CN105480378A - Equipment maintenance method during drilling platform building process - Google Patents
Equipment maintenance method during drilling platform building process Download PDFInfo
- Publication number
- CN105480378A CN105480378A CN201510816907.XA CN201510816907A CN105480378A CN 105480378 A CN105480378 A CN 105480378A CN 201510816907 A CN201510816907 A CN 201510816907A CN 105480378 A CN105480378 A CN 105480378A
- Authority
- CN
- China
- Prior art keywords
- carried out
- equipment
- protection
- drilling platform
- maintenance method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B71/00—Designing vessels; Predicting their performance
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B35/00—Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
- B63B35/44—Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
- B63B35/4413—Floating drilling platforms, e.g. carrying water-oil separating devices
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Housings And Mounting Of Transformers (AREA)
Abstract
The invention discloses an equipment maintenance method during a drilling platform building process. The equipment maintenance method during the drilling platform building process comprises the following steps of during the drilling platform building process, performing protection, cleaning, surface painting, waxing and plastic packaging of anti-corrosion protective film on mechanical equipment; performing sand blasting, chemical washing and grease fabric winding on pipelines to protect joints and plug openings; flushing and turning bearing lubricating points of a diesel engine; performing driving protection on a pump shaft of the pump; filling gases into a pressure container and a hydraulic energy accumulator to protect the pressure container and the hydraulic energy accumulator; spraying waxes on the surface of a stainless steel control box to protect the stainless steel control box; placing drying agents and gas-phase sustained release anti-corrosion transmitters in an electric appliance cabinet and a junction box; electrifying and heating space heater equipment; periodically performing insulation measurement on a motor winding; coating acid-free vaseline on a sealing rubber strip of the electric appliance cabinet to protect the sealing rubber strip; plugging a spare cable hole in the electric appliance cabinet; and protecting a mechanical instrument by using a wood box. Therefore, each part for building the drilling platform is prevented from being damaged before being mounted.
Description
Technical field
The present invention relates to oil exploration equipment technology, the equipment maintenance method during espespecially a kind of drilling platform construction.
Background technology
Drilling platform equipment production cycle is long, from equipment deliver goods deliver the vessel often span be several years, need to carry out good storage and maintenance to each parts of equipment, to maintain function and the precision of its design, otherwise the parts of equipment occur that damage often needs to pay very large economic cost.
Prior art, during shipbuilding, is just protected the parts on equipment simply, and does not carry out entirety and full maintenance and maintenance to each parts of equipment, causes equipment to shelve for a long time and is easy to damage.
Summary of the invention
In order to solve the problems of the technologies described above, the invention provides a kind of equipment maintenance method during drilling platform is built, during drilling platform is built, entirety and comprehensive care and maintenance can be carried out to each parts of equipment, causing equipment to shelve for a long time and do not damage.
In order to reach the object of the invention, the invention provides a kind of equipment maintenance method during drilling platform is built, comprising: during drilling platform is built: mechanical equipment is carried out that protection is cleaned, surface lacquer, waxing and plastic packaging preservative protective film; Sandblasting, chemical souring, butter cloth winding protection joint and shutoff opening are carried out to pipeline; String oil and jiggering are carried out to the bearing lubrication point of diesel engine; To the dynamic protection of the pump shaft dish of pump; Inflatable body protection is carried out to pressure container and hydraulic accumulator; The protection of spraying wax is carried out to the surface of corrosion-resistant steel control box; Desiccant and the anticorrosion projector of gas-phase slow-release are placed to Electric Appliance Cabinet and connection box; Electrified regulation is carried out to space heater equipment; Regularly insulation measurement is carried out to motor winding; The protection of painting anacidity petroleum ointment is carried out to the sealing joint strip of Electric Appliance Cabinet; Shutoff is carried out to cable aperture for subsequent use on regulator cubicle; Tub is used to protect to machinery instrument.
Alternatively, the atmosphere gas filled is nitrogen.
The present invention adopts new method to carry out maintaining to the equipment components during platform construction.It is emphasised that the periodical maintenance care work that equipment was done before normal mounting uses, the care and maintenance namely carried out from mother's womb, instead of to the periodical maintenance of the equipment installed after operation on ordinary meaning.
By the maintaining before each parts on equipment use can ensure from the dispatch from the factory storage Installation and Debugging of equipment of equipment be in brand-new upstate whole process always; The process of the maintaining of equipment is also the process of cost risk management, for shipyard is guaranteed both quality and quantity deliver the vessel on time, also for the operation of coming into operation of new shipbuilding oceangoing ship is given security on time, avoids parts also not use and just damages because shelving for a long time.By taking different requirement to an equipment point specialty; mainly good storage, protection, clean and lubrication are carried out to equipment; electrical equipment carries out winding heating and insulation controls; electric power distribution cabinet and connection box place gas phase desiccant; the dish of large-scale pump shaft moves; pressure container and the protection of energy storage inflated with nitrogen, and the breadboard of equipment, ensure that on equipment, each parts are in good state always.
Other features and advantages of the present invention will be set forth in the following description, and, partly become apparent from specification sheets, or understand by implementing the present invention.Object of the present invention and other advantages realize by structure specifically noted in specification sheets, claims and accompanying drawing and obtain.
Accompanying drawing explanation
Accompanying drawing is used to provide the further understanding to technical solution of the present invention, and forms a part for specification sheets, is used from and explains technical scheme of the present invention, do not form the restriction to technical solution of the present invention with the embodiment one of the application.
Fig. 1 is the diagram of circuit of the equipment maintenance method during the drilling platform construction described in one embodiment of the invention.
Detailed description of the invention
For making the object, technical solutions and advantages of the present invention clearly understand, hereinafter will be described in detail to embodiments of the invention by reference to the accompanying drawings.It should be noted that, when not conflicting, the embodiment in the application and the feature in embodiment can combination in any mutually.
Set forth a lot of detail in the following description so that fully understand the present invention; but; the present invention can also adopt other to be different from mode described here to implement, and therefore, protection scope of the present invention is not by the restriction of following public specific embodiment.
Equipment maintenance method during the drilling platform construction of some embodiments of the invention is described below in conjunction with accompanying drawing.
Drilling platform provided by the invention build during equipment maintenance method, as shown in Figure 1, comprising: during drilling platform is built: mechanical equipment is carried out that protection is cleaned, surface lacquer, waxing and plastic packaging preservative protective film; Sandblasting, chemical souring, butter cloth winding protection joint and shutoff opening are carried out to pipeline; String oil and jiggering are carried out to the bearing lubrication point of diesel engine; To the dynamic protection of the pump shaft dish of pump; Inflatable body protection is carried out to pressure container and hydraulic accumulator; The protection of spraying wax is carried out to the surface of corrosion-resistant steel control box; Desiccant and the anticorrosion projector of gas-phase slow-release are placed to Electric Appliance Cabinet and connection box; Electrified regulation is carried out to space heater equipment; Regularly insulation measurement is carried out to motor winding; The protection of painting anacidity petroleum ointment is carried out to the sealing joint strip of Electric Appliance Cabinet; Shutoff is carried out to cable aperture for subsequent use on regulator cubicle; Tub is used to protect to machinery instrument.
Wherein, the atmosphere gas filled is nitrogen etc.
The present invention adopts new method to carry out maintaining to the equipment components during platform construction.It is emphasised that the periodical maintenance care work that equipment was done before normal mounting uses, the care and maintenance namely carried out from mother's womb, instead of to the periodical maintenance of the equipment installed after operation on ordinary meaning.
By the maintaining before each parts on equipment use can ensure from the dispatch from the factory storage Installation and Debugging of equipment of equipment be in brand-new upstate whole process always; The process of the maintaining of equipment is also the process of cost risk management, for shipyard is guaranteed both quality and quantity deliver the vessel on time, also for the operation of coming into operation of new shipbuilding oceangoing ship is given security on time, avoids parts also not use and just damages because shelving for a long time.By taking different requirement to an equipment point specialty; mainly good storage, protection, clean and lubrication are carried out to equipment; electrical equipment carries out winding heating and insulation controls; electric power distribution cabinet and connection box place gas phase desiccant; the dish of large-scale pump shaft moves; pressure container and the protection of energy storage inflated with nitrogen, and the breadboard of equipment, ensure that on equipment, each parts are in good state always.
Mechanical equipment (comprises piping, HVAC, safety apparatus, structure, surface paints and lacquers protection, insulation): protection is clean, and equipment surface paint spraying wax is protected, gas-phase slow-release preservative protective film is used to carry out plastic packaging protection, plain bearing fatten, the shutoff of pipeline opening prevents dust from entering, sandblasting and chemical souring pipeline protection, the pump shaft dish of mammoth pump class moves, the oily also jiggering of Bearing Lubrication of Diesel Engines point string etc.; Pressure container and hydraulic accumulator inflated with nitrogen are protected, and hydraulic power line uses butter cloth to be wound around protection joint, and other are insulation protection such as, exposes screw thread protection, and metal surface is coated with anti-corrosion oil etc.
The protection of electric meter: corrosion-resistant steel control box spraying wax protection metal surface; Electric Appliance Cabinet and connection box place desiccant and the anticorrosion projector of gas-phase slow-release; space heater equipment carries out electrified regulation; motor winding regularly carries out insulation measurement; the sealing joint strip of all Electric Appliance Cabinets is coated with the protection of anacidity petroleum ointment; cable aperture for subsequent use on regulator cubicle carries out shutoff, and machinery instrument uses tub to protect etc.
Adopt the method, during shipbuilding, equipment receives good maintaining, for debugging and normal operation provide guarantee; Shipyard avoids the damage of equipment by the maintaining of equipment and cleans simultaneously, thus saves a large number of spending.
In describing the invention, term " installation ", " being connected ", " connection ", " fixing " etc. all should be interpreted broadly, and such as, " connection " can be fixedly connected with, and also can be removably connect, or connects integratedly; Can be directly be connected, also indirectly can be connected by intermediary.For the ordinary skill in the art, above-mentioned term concrete meaning in the present invention can be understood as the case may be.
In the description of this specification sheets, specific features, structure, material or feature that the description of term " embodiment ", " some embodiments ", " specific embodiment " etc. means to describe in conjunction with this embodiment or example are contained at least one embodiment of the present invention or example.In this manual, identical embodiment or example are not necessarily referred to the schematic representation of above-mentioned term.And the specific features of description, structure, material or feature can combine in an appropriate manner in any one or more embodiment or example.
Although the embodiment disclosed by the present invention is as above, the embodiment that described content only adopts for ease of understanding the present invention, and be not used to limit the present invention.Those of skill in the art belonging to any the present invention; under the prerequisite not departing from the spirit and scope disclosed by the present invention; any amendment and change can be carried out in the form implemented and details; but scope of patent protection of the present invention, the scope that still must define with appending claims is as the criterion.
Claims (2)
1. the equipment maintenance method during drilling platform construction, is characterized in that, comprising:
During drilling platform is built: mechanical equipment is carried out that protection is cleaned, surface lacquer, waxing and plastic packaging preservative protective film; Sandblasting, chemical souring, butter cloth winding protection joint and shutoff opening are carried out to pipeline; String oil and jiggering are carried out to the bearing lubrication point of diesel engine; To the dynamic protection of the pump shaft dish of pump; Inflatable body protection is carried out to pressure container and hydraulic accumulator; The protection of spraying wax is carried out to the surface of corrosion-resistant steel control box; Desiccant and the anticorrosion projector of gas-phase slow-release are placed to Electric Appliance Cabinet and connection box; Electrified regulation is carried out to space heater equipment; Regularly insulation measurement is carried out to motor winding; The protection of painting anacidity petroleum ointment is carried out to the sealing joint strip of Electric Appliance Cabinet; Shutoff is carried out to cable aperture for subsequent use on regulator cubicle; Tub is used to protect to machinery instrument.
2. the equipment maintenance method during drilling platform construction according to claim 1, it is characterized in that, the atmosphere gas filled is nitrogen.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510816907.XA CN105480378A (en) | 2015-11-23 | 2015-11-23 | Equipment maintenance method during drilling platform building process |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510816907.XA CN105480378A (en) | 2015-11-23 | 2015-11-23 | Equipment maintenance method during drilling platform building process |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105480378A true CN105480378A (en) | 2016-04-13 |
Family
ID=55667735
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510816907.XA Pending CN105480378A (en) | 2015-11-23 | 2015-11-23 | Equipment maintenance method during drilling platform building process |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105480378A (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1144290A (en) * | 1995-08-30 | 1997-03-05 | 麦克德莫股份有限公司 | Fixed offshore platform structures using small diameter, tensioned, well casing tiebacks |
CN101544270A (en) * | 2008-03-26 | 2009-09-30 | 吴植融 | Floating type platform with underwater storage tank |
CN102167141A (en) * | 2011-03-07 | 2011-08-31 | 中船重工船舶设计研究中心有限公司 | Box-shaped truss type four-stand column deep water platform system with asymmetric soft cabin |
CN204527563U (en) * | 2015-02-02 | 2015-08-05 | 中集海洋工程研究院有限公司 | Middle deep water semi-submersible drilling platform |
-
2015
- 2015-11-23 CN CN201510816907.XA patent/CN105480378A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1144290A (en) * | 1995-08-30 | 1997-03-05 | 麦克德莫股份有限公司 | Fixed offshore platform structures using small diameter, tensioned, well casing tiebacks |
CN101544270A (en) * | 2008-03-26 | 2009-09-30 | 吴植融 | Floating type platform with underwater storage tank |
CN102167141A (en) * | 2011-03-07 | 2011-08-31 | 中船重工船舶设计研究中心有限公司 | Box-shaped truss type four-stand column deep water platform system with asymmetric soft cabin |
CN204527563U (en) * | 2015-02-02 | 2015-08-05 | 中集海洋工程研究院有限公司 | Middle deep water semi-submersible drilling platform |
Non-Patent Citations (1)
Title |
---|
王欢: "基于海洋平台钻井设备安装及完工调试的研究", 《科技信息》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2542388B1 (en) | Installation with mobile robot for a harsh, corrosive outdoor environment | |
CN102944605B (en) | Arm-type swing following device | |
GB2562812A (en) | Additive manufacture system | |
CN103008207A (en) | Antiseptic treatment process of water jacket motor base | |
CN207254619U (en) | A kind of construction site steel pipe scaffold paint spraying machine | |
CN104988778A (en) | Rustproof maintaining device for steel wire rope specially for scientific expedition ship and maintenance method thereof | |
CN105480378A (en) | Equipment maintenance method during drilling platform building process | |
CN109807030B (en) | Petroleum pipeline with double-layer anti-corrosion structure and method for coating petroleum pipeline | |
CN207161270U (en) | A kind of blower fan oil leakage monitoring device | |
CN110596204A (en) | Method and system for detecting damage condition of lining glue layer of pipeline of nuclear power station | |
CN108609311A (en) | A kind of SF two-compartment oil tanks | |
CN105423066A (en) | Anti-corrosion repairing method for flange on ocean oil platform | |
CN102231500A (en) | Method for installing intensive plug-in type bus duct | |
CN106064139A (en) | A kind of external coating technique of oil tank of transformer | |
KR100450283B1 (en) | A overhaul method of a water turbine generator | |
JP2000354793A (en) | Device for applying liquid material on surface and use of the same | |
CN204564638U (en) | A kind of environment-protecting high-pressure Sorbet cleaning machine | |
CN105711752B (en) | The installation method of the vertical bearing insulation of A type independent liquid cargo tank outer side bottom surfaces | |
CN207308160U (en) | A kind of mopping device of auto spray painting | |
CN203297610U (en) | Anti-corrosion pressure vessel | |
CN216478321U (en) | Bolt rust prevention device | |
Stay | Rope access for inspection, testing and maintenance of industrial structures | |
CN217738674U (en) | Fixed multipurpose rain test equipment | |
CN201576908U (en) | Central control room temporary cable pass-through device | |
CN210103128U (en) | Wire barrow is used in distribution lines construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20160413 |