memory 704 of instruction, above-metioned instruction can be executed by the processor 720 of device 700 to complete the above method.For example, The non-transitorycomputer readable storage medium can be ROM, random access memory (RAM), CD-ROM, tape, floppy disk With optical data storage devices etc..
A kind of non-transitorycomputer readable storage medium, when the instruction in the storage medium is by the processing of device 700 When device executes, so that device 700 is able to carry out the controlled plant switching method that above-mentioned each embodiment provides.
Fig. 8 is a kind of block diagram of controlled plant switching device 800 shown according to an exemplary embodiment.For example, device 800 may be provided as a server.Referring to Fig. 8, it further comprises one or more that device 800, which includes processing component 822, Processor, and the memory resource as representated by memory 832, for storing the instruction that can be executed by processing component 822, example Such as application program.The application program stored in memory 832 may include it is one or more each correspond to one group The module of instruction.In addition, processing component 822 is configured as executing instruction, to execute above-mentioned controlled plant switching method.
Device 800 can also include the power management that a power supply module 826 is configured as executive device 800, and one has Line or radio network interface 850 are configured as device 800 being connected to network and input and output (I/O) interface 858.Dress Setting 800 can operate based on the operating system for being stored in memory 832, such as Windows ServerTM, Mac OS XTM, UnixTM, LinuxTM, FreeBSDTM or similar.
Fig. 9 is a kind of structural schematic diagram of controlled plant switching system 900 shown according to an exemplary embodiment, referring to Fig. 9, the controlled plant switching system 900 may include: server 901, control equipment 902 and at least one controlled plant 903.
Wherein, server 901 includes that Fig. 5-1, Fig. 5-2, Fig. 5-3 or controlled plant switching device shown in Fig. 7, control are set Standby 902 include Fig. 6-1, Fig. 6-2, Fig. 6-3, Fig. 6-4 or controlled plant switching device shown in Fig. 8.
In conclusion the controlled plant switching system that the embodiment of the present disclosure provides, server is receiving control equipment hair After the controlled plant acquisition request sent, it can be determined according to user current location and current time, preset manipulation corresponding relationship Target controlled plant mark, and send the controlled plant identified including target controlled plant to control equipment and obtain response, it solves The operating steps of controlled plant are cumbersome in the related technology, and the lower problem of manipulation efficiency has reached simplified operating steps, mentions The effect of height manipulation efficiency.
Those skilled in the art after considering the specification and implementing the invention disclosed here, will readily occur to its of the disclosure Its embodiment.This application is intended to cover any variations, uses, or adaptations of the disclosure, these modifications, purposes or Person's adaptive change follows the general principles of this disclosure and including the undocumented common knowledge in the art of the disclosure Or conventional techniques.The description and examples are only to be considered as illustrative, and the true scope and spirit of the disclosure are wanted by right It asks and points out.
It should be understood that the present disclosure is not limited to the precise structures that have been described above and shown in the drawings, and And various modifications and changes may be made without departing from the scope thereof.The scope of the present disclosure is only limited by the accompanying claims.

Claims (18)

1. a kind of controlled plant switching method, which is characterized in that the described method includes:
The controlled plant acquisition request that receiving control apparatus is sent;
Receive the user current location that the control equipment is sent;
Current time is obtained according to the controlled plant acquisition request;
N target controlled plant is determined according to the user current location and the current time, preset manipulation corresponding relationship Mark, the n are greater than or equal to 1, and the manipulation corresponding relationship manipulates the time for recording user, user manipulates position and controlled The corresponding relationship of device identification;
Send controlled plant to the control equipment and obtain response, the controlled plant obtain response include the n target by Device identification is controlled,
Wherein, the controlled plant obtains response, comprising: first object list, the first object list are provided with m mark Position, the m be greater than n, each of preceding n marker of first object list marker record the n target by Each of device identification target controlled plant mark is controlled,
Alternatively, the controlled plant obtains response, comprising: the second object listing, second object listing are provided with n mark Position, it is controlled that each of described n marker marker records each of n target controlled plant mark target Device identification,
Alternatively, the controlled plant obtains response, comprising: the first object controlled plant of first object controlled plant mark instruction Corresponding equipment interface opens message, and the equipment interface opens message for notifying the control equipment to show first mesh The equipment operation interface of the first object controlled plant of controlled plant mark instruction is marked, the first object controlled plant is identified as Any one in n target controlled plant mark.
2. the method according to claim 1, wherein the method also includes:
Receive it is described control equipment send at least one manipulation information, each manipulation information include controlled plant identify, The position and moment that controlled plant is steered;
Determine that each controlled plant of at least one manipulation information record identifies corresponding user and manipulates time, user's manipulation Position;
Corresponding user, which is identified, according to each controlled plant of at least one manipulation information record manipulates time, user's manipulation Position and controlled plant mark establish the manipulation corresponding relationship.
3. according to the method described in claim 2, it is characterized in that, it is described according to the user current location and it is described current when It carves, preset manipulation corresponding relationship determines n target controlled plant mark, comprising:
The user for determining that current time described in the manipulation corresponding relationship belongs to manipulates time and the user current location category In user manipulate position;
In the manipulation corresponding relationship, determine that the user that the current time belongs to manipulates time and the user current location The user belonged to manipulates n target controlled plant mark corresponding to position.
4. the method according to claim 1, wherein the method also includes:
Receive the controlled plant addition information that the control equipment is sent, controlled plant addition information include at least one by Control device identification.
5. a kind of controlled plant switching method, which is characterized in that the described method includes:
Receive controlled plant acquisition instruction;
Controlled plant acquisition request is sent to server according to the controlled plant acquisition instruction;
User current location is sent to the server;
It receives the controlled plant that the server is sent and obtains response, it includes that n target is controlled that the controlled plant, which obtains response, Device identification, the n are greater than or equal to 1, and the n target controlled plant mark is that the server is current according to the user Position and current time, preset manipulation corresponding relationship determine, the manipulation corresponding relationship for record user's manipulation time, User manipulates the corresponding relationship of position and controlled plant mark,
Wherein, the controlled plant obtains response, comprising: first object list, the first object list are provided with m mark Position, the m be greater than n, each of preceding n marker of first object list marker record the n target by Each of device identification target controlled plant mark is controlled,
Alternatively, the controlled plant obtains response, comprising: the second object listing, second object listing are provided with n mark Position, it is controlled that each of described n marker marker records each of n target controlled plant mark target Device identification,
Alternatively, the controlled plant obtains response, comprising: the first object controlled plant of first object controlled plant mark instruction Corresponding equipment interface opens message, and the equipment interface opens message for notifying the control equipment to show first mesh The equipment operation interface of the first object controlled plant of controlled plant mark instruction is marked, the first object controlled plant is identified as Any one in n target controlled plant mark,
It is responded when the controlled plant obtains, comprising: the first object controlled plant pair of first object controlled plant mark instruction When the equipment interface answered opens message, the method also includes:
It shows that the first object of the first object controlled plant mark instruction is controlled according to equipment interface opening message to set Standby equipment operation interface, the first object controlled plant are identified as any one in the n target controlled plant mark It is a.
6. according to the method described in claim 5, it is characterized in that, the method also includes:
Receive at least one manipulation instruction;
At least one manipulation information, each manipulation information are sent to the server according at least one described manipulation instruction The position being steered including controlled plant mark, controlled plant and moment.
7. according to the method described in claim 5, it is characterized in that, the method also includes:
Receive controlled plant addition instruction;
Controlled plant, which is sent, to the server according to controlled plant addition instruction adds information, the controlled plant addition Information includes at least one controlled plant mark.
8. a kind of controlled plant switching device, which is characterized in that described device includes:
First receiving module is configured as the controlled plant acquisition request of receiving control apparatus transmission;
Second receiving module is configured as receiving the user current location that the control equipment is sent;
Module is obtained, is configured as obtaining current time according to the controlled plant acquisition request;
First determining module is configured as according to the user current location and the current time, the corresponding pass of preset manipulation System determines n target controlled plant mark, and the n is greater than or equal to 1, when the manipulation corresponding relationship is for recording user's manipulation Between, user manipulate position and controlled plant mark corresponding relationship;
Sending module is configured as sending controlled plant acquisition response to the control equipment, and the controlled plant obtains response It is identified including the n target controlled plant,
Wherein, the controlled plant obtains response, comprising: first object list, the first object list are provided with m mark Position, the m be greater than n, each of preceding n marker of first object list marker record the n target by Each of device identification target controlled plant mark is controlled,
Alternatively, the controlled plant obtains response, comprising: the second object listing, second object listing are provided with n mark Position, it is controlled that each of described n marker marker records each of n target controlled plant mark target Device identification,
Alternatively, the controlled plant obtains response, comprising: the first object controlled plant of first object controlled plant mark instruction Corresponding equipment interface opens message, and the equipment interface opens message for notifying the control equipment to show first mesh The equipment operation interface of the first object controlled plant of controlled plant mark instruction is marked, the first object controlled plant is identified as Any one in n target controlled plant mark.
9. device according to claim 8, which is characterized in that described device further include:
Third receiving module is configured as receiving at least one manipulation information that the control equipment is sent, each manipulation Information includes the position and moment that controlled plant identifies, controlled plant is steered;
Second determining module is configured to determine that each controlled plant mark of at least one manipulation information record is corresponding User manipulates the time, user manipulates position;
Module is established, is configured as identifying corresponding user according to each controlled plant of at least one manipulation information record Manipulation time, user manipulate position and controlled plant mark establishes the manipulation corresponding relationship.
10. device according to claim 9, which is characterized in that first determining module is configured as:
The user for determining that current time described in the manipulation corresponding relationship belongs to manipulates time and the user current location category In user manipulate position;
In the manipulation corresponding relationship, determine that the user that the current time belongs to manipulates time and the user current location The user belonged to manipulates n target controlled plant mark corresponding to position.
11. device according to claim 8, which is characterized in that described device further include:
4th receiving module is configured as receiving the controlled plant addition information that the control equipment is sent, the controlled plant Addition information includes at least one controlled plant mark.
12. a kind of controlled plant switching device, which is characterized in that described device includes:
First receiving module is configured as receiving controlled plant acquisition instruction;
First sending module is configured as being asked according to the controlled plant acquisition instruction to server transmission controlled plant acquisition It asks;
Second sending module is configured as sending user current location to the server;
Second receiving module is configured as receiving the controlled plant acquisition response that the server is sent, and the controlled plant obtains Taking response includes n target controlled plant mark, and the n is greater than or equal to 1, and the n target controlled plant mark is described Server determines that the manipulation is corresponding to close according to the user current location and current time, preset manipulation corresponding relationship It is the corresponding relationship that time, user manipulation position and controlled plant mark are manipulated for recording user,
Wherein, the controlled plant obtains response, comprising: first object list, the first object list are provided with m mark Position, the m be greater than n, each of preceding n marker of first object list marker record the n target by Each of device identification target controlled plant mark is controlled,
Alternatively, the controlled plant obtains response, comprising: the second object listing, second object listing are provided with n mark Position, it is controlled that each of described n marker marker records each of n target controlled plant mark target Device identification,
Alternatively, the controlled plant obtains response, comprising: the first object controlled plant of first object controlled plant mark instruction Corresponding equipment interface opens message, and the equipment interface opens message for notifying the control equipment to show first mesh The equipment operation interface of the first object controlled plant of controlled plant mark instruction is marked, the first object controlled plant is identified as Any one in n target controlled plant mark,
The controlled plant obtains response, comprising: the first object controlled plant of first object controlled plant mark instruction is corresponding Equipment interface open message, described device further include:
Display module is configured as showing the first object controlled plant mark instruction according to equipment interface opening message First object controlled plant equipment operation interface, the first object controlled plant is identified as that the n target is controlled to be set For any one in mark.
13. device according to claim 12, which is characterized in that described device further include:
Third receiving module is configured as receiving at least one manipulation instruction;
Third sending module is configured as sending at least one manipulation to the server according at least one described manipulation instruction Information, each manipulation information include the position and moment that controlled plant identifies, controlled plant is steered.
14. device according to claim 12, which is characterized in that described device further include:
4th receiving module is configured as receiving controlled plant addition instruction;
4th sending module is configured as adding instruction according to the controlled plant to server transmission controlled plant addition Information, the controlled plant addition information include at least one controlled plant mark.
15. a kind of controlled plant switching device characterized by comprising
Processor;
For storing the memory of the executable instruction of the processor;
Wherein, the processor is configured to:
The controlled plant acquisition request that receiving control apparatus is sent;
Receive the user current location that the control equipment is sent;
Current time is obtained according to the controlled plant acquisition request;
N target controlled plant is determined according to the user current location and the current time, preset manipulation corresponding relationship Mark, the n are greater than or equal to 1, and the manipulation corresponding relationship manipulates the time for recording user, user manipulates position and controlled The corresponding relationship of device identification;
Send controlled plant to the control equipment and obtain response, the controlled plant obtain response include the n target by Device identification is controlled,
Wherein, the controlled plant obtains response, comprising: first object list, the first object list are provided with m mark Position, the m be greater than n, each of preceding n marker of first object list marker record the n target by Each of device identification target controlled plant mark is controlled,
Alternatively, the controlled plant obtains response, comprising: the second object listing, second object listing are provided with n mark Position, it is controlled that each of described n marker marker records each of n target controlled plant mark target Device identification,
Alternatively, the controlled plant obtains response, comprising: the first object controlled plant of first object controlled plant mark instruction Corresponding equipment interface opens message, and the equipment interface opens message for notifying the control equipment to show first mesh The equipment operation interface of the first object controlled plant of controlled plant mark instruction is marked, the first object controlled plant is identified as Any one in n target controlled plant mark.
16. a kind of controlled plant switching device characterized by comprising
Processor;
For storing the memory of the executable instruction of the processor;
Wherein, the processor is configured to:
Receive controlled plant acquisition instruction;
Controlled plant acquisition request is sent to server according to the controlled plant acquisition instruction;
User current location is sent to the server;
It receives the controlled plant that the server is sent and obtains response, it includes that n target is controlled that the controlled plant, which obtains response, Device identification, the n are greater than or equal to 1, and the n target controlled plant mark is that the server is current according to the user Position and current time, preset manipulation corresponding relationship determine, the manipulation corresponding relationship for record user's manipulation time, User manipulates the corresponding relationship of position and controlled plant mark,
Wherein, the controlled plant obtains response, comprising: first object list, the first object list are provided with m mark Position, the m be greater than n, each of preceding n marker of first object list marker record the n target by Each of device identification target controlled plant mark is controlled,
Alternatively, the controlled plant obtains response, comprising: the second object listing, second object listing are provided with n mark Position, it is controlled that each of described n marker marker records each of n target controlled plant mark target Device identification,
Alternatively, the controlled plant obtains response, comprising: the first object controlled plant of first object controlled plant mark instruction Corresponding equipment interface opens message, and the equipment interface opens message for notifying the control equipment to show first mesh The equipment operation interface of the first object controlled plant of controlled plant mark instruction is marked, the first object controlled plant is identified as Any one in n target controlled plant mark.
17. a kind of controlled plant switching system, which is characterized in that the system comprises: server controls equipment and at least one Controlled plant,
The server includes any controlled plant switching device of claim 8 to 11;
The control equipment includes any controlled plant switching device of claim 12 to 14.
18. a kind of controlled plant switching system, which is characterized in that the system comprises: server controls equipment and at least one Controlled plant,
The server includes controlled plant switching device described in claim 15;
The control equipment includes controlled plant switching device described in claim 16.
CN201510829171.XA 2015-11-25 2015-11-25 Controlled plant switching method, apparatus and system Active CN105491114B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510829171.XA CN105491114B (en) 2015-11-25 2015-11-25 Controlled plant switching method, apparatus and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510829171.XA CN105491114B (en) 2015-11-25 2015-11-25 Controlled plant switching method, apparatus and system

Publications (2)

Publication Number Publication Date
CN105491114A CN105491114A (en) 2016-04-13
CN105491114B true CN105491114B (en) 2019-04-26

Family

ID=55677824

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510829171.XA Active CN105491114B (en) 2015-11-25 2015-11-25 Controlled plant switching method, apparatus and system

Country Status (1)

Country Link
CN (1) CN105491114B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109085807A (en) * 2018-08-10 2018-12-25 深圳市中福信息科技有限公司 A kind of intelligence control system and its control method
CN111654420A (en) * 2020-05-18 2020-09-11 珠海格力电器股份有限公司 Method and device for controlling household equipment, computer equipment and storage medium

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104181886A (en) * 2014-08-13 2014-12-03 惠州Tcl移动通信有限公司 Intelligent home system and intelligent home control method
CN104614998A (en) * 2014-12-19 2015-05-13 小米科技有限责任公司 Method and device for controlling household equipment
CN104637288A (en) * 2014-12-31 2015-05-20 小米科技有限责任公司 Instruction set determining method and instruction set determining device

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130024033A1 (en) * 2011-07-20 2013-01-24 General Electric Company Systems and methods for a power distribution transfer capacity calculator

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104181886A (en) * 2014-08-13 2014-12-03 惠州Tcl移动通信有限公司 Intelligent home system and intelligent home control method
CN104614998A (en) * 2014-12-19 2015-05-13 小米科技有限责任公司 Method and device for controlling household equipment
CN104637288A (en) * 2014-12-31 2015-05-20 小米科技有限责任公司 Instruction set determining method and instruction set determining device

Also Published As

Publication number Publication date
CN105491114A (en) 2016-04-13

Similar Documents

Publication Publication Date Title
CN104460365B (en) Apparatus control method and device
CN104540184B (en) Equipment networking method and device
CN103997688B (en) intelligent interactive system, device and method
CN107294793B (en) Replacement method, device and equipment of intelligent household equipment and storage medium
JP6030808B2 (en) Intelligent remote control method, router, terminal, device, program, and recording medium
CN104932455B (en) The group technology and apparatus for grouping of smart machine in intelligent domestic system
CN105515834B (en) Device packets management system, method and device
CN104614998B (en) The method and apparatus for controlling home equipment
CN104407592B (en) A kind of method and device adjusting smart home device operating status
WO2017084269A1 (en) Method and apparatus for controlling a smart device
CN104735548B (en) Incidence prompt method and device
CN105207864A (en) Household appliance control method and device
CN105512545B (en) Access rights management method and device
CN105204356B (en) Display methods, device and the terminal of application
CN108710306A (en) Control method, device and the computer readable storage medium of smart machine
CN105549944B (en) Equipment display methods and device
CN106371329B (en) Intelligent appliance correlating method and device
CN107346115B (en) Control method and control terminal of intelligent device and intelligent device
CN108803444A (en) Control method, device and the storage medium of smart machine
US20170286057A1 (en) Method and system for volume control by hand gesture
CN105278336A (en) Application display method and apparatus, and terminal
CN107529699A (en) Control method of electronic device and device
CN111683177B (en) Function parameter adjusting method, function parameter adjusting device and storage medium
CN109525966B (en) Intelligent device query method and device and storage medium
CN106990903A (en) Display and the method and device of hide application program

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant