The present invention relates to asphalt pavement maintenance and repair association area, being specifically related to a kind of double-deck layer paving formula flexible pavement fine surface treatment method.
Background technology
Flexible pavement as the jointless continuous pavement of one, because having surfacing, drive a vehicle comfortable, wear-resisting, noise is low, short construction period, the advantage such as easy to maintenance, be widely applied in high-grade highway construction.
Due to the complexity of bituminous coat project itself, polytropy and the various reasons such as structure design and quality control on construction, add the factors such as the continuous increase of the traffic volume, the canalization of vehicle traveling, the aggravation of overload transportation and Moisture Damage, flexible pavement (or bridge deck pavement) is occurred earlier period damages such as crack in various degree, rut, surface are loose, hole groove, seriously reduce road surface (or bridge floor) functional performance.In order to administer the early disease that flexible pavement (or bridge floor) occurs, it is made again to recover the pavement performance of flexible pavement (or bridge floor), ensure the normal use of road, current most domestic area have employed corrective maintenance method, namely just process after disease occurs, the drawback of so easy appearance " headache doctor head, pin pain controls pin ", cause process effect to fall flat, overlapping investment is also larger.Simultaneously, fasten in the pass of maintenance of surface and maintenance, highway industry is due to the tendency of ubiquity " reconstruction is gently supported ", " supporting to build generation ", maintenance of surface just starts to keep in repair after usually waiting road surface (or bridge floor) to start to occur destruction, maintenance fund limited is like this mainly used in overhaul and even reconstructs and reproduce, the circumstances of the low output of awkward high investment that caused highway maintenance to be absorbed in, comes into the vicious circle of a vicious circle.
The huge pressure brought with maintenance financing gap is increased fast in order to effectively alleviate maintenance management workload, improve road network performance, except quickening Maintenance System and maintenance operation mechanism are reformed, strengthen outside the input of maintenance fund, also must change maintenance management guiding theory, change Maintain management mode, across-the-board regulation some traditional maintenance idea and usual practices, highway maintenance is changed to scientific maintenance by passive maintenance, by single maintenance, extensive maintenance is to compound, intensive maintenance changes, to carry out in an all-round way preventive maintenance, thus set up there is initiative, foresight and systematic highway maintenance work system.
Asphalt Pavement Maintenance Technology specification clear stipulaties, must carry out preventative, regular and periodically maintenance to flexible pavement.According to u s. state highway and transport NAB National Association 0f Broadcasters AASHTO road Standing Committee to the definition of preventive maintenance, preventive maintenance be a kind of take when pavement behavior is good to existing road system carry out planned, based on the maintenance strategy of Cost-Electiveness; Preventive maintenance, when not improving Pavement structural capacity, can postpone the damage on road surface, maintains or improves the existing train-passing through conditions in road surface.By to Expressway Implementing road surface preventive maintenance, energy is the small disease of redeck in time, prevent major injury, reduce moisture and enter road structure internal sabotage basic unit, ensure the globality of road structure, slow down the breakdown speed of road, correcting pavement such as cling property and non-load destroy, postpone expensive overhaul and reconstruction activities, thus extend the application life on road surface, keep the service state that road surface is good.
Along with the center of gravity of highway administration department from new highway to the transfer of maintaining public highway, road surface transform is also from the mode of maintenance priority ordered to supporting that maintenance strategy such as the preventive maintenance of cost effectiveness shifts.Therefore, research and development Expressway Pavement Preventional Curing new technology, implement road surface preventive maintenance be China's Expressway Development in the urgent need to.
In order to keep the kilter of Pavement Condition and extend its application life, different maintenance measures is adopted in each different phase of life cycle, the maintenance technology of employing science, becomes Recent study focus with the maintenance quality and reduction maintenance cost that ensure road surface.Such as at the early stage stage of development of road disease, joint filling, joint seal, mist sealing, slurry seal, micro-surface area, cape sealing, screening seal coat, rut are filled up, the technology such as thin overlay, ultra-thin wearing layer, superthin layer cover as emerged rapidly in large numbersBamboo shoots after a spring rain, start one preventive maintenance upsurge at home.But, through application for many years, the domestic technology such as cover, micro-surface area, overlay heated bitumen generally taked is limited to road elevation, durability, load-bearing, traffic pressure, cost and self can not adapts to the needs of modern urban road development to factors such as material, equipment requirement height at present, and steps down from the stage of history gradually.And mist sealing covers and its relevant substitute products are still subject to heat handful to a certain extent, but by reducing the reason such as former pavement skid resistance condition and durability deficiency after it uses, its extensive use still lacks of staying power.
So seek a kind of environmental protection, quick, effect is durable, can pavement skid resistance condition be improved and the new technology of relative inexpensiveness, with to occurring that the bad flexible pavement of the disease such as aging, pitted skin, loose, cracking, infiltration, polishing processes in time, prolongation Road Service Life is imperative.
Summary of the invention
The anti-slide performance decline occurred is for many years being used for solving flexible pavement, the problems such as road surface is aging, pitted skin, loose, cracking, infiltration, polishing, extend Road Service Life, the invention provides a kind of double-deck layer paving formula flexible pavement fine surface treatment method, reach fast quick-recovery function path and aesthetic road, and road maintenance cost can be reduced.
Object of the present invention is achieved through the following technical solutions:
A kind of double-deck layer paving formula flexible pavement fine surface treatment method, comprising step 1) bottom is after each for bituminous epoxy binding material component being stirred evenly on request, by its with certain pressure even application on flexible pavement, and synchronous evenly spreading layer of fine sand.Step 2) surface layer be until bottom solidification after form waterproof antiskid topping according to the mode of step 1) at its surface coverage one deck again.
Described bottom bituminous epoxy binding material used is epoxy modified asphalt glue, and its quantity for spray controls at 0.3-0.4kg/ ㎡, and fine sand spreading amount is 0.1 ~ 0.3kg/ ㎡.
Described surface layer bituminous epoxy binding material used is epoxy modified asphalt glue, and its quantity for spray controls at 0.2-0.3kg/ ㎡, and fine sand spreading amount is 0.5 ~ 1.0kg/ ㎡.
Described fine sand is the mixture of any one or more in diamond dust, basalt, ceramic particle, and fine sand specification is 30-50 order, dried and clean.
Relative to prior art, the advantage of this technological invention:
(1) one of the present invention double-deck layer paving formula flexible pavement fine surface treatment method is with epoxy modified asphalt binding material for sizing material, namely improves the adhesive power of material itself, effectively shortens the construction and maintenance time again.After sprinkling bituminous epoxy binding material, synchronous spreading layer of fine sand improves material monolithic hardness, abrasion resistance, high and low temperature resistance etc. simultaneously, drastically increases pavement skid resistance ability, durability, and can reduce road maintenance cost after pavement usage.
(2) a kind of double-deck layer paving formula flexible pavement fine surface treatment method of the present invention proposes on the basis of individual layer, is adapted to the road surface that heavy traffic or bend, long descending etc. have specific demand especially, greatly can improves the wear-proof sliding-proof performance of material.
(3) one of the present invention double-deck layer paving formula flexible pavement fine surface treatment method does not increase road clear height, net weight, constructs convenient, can realize Rapid-Repair to flexible pavement, improve road efficiency of operation.
Detailed description of the invention
Embodiment
For a better understanding of the present invention, below in conjunction with embodiment, the present invention is further described.
For a better understanding of the present invention, below by embodiment 1 ~ 4, the one of invention double-deck layer paving formula flexible pavement fine surface treatment method is described in detail.Bituminous epoxy binding material is the epoxy modified asphalt maintenance of surface agent that Chongqing Cheng Bang ground surface material Co., Ltd produces.
Embodiment 1:
Select AC-13 road surface, former pavement detection situation is construction depth 0.5mm, friction pendulum value 45BPN, infiltration coefficient 47mL/min.
Under 30 DEG C of temperature conditions, construction technology is as follows: step 1) bottom is after each for bituminous epoxy binding material component being stirred evenly on request, by its with certain pressure even application on flexible pavement, and synchronous evenly spreading layer of fine sand.Step 2) surface layer be until bottom solidification after form waterproof antiskid topping according to the mode of step 1) at its surface coverage one deck again.
Described bottom bituminous epoxy binding material used quantity for spray controls at 0.3kg/ ㎡, and fine sand spreading amount is 0.1kg/ ㎡.
Described surface layer bituminous epoxy binding material used quantity for spray controls at 0.2kg/ ㎡, and fine sand spreading amount is 0.5kg/ ㎡.Waterproof antiskid topping is formed by 2 hours curing reactions.Described fine sand is diamond dust, and specification is 30-50 order, originates from Henan.
According to the detection method that on-the-spot test code JTGE60-2008 in highway subgrade road surface specifies, construction depth 0.56mm, friction pendulum value 67BPN, infiltration coefficient 0mL/min.
Embodiment 2:
Select AC-13 road surface, former pavement detection situation is construction depth 0.5mm, friction pendulum value 45BPN, infiltration coefficient 47mL/min.
Under 30 DEG C of temperature conditions, construction technology is as follows: step 1) bottom is after each for bituminous epoxy binding material component being stirred evenly on request, by its with certain pressure even application on flexible pavement, and synchronous evenly spreading layer of fine sand.Step 2) surface layer be until bottom solidification after form waterproof antiskid topping according to the mode of step 1) at its surface coverage one deck again.
Described bottom bituminous epoxy binding material used quantity for spray controls at 0.35kg/ ㎡, and fine sand spreading amount is 0.2kg/ ㎡.
Described surface layer bituminous epoxy binding material used quantity for spray controls at 0.2kg/ ㎡, and fine sand spreading amount is 0.5kg/ ㎡.Waterproof antiskid topping is formed by 2 hours curing reactions.Described fine sand is diamond dust, and specification is 30-50 order, originates from Henan.
According to the detection method that on-the-spot test code JTGE60-2008 in highway subgrade road surface specifies, construction depth 0.56mm, friction pendulum value 67BPN, infiltration coefficient 0mL/min.
Embodiment 3:
Select AC-13 road surface, former pavement detection situation is construction depth 0.5mm, friction pendulum value 45BPN, infiltration coefficient 47mL/min.
Under 30 DEG C of temperature conditions, construction technology is as follows: step 1) bottom is after each for bituminous epoxy binding material component being stirred evenly on request, by its with certain pressure even application on flexible pavement, and synchronous evenly spreading layer of fine sand.Step 2) surface layer be until bottom solidification after form waterproof antiskid topping according to the mode of step 1) at its surface coverage one deck again.
Described bottom bituminous epoxy binding material used quantity for spray controls at 0.4kg/ ㎡, and fine sand spreading amount is 0.3kg/ ㎡.
Described surface layer bituminous epoxy binding material used quantity for spray controls at 0.25kg/ ㎡, and fine sand spreading amount is 0.6kg/ ㎡.Waterproof antiskid topping is formed by 2 hours curing reactions.Described fine sand is diamond dust, and specification is 30-50 order, originates from Henan.
According to the detection method that on-the-spot test code JTGE60-2008 in highway subgrade road surface specifies, construction depth 0.58mm, friction pendulum value 68BPN, infiltration coefficient 0mL/min.
Embodiment 4:
Select SMA-13 road surface, former pavement detection situation is construction depth 0.7mm, friction pendulum value 48BPN, infiltration coefficient 23mL/min.
Under 25 DEG C of temperature conditions, construction technology is as follows: step 1) bottom is after each for bituminous epoxy binding material component being stirred evenly on request, by its with certain pressure even application on flexible pavement, and synchronous evenly spreading layer of fine sand.Step 2) surface layer be until bottom solidification after form waterproof antiskid topping according to the mode of step 1) at its surface coverage one deck again.
Described bottom bituminous epoxy binding material used quantity for spray controls at 0.3kg/ ㎡, and fine sand spreading amount is 0.3kg/ ㎡.
Described surface layer bituminous epoxy binding material used quantity for spray controls at 0.3kg/ ㎡, and fine sand spreading amount is 1.0kg/ ㎡.Waterproof antiskid topping is formed by 2 hours curing reactions.Described fine sand is basalt particle, and specification is 30-50 order, originates from Mount Emei.
According to the detection method that on-the-spot test code JTGE60-2008 in highway subgrade road surface specifies, construction depth 0.62mm, friction pendulum value 71BPN, infiltration coefficient 0mL/min.
Embodiment 5:
Select SMA-13 road surface, former pavement detection situation is construction depth 0.7mm, friction pendulum value 48BPN, infiltration coefficient 23mL/min.
Under 25 DEG C of temperature conditions, construction technology is as follows: step 1) bottom is after each for bituminous epoxy binding material component being stirred evenly on request, by its with certain pressure even application on flexible pavement, and synchronous evenly spreading layer of fine sand.Step 2) surface layer be until bottom solidification after form waterproof antiskid topping according to the mode of step 1) at its surface coverage one deck again.
Described bottom bituminous epoxy binding material used quantity for spray controls at 0.3kg/ ㎡, and fine sand spreading amount is 0.3kg/ ㎡.
Described surface layer bituminous epoxy binding material used quantity for spray controls at 0.3kg/ ㎡, and fine sand spreading amount is 1.0kg/ ㎡.Waterproof antiskid topping is formed by 2 hours curing reactions.Described fine sand is ceramic particle, and specification is 30-50 order, originates from Shandong.
According to the detection method that on-the-spot test code JTGE60-2008 in highway subgrade road surface specifies, construction depth 0.60mm, friction pendulum value 70BPN, infiltration coefficient 0mL/min.