CN105421236B - Closing method for cable-stayed and suspension composite bridge - Google Patents

Closing method for cable-stayed and suspension composite bridge Download PDF

Info

Publication number
CN105421236B
CN105421236B CN201510716506.7A CN201510716506A CN105421236B CN 105421236 B CN105421236 B CN 105421236B CN 201510716506 A CN201510716506 A CN 201510716506A CN 105421236 B CN105421236 B CN 105421236B
Authority
CN
China
Prior art keywords
oblique pull
cable
closing
area
girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510716506.7A
Other languages
Chinese (zh)
Other versions
CN105421236A (en
Inventor
张永涛
陈鸣
游新鹏
彭成明
黄灿
潘桂林
陈少林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
Original Assignee
CCCC Second Harbor Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co filed Critical CCCC Second Harbor Engineering Co
Priority to CN201510716506.7A priority Critical patent/CN105421236B/en
Publication of CN105421236A publication Critical patent/CN105421236A/en
Application granted granted Critical
Publication of CN105421236B publication Critical patent/CN105421236B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D11/00Suspension or cable-stayed bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a closing method for a cable-stayed and suspension composite bridge, which belongs to the technical field of bridges. With an overlapping region (b), of the cable-stayed and suspension composite bridge as the position of a closing opening, the form of the closing opening is compositely adjusted through a deck derrick crane and a cable loading crane so as to realize closing of a cantilever end girder of a cable-stayed region (a) and a cantilever end girder of a suspension region (c). The position of the closing opening is arranged at the junction of the cable-stayed region (a) and the overlapping region (b), and is close to the cable-stayed region (a). For the closing construction of the cable-stayed and suspension composite bridge, the invention discloses a construction method for compositely adjusting the form of the closing opening through the reasonable closing opening position, the deck derrick crane and the cable loading crane; on the one hand, a problem that great horizontal force is burdened on a tower-girder temporary consolidation can be solved; and on the other hand, the adjustment of the closing opening can be finished by using the traditional construction equipment. Therefore, the working efficiency is effectively increased and the labor intensity of construction personnel is reduced.

Description

A kind of folding method of oblique pull suspension cable co-operative system bridge
Technical field
The present invention relates to a kind of folding method of bridge, belongs to technical field of bridge construction, more particularly to a kind of oblique pull is hanged The folding method of rope co-operative system bridge.
Background technology
The advantage of oblique pull suspension cable co-operative system bridge synthesis two kinds of bridge types of cable-stayed bridge and suspension bridge, Jin Ta areas adopt oblique pull body System, span centre region adopts cable-cabin structure.To ensure the reasonable transition between two kinds of rigidity difference system bridges, can be in certain limit Interior setting overlay region, i.e., in a part of section, the suspension cable of existing cable-stayed bridge, has the hoist cable of suspension bridge again, by suspension cable and hoist cable Shared girder is conducted oneself with dignity and mobile load.
Generally Longspan Bridge selects to close up mouth all in span centre or the position of nearly tower.To oblique pull suspension cable co-operative system bridge For, close up mouth and be arranged on the length that span centre can then increase cantilever, greatly increase the design difficulty of tower beam temporary consolidation, select Nearly tower position, then oblique pull part-structure stress cannot ensure.Therefore, oblique pull suspension cable co-operative system closure of bridge structure method should be wrapped first Include the selection for rationally closing up mouthful position.
Further, since the rigidity of structure of two kinds of systems is inconsistent, and the suspension cable of overlay region does not also set up, must mouth is closed up The larger discrepancy in elevation and corner irregularity will be produced, therefore, folding method also needs to include closing up regulating measures to ensure smoothly to close up.
A kind of self-anchored stayed cable-suspension combined bridge is disclosed in Chinese invention patent description CN1676753A, this It is bright by first construct oblique pull bridge portion, resuspend main push-towing rope, temporarily by main push-towing rope anchor in the frame structure that multiple abutment piers are formed, so The firm girder of suspension cable bridge portion is lifted afterwards, conversion of the earth anchor system to self-anchoring system is completed after girder closes up, formed forever certainly Anchor system.Although the invention has the advantages that low engineering cost, construction period are short, it is not open a kind of suitable for oblique The folding method of drawing-suspension cable cooperation bridge, so as to what is existed when cannot efficiently solve oblique pull suspension cable co-operative system closure of bridge structure The design difficulty of tower beam temporary consolidation is big, oblique pull part-structure stress cannot ensure, close up mouth produces the larger discrepancy in elevation and corner The problems such as irregularity.
Disclose in Chinese invention patent description CN102154990B a kind of suspention of end bay-in across three tower of oblique pull from anchor Formula combines the erection method of cable bridge, the step of its erection method is:1. the girder that the cable-stayed bridge and side tower crane of tower draws in being formed;② Close up girder;3. set up side tower cable crane system;Remove suspention section support;5. oblique pull dorsal funciculus, hoist cable, cable-stayed bridge are adjusted;6. Cheng Qiao. The invention eliminates temporary consolidation construction and the working procedure for releasing between Bian Ta and girder, and incites somebody to action " side tower cable crane system sets up " Working procedure moves to girder and all closes up after mouth closes up and carries out, therefore shortens the duration, has saved material consumption and mechanical stage Class expends, it is to avoid releases and bears the security risk brought by the temporary consolidation of powerful horizontal force.But, the invention is not complete The whole method for disclosing a kind of determination of determination oblique pull suspension cable co-operative system closure of bridge structure mouth position and closed configuration adjustment, therefore The design difficulty that cannot efficiently solve the tower beam temporary consolidation existed during oblique pull suspension cable co-operative system closure of bridge structure is big, oblique pull portion The problems such as separation structure stress cannot ensure, close up the larger discrepancy in elevation of mouth generation and corner irregularity.
The content of the invention
The present invention proposes improvement for the problem that above-mentioned prior art is present, i.e., the technical problem to be solved in the present invention is A kind of folding method of oblique pull suspension cable co-operative system bridge is provided, oblique pull suspension cable cooperation learning can reasonably be determined by the method It is the closed position of bridge, while the adjustment of oblique pull suspension cable co-operative system closure of bridge structure state can be realized to ensure smoothly conjunction Hold together.
The present invention solves the technical scheme of technical problem and is to provide a kind of folding method of oblique pull suspension cable co-operative system bridge, Which is using the overlay region of oblique pull suspension cable co-operative system bridge as closing up a mouthful position, and passes through erection crane and deck unit erection gantry collaboration is adjusted Integrate degree of lip-rounding state to realize oblique pull area cantilever end girder and suspend closing up for area's cantilever end girder in midair;Mouthful position that closes up is arranged on Oblique pull area (A) and the intersection of overlay region (B), and near oblique pull area (A).
In a kind of preferred embodiment of the present invention, by changing the position that the erection crane is located on girder, realize Adjustment to the elevation and corner of oblique pull area cantilever end girder.
In a kind of preferred embodiment of the present invention, by changing the position that the deck unit erection gantry is located on main push-towing rope, realize Adjustment to suspending the elevation and corner of area's cantilever end girder in midair.
In a kind of preferred embodiment of the present invention, the main depth of beam of oblique pull area cantilever end after closing up and after closing up The main depth of beam of suspention area cantilever end between the two difference within 1-2cm.
In a kind of preferred embodiment of the present invention, the corner of the oblique pull area cantilever end girder after closing up and after closing up The suspention area cantilever end girder corner it is equal.
The invention has the beneficial effects as follows:Closure construction of the present invention for oblique pull suspension cable co-operative system bridge, it is proposed that one Kind is reasonably closed up mouthful position and erection crane and closes up the construction method of degree of lip-rounding state with deck unit erection gantry corrdinated adjustment.One side of the method Face can avoid tower beam temporary consolidation from bearing the problem of greater level power, on the other hand using existing construction equipment (two kinds of loop wheel machines) Can complete to close up the adjustment of mouth, while present invention can ensure that the measure of adjustment needed for loop wheel machine or other devices on girder Amount is minimum, and when also closing up, the required position adjustment amount to girder is minimum, so as to be effectively improved work efficiency, reduces workmen Labor intensity.
Description of the drawings
Fig. 1 is a kind of signal for rationally closing up mouthful position of the folding method of oblique pull suspension cable co-operative system bridge of the invention Figure;
Fig. 2 is a kind of erection crane of the folding method of oblique pull suspension cable co-operative system bridge of the invention and deck unit erection gantry collaboration Carry out closing up a mouthful experiment material schematic diagram;
In figure:1- erection cranes;2- deck unit erection gantries;3- main push-towing ropes;4- girders;A- oblique pulls area;B- overlay regions;C- suspends area in midair.
Specific embodiment
In order that the objects, technical solutions and advantages of the present invention become more apparent, it is below in conjunction with drawings and Examples, right The present invention is further elaborated.It should be appreciated that specific embodiment described herein is only to explain the present invention, not For limiting the present invention.
By a kind of closed position schematic diagram (as shown in Figure 1) of the folding method of oblique pull suspension cable co-operative system bridge of the invention And closed configuration illustrate it is (as shown in Figure 2) understand, a kind of present invention proposition closing up suitable for oblique pull suspension cable co-operative system bridge Method, including reasonable closed position selection and close up the regulating measures of degree of lip-rounding state, reasonable closed position is selected in oblique pull and outstanding The transition region (near oblique pull area) of rope, regulating measures are mainly using 2 corrdinated adjustment of erection crane 1 and deck unit erection gantry;It is concrete to wrap Include following steps:1st, determine and rationally close up a mouthful position:The reasonable closed position of oblique pull suspension cable co-operative system bridge is preferably selected in weight Folded area's (existing suspension cable has hoist cable again), and near oblique pull area;Because can increase outstanding if a mouthful position is arranged on span centre if closing up Arm lengths, increase the design difficulty of tower beam temporary consolidation;Select in nearly tower position if mouthful position will be closed up and arranged, cable-stayed bridge is received Power cannot ensure.Therefore, close up mouth to may be selected within overlay region.Meanwhile, it is the length for reducing oblique pull area cantilever erection, closed position The boundary position selected in oblique pull area with overlay region is put, and near oblique pull area.2nd, adjustment is closed up degree of lip-rounding state and carries out girder 4 and closes up; Close up mouthful position and determine in overlay region near the position in oblique pull area, before girder 4 closes up, still have part suspension cable and hoist cable not to pacify Dress.Carry out closing up the adjustment of degree of lip-rounding state using erection crane 1 and the collaboration of deck unit erection gantry 2, erection crane 1 is to 4 elevation of girder and turns The adjustment at angle be it is direct, by toward end bay or in across mobile erection crane 1, change position of the erection crane 1 on girder 4, The elevation and corner at kingpost cantalever end can be changed;Adjustment of the deck unit erection gantry 2 to 4 elevation of girder and corner is indirectly, to pass through Toward end bay or in across mobile deck unit erection gantry 2, change position of the deck unit erection gantry 2 on main push-towing rope 3, the linear generation to main push-towing rope 3 is direct Affect, so as to realize indirectly the adjustment to kingpost cantalever end elevation and corner;3rd, checking and accepting is completed after girder closes up.Girder is closed The target for holding together adjustment is that cantilever end smoothly can be matched, and closes up the girder top highness change of mouthful both sides within 1 to 2cm, and corner is most May be equal, the corner of its middle girder is the angle formed with horizontal plane by girder.
The present invention for oblique pull suspension cable co-operative system bridge closure construction, it is proposed that one kind reasonably close up mouthful position and Erection crane closes up the construction method of degree of lip-rounding state with deck unit erection gantry corrdinated adjustment.On the one hand tower beam temporary consolidation can be avoided from bearing The problem of greater level power, on the other hand can complete to close up the adjustment of mouth using existing construction equipment (two kinds of loop wheel machines), improve Work efficiency.
The above, the only specific embodiment of the present invention, but protection scope of the present invention is not limited thereto, any Those of ordinary skill in the art disclosed herein technical scope in, the change or replacement that can be readily occurred in should all be contained Cover within protection scope of the present invention.

Claims (5)

1. a kind of folding method of oblique pull suspension cable co-operative system bridge, which is with the overlay region (B) of oblique pull suspension cable co-operative system bridge As closing up a mouthful position, and degree of lip-rounding state is closed up by erection crane (1) and deck unit erection gantry (2) corrdinated adjustment realize oblique pull area (A) Cantilever end girder closes up with suspention area's (C) cantilever end girder;It is characterized in that:Mouthful position that closes up is arranged on oblique pull area (A) and overlay region (B) intersection, and near oblique pull area (A).
2. a kind of folding method of oblique pull suspension cable co-operative system bridge as claimed in claim 1, it is characterised in that:By changing Position of the erection crane (1) on girder, realizes the adjustment of elevation and corner to oblique pull area (A) cantilever end girder.
3. a kind of folding method of oblique pull suspension cable co-operative system bridge as claimed in claim 1, it is characterised in that:By changing Position of the deck unit erection gantry (2) on main push-towing rope (3), realizes the tune of the elevation and corner to suspending area (C) cantilever end girder in midair It is whole.
4. a kind of folding method of oblique pull suspension cable co-operative system bridge as claimed in claim 1, it is characterised in that:After closing up The main depth of beam of oblique pull area (A) cantilever end and the main depth of beam of suspention area (C) cantilever end after closing up are between the two Difference is within 1-2cm.
5. a kind of folding method of oblique pull suspension cable co-operative system bridge as claimed in claim 1, it is characterised in that:After closing up The corner of the corner of oblique pull area (A) the cantilever end girder and suspention area (C) the cantilever end girder after closing up is equal.
CN201510716506.7A 2015-10-29 2015-10-29 Closing method for cable-stayed and suspension composite bridge Active CN105421236B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510716506.7A CN105421236B (en) 2015-10-29 2015-10-29 Closing method for cable-stayed and suspension composite bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510716506.7A CN105421236B (en) 2015-10-29 2015-10-29 Closing method for cable-stayed and suspension composite bridge

Publications (2)

Publication Number Publication Date
CN105421236A CN105421236A (en) 2016-03-23
CN105421236B true CN105421236B (en) 2017-04-12

Family

ID=55499751

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510716506.7A Active CN105421236B (en) 2015-10-29 2015-10-29 Closing method for cable-stayed and suspension composite bridge

Country Status (1)

Country Link
CN (1) CN105421236B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107022958B (en) * 2017-06-02 2019-04-16 广西路桥工程集团有限公司 Use the method across girder in cable crane installation cable-stayed bridge
CN109371805A (en) * 2018-11-14 2019-02-22 西南交通大学 A kind of large span multitower cable-cabin structure bridge and its construction method
CN110939067B (en) * 2019-12-09 2021-08-03 中铁大桥勘测设计院集团有限公司 Method for determining position of bridge closure section of collaboration system
CN111973290B (en) * 2020-06-30 2023-03-14 温州医科大学附属第二医院、温州医科大学附属育英儿童医院 Operating frame for transforaminal endoscope
CN113174863B (en) * 2021-04-30 2022-05-17 中铁大桥勘测设计院集团有限公司 Construction method of cable-stayed suspension cable cooperation system bridge

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1676753A (en) * 2005-04-20 2005-10-05 大连理工大学 Self-anchored stayed cable-suspension combined bridge
CN101418543A (en) * 2008-11-21 2009-04-29 上海市政工程设计研究总院 Self-anchored rope-suspension bridge inclined drawing construction method
KR100969005B1 (en) * 2009-11-06 2010-07-09 동아대학교 산학협력단 Constructing method of suspension bridge and temporary cable therefor
CN104631326A (en) * 2014-12-22 2015-05-20 广东省公路勘察规划设计院股份有限公司 Main beam cable-stayed suspension forming technological method for self-anchorage type suspension bridge

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1676753A (en) * 2005-04-20 2005-10-05 大连理工大学 Self-anchored stayed cable-suspension combined bridge
CN101418543A (en) * 2008-11-21 2009-04-29 上海市政工程设计研究总院 Self-anchored rope-suspension bridge inclined drawing construction method
KR100969005B1 (en) * 2009-11-06 2010-07-09 동아대학교 산학협력단 Constructing method of suspension bridge and temporary cable therefor
CN104631326A (en) * 2014-12-22 2015-05-20 广东省公路勘察规划设计院股份有限公司 Main beam cable-stayed suspension forming technological method for self-anchorage type suspension bridge

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
斜拉-悬吊组合体系桥梁的力学及施工过程分析;邱景;《中国优秀硕士学位论文全文数据库 工程科技II辑》;20130115(第1期);正文第59页第2段、第70页第2段及图4-17 *

Also Published As

Publication number Publication date
CN105421236A (en) 2016-03-23

Similar Documents

Publication Publication Date Title
CN105421236B (en) Closing method for cable-stayed and suspension composite bridge
CN202936736U (en) Cable-stayed bridge composite beam construction bridge floor crane
CN106958206B (en) Hybrid structure of arch and beam formula continuous rigid frame bridge bilayer bottom basket bilayer button hangs constructing device and method
CN105298100B (en) A kind of cylinder building cast-in-place flare structure of superelevation is encorbelmented the construction method of operation platform
CN110130652A (en) Large complicated composite structure steel worm-gearing construction method for lifting whole
CN104695337B (en) Self-lifting sliding and turnover construction system and construction method
CN103882812B (en) Across the construction method of girder in stayed-cable bridge
CN105274941B (en) General construction method for partially ground-anchored cable-stayed suspension bridge
CN103290784B (en) Arched girder conjugative bridge construction method for hanging
CN103075025A (en) Wholly lifting construction method for asymmetric structure of huge overhang steel of high-rise building
CN101446074B (en) Installation and closure construction method for steel sliding roadway arch on top surface of steel trussed beam bridge
CN106087752A (en) Multispan cable-carried arch bridge construction method
CN207001991U (en) A kind of hanging apparatus of high ferro prefabricated case beam
CN108978499A (en) A kind of oblique pull suspension cable co-operative system bridge erection method
CN206667079U (en) Basket double-deck button in hybrid structure of arch and beam formula continuous rigid frame bridge bilayer bottom hangs constructing device
CN208088097U (en) A kind of three-tower suspension bridge erection of main beam constructing structure
CN105256728A (en) Cable-stayed bridge warren steel truss cantilever erection method
CN114215170A (en) Method for lifting super-altitude giant hanging multi-layer connected structure
CN110359671A (en) A kind of assembled rail pipeline construction method against the wind
CN102381438B (en) Wholly lifting mounting method for wholly built upstairs stem section of large-size semi-submerged ship
CN202380403U (en) Integral hoisting system of arch rib of arch bridge
CN208167497U (en) A kind of elevated steel suspension bridge navigable
CN107012797B (en) A kind of construction system that Support Method is combined with stayed knotting method and method
CN206590793U (en) Connect arm assembly and the movable arm tower crane comprising the device in the air
CN108625289A (en) A kind of stringer and erection method suitable for stiffening girder of suspension bridge

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant