CN105430772B - The hot rail production carbon-point of carbon and power cord assembly equipment - Google Patents

The hot rail production carbon-point of carbon and power cord assembly equipment Download PDF

Info

Publication number
CN105430772B
CN105430772B CN201510994493.XA CN201510994493A CN105430772B CN 105430772 B CN105430772 B CN 105430772B CN 201510994493 A CN201510994493 A CN 201510994493A CN 105430772 B CN105430772 B CN 105430772B
Authority
CN
China
Prior art keywords
carbon
point
power cord
feedway
connector
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510994493.XA
Other languages
Chinese (zh)
Other versions
CN105430772A (en
Inventor
陈滨
张雪芳
底杏甫
王浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING SINOBEL TECHNOLOGY Co Ltd
Original Assignee
BEIJING SINOBEL TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING SINOBEL TECHNOLOGY Co Ltd filed Critical BEIJING SINOBEL TECHNOLOGY Co Ltd
Priority to CN201510994493.XA priority Critical patent/CN105430772B/en
Publication of CN105430772A publication Critical patent/CN105430772A/en
Application granted granted Critical
Publication of CN105430772B publication Critical patent/CN105430772B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H05ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
    • H05BELECTRIC HEATING; ELECTRIC LIGHT SOURCES NOT OTHERWISE PROVIDED FOR; CIRCUIT ARRANGEMENTS FOR ELECTRIC LIGHT SOURCES, IN GENERAL
    • H05B3/00Ohmic-resistance heating
    • H05B3/02Details
    • H05B3/06Heater elements structurally combined with coupling elements or holders
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D13/00Electric heating systems
    • F24D13/02Electric heating systems solely using resistance heating, e.g. underfloor heating

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Carbon And Carbon Compounds (AREA)

Abstract

The present invention relates to a kind of hot rail production carbon-points of carbon and power cord assembly equipment comprising:Carbon-point feedway is used to provide the carbon-point in the hot rail of carbon;Power supply thread supplying apparatus is used to provide the power cord in the hot rail of the carbon;Connector feedway is used to provide connector for the connection of the carbon-point and the power cord;Device is assembled, is used to the carbon-point being assembled together by the connector with the power cord;The controller for being connected with the carbon-point feedway, the power supply thread supplying apparatus, the connector feedway and the assembly device and they being controlled;And supporting rack, the carbon-point feedway, the power supply thread supplying apparatus, the connector feedway, assembly device and the controller are set on support frame as described above.

Description

The hot rail production carbon-point of carbon and power cord assembly equipment
Technical field
The present invention relates to floor heating production technical fields more particularly to a kind of hot rail production carbon-point of carbon to be set with power cord assembly It is standby.
Background technology
A kind of novel ground hot material of the hot rail of carbon, he is different from traditional underground heat heating system.Traditional geothermal heating system master Room is heated with conduction and convection current two ways, both heating systems are all first to add to indoor air Heat, indoor people obtain heat from air, however indoor hot-air often all rises to upper layer, under cold air is present in Layer, this results in indoor temperature distribution uneven, the case where top heat and bottom cold occurs.Wind will be assisted using the radiator of convection type Machine radiates, but wind turbine has the rest that noise can influence people in operation.And the hot rail of carbon be then by infra-red radiation come Heating, directly acts on human body surface, people is allowed to bask, and is fabulous ground hot material, market is in great demand.
And in traditional ground warm heat rail carbon-point and power cord assembly method inefficiency, affect ground warm heat rail production A kind of efficiency, it is therefore desirable to assembly equipment of efficient carbon-point and power cord.
Invention content
For the deficiency of the prior art, the present invention provides a kind of hot rail production carbon-points of carbon and power cord assembly equipment. Technical program of the present invention lies in:
A kind of hot rail production carbon-point of carbon and power cord assembly equipment comprising:Carbon-point feedway is used to provide carbon Carbon-point in hot rail;Power supply thread supplying apparatus is used to provide the power cord in the hot rail of the carbon;Connector feedway, For providing connector for the connection of the carbon-point and the power cord;Device is assembled, is used for the carbon-point and the electricity Source line is assembled together by the connector;With the carbon-point feedway, the power supply thread supplying apparatus, the connector The controller that feedway is connected and is controlled to them with the assembly device;And supporting rack, the carbon-point supply dress Set, the power supply thread supplying apparatus, the connector feedway, assembly device and the controller be set to support frame as described above On.
Further, the first guide rail and the second guide rail being mutually parallel are provided in support frame as described above;And described It is provided with the levelling machine for being straightened to the power cord on one guide rail and second guide rail, is used for the power cord The wire clamp and the first drilling machine to drill.
According to a preferred embodiment, the carbon-point feedway is set to first guide rail and the second guide rail institute Below the plane of formation;It includes:First carbon-point conveyer, is used to store the carbon-point;By carbon-point separate transport machine with Second stick conveyer of the first carbon-point conveyer linking;Connect in the carbon-point separate transport machine and the second stick conveyer The place of connecing is provided with cutting machine, is used to the carbon-point being cut to designated length;Further include for drilling to the carbon-point Two drilling machines and carbon-point stone tongs.And it is provided in the tail end of the second stick conveyer and is connected with the controller End sensor.
According to a preferred embodiment, the first carbon-point conveyer with the second stick conveyer is stepped sets It sets;The carbon-point separate transport machine is obliquely installed.
According to a preferred embodiment, the power supply thread supplying apparatus includes drum and is set to first guide rail With the thread feeding mechanism on second guide rail;And the buffering control being connected with the controller is provided with below the drum Sensor processed.
According to a preferred embodiment, the connector feedway includes feed hopper and is connect with the feed hopper Feeding guide;The feeding guide is connected to the assembly device.
According to a preferred embodiment, the assembly device is nailing machine.
According to a preferred embodiment, the controller includes control cabinet and the control that is connected with the control cabinet Operating display.
According to a preferred embodiment, heating device is additionally provided on support frame as described above.
Further, the second thread feeding mechanism is additionally provided on support frame as described above, the carbon-point for assembly will to be completed It is delivered to subsequent processing with the power cord;Also, it is provided with inspection between second thread feeding mechanism and the assembly device Sensor is looked into, for detecting whether the carbon-point assembles with the power cord.
Compared with prior art, the beneficial effects of the present invention are:
Few 500 carbon-points may be done to using the hot rail production carbon-point of carbon of the present invention and power cord assembly equipment per hour With the assembly of power cord, the efficiency of assembling of carbon-point and power cord can be greatly improved;
Also, using the carbon-point and power cord connector of the hot rail production carbon-point of carbon of the present invention and the assembly of power cord assembly equipment It can be avoided the phenomenon of cocking off of power cord and carbon-point contact surface, it is ensured that whole electric conductivity and safety ensure that carbon heat Rail has splendid heating effect;Meanwhile the expense of repair is avoided, the service life of the hot rail of carbon is also extended, reducing makes Use cost.
Description of the drawings
Fig. 1 is the front view of the present invention;
Fig. 2 is the vertical view of the present invention;
Fig. 3 is the side view of the present invention;With
Fig. 4 is the attachment structure schematic diagram of carbon-point and power cord in the present invention.
Reference numerals list
100:The hot rail production carbon-point of carbon and power cord assembly equipment
110:Carbon-point feedway
111:First carbon-point conveyer
112:Second stick conveyer
113:Carbon-point separate transport machine
114:Cutting machine
115:Second drilling machine
116:Carbon-point stone tongs
117:End sensor
120:Power supply thread supplying apparatus
121:Drum
122:Thread feeding mechanism
123:Cushioning control sensor
130:Connector feedway
131:Feed hopper
132:Feeding guide
140:Assemble device
150:Controller
151:Control cabinet
152:Control operating display
160:Supporting rack
161:First guide rail
162:Second guide rail
170:Levelling machine
180:First drilling machine
190:Heating device
210:Carbon-point
220:Power cord
230:Connector
Specific implementation mode
It is described in detail below in conjunction with the accompanying drawings.
As shown in Figures 1 to 3, it illustrates a kind of preferred embodiments of the present invention.In the present embodiment, the hot rail production of carbon Include with carbon-point and power cord assembly equipment 100:Carbon-point feedway 110 for providing the carbon-point 210 in the hot rail of carbon;For The power supply thread supplying apparatus 120 of power cord 220 in the hot rail of carbon is provided;For being provided for carbon-point 210 and the connection of power cord 220 The connector feedway 130 of connector 230;For carbon-point 210 to be assembled together with power cord 220 by connector 230 Assembly device 140;With carbon-point feedway 110, power supply thread supplying apparatus 120, connector feedway 130 and assembly device 140 controllers 150 and supporting rack 160 for being connected and they being controlled.Carbon-point feedway 110, power cord supply dress 120, connector feedway 130, assembly device 140 and controller 150 is set to be set on supporting rack 160.Carbon-point and power cord The structure completed after assembly is as shown in Figure 4.
The first guide rail 161 and the second guide rail 162 being mutually parallel are provided in supporting rack 160.And in the first guide rail 161 With levelling machine 170 for being straightened to power cord 220 is provided on the second guide rail 162, for being bored to power cord 220 The wire clamp in hole and the first drilling machine 180.
Power supply thread supplying apparatus 120 includes drum 121 and the line sending being set on the first guide rail 161 and the second guide rail 162 Mechanism 122.And the cushioning control sensor 123 being connected with controller 150, cushioning control are provided with below drum 121 Sensor 123 adjusts drum payingoff speed for avoiding power cord pine or tension excessively.
Power cord on drum 121 is delivered to levelling machine 170 by thread feeding mechanism 122, then by first after being fixed by wire clamp Drilling machine 180 completes drilling, then is delivered at 140 position of assembly device, and the dress of carbon-point and power cord is completed by assembly device 140 Match.
Carbon-point feedway 110 is set to the first guide rail 161 and the second guide rail 162 is formed by below plane.Preferably, Carbon-point feedway 110 includes the first carbon-point conveyer 111, is used to store carbon-point 210.Pass through carbon-point separate transport machine 113 The second stick conveyer 112 being connected with the first carbon-point conveyer 111.It is additionally provided with separation unit on carbon-point separate transport machine 113 Part (such as block, clip), the carbon-point for storing the first carbon-point conveyer 111 are divided into single transport to the second stick conveyer 112.Carbon-point separate transport machine 113 and 112 junction of the second stick conveyer are provided with cutting machine 114, are used for carbon-point 210 It is cut to designated length.Carbon-point feedway 110 further includes that the second drilling machine 115 and carbon-point for drilling to carbon-point 210 are hung Clamps 116.And the end sensor 117 being connected with controller 150 is provided in the tail end of the second stick conveyer 112, Its role is to detect rigging screw to install dynamics, screw tension or not in place by filling is avoided.Carbon-point stone tongs 116 is used for The carbon-point for completing cutting on second stick conveyer 112 is delivered at 115 position of the second drilling machine and completes drilling, carbon-point hanging clamp Tool 116 is delivered to the carbon-point after drilling is completed at 140 position of assembly device, and carbon-point and power cord are completed by assembly device 140 Assembly.
Preferably, 112 stepped setting of the first carbon-point conveyer 111 and the second stick conveyer;Carbon-point separate transport machine 113 are obliquely installed.
Connector feedway 130 includes feed hopper 131 and the feeding guide 132 being connect with feed hopper 131;Feeding guide 132 are connected to assembly device 140.Preferably, connector is screw.
Preferably, assembly device 140 is nailing machine.
Controller 150 includes control cabinet 151 and the control operating display 152 being connected with control cabinet.151 He of control cabinet Control operating display 152 can be set together, and can also open up and set, as shown in Figure 2.
Further, heating device 190 is additionally provided on supporting rack 160.Heating device 190 be used for rubber material into Row hot melt, for injection molding machine by mold to being molded at carbon-point and power cord connector.Preferably, heating device 190 is heating wire Circle.
Further, the second thread feeding mechanism 124 is additionally provided on supporting rack 160, the carbon-point 210 for assembly will to be completed It is delivered to subsequent processing with power cord 220;Also, it is provided with inspection between the second thread feeding mechanism 124 and assembly device 140 to pass Sensor 310, for detecting whether carbon-point 210 assembles with power cord 220.
The hot rail production carbon-point of carbon of the present invention may be done to few 500 carbon-points and electricity per hour with power cord assembly equipment The assembly of source line can greatly improve the efficiency of assembling of carbon-point and power cord;Also, use the hot rail production carbon-point of carbon of the present invention It can be avoided the phenomenon of cocking off of power cord and carbon-point contact surface with the carbon-point and power cord connector of the assembly of power cord assembly equipment, It ensures whole electric conductivity and safety, ensure that the hot rail of carbon has splendid heating effect;Meanwhile avoiding the expense of repair With also extending the service life of the hot rail of carbon, reduce use cost.
It should be noted that all features disclosed in this specification or disclosed all methods or in the process the step of, Other than mutually exclusive feature and/or step, it can combine in any way.
In addition, above-mentioned specific embodiment is exemplary, those skilled in the art can opening in the disclosure of invention It gives and finds out various solutions, and these solutions also belong to disclosure of the invention range and fall into the protection of the present invention Within the scope of.It will be understood by those skilled in the art that description of the invention and its attached drawing be it is illustrative and not constitute to power The limitation that profit requires.Protection scope of the present invention is limited by claim and its equivalent.

Claims (8)

1. a kind of hot rail production carbon-point of carbon and power cord assembly equipment (100), which is characterized in that it includes:
Carbon-point feedway (110) is used to provide the carbon-point (210) in the hot rail of carbon (200);
Power supply thread supplying apparatus (120) is used to provide the power cord (220) in the hot rail of the carbon (200);
Connector feedway (130) is used to provide connection for the connection of the carbon-point (210) and the power cord (220) Part (230);
Device (140) is assembled, is used to fill the carbon-point (210) and the power cord (220) by the connector (230) With together;
With the carbon-point feedway (110), the power supply thread supplying apparatus (120), the connector feedway (130) and The controller (150) that the assembly device (140) is connected and is controlled to them;And
Supporting rack (160), the carbon-point feedway (110), the power supply thread supplying apparatus (120), connector supply Device (130), assembly device (140) and the controller (150) are set on support frame as described above (160);
Support frame as described above (160) is provided with the first guide rail (161) being mutually parallel and the second guide rail (162);
And be provided on first guide rail (161) and second guide rail (162) for the power cord (220) into The levelling machine (170) of row alignment, wire clamp and the first drilling machine (180) for drilling to the power cord (220);
The carbon-point feedway (110) is set to first guide rail (161) and the second guide rail (162) is formed by under plane Side;It includes:
First carbon-point conveyer (111), is used to store the carbon-point (210);
The second stick conveyer (112) being connected with the first carbon-point conveyer (111) by carbon-point separate transport machine (113);
The carbon-point separate transport machine (113) and the second stick conveyer (112) junction are provided with cutting machine (114), It is used to the carbon-point (210) being cut to designated length;
Further include the second drilling machine (115) and carbon-point stone tongs (116) for drilling to the carbon-point (210);
And the tail end sensing being connected with the controller (150) is provided in the tail end of the second stick conveyer (112) Device (117).
2. the hot rail production carbon-point of carbon according to claim 1 and power cord assembly equipment (100), which is characterized in that
The first carbon-point conveyer (111) and the stepped setting of the second stick conveyer (112);The carbon-point separation fortune Defeated machine (113) is obliquely installed.
3. the hot rail production carbon-point of carbon according to claim 1 and power cord assembly equipment (100), which is characterized in that institute Power supply thread supplying apparatus (120) is stated to include drum (121) and be set to first guide rail (161) and second guide rail (162) thread feeding mechanism (122) on;
And it is provided with the cushioning control sensor being connected with the controller (150) below the drum (121) (123)。
4. the hot rail production carbon-point of carbon according to claim 1 and power cord assembly equipment (100), which is characterized in that institute It includes feed hopper (131) and the feeding guide (132) being connect with the feed hopper (131) to state connector feedway (130);Institute It states feeding guide (132) and is connected to the assembly device (140).
5. the hot rail production carbon-point of carbon according to claim 1 and power cord assembly equipment (100), which is characterized in that institute It is nailing machine to state assembly device (140).
6. the hot rail production carbon-point of carbon according to claim 1 and power cord assembly equipment (100), which is characterized in that institute It includes control cabinet (151) and the control operating display (152) being connected with the control cabinet to state controller (150).
7. the hot rail production carbon-point of carbon according to claim 1 and power cord assembly equipment (100), which is characterized in that Heating device (190) is additionally provided on support frame as described above (160).
8. the hot rail production carbon-point of carbon according to claim 1 and power cord assembly equipment (100), which is characterized in that
The second thread feeding mechanism (124) is additionally provided on support frame as described above (160), the carbon-point for assembly will to be completed (210) it is delivered to subsequent processing with the power cord (220);
Also, it is provided between second thread feeding mechanism (124) and the assembly device (140) and checks sensor (310), For detecting whether the carbon-point (210) assembles with the power cord (220).
CN201510994493.XA 2015-12-25 2015-12-25 The hot rail production carbon-point of carbon and power cord assembly equipment Expired - Fee Related CN105430772B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510994493.XA CN105430772B (en) 2015-12-25 2015-12-25 The hot rail production carbon-point of carbon and power cord assembly equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510994493.XA CN105430772B (en) 2015-12-25 2015-12-25 The hot rail production carbon-point of carbon and power cord assembly equipment

Publications (2)

Publication Number Publication Date
CN105430772A CN105430772A (en) 2016-03-23
CN105430772B true CN105430772B (en) 2018-11-13

Family

ID=55508629

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510994493.XA Expired - Fee Related CN105430772B (en) 2015-12-25 2015-12-25 The hot rail production carbon-point of carbon and power cord assembly equipment

Country Status (1)

Country Link
CN (1) CN105430772B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109940438B (en) * 2019-04-24 2021-03-02 青岛怡口工业自动化科技有限公司 Carbon-point length fixing machine

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202004994U (en) * 2011-04-13 2011-10-05 河北圣佳电子科技有限公司 Carbon fiber cold and hot line integrated injection molding heating device
CN202169476U (en) * 2011-06-10 2012-03-21 东莞劲胜精密组件股份有限公司 Multifunctional press machine
CN103722663A (en) * 2013-12-20 2014-04-16 惠州市天顺精密注塑有限公司 Precision hardware processing device and processing method
CN203912221U (en) * 2014-03-12 2014-10-29 北京中科联众科技股份有限公司 Carbon fiber electrical-warming type three-pin joint
CN204123580U (en) * 2014-08-19 2015-01-28 安徽金科橡塑制品有限公司 A kind of forming machine with upper die station
CN204180288U (en) * 2014-10-03 2015-02-25 北京中科联众科技股份有限公司 A kind of carbon fiber electric heating rail
CN104955182A (en) * 2014-03-31 2015-09-30 天津旭洋现代科技有限公司 Automatic production line for carbon-rod hot rail
CN205283840U (en) * 2015-12-25 2016-06-01 北京中科联众科技股份有限公司 Production of hot rail of carbon is with carbon -point and power cord rigging equipment

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202004994U (en) * 2011-04-13 2011-10-05 河北圣佳电子科技有限公司 Carbon fiber cold and hot line integrated injection molding heating device
CN202169476U (en) * 2011-06-10 2012-03-21 东莞劲胜精密组件股份有限公司 Multifunctional press machine
CN103722663A (en) * 2013-12-20 2014-04-16 惠州市天顺精密注塑有限公司 Precision hardware processing device and processing method
CN203912221U (en) * 2014-03-12 2014-10-29 北京中科联众科技股份有限公司 Carbon fiber electrical-warming type three-pin joint
CN104955182A (en) * 2014-03-31 2015-09-30 天津旭洋现代科技有限公司 Automatic production line for carbon-rod hot rail
CN204123580U (en) * 2014-08-19 2015-01-28 安徽金科橡塑制品有限公司 A kind of forming machine with upper die station
CN204180288U (en) * 2014-10-03 2015-02-25 北京中科联众科技股份有限公司 A kind of carbon fiber electric heating rail
CN205283840U (en) * 2015-12-25 2016-06-01 北京中科联众科技股份有限公司 Production of hot rail of carbon is with carbon -point and power cord rigging equipment

Also Published As

Publication number Publication date
CN105430772A (en) 2016-03-23

Similar Documents

Publication Publication Date Title
CN103474173B (en) The self circulation cooling device produced for cable and wire and cable product line
CN105430772B (en) The hot rail production carbon-point of carbon and power cord assembly equipment
CN205283840U (en) Production of hot rail of carbon is with carbon -point and power cord rigging equipment
CN107511961A (en) A kind of device to the automatic heating of Insulating heat shrink
CN105423404B (en) The hot rail production line of carbon
CN104955182A (en) Automatic production line for carbon-rod hot rail
CN204404700U (en) Adopt the tea-drying case of Far-infrared Heating
CN202571625U (en) Hot air circulation system of point welding machine
CN205364119U (en) Geothermal floor nailing device
CN203714606U (en) Near-infrared conveying machine for sole laying sections
CN205316846U (en) Constant temperature infrared ray capsule drying device
CN210094844U (en) Heating and stretching drying tunnel mechanism of industrial intelligent shoe making production line
KR101266235B1 (en) The automatic wire supplying device for heating element manufacturing line
CN205732334U (en) A kind of improved structure of aluminium alloy extrusions extruder ingot-containing tube
CN203896522U (en) Automatic production line of carbon rod hot rails
CN107671935B (en) Protection component for water feeding port joint of flat plate collector and production equipment thereof
CN206412151U (en) A kind of cable production line water-blowing device
CN206134846U (en) Lithium cell electricity core scalds needle reaming device
CN204043193U (en) Air-conditioning auxiliary electrical heater device
CN206356218U (en) The rotary plug baking-glue machine of LED lamp tube
CN106630547B (en) A kind of glass heat-insulating device
CN205199847U (en) Coating machine film rubberizing equipment take out air cooling system
CN205783287U (en) Industry electrothermic heating installation
CN106269881A (en) Heatable accumulator cell lead band calendering roll device
CN103128466B (en) A kind of mash welder hot air circulating system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181113

Termination date: 20181225