China
Prior art keywords
fixed mount
embedded part
side wall
construction method
reinforcing bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410409768.4A
Other languages
Chinese (zh)
Other versions
CN105442628A (en
Inventor
周煜源
代智肄
程勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN201410409768.4A priority Critical patent/CN105442628B/en
Publication of CN105442628A publication Critical patent/CN105442628A/en
Application granted granted Critical
Publication of CN105442628B publication Critical patent/CN105442628B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)
  • Foundations (AREA)

Abstract

A construction method for a cantilever foundation side wall heavy embedded part is characterized by comprising the following steps of a, paying-off for positioning and binding of bottom steel bars; b, machining of a fixing frame; c, installation of the embedded part; d, binding of upper steel bars and e, closing of a template. The construction method for the cantilever foundation side wall heavy embedded part has the advantages that construction steps are designed reasonably, operation is simple, installation requirements for the cantilever foundation side wall heavy embedded part are met, installation accuracy of the embedded part is increased, damage caused by installation of the embedded part to the foundation structure is reduced, and the construction quality is guaranteed.

Description

The heavy embedded part construction method of foundation side wall of encorbelmenting
Technical field
It is that one kind is encorbelmented base side specifically the present invention relates to the heavy embedded part construction method in a kind of civil engineering Wall heavy type embedded part construction method.
Background technology
The side wall embedded part on the basis of encorbelmenting in some equipment Foundations, monolithic embedded part is from more than the 80kg that weighs, and dowel is more close Collection.Fig. 1 is the structural representation of the side wall embedded part on the basis of encorbelmenting in known equipment Foundations, and Fig. 2 is the side view of Fig. 1.Adopt It is with conventional installation methods, i.e., anti-with nail after embedded part is positioned during the side form of closing basis after reinforcement foundation colligation is finished To being fixed in template, then with template closing by embedded part installation.There is problems with such installation method:(1), exist Because reinforcing bar and dowel are all more intensive during installation, when both collide, part reinforcing bar or dowel can be sliced off, to basis structure or Person's embedded parts structure has an impact;(2), because embedded part is heavier, template is born incessantly, and embedded part can be caused to shift, or even recessed concrete The inside, installation accuracy does not reach design requirement.In the case that embedded part stress is heavier in this building encorbelments foundation side wall, once Any of the above problem occur all can have a strong impact on to construction quality.
Therefore the known side wall embedded part installation method for encorbelmenting basis there are problems that above-mentioned a variety of inconvenience and.
The content of the invention
The purpose of the present invention, is to propose that tie up reinforcing bar after a kind of first installation embedded part encorbelments to reduce to base structure injury Foundation side wall heavy type embedded part construction method.
It is another object of the present invention to propose a kind of individually to set up fixed mount to support embedded part to guarantee the outstanding of installation accuracy Choose foundation side wall heavy type embedded part construction method.
For achieving the above object, technical solution of the invention is:
One kind is encorbelmented foundation side wall heavy type embedded part construction method, it is characterised in that comprised the following steps:
A, unwrapping wire positioning, colligation bottom reinforcement bars
The position of embedded part is set according to design drawing, the labelling on bed die determines fixed mount further according to the position of embedded part Position, fixed mount setting is from embedded part position 80-100mm;The cover to reinforcement of foundation side wall is 30-40mm, then adds bilayer Reinforcing bar 50-60mm;The fixed mount is the framework that the main frame bar of fixed mount is welded into, and the centre of framework is provided with middle studdle, Gu Determine frame two ends and be welded with fixed mount push rod, fixed mount lower end is provided with fixed mount column, the solid welding column sole in fixed mount column bottom;
Foundation bottom reinforcing bar is good according to construction blueprint colligation, in fixed mount stud if any reinforcing bar, this reinforcing bar is entered Row adjustment, vacates fixed mount stud;
B, processing fixed mount
Fixed mount is welded using angle steel;The fixed mount push rod at fixed mount two ends, is welded on fixed mount top;Fixed mount Main frame bar is angle steel, and its lateral length is embedded part length, and longitudinal length is 300-400mm, between the main frame bar of upper and lower two fixed mounts Away from the distance that row's embedded part dowel and most next row dowel are most gone up for embedded part;The main frame bar of fixed mount is provided with the fixed mount of angle steel making Middle studdle;The centre of framework is provided with fixed mount middle studdle, and the fixed mount strut length of framework is to base at the top of embedded part The distance of plinth bed die, the bottom of fixed mount column is heel slab;
C, embedded part are installed
After fixed mount installation, according to embedded part position, embedded part is mounted on fixed mount, dowel is welded on In the main frame bar component of fixed mount, dowel termination flushes with fixed mount termination;Embedded part steel plate upper weld is chosen outside fixed mount two ends Fixed mount push rod on, fixed mount push rod bottom be embedded part upper surface absolute altitude;
D, upper reinforcement colligation
After embedded part installation, start colligation upper reinforcement, when meeting embedded part and colliding, carry out reinforcing bar, avoid collision;
E, form for seal
Treat that reinforcing bar colligation is finished, embedded part fixes the errorless closing side form afterwards in repetition measurement position, reserved in embedded part after side form closing Aperture at add and play self-tapping screw, fixed side form and embedded part, it is ensured that side form swollen mould is not resulted in during casting concrete and causes to bury The recessed concrete the inside of part.
The foundation side wall heavy type embedded part construction method of encorbelmenting of the present invention can also be using following technical measures come further Realize.
Aforesaid method, wherein the fixed mount push rod is φ 16mm round steel, chooses outward length 100mm.
Aforesaid method, wherein the main frame bar of the fixed mount is L63*5 angle steel.
Aforesaid method, wherein the middle studdle is L50*5 angle steel.
After above-mentioned technical proposal, the foundation side wall heavy type embedded part construction method of encorbelmenting of the present invention has advantages below:
1st, construction procedure is reasonable in design, simple to operate;
2nd, meet the installation requirement of the heavy embedded part on basis of encorbelmenting, increase the installation accuracy of embedded part, reduce embedded part and install right The damage of base structure, it is ensured that construction quality.
Description of the drawings
Fig. 1 is the structural representation of the side wall embedded part on the basis of encorbelmenting in known equipment Foundations;
Fig. 2 is the side view of Fig. 1;
Fig. 3 is the fixed mount plane graph of the embodiment of the present invention;
Fig. 4 is the A-A sectional views in Fig. 3;
Fig. 5 is the B-B sectional views in Fig. 3.
In figure:1 embedded part steel plate, 2 embedded part dowels, 3 fixed mount push rods, the main frame bar of 4 fixed mounts, 5 fixed mount middle studdles, 6 fixed mount columns, 7 heel slabs, 8 perforation plug weldings.
Specific embodiment
With reference to embodiments and its accompanying drawing to the present invention illustrate further.
Embodiment 1
The foundation side wall heavy type embedded part construction method of encorbelmenting of the present invention, it is characterised in that comprise the following steps:
A, unwrapping wire positioning, colligation bottom reinforcement bars
The position of embedded part is set according to design drawing, the labelling on bed die determines fixed mount further according to the position of embedded part Position, fixed mount setting from embedded part position 80mm, i.e., from base side 80mm;The cover to reinforcement of foundation side wall is generally 30mm, then add double-deck reinforcing bar about 50mm;
Foundation bottom reinforcing bar is good according to construction blueprint colligation, in fixed mount stud if any reinforcing bar, this reinforcing bar is entered Row adjustment, vacates fixed mount stud;
B, processing fixed mount
Referring now to Fig. 3-Fig. 5, Fig. 3 is the fixed mount plane graph of the embodiment of the present invention, and Fig. 4 is the A-A section views in Fig. 3 Figure, Fig. 5 is the B-B sectional views in Fig. 3.As illustrated, the fixed mount is welded using angle steel, fixed mount push rod 3 is φ 16mm round steel, chooses outward length 100mm, and round steel is welded on fixed mount top, is that control embedded part absolute altitude is used;The main frame bar 4 of fixed mount is L63*5 angle steel, horizontal angle steel length for embedded part length, longitudinal length is 300mm, between the main frame bar 4 of upper and lower two fixed mounts Away from the distance that row's embedded part dowel and most next row dowel are most gone up for embedded part;Fixed mount middle studdle 5 is enhancing intermediate supports Dynamics, its material is L50*5 angle steel;Fixed mount column 6 is L63*5 angle steel, and strut length is embedded part top to basic bed die Distance;Heel slab 7 is 100*100*6mm steel plates, and it is welded on the bottom of fixed mount column 6;
C, embedded part are installed
After fixed mount installation, according to embedded part position, embedded part is mounted on fixed mount, dowel is welded on On the main component of frame bar 4 of fixed mount, dowel termination flushes with fixed mount termination.Embedded part steel plate upper weld chooses round steel outside fixed mount On, round steel bottom is embedded part upper surface absolute altitude;
D, upper reinforcement colligation
After embedded part installation, start colligation upper reinforcement, when meeting embedded part and colliding, carry out reinforcing bar, avoid collision;
E, form for seal
Treat that reinforcing bar colligation is finished, embedded part fixes the errorless closing side form afterwards in repetition measurement position, reserved in embedded part after side form closing Aperture at add and play self-tapping screw, fixed side form and embedded part, it is ensured that side form swollen mould is not resulted in during casting concrete and causes to bury The recessed concrete the inside of part.
The present invention has substantive distinguishing features and significant technological progress, the foundation side wall heavy type embedded part construction of encorbelmenting of the present invention Method can meet the installation of the heavy embedded part on basis of encorbelmenting, and increase the installation accuracy of embedded part, reduce embedded part and install to basis knot The damage of structure, it is ensured that construction quality.
The foundation side wall heavy type embedded part construction method An Saile meter tal fibre Automobile Plate 1# galvanizings of Pedicellus et Pericarpium Trapae magnificent of encorbelmenting of the present invention Use in unit engineering entrance, outlet looping foundation engineering.This engineering one has 20 pieces of embedded parts to be needed to install, generally 900* 550mm, wherein have the embedded part of 2 pieces of 5500*550mm sizes, all using the foundation side wall heavy type embedded part construction of encorbelmenting of the present invention Method, the effective control installation quality of embedded part, effect is significant.
Above example is used for illustrative purposes only, rather than limitation of the present invention, about the technology people of technical field Member, without departing from the spirit and scope of the present invention, can also make various conversion or change.Therefore, all equivalents Technical scheme should also belong to scope of the invention, should be limited by each claim.

Claims (4)

1. one kind is encorbelmented foundation side wall heavy type embedded part construction method, it is characterised in that comprised the following steps:
A, unwrapping wire positioning, colligation bottom reinforcement bars
The position of embedded part is set according to design drawing, the labelling on bed die determines the position of fixed mount further according to the position of embedded part, Fixed mount setting is from embedded part position 80-100mm;The cover to reinforcement of foundation side wall is 30-40mm, then adds double-deck reinforcing bar 50-60mm;The fixed mount is the main frame bar of fixed mount(4)The framework being welded into, the centre of framework is provided with middle studdle(5), Fixed mount two ends are welded with fixed mount push rod(3), fixed mount lower end is provided with fixed mount column(6), fixed mount column bottom is welded admittedly Heel slab(7);
Foundation bottom reinforcing bar is good according to construction blueprint colligation, in fixed mount column(6)Position is carried out this reinforcing bar if any reinforcing bar Adjustment, vacates fixed mount stud;
B, processing fixed mount
Fixed mount is welded using angle steel;The fixed mount push rod at fixed mount two ends(3), it is welded on fixed mount top;Fixed mount Main frame bar(4)For angle steel, its lateral length is embedded part length, and longitudinal length is 300-400mm, the main frame bar of upper and lower two fixed mounts (4)Spacing is the distance that embedded part most goes up row's embedded part dowel and most next row dowel;The main frame bar of fixed mount(4)It is provided with angle steel making Fixed mount middle studdle(5);The centre of framework is provided with fixed mount middle studdle(5), the fixed mount column of framework(6)It is long Spend for the distance at embedded part top to basic bed die, fixed mount column(6)Bottom be heel slab(7);
C, embedded part are installed
After fixed mount installation, according to embedded part position, embedded part is mounted on fixed mount, dowel is welded on fixation The main frame bar of frame(4)On component, dowel termination flushes with fixed mount termination;What embedded part steel plate upper weld was chosen outside fixed mount two ends Fixed mount push rod(3)On, fixed mount push rod(3)Bottom is embedded part upper surface absolute altitude;
D, upper reinforcement colligation
After embedded part installation, start colligation upper reinforcement, when meeting embedded part and colliding, carry out reinforcing bar, avoid collision;
E, form for seal
Treat that reinforcing bar colligation is finished, embedded part fix repetition measurement position it is errorless after closing side form, after side form closing, embedded part reserve it is little Add at hole and play self-tapping screw, fix side form and embedded part, it is ensured that side form swollen mould is not resulted in during casting concrete and causes embedded part recessed Enter concrete the inside.
2. the heavy embedded part construction method of foundation side wall of encorbelmenting as claimed in claim 1, it is characterised in that the fixed mount push rod (3)For φ 16mm round steel, length 100mm is chosen outward.
3. encorbelment as claimed in claim 1 foundation side wall heavy type embedded part construction method, it is characterised in that the main frame of the fixed mount Bar(4)For L63*5 angle steel.
4. the heavy embedded part construction method of foundation side wall of encorbelmenting as claimed in claim 1, it is characterised in that the middle studdle (5)For L50*5 angle steel.
CN201410409768.4A 2014-08-20 2014-08-20 Construction method for cantilever foundation side wall heavy embedded part Active CN105442628B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410409768.4A CN105442628B (en) 2014-08-20 2014-08-20 Construction method for cantilever foundation side wall heavy embedded part

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410409768.4A CN105442628B (en) 2014-08-20 2014-08-20 Construction method for cantilever foundation side wall heavy embedded part

Publications (2)

Publication Number Publication Date
CN105442628A CN105442628A (en) 2016-03-30
CN105442628B true CN105442628B (en) 2017-04-19

Family

ID=55553223

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410409768.4A Active CN105442628B (en) 2014-08-20 2014-08-20 Construction method for cantilever foundation side wall heavy embedded part

Country Status (1)

Country Link
CN (1) CN105442628B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759457A (en) * 2017-03-23 2017-05-31 中国二十二冶集团有限公司 The installation method of cantilever design high-accuracy built-in fitting
CN113136974B (en) * 2021-04-26 2022-09-23 中国建筑第八工程局有限公司 Embedded part installation method for group vertical actuators in super-thick bottom plate

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101538899A (en) * 2009-04-14 2009-09-23 中建三局第二建设工程有限责任公司 Fixation and installation method of embedded iron parts
CN201818051U (en) * 2010-09-30 2011-05-04 浙江丰惠建设集团有限公司 Supporting frame for overhanging mold plate
CN201962804U (en) * 2011-01-12 2011-09-07 陕西建工集团第六建筑工程有限公司 Embedded part embedding structure for ultralong device foundation platform
CN202247942U (en) * 2011-01-07 2012-05-30 中国建筑第四工程局有限公司 Overhanging type lifter foundation
CN102817467A (en) * 2012-08-15 2012-12-12 中建钢构有限公司 Operating platform for high-altitude installation of steel structure
EP2551471A1 (en) * 2010-07-16 2013-01-30 Mitsubishi Heavy Industries, Ltd. Method and apparatus for affixing bearing box
CN203113371U (en) * 2013-02-05 2013-08-07 中国建筑第七工程局有限公司 Concrete foundation pillar top structure with steel plate embedded parts

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105533835A (en) * 2015-11-17 2016-05-04 谭映林 Upper garment for infant and convenient to wear

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101538899A (en) * 2009-04-14 2009-09-23 中建三局第二建设工程有限责任公司 Fixation and installation method of embedded iron parts
EP2551471A1 (en) * 2010-07-16 2013-01-30 Mitsubishi Heavy Industries, Ltd. Method and apparatus for affixing bearing box
CN201818051U (en) * 2010-09-30 2011-05-04 浙江丰惠建设集团有限公司 Supporting frame for overhanging mold plate
CN202247942U (en) * 2011-01-07 2012-05-30 中国建筑第四工程局有限公司 Overhanging type lifter foundation
CN201962804U (en) * 2011-01-12 2011-09-07 陕西建工集团第六建筑工程有限公司 Embedded part embedding structure for ultralong device foundation platform
CN102817467A (en) * 2012-08-15 2012-12-12 中建钢构有限公司 Operating platform for high-altitude installation of steel structure
CN203113371U (en) * 2013-02-05 2013-08-07 中国建筑第七工程局有限公司 Concrete foundation pillar top structure with steel plate embedded parts

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
万基-极度科研楼工程高位悬挑安装施工技术;王明皓等;《建筑安全》;20150228(第2期);第18-20页 *
水工混凝土悬臂模板施工工法;吴金华等;《水利水电工法展示》;20110930(第9期);第15-20页 *

Also Published As

Publication number Publication date
CN105442628A (en) 2016-03-30

Similar Documents

Publication Publication Date Title
CN105888108B (en) Built-in positioning prefabricated component reinforced concrete shear wall and construction method
CN109837994A (en) A kind of Prefabricated reinforced concrete is whole to pour building structure and its construction method
US10688685B2 (en) Formwork for providing a concrete foundation plinth with exposed horizontal reinforcing bars, plinth provided with such formwork, and structure comprising such plinth
CN204645268U (en) A kind of infilled wall tie bar built-in fitting
CN102418385A (en) Novel reinforced concrete prefabricated whole-poured building structure system and construction method thereof
CN205444887U (en) Slope roofing template system
CN103422677A (en) Construction method for binding steel reinforced concrete composite structure reinforcing steel bars
CN206174120U (en) Prefabricated constructional column and structure thereof
CN106245821A (en) A kind of lightweight steel construction lightweight concrete prefabrication and assembly construction body of wall and construction method thereof
CN106284689B (en) A kind of fabricated assembly overall special-shaped column structure and its connection construction method
CN105442628B (en) Construction method for cantilever foundation side wall heavy embedded part
CN207812307U (en) The construction system of Cable stayed Bridge Main Tower and steel anchor beam
CN106193340A (en) Cast-in-place prestressing without bondn ultralong floor combination type reinforcing strip anti-cracking structure and construction method
CN104499624B (en) The cored slab that a kind of filling box is applied in combination
CN104695555A (en) Construction process for joint of large-section beam column of different concrete strength grades
CN106049665B (en) The construction method of the cast-in-place core of light block wall
CN206110331U (en) Prefabricated assembly building of lightweight steel construction lightweight concrete
CN206873942U (en) The anti-side steel bar rod reinforcing member of basement shear wall
CN105317146A (en) Steel structure earthquake-resistant floor for construction and manufacturing method
CN107882243B (en) A kind of cassette ceiling and construction method of concrete-filled rectangular steel tube waffle beam structure
CN103061444B (en) Self-supporting deformed steel-encased concrete composite beam
CN206769201U (en) A kind of reinforced concrete combination rod structure
CN205558007U (en) Can pack wallboard with atress structure synchronous construction's prefabrication
CN205840052U (en) Reinforced concrete wall and attachment structure thereof is filled out in a kind of assembled steel framework
KR101615118B1 (en) Rahmen bridge construction method using temporary support member and tendon and the rahmen bridge therewith

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant