CN105469496B CN201510476798.1A CN201510476798A CN105469496B CN 105469496 B CN105469496 B CN 105469496B CN 201510476798 A CN201510476798 A CN 201510476798A CN 105469496 B CN105469496 B CN 105469496B
Authority
CN
China
Prior art keywords
coin
storage facility
collecting storage
income
money
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510476798.1A
Other languages
Chinese (zh)
Other versions
CN105469496A (en
Inventor
新妻信行
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fuji Electric Co Ltd
Original Assignee
Fuji Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuji Electric Co Ltd filed Critical Fuji Electric Co Ltd
Publication of CN105469496A publication Critical patent/CN105469496A/en
Application granted granted Critical
Publication of CN105469496B publication Critical patent/CN105469496B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Cash Registers Or Receiving Machines (AREA)
  • Control Of Vending Devices And Auxiliary Devices For Vending Devices (AREA)

Abstract

The present invention provides Coin processor, is easy structure, flexibly can effectively apply flexibly existing coin collecting storage facility.Coin processor, it is taken into the coin of income and is at par accommodated in multiple coin collecting storage facilities, sends out storage coin from coin collecting storage facility according to income instruction is gone out, the Coin processor includes:Operating portion, the coin collecting storage facility that the non-coin using face amount is stored among multiple coin collecting storage facilities (1 yen of collecting storage facility 12a and 5 yen of collecting storage facility 12c) is set as only carrying out out the coin collecting storage facility of money by it;And control unit, its setting content based on the operating portion, storage is gone out income using coin collecting storage facility (50 yen of collecting storage facility 12b, 100 yen of collecting storage facility 12d, 10 yen of collecting storage facility 12e, 500 yen of collecting storage facility 12f) the progress coin of the coin of face amount, and the coin collecting storage facility (1 yen of collecting storage facility 12a and 5 yen of collecting storage facility 12c) for only carrying out out money is only carried out out money.

Description

Coin processor
Technical field
Multiple coin collecting storage facilities are accommodated in the present invention relates to the coin for being taken into income and at par, are referred to according to income is gone out Show from above-mentioned coin collecting storage facility send out storage coin Coin processor, more particularly, to simple structure and can be flexible Effectively apply flexibly the Coin processor of existing coin collecting storage facility.
Background technology
Coin processor has following functions:In identifying that the coin for putting into coin slot is taken into automatically afterwards Portion, is accommodated in the coin collecting storage facility at par set, and by the coin for being accommodated in coin collecting storage facility according to coming from external device (ED) Deng the request of small change expenditure the coin for asking the amount of money passed out into coin as small change send out mouth (reference patent document 1).
Prior art literature
Patent document
Patent document 1:Japanese Unexamined Patent Publication 2011-39773 publications
Patent document 2:Japanese Unexamined Patent Publication 2007-279907 publications
The content of the invention
Invent problem to be solved
But common Coin processor in advance have with 1 yen, 5 yen, 10 yen, 50 yen, 100 yen, The coin collecting storage facility of the corresponding specified volume of 500 yen of this 6 kinds of face amounts.Moreover, according to the shop for setting Coin processor Deng environment, the coin of input or as small change send out coin amount it is different according to every kind of face amount.As a result, face is pressed sometimes The capacity for the coin collecting storage facility that value is set produced deficiency.For example, the price in commodity is 100 yen of speciality store, 1 yen It is few with the income amount of 5 yen of coin, in addition, the situation for going out money as small change in the case of income does not almost have yet. Therefore, the coin collecting storage facility of 1 yen or 5 yen of specified volume can not be applied flexibly effectively, turn into wasted space.On the other hand, Amount of money is more due to entering for 100 Japanese yen coins, so the coin collecting storage facility of 100 Japanese yen coins of specified volume turns into the frequency for state of filling Rate improves.In this case, in Coin processor, 100 Japanese yen coins of the coin collecting storage facility of 100 Japanese yen coins will be reserving at The operation increase discharged to outside device.
In addition, the Coin processing device described in patent document 2 has following function, i.e. is provided with the bottom surface of classification path The multiple sorting apertures classified to coin, and the classification opening that can be driven by electric driver is configured with, based on knowledge The face amount recognition result in other portion is opened and closed the classification opening, and coin is classified in sorting apertures by opening classification opening.Make During with the Coin processing device, in the case where having non-use face amount, such as 1 Japanese yen coin to be non-use, 1 yen can be replaced firmly Coin and 100 high Japanese yen coins of frequency of use are assigned to two coin collecting storage facilities.But the coin described in patent document 2 In processor, classification opening etc., from income differentiate that the constituent part of classified storage is more, and it is complicated to convey control.
The present invention is to complete in view of the foregoing, and its object is to provide a kind of Coin processor, it is simple Structure, flexibly can effectively apply flexibly existing coin collecting storage facility.
For solving the technical scheme of problem
To solve above-mentioned problem, purpose is realized, Coin processor of the invention, it is taken into the coin of income and at par Multiple coin collecting storage facilities are accommodated in, send out storage coin from the coin collecting storage facility according to income instruction is gone out, its feature exists In, including:Operating portion, it sets the coin collecting storage facility that the non-coin using face amount is stored among the multiple coin collecting storage facility Only to carry out out the coin collecting storage facility of money;Control unit, its setting content based on the operating portion, storage is set to use the hard of face amount The coin collecting storage facility progress coin of coin goes out income, and the coin collecting storage facility for only carrying out out money is only carried out out money.
In addition, the Coin processor of the present invention is on the basis of foregoing invention, it is characterised in that the operating portion is by institute The coin collecting storage facility for stating the non-coin using face amount of storage is appointed as the coin collecting storage facility for only carrying out out money, inputs for this The face amount and supplemental amount for the coin collecting storage facility specified, record coin collecting storage facility, face amount and the supplemental amount specified.
In addition, the Coin processor of the present invention is on the basis of foregoing invention, it is characterised in that the operating portion is not having Have the income of the coin of the first regulation face amount and have the coin of the second regulation face amount go out money in the case of, with first regulation face amount It is one group with the second regulation face amount, the coin collecting storage facility of the first regulation face amount is appointed as only carrying out to the coin of the second regulation face amount The coin collecting storage facility for going out money.
In addition, the Coin processor of the present invention is on the basis of foregoing invention, it is characterised in that the control unit is based on The supplemental amount of the coin collecting storage facility for only carrying out out money and storage is identical with the coin collecting storage facility for only carrying out out money Total number of coins of the total gained of the number of coins of the coin collecting storage facility of the coin of face amount, carries out existing volume management.
In addition, the Coin processor of the present invention is on the basis of foregoing invention, it is characterised in that the operating portion is being set In the case of having determined the coin collecting storage facility for only carrying out out money, selection setting any submitting mould set in advance as described below Formula:Make preferentially to send out pattern from the preferential auxiliary small change of the submitting of the coin collecting storage facility for only carrying out out money;Make from being gone out The income that goes out that the submitting of the coin collecting storage facility of income is preferential preferentially sends out pattern;With from the coin collecting storage facility for only carrying out out money And the coin collecting storage facility for carrying out out income sends out pattern while sent out simultaneously in parallel parallel.
In addition, the Coin processor of the present invention is on the basis of foregoing invention, it is characterised in that the control unit is entering The number of coins that row goes out the coin collecting storage facility of income is in the case of approaching more than the specified quantity filled, to force to set it to It is described go out income preferentially send out pattern.
In addition, the Coin processor of the present invention is on the basis of foregoing invention, it is characterised in that the operating portion is set In the superior device side connected via the control unit.
Invention effect
According to the present invention, operating portion will be stored among multiple coin collecting storage facilities non-to be set as using the coin collecting storage facility of face amount The coin collecting storage facility of money is only carried out out, setting content of the control unit based on the operating portion, storage is received using the coin of face amount Na Ku progress coins go out income, and the coin collecting storage facility for only carrying out out money is only carried out out money.Thereby, it is possible to reduce Classification opening etc., the component parts that differentiates from income classified storage, and convey control and become easy.As a result, in this hair In bright, easy structure can be realized, flexibly can effectively apply flexibly the Coin processor of existing coin collecting storage facility.
Brief description of the drawings
Fig. 1 is the top view of the structure for the Coin processor for representing embodiment of the present invention.
Fig. 2 is the front view of the Coin processor shown in Fig. 1.
Fig. 3 is the top view for the internal structure for schematically showing the Coin processor shown in Fig. 1.
Fig. 4 is the block diagram of the structure for the control system for representing the Coin processor shown in Fig. 1.
Fig. 5 is represent not set collecting storage facility set information in the case that small change sends out special collecting storage facility one Figure.
Fig. 6 is represent to set collecting storage facility set information in the case that small change sends out special collecting storage facility one Figure.
Fig. 7 is to schematically show the inside for setting the Coin processor in the case that small change sends out special collecting storage facility The top view of structure.
Fig. 8 is to represent to set the collecting storage facility in the case that the small change corresponding with Taiwan face amount sends out special collecting storage facility The figure of one of set information.
Fig. 9 is represent not set existing volume management information in the case that small change sends out special collecting storage facility one Figure.
Figure 10 is represent to set existing volume management information in the case that small change sends out special collecting storage facility one Figure.
Figure 11 is to represent to set the existing volume in the case that the small change corresponding with Taiwan face amount sends out special collecting storage facility The figure of one of management information.
Figure 12 is the outside drawing for the detailed construction for representing operation display part.
Symbol description
1 Coin processor
2 apparatus main bodies
3 coin slots
4 operation display parts
5 display parts
6 operating portions
6a~6k, 6m buttons
7 coin bank note dispensing ports
8 coin return buckets
9 income delivery sections
10 a part of reserve parts
11 coin dispensers
12 coin collecting storage facilities
The Japanese yen coin collecting storage facilities of 12a 1
The Japanese yen coin collecting storage facilities of 12b 50
The Japanese yen coin collecting storage facilities of 12c 5
The Japanese yen coin collecting storage facilities of 12d 100
The Japanese yen coin collecting storage facilities of 12e 10
The Japanese yen coin collecting storage facilities of 12f 500
15 go out money delivery section
17 currency examination portions
20 take-up reels
30 control units
31 go out income control unit
32 send out mode control unit
34th, 35,36 switching lock
40 coin conveying mechanisms
50 storage parts
51 go out income information
52 collecting storage facility set informations
53 send out mode setting information
53a auxiliary small changes preferentially send out pattern
53b goes out income and preferentially sends out pattern
53c is simultaneously parallel to send out pattern
E1~E3 regions
L1, L2 display part
Embodiment
Hereinafter, with reference to the accompanying drawings of the mode for implementing the present invention.
(construction of automation change machine)
Fig. 1 is the top view of the structure for the Coin processor 1 for representing embodiment of the present invention.In addition, Fig. 2 is Fig. 1 institutes The front view of the Coin processor 1 shown.At this illustrate Coin processor 1 as in the shop such as supermarket or convenience store with The automation change machine of POS cash devices connection uses.As shown in Figures 1 and 2, Coin processor 1 is forming rectangular-shape Right side above the front end of apparatus main body 2 has coin slot 3, and the left side on the front end of apparatus main body 2 has operation Display part 4.Operation display part 4 has display part 5 and operating portion 6.In addition, the front, left side in apparatus main body 2 goes out provided with coin Money mouth 7.The coin discharged from coin bank note dispensing port 7 is caught by take-up reel 20.In addition, right side has firmly before apparatus main body 2 Coin returns mouth 8.
(the summary action of Coin processor)
Coin slot 3 is for by the opening of the inside of the coin receiving device main body 2 of input.Coin slot 3 is made Temporarily to keep the temporary transient maintaining part of the advance payment from customer to work.The coin of coin slot 3 is put to, is being received Income grant instruction from superior device sides such as POS cash devices (not shown) is simultaneously entered by input detection sensor (not shown) Go after detection, conveyed as shown in Figure 3 by income delivery section 9.Currency examination portion 17 in income delivery section 9 judges coin The true and false and face amount.In the case where the coin conveyed is genuine note, reserve part 10 is temporarily remained in.Another side, conveyed Coin be counterfeit money in the case of, via switching lock 34 and coin bank note dispensing port 7 return take-up reel 20.In addition, come from higher level having In the case of the return instruction of device side, the coin for temporarily remaining in reserve part 10 returns to coin return bucket via switching lock 35 8。
Afterwards, the coin for temporarily remaining in reserve part 10 is conveyed by coin dispenser 11.Conveyed by coin dispenser 11 Coin is incorporated in coin collecting storage facility 12 according to face amount.In present embodiment, in the inside of apparatus main body 2, stored as coin Storehouse 12 is provided with 1 Japanese yen coin collecting storage facility 12a, 50 Japanese yen coin collecting storage facility 12b, 5 Japanese yen coin collecting storage facility 12c, 100 Japanese yen coins Collecting storage facility 12d, 10 Japanese yen coin collecting storage facility 12e, 500 Japanese yen coin collecting storage facility 12f this six collecting storage facilities.Moreover, each coin is received Receive storehouse 12 and input coin is respectively stored by every kind of face amount.
Here, as be described hereinafter, in the case where there is the non-coin collecting storage facility 12 using face amount of storage, by the coin collecting storage facility 12 As only carrying out out the high coin collecting storage facility 12 for going out money using face amount of money frequency.That is, the coin collecting storage facility 12 of sky is used as The small change of auxiliary goes out the coin collecting storage facility 12 of money.In addition, the coin for being accommodated in each coin collecting storage facility 12 can be via switching lock 36 are transported to a part of reserve part 10.A part of reserve part 10 can also be as making to deposit in the hard of each coin collecting storage facility 12 Coin temporarily works for the empty detailed survey storehouse counted again come the storage number to each coin collecting storage facility 12.
Afterwards, the coin with the face amount that to go out money instruction corresponding from superior device side is passed through from each coin collecting storage facility 12 Exported by going out money delivery section 15, the outside submitting from coin bank note dispensing port 7 to apparatus main body 2.
(control system of Coin processor)
Fig. 4 is the block diagram for the control system for representing Coin processor 1.As shown in figure 4, connect display part in control unit 30 5th, operating portion 6, storage part 50, coin conveying mechanism 40, currency examination portion 17.In addition, it is outer to connect POS cash devices etc. in control unit 30 The superior device in portion.Coin conveying mechanism 40 includes income delivery section 9, coin dispenser 11, goes out money delivery section 15 and switches lock 34、35、36。
Control unit 30 by operating portion 6 in the case where giving instruction, or is giving detection letter from currency examination portion 17 In the case of number, and in the case where giving various instructions from superior device, based on the program for being stored in storage part 50 or Primary data carries out display control, the drive control of coin conveying mechanism 40 of display part 5.Control unit 30 has income control Portion 31 and submitting mode control unit 32.
Go out income control unit 31 in the case where having put into coin after giving import admission instruction from superior device, according to Income grant instruction carries out the income processing of coin, and in the case where giving out money instruction from superior device, according to going out money The money that goes out that instruction carries out coin is handled.Also carry out implementing the processing of these incomes and going out money processing in addition, going out income control unit 31 During, the content that the income implemented is handled and goes out money processing is stored in storage part 50 successively as income information 51 is gone out Processing.In addition, going out income control unit 31 carries out existing volume management etc..In addition, aftermentioned submitting mode control unit 32.
(collecting storage facility set information)
Collecting storage facility set information 52 is stored with storage part 50.Collecting storage facility set information 52 can be set by operating portion 6, And it is updated.It is non-using the hard of face amount with will be stored among multiple coin collecting storage facilities 12 in collecting storage facility set information 52 The coin collecting storage facility 12 of coin is set as only carrying out out the information of the coin collecting storage facility 12 of money.Control unit 30 is based on collecting storage facility setting letter The setting content of breath 52 makes storage go out income using the progress coin of coin collecting storage facility 12 of face amount, and makes only to carry out out money Coin collecting storage facility 12 only carries out out money.In addition, control unit 30 preferably put into it is non-using in the case of face amount, via switching lock 34 return to this from coin bank note dispensing port 7 non-uses face amount.
Fig. 5 represents no non-content for using the collecting storage facility set information 52 in the case of face amount.As shown in figure 5, with 1 Yen collecting storage facility 12a, 50 yen of collecting storage facility 12b, 5 yen of collecting storage facility 12c, 100 yen of collecting storage facility 12d, 10 yen of collecting storage facilities 12e, 500 yen of collecting storage facility 12f can carry out 1 yen, 50 yen, 5 yen, 100 yen, 10 yen, 500 yen all 6 respectively The mode for going out income of kind face amount is set.
In contrast, the collecting storage facility set information 52 shown in Fig. 6 using the environment without using 1 yen and 5 yen of face amount as Premise was set, and is set in a manner of not to 1 yen of collecting storage facility 12a and 5 yen of collecting storage facility 12c incomes, on 1st First collecting storage facility 12a deposits 10 yen of face amount, and 100 yen of face amount is deposited in 5 yen of collecting storage facility 12c.That is, due to depositing non-make It is empty collecting storage facility with the 1 yen of collecting storage facility 12a and 5 yen of collecting storage facility 12c of face amount, so by 1 yen of collecting storage facility 12a and 5 days First collecting storage facility 12c is used as depositing the high face amount of frequency of use respectively and is the face amount of 10 yen and 100 yen and is used to aid in small change Collecting storage facility.Therefore, in the 1 yen of collecting storage facility 12a and 5 yen of collecting storage facility 12c shown in Fig. 6, the attribute for whetheing there is income is set It is set to "None", the attribute for whetheing there is money is respectively set as 10 yen and 100 yen.
As a result, as shown in fig. 7, there is small change to send out the hard of 10 yen of special face amounts in 1 yen of collecting storage facility 12a storage Coin, in the coin that 5 yen of collecting storage facility 12c storages have small change to send out 100 yen of special face amounts.Moreover, do not distributed from coin Portion 11 is to 1 yen of collecting storage facility 12a and 5 yen of collecting storage facility 12c income coins.1 day thereby, it is possible to effectively utilize wasted space First collecting storage facility 12a and 5 yen of collecting storage facility 12c, reduce 10 yen and 100 yen high of small change (the supplementary number of frequency of use.
In addition, above-mentioned Coin processor 1 with Japan face amount it is corresponding, but also can with it is foreign beyond Japan Coin is corresponding.For example, the coin circulation in Taiwan is 0.5 yuan, 1 yuan, 5 yuan, 10 yuan, 20 yuan, 50 yuan of this 6 kinds of face amounts, actual fortune The circulation currency used is 1 yuan, 5 yuan, 10 yuan, 50 yuan of this 4 kinds of face amounts.Therefore, 0.5 yuan of face amount and 20 yuan are used using as non- Collecting storage facility be set as the special collecting storage facility of the small change submitting for depositing high 1 yuan and 10 yuan of the face amount of frequency of use, in the storage Storehouse supplements the coin of 1 yuan and 10 yuan face amount in advance.In Fig. 8, by 1 yen of collecting storage facility 12a, 50 yen of collecting storage facility 12b, 5 days First collecting storage facility 12c, 100 yen of collecting storage facility 12d were set to that 1 yuan of income, 5 yuan, 10 yuan, 50 yuan of collecting storage facility can be gone out, by 10 days First collecting storage facility 12e, 500 yen of collecting storage facility 12f be respectively set as 1 yuan, 10 yuan of small change send out special collecting storage facility.
(existing volume management)
In addition, going out income control unit 31 in the case where carrying out existing volume management, small change is sent out to the face of special collecting storage facility It is worth (coin) and supplemental amount phase Calais manages the existing volume of every kind of face amount.Fig. 9 is corresponding with Fig. 5, and expression is not provided with small change and sent Go out one of the existing volume management information gone out in income information 51 in the case of special collecting storage facility.In Fig. 9, each face amount it is hard Coin quantity is stored by the attribute of " going out income " as the collecting storage facility for representing to go out income.On the other hand, Figure 10 is relative with Fig. 6 Should, represent to be provided with one of the existing volume management information gone out in income information 51 in the case that small change sends out special collecting storage facility Example.As shown in Figure 10, storage special plus small change submitting is represented in the number of coins of the attribute of " the going out income " of each face amount The number of coins of the face amount of the attribute of " the auxiliary small change " in storehouse is managed.In addition, these quantity when producing money every time Value reduces.In addition, income or supplement duration increase every time.In addition, Figure 11 is corresponding using face amount with Fig. 8 Taiwan, represent to set Have small change send out special collecting storage facility in the case of one of the existing volume management information gone out in income information 51.The situation Under, existing volume management is also carried out plus the number of coins of " auxiliary small change ".
(sending out pattern setting)
It is stored with storage part 50 and sends out mode setting information 53.Auxiliary is stored with mode setting information 53 is sent out to look for Zero preferential send out pattern 53a, goes out income and preferentially send out pattern 53b and send out pattern 53c parallel simultaneously.Auxiliary small change is preferentially sent out Pattern 53a is the mould for making the coin for depositing in the special collecting storage facility of small change submitting preferentially send out in the case where carrying out small change submitting Formula.It is to make to deposit in the hard of the collecting storage facility that can go out income in the case where carrying out small change submitting to go out income preferentially to send out pattern 53b The pattern that coin is preferentially sent out.The simultaneously parallel pattern 53c that sends out is to send out storage parallel simultaneously in the case where carrying out small change submitting In the pattern of the coin of the coin for the collecting storage facility that can the go out income collecting storage facility special with small change submitting is deposited in.These send out pattern The selection for being set by operating portion 6 set and carry out.
Auxiliary small change preferentially sends out pattern 53a and setting is selected for example in the case of the high face amount of income frequency.The situation Under, it is the state of empty or few number of coins by the collecting storage facility for making that income can be gone out for the face amount, this can be avoided to come in and go out The collecting storage facility of money is filled, and can reduce the recovery of coin or the number of supplement.
In addition, special collecting storage facility can be sent out from the collecting storage facility and small change that can go out income by sending out pattern 53c parallel simultaneously This both sides can shorten and the money time via going out money delivery section 15 while send out the coin of identical face amount.For example, there are 40 yen Submitting in the case of, it is necessary to send out 4 10 yen, the submitting action that in this case two ground pass through twice every time is completed.
(details of operation display part)
Figure 12 is the outside drawing for the detailed construction for representing operation display part 4.In addition, the operation display part 4 is except coin processing Outside device 1, operation also is carried out to the bank note treatment device (not shown) being arranged side-by-side and shown.Configured in the region E1 of display part 5 Show the light-emitting diode display of the storage situation of the currency of each face amount.In addition, the storage shape of region E2 displays recovery storehouse and collecting storage facility State.On " recovery storehouse ", currency is accommodated with the case that recovery storehouse is set in addition in apparatus main body and in the recovery storehouse In the case of put bright green, close to putting shiny red in the case of full storehouse (close to filling) in recovery storehouse." close to filling " is in coin The grade currency of collecting storage facility 12 collecting storage facility is close to be filled or lights up as red when filling.In addition, on " close to sky ", in currency collecting storage facility Red is lit up as in the case of close to sky or for sky." detailed survey " lights up as red in the case where being possible to and existing volume being inconsistent. It is the display for calling attention to.In region, E3 configurations show the LCD display of various guidances.In addition, display part L1 is to dodge The help lamp for the information that bright notice, which has, to be shown or sound exports.In addition, display part L2 is in region E3 displays income, gone out " notice lamp " in the case of money state, in the case of going out income state and being normal, green is lit up as, in the situation of exception Under, light up as red.
In addition, being state in the case of turning into close to more than the first stated number for filling close to filling, it is into close to sky State in the case of to approach below the second empty stated number.
Button 6a be select bank note treatment device button, button 6b be select Coin processor button, button 6c The button for moving up region E1, E3 dispaly state, button 6d be for make region E1, E3 dispaly state to The button of lower movement.Button 6e is the button by pressing down the help information of display now when display part L1 flashes.Button 6f is the button for showing existing volume.Button 6g, 6h are to carry out the recovery of remaining currency of currency or the supplement of the insufficient amount of money respectively When the button pressed.Button 6i is for showing the button for going out the resume such as income information so far.Button 6j be used for into Row includes the setting of above-mentioned collecting storage facility set information 52 and sends out the button of the various settings of the selection of mode setting information.Press Button 6k be for make it is currently processed in content return A-stage button.Whether button 6m is to be used to input to permit in selection Processing implementation button.In addition, there is the drawing word for showing each currency in region E1 top note.Region E1 display energy It is enough accordingly to be shown with the drawing word.
In addition, above-mentioned button 6a~6j can also work as numerical key.Refer to showing as numerical key action In region El content be set as numerical value in the case of automatically switch to numerical value to input.

Claims (6)

1. a kind of Coin processor, it is taken into the coin of income and is at par accommodated in multiple coin collecting storage facilities, according to Go out income instruction and send out storage coin from the coin collecting storage facility, it is characterised in that including:
Operating portion, the coin collecting storage facility that the non-coin using face amount is stored among the multiple coin collecting storage facility is set as only by it Carry out out the coin collecting storage facility of money;With
Control unit, its setting content based on the operating portion, storage is set to be carried out using the coin collecting storage facility of the coin of face amount hard Coin goes out income, and the coin collecting storage facility for only carrying out out money is only carried out out money,
The operating portion the coin without the first regulation face amount income and have the feelings for going out money of the coin of the second regulation face amount Under condition, using the first regulation face amount and the second regulation face amount as one group, the coin collecting storage facility of the coin of the first regulation face amount is specified Only to carry out the coin collecting storage facility for going out money of the coin of the second regulation face amount.
2. Coin processor as claimed in claim 1, it is characterised in that
The operating portion, the coin collecting storage facility of the non-coin using face amount of the storage is appointed as described only to carry out out the hard of money Coin collecting storage facility, coin value and supplemental amount for the coin collecting storage facility specified are inputted, record the coin storage specified Storehouse, face amount and supplemental amount.
3. Coin processor as claimed in claim 1 or 2, it is characterised in that
The control unit is based on the supplemental amount of the coin collecting storage facility for only carrying out out money and storage are only gone out with described Total number of coins of the total gained of the number of coins of the coin collecting storage facility of the coin of the identical face amount of coin collecting storage facility of money, is carried out Existing volume management.
4. Coin processor as claimed in claim 1 or 2, it is characterised in that
For the operating portion in the case where only carrying out out the coin collecting storage facility of money described in setting, selection sets as described below pre- Any submitting pattern first set:Make preferentially to send from the preferential auxiliary small change of the submitting of the coin collecting storage facility for only carrying out out money Exit pattern;Make preferentially to send out pattern from the preferential income that goes out of the submitting for the coin collecting storage facility for carrying out out income;Only enter with from described Row go out money coin collecting storage facility and the coin collecting storage facility for carrying out out income it is parallel while sent out simultaneously in parallel Submitting pattern.
5. Coin processor as claimed in claim 4, it is characterised in that
The control unit is the feelings more than close specified quantity filled in the number of coins for carrying out out the coin collecting storage facility of income Under condition, pressure set it to it is described go out income preferentially send out pattern.
6. Coin processor as claimed in claim 1 or 2, it is characterised in that
The operating portion is arranged on the superior device side connected via the control unit.
CN201510476798.1A 2014-09-30 2015-08-06 Coin processor Active CN105469496B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2014-200688 2014-09-30
JP2014200688A JP6467844B2 (en) 2014-09-30 2014-09-30 Coin processing equipment

Publications (2)

Publication Number Publication Date
CN105469496A CN105469496A (en) 2016-04-06
CN105469496B true CN105469496B (en) 2018-02-13

Family

ID=55607147

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510476798.1A Active CN105469496B (en) 2014-09-30 2015-08-06 Coin processor

Country Status (3)

Country Link
JP (1) JP6467844B2 (en)
CN (1) CN105469496B (en)
TW (1) TWI585718B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018014013A (en) * 2016-07-22 2018-01-25 富士電機株式会社 Coin processing device
JP6756282B2 (en) * 2017-03-16 2020-09-16 富士電機株式会社 Coin check device
JP7021480B2 (en) * 2017-09-12 2022-02-17 富士電機株式会社 Coin processing equipment
JP7043851B2 (en) * 2018-01-26 2022-03-30 富士電機株式会社 Money processing equipment
JP6867043B2 (en) * 2018-11-01 2021-04-28 旭精工株式会社 Coin deposit / withdrawal device
JP7293721B2 (en) * 2019-02-27 2023-06-20 富士電機株式会社 money handling device
JP7275696B2 (en) * 2019-03-18 2023-05-18 富士電機株式会社 coin handling equipment

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102013124A (en) * 2009-09-04 2011-04-13 冲电气工业株式会社 Automatic cash transaction device
CN102667877A (en) * 2010-04-30 2012-09-12 富士通先端科技株式会社 Bill-handling apparatus and method for operating the same
CN203786811U (en) * 2013-12-04 2014-08-20 光荣株式会社 Change machine

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2728337B2 (en) * 1992-04-17 1998-03-18 ローレルバンクマシン株式会社 Money replenishment and collection system
JPH09245226A (en) * 1996-03-06 1997-09-19 Toyo Commun Equip Co Ltd Cash processing device
JP3415388B2 (en) * 1997-02-28 2003-06-09 グローリー工業株式会社 Coin sorting equipment
JP3950742B2 (en) * 2002-05-29 2007-08-01 日立オムロンターミナルソリューションズ株式会社 Banknote handling equipment
JP4364589B2 (en) * 2003-09-08 2009-11-18 グローリー株式会社 Cash processing equipment
JP5261879B2 (en) * 2006-02-16 2013-08-14 富士電機株式会社 Money handling machine
JP5101831B2 (en) * 2006-04-04 2012-12-19 グローリー株式会社 Coin deposit and withdrawal machine
JP4960690B2 (en) * 2006-12-08 2012-06-27 グローリー株式会社 Coin deposit and withdrawal machine
JP5375425B2 (en) * 2009-08-11 2013-12-25 富士電機株式会社 Coin processing equipment
JP4846855B2 (en) * 2010-02-23 2011-12-28 株式会社三共 Game equipment

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102013124A (en) * 2009-09-04 2011-04-13 冲电气工业株式会社 Automatic cash transaction device
CN102667877A (en) * 2010-04-30 2012-09-12 富士通先端科技株式会社 Bill-handling apparatus and method for operating the same
CN203786811U (en) * 2013-12-04 2014-08-20 光荣株式会社 Change machine

Also Published As

Publication number Publication date
JP2016071662A (en) 2016-05-09
TW201616452A (en) 2016-05-01
JP6467844B2 (en) 2019-02-13
TWI585718B (en) 2017-06-01
CN105469496A (en) 2016-04-06

Similar Documents

Publication Publication Date Title
CN105469496B (en) Coin processor
US7500568B2 (en) Standalone device and method for managing, depositing and dispensing cash
JP4536336B2 (en) Money handling system
RU2579338C2 (en) Banknote handling device
US9542792B2 (en) Banknote handling apparatus and banknote handling method
TW201621822A (en) Currency processing device and currency receiving control method of currency processing device
JP2017126275A (en) Money management device, money processing system, and money processing method
WO2016204195A1 (en) Currency management device and currency management system
JP2007034522A (en) Automatic change paying machine and automatic replenishing and recovering machine
JP2000268220A (en) Paper money receiving/arranging machine
CN209803933U (en) Cash recycling apparatus
JP2004110132A (en) Proceeds receiving processor
JP4173698B2 (en) Sales receipt processing equipment
JP2012014501A (en) Currency depositing and dispensing device
JP6750337B2 (en) Cash processing equipment
JP2010079694A (en) Automatic transaction apparatus, automatic transaction system, information management server and automatic transaction method
JP6803677B2 (en) Money processor, light emission control method and program
JP2002074467A (en) Cash-processing system for vending machine
JP4645232B2 (en) Vending and lending equipment
JPWO2009040896A1 (en) Bill processing device and issuing device
JPH056479A (en) Cash automatic transaction device
JP2020154972A (en) Cash processing system and cash processing device
JP5926206B2 (en) Coin handling equipment
JPH0737012A (en) Preprocessor for transaction processor
JP2021018724A (en) Cash processing apparatus

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant