CN105429290B - A kind of electric power rapid rush-repair automatic dispatching system - Google Patents

A kind of electric power rapid rush-repair automatic dispatching system Download PDF

Info

Publication number
CN105429290B
CN105429290B CN201410489199.9A CN201410489199A CN105429290B CN 105429290 B CN105429290 B CN 105429290B CN 201410489199 A CN201410489199 A CN 201410489199A CN 105429290 B CN105429290 B CN 105429290B
Authority
CN
China
Prior art keywords
repairing
center
electric power
automatic dispatching
rapid rush
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410489199.9A
Other languages
Chinese (zh)
Other versions
CN105429290A (en
Inventor
史宏伟
韩爱芝
刘守明
魏韬
柴冰
王彪
郭宝林
韩庆军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHENGZHOU KAITONG SICHUANG TECHNOLOGY CO., LTD.
Zhoukou Power Supply Co of State Grid Henan Electric Power Co Ltd
Original Assignee
ZHENGZHOU KAITONG SICHUANG TECHNOLOGY Co Ltd
Zhoukou Power Supply Co of State Grid Henan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHENGZHOU KAITONG SICHUANG TECHNOLOGY Co Ltd, Zhoukou Power Supply Co of State Grid Henan Electric Power Co Ltd filed Critical ZHENGZHOU KAITONG SICHUANG TECHNOLOGY Co Ltd
Priority to CN201410489199.9A priority Critical patent/CN105429290B/en
Publication of CN105429290A publication Critical patent/CN105429290A/en
Application granted granted Critical
Publication of CN105429290B publication Critical patent/CN105429290B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Locating Faults (AREA)

Abstract

The invention discloses a kind of electric power rapid rush-repair automatic dispatching systems, including pylon normal work monitoring device, positioning device, wireless communication device, distribution map, distance to calculate and analytical equipment, calling device;Wherein, positioning device can work normally after monitoring device detects fault-signal in pylon and start, the included position coordinates for showing each repairing center of distribution map;It is provided with repairing center situation indicator in the system, when certain repairing center does not have repairing condition, is notified that control centre, the state instruction for adjusting corresponding repairing center situation indicator is not have repairing.Abort situation can be notified at once, automatically position of failure point is shown in the distribution map of control centre, it calculates at a distance from several repairing centers closer with surrounding, a nearest repairing center for having repairing condition of accurate calling, complete automatic dispatching, artificial calling step by step has been abandoned to realize the inefficient way of scheduling, has improved the rapid rush-repair of power failure.

Description

A kind of electric power rapid rush-repair automatic dispatching system
Technical field
The present invention relates to electric power first-aid dispatching technique field more particularly to a kind of electric power rapid rush-repair automatic dispatching systems System.
Background technology
Safety in production is the most important thing of power industry, since the problems such as natural calamity, misoperation, ageing equipment causes Power failure is inevitable, once repairing not in time will bring about great losses to lives and properties.However, in recent years, from Right environment is more severe, and natural calamity takes place frequently, a wide range of consecutive low temperature freezing rain and snow disaster weather in south, Ya'an Sichuan province earthquake, The natural calamities such as the flood of Heilongjiang river cause high risks to power grid security.The nature of large area, long-time, high intensity Disaster will cause grid power transmission circuit occurs to fall tower, broken string and conducting wire flashover fault, be caused greatly to the safe operation of power grid Harm.Since electric system is the economic development of society, the stability basis of order and public welfare, usually requiring that must be most Restore the supply of electric power in the short time.How when first after power failure caused by natural calamity or other reasons occurs Between restore electricity, quickly transfer available resources and the electric power facility damaged repaired, be that power industry must face To project.
The scheduling mode of main electric power repairing at present is the information passed back by fault in-situ or after personnel rushes for scene, passes through Each repairing center on manual calling periphery, then selects the troop for having repairing condition(Perfect, without it including equipment He repairs task)It rushes towards scene and carries out repairing work.By the way that manually calling is completed step by step, inefficiency is not met which The demand of current rapid rush-repair, it would therefore be desirable to which looking for a kind of more efficient electric power first-aid transfers method and its automation Scheduling system.
Invention content
Present invention mainly solves the problem of be to provide a kind of electric power rapid rush-repair automatic dispatching system, can due to After power failure caused by natural calamity or other reasons, abort situation is notified at once, match entoilage in control centre automatically Show position of failure point in figure, and calculate at a distance from several repairing centers closer with surrounding, accurately with wherein recently A breakdown service for having repairing condition get in touch, complete automatic dispatching, abandoned artificial called step by step to realize The inefficient way of scheduling, further improves the rapid rush-repair of electric power.
To solve the above problems, the present invention adopts the following technical scheme that:
A kind of electric power rapid rush-repair automatic dispatching system, including it is pylon normal work monitoring device, positioning device, wireless Communication device, distribution map, distance calculate and analytical equipment, calling device;Wherein, positioning device can be worked normally in pylon and be supervised It surveys after device detects fault-signal and starts, the included position coordinates for showing each repairing center of distribution map;The system In be provided with repairing center situation indicator and be notified that control centre when certain repairing center does not have repairing condition, adjust phase The state instruction that center situation indicator should be repaired is not have repairing.
Preferably, the pylon normal work monitoring device is designed with secondary detection mechanism, when the inspection twice for being separated by 1 minute When survey all shows exception, power failure signal is just sent out.
Preferably, the positioning device uses satellite positioning mode, including GPS or Beidou satellite system or Galileo, Or the integrated positioning between the arbitrary several persons of GLONASS or above-mentioned.
Preferably, by the way of the wireless communication device is bound using unique communication side, communication party is only power failure Repair control centre.
Preferably, the distribution map application GIS technology, provides real-time update, can receive power failure position After information, the position coordinates of fault point at this are directly shown on map.
Preferably, the distance is calculated is used for calculating fault point and 10 closer repairing centers of surrounding with analytical equipment Distance accurately analyze and nearest at least one have robbing for repairing condition and according to repairing center situation pointer information Repair center.
Preferably, calling device can call distance and calculate automatically nearest has repairing condition with what analytical equipment provided Repairing center, and the location information of power failure point is sent to the repairing center, so that it quickly carries out repairing Work.
Using above-mentioned technical proposal, beneficial effects of the present invention are:
1, this system obviates the trouble of manual calling and poor efficiency, from malfunction monitoring to dispatch call, all automate It completes, greatly improves the dispatching efficiency in power failure repairing work, ensured the rapid rush-repair of power failure;
2, in distribution map fault point with repairing center common display, it is very clear, more conducively repairing commander;
3, a few place breakdown services nearest from fault point can be automatically analyzed out, and can select and have repairing condition Repairing center substantially increases the intelligent level in electric power first-aid scheduling.
Description of the drawings
Fig. 1 is the system framework figure of the invention;
Fig. 2 is the work flow diagram of the invention.
Specific implementation mode
In order to make the purpose , technical scheme and advantage of the present invention be clearer, below in conjunction with attached drawing and specific implementation Mode is described in further detail a kind of electric power rapid rush-repair automatic dispatching system of the present invention.It should be appreciated that this place The specific implementation mode of description can not be limited the scope of the invention with this only to explain the present invention.
Attached drawing 1 gives the system framework figure of the invention, and a kind of electric power rapid rush-repair automatic dispatching system includes pylon Work normally monitoring device 1, positioning device 2, wireless communication device 3, distribution ground Fig. 4, repairing center situation indicator 5, distance It calculates and analytical equipment 6 and calling device 7.
Wherein, pylon normal work monitoring device 1 is installed in the power grid layout in each area, to monitor difference The power condition in region is designed with secondary detection mechanism, when the detection twice for being separated by 1 minute all shows exception, just sends out Power failure signal prevents the mistake of fault-signal from sending out.
Positioning device 2 uses satellite positioning mode, including GPS or Beidou satellite system or Galileo or GLONASS, Or the integrated positioning between above-mentioned arbitrary several persons, only in the power failure letter for receiving pylon normal work monitoring device 1 and providing After number, it can just start positioning function.
It is unique communication side that wireless communication device 3, which binds power failure repairing control centre, is responsible for positioning positioning device 2 To fault location information pass to power failure repair control centre.
Distribution Fig. 4 be placed in power failure repairing control centre be capable of providing real-time update using GIS technology, receive After the power failure location information come to the transmission of wireless communication device 3, by the position coordinates of fault point together in included repairing Heart position coordinates are shown in map together.
It repairs center situation indicator 5 and establishes connection with each repairing center, when equipment fault occurs in some repairing center Or when existing repairing task, it is adjusted to not have at the state at the corresponding repairing center in repairing center situation indicator 5 Repairing condition, on the contrary, being then adjusted to have repairing condition.
Distance is calculated to be used for calculating at a distance from 10 repairing centers closer with surrounding of fault point with analytical equipment 6, and According to the information in repairing center situation indicator 5, nearest at least one repairing for having repairing condition is accurately analyzed Center.
Calling device 7 can call automatically distance calculate with analytical equipment 6 provide recently have robbing for repairing condition Center is repaiied, and the location information of power failure point is sent to the repairing center, so that it quickly carries out repairing work.
Attached drawing 2 gives the work flow diagram of the invention, which is working normally When, monitoring device 1 is worked normally by pylon first and judges the testing result twice for being separated by 1 minute whether all to be abnormal, if different Often, then power failure signal is initiated;After positioning device 2 receives power failure signal, start positioning function;After positioning, Fault location information is passed into power failure by wireless communication device 3 and repairs control centre;Power failure repairs control centre The distribution at place after Fig. 4 receives power failure location information, by the position coordinates of fault point together with included repairing centre bit Coordinate is set to be shown in map together;Distance, which is calculated, to be calculated 10 closer with surrounding in fault point with analytical equipment 6 and robs Repair the distance at center;Whether have repairing condition according to repairing center indicated in repairing center situation indicator 5, judges most Whether close repairing center has repairing condition, forecloses if without if, then judges time close repairing center, until finding out and Closely but also with repairing condition repairing center until;Start calling device 7, automatic calling distance is calculated to be provided with analytical equipment 6 The nearest repairing center for having repairing condition, and the location information of power failure point is sent to the repairing center, for It quickly carries out repairing work.
The foregoing is merely the better embodiments of the present invention, are not intended to limit the invention, the general technology of this field Personnel using the solution of the present invention it will be recognized that can also realize many optional embodiments.It is all the present invention spirit and All any modification, equivalent and improvement made by within principle etc., should all be included in the protection scope of the present invention.

Claims (5)

1. a kind of electric power rapid rush-repair automatic dispatching system, including pylon normal work monitoring device, positioning device, channel radio T unit, distribution map, distance calculate and analytical equipment, calling device;It is characterized in that, positioning device can be in the normal work of pylon As monitoring device detect fault-signal after start, the included position coordinates for showing each repairing center of distribution map;It is described It is provided with repairing center situation indicator in system and is notified that control centre when certain repairing center does not have repairing condition, adjusts The state instruction of whole corresponding repairing center situation indicator is not have repairing, and the pylon normal work monitoring device is designed with Secondary detection mechanism just sends out power failure signal, the distance meter when the detection twice for being separated by 1 minute all shows exception It calculates and is used for calculating at a distance from 10 repairing centers closer with surrounding of fault point, and according to heart shaped in repairing with analytical equipment State pointer information accurately analyzes nearest at least one repairing center for having repairing condition.
2. according to the electric power rapid rush-repair automatic dispatching system described in claim 1, which is characterized in that the positioning device Using between satellite positioning mode, including the arbitrary several persons of GPS or Beidou satellite system or Galileo or GLONASS or above-mentioned Integrated positioning.
3. according to the electric power rapid rush-repair automatic dispatching system described in claim 1, which is characterized in that the wireless communication By the way of device is bound using unique communication side, communication party is only power failure repairing control centre.
4. according to the electric power rapid rush-repair automatic dispatching system described in claim 1, which is characterized in that the distribution map Using GIS technologies, real-time update is provided, can directly be shown at this on map after receiving power failure location information The position coordinates of fault point.
5. according to the electric power rapid rush-repair automatic dispatching system described in claim 1, which is characterized in that calling device can Automatic calling distance calculates the nearest repairing center for having repairing condition provided with analytical equipment, and power failure point Location information sends the repairing center to, so that it quickly carries out repairing work.
CN201410489199.9A 2014-09-23 2014-09-23 A kind of electric power rapid rush-repair automatic dispatching system Active CN105429290B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410489199.9A CN105429290B (en) 2014-09-23 2014-09-23 A kind of electric power rapid rush-repair automatic dispatching system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410489199.9A CN105429290B (en) 2014-09-23 2014-09-23 A kind of electric power rapid rush-repair automatic dispatching system

Publications (2)

Publication Number Publication Date
CN105429290A CN105429290A (en) 2016-03-23
CN105429290B true CN105429290B (en) 2018-08-03

Family

ID=55507299

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410489199.9A Active CN105429290B (en) 2014-09-23 2014-09-23 A kind of electric power rapid rush-repair automatic dispatching system

Country Status (1)

Country Link
CN (1) CN105429290B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113517908B (en) * 2021-09-10 2021-11-26 机械科学研究总院江苏分院有限公司 System and method for remotely detecting and locating faults in an electrical power system

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100683246B1 (en) * 2006-06-07 2007-02-16 주식회사 세니온 Automated electric power distribution system and fixed wireless bridge communication apparatus for the system
CN201994967U (en) * 2011-01-19 2011-09-28 山东电力集团公司泰安供电公司 Intelligent electric power emergency repair terminal
CN102437526A (en) * 2011-10-10 2012-05-02 江苏省电力公司阜宁县供电公司 Rapid repairing and integral dispatching system of power grid
CN202395900U (en) * 2011-11-30 2012-08-22 陕西秦能电力科技有限公司 Mobile urgent repair operation platform for urban distribution network
CN202474601U (en) * 2011-11-17 2012-10-03 江苏省电力公司南京供电公司 Power grid fault rush repair system based on GIS
CN103248122A (en) * 2013-04-27 2013-08-14 国家电网公司 Active reporting system for power failure
CN203204157U (en) * 2012-11-19 2013-09-18 浙江省电力公司供电服务中心 Distribution network fault emergency repair positioning system of electrical power system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100683246B1 (en) * 2006-06-07 2007-02-16 주식회사 세니온 Automated electric power distribution system and fixed wireless bridge communication apparatus for the system
CN201994967U (en) * 2011-01-19 2011-09-28 山东电力集团公司泰安供电公司 Intelligent electric power emergency repair terminal
CN102437526A (en) * 2011-10-10 2012-05-02 江苏省电力公司阜宁县供电公司 Rapid repairing and integral dispatching system of power grid
CN202474601U (en) * 2011-11-17 2012-10-03 江苏省电力公司南京供电公司 Power grid fault rush repair system based on GIS
CN202395900U (en) * 2011-11-30 2012-08-22 陕西秦能电力科技有限公司 Mobile urgent repair operation platform for urban distribution network
CN203204157U (en) * 2012-11-19 2013-09-18 浙江省电力公司供电服务中心 Distribution network fault emergency repair positioning system of electrical power system
CN103248122A (en) * 2013-04-27 2013-08-14 国家电网公司 Active reporting system for power failure

Also Published As

Publication number Publication date
CN105429290A (en) 2016-03-23

Similar Documents

Publication Publication Date Title
US9910102B2 (en) Methods, systems, and computer readable media for monitoring and management of a power distribution system
WO2021108537A1 (en) Systems and methods for power line fault detection
CN103915827A (en) Power distribution network fault studying and judging method and system
CN203422438U (en) Real-time monitoring and fault location system for overhead lines of power distribution network
CN104296803A (en) Digital nuclear facility environmental radiation monitoring system
CN106846700B (en) Method and system for monitoring forest fire of power transmission line
CN104459464A (en) Power transmission line fault point positioning system and method
CN107588329A (en) A kind of water supply pipe real-time monitoring system
US11736208B2 (en) Antenna and environmental conditions monitoring for wireless and telecommunications for private, public, and first responders
CN104950351A (en) Meteorology-based multi-meteorological-element composite horizontal display method and system thereof
CN206147023U (en) Wire pole trouble intelligence location and monitoring devices
CN106026388A (en) Substation fault information automatic publishing and processing system
CN108933482B (en) Power distribution terminal equipment off-line reason analysis method based on wireless signal intensity
US11309699B2 (en) Control system for and method of fault location, isolation and supply restoration
CN103605047A (en) Power restoration monitoring system and method
CN105429290B (en) A kind of electric power rapid rush-repair automatic dispatching system
CN108020755B (en) Power grid fault positioning method based on fault recording and lightning positioning system
CN106680659A (en) Distribution network fault indication system
CN105203926B (en) A kind of method for improving super high voltage direct current electricity transmission line fault location accuracy
WO2021035281A1 (en) Cathodic protection management system
CN105223472B (en) A kind of ultra-high-tension power transmission line Fault Locating Method based on multi-source data set theory
CN210293276U (en) Unmanned aerial vehicle-based substation operation environment monitoring system
CN104391322A (en) Outdoor automated monitoring system and method for seismic apparatus arrangement equipment
Capelini et al. Methodology for fast fault location in overhead distribution networks by the application of temporary georeferenced fault indicators
CN104330700B (en) A kind of dispatching method of power failure rapid rush-repair

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20180620

Address after: 466000 Tai Hao Road, Chuan Hui District, Zhoukou, Henan Province, No. 2

Applicant after: Zhoukou Power Supply Company of State Grid Henan Electric Power Company

Applicant after: ZHENGZHOU KAITONG SICHUANG TECHNOLOGY CO., LTD.

Address before: 466000 Tai Hao Road, Zhoukou, Henan

Applicant before: Zhoukou Power Supply Company of State Grid Henan Electric Power Company

GR01 Patent grant
GR01 Patent grant