CN1054112A - 滑升翻模施工装置 - Google Patents

滑升翻模施工装置 Download PDF

Info

Publication number
CN1054112A
CN1054112A CN 90105766 CN90105766A CN1054112A CN 1054112 A CN1054112 A CN 1054112A CN 90105766 CN90105766 CN 90105766 CN 90105766 A CN90105766 A CN 90105766A CN 1054112 A CN1054112 A CN 1054112A
Authority
CN
China
Prior art keywords
guide rail
punching block
joint punching
bearing form
joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 90105766
Other languages
English (en)
Inventor
吉中仁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SICHUAN PROV BIRDGE ENGINEERING Co
Original Assignee
SICHUAN PROV BIRDGE ENGINEERING Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SICHUAN PROV BIRDGE ENGINEERING Co filed Critical SICHUAN PROV BIRDGE ENGINEERING Co
Priority to CN 90105766 priority Critical patent/CN1054112A/zh
Publication of CN1054112A publication Critical patent/CN1054112A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

本发明的翻模至少由两节钢模组成。每节钢模 的模板间有连接螺栓。每节钢模至少有一块承重模 板,其背面焊接有导轨,上、下节钢模的承重模板的导 轨衔接,滑升桁架通过数个钢夹头可在导轨上滑动或 固定。施工时待上节钢模灌注的混凝土达到一定强 度后,将滑升桁架沿导轨连同全部施工设备向上提升 并重新固定。露出下节钢模,拆下并在上面安装进行 翻模作业。结构简单,操作方便,安全可靠,成本较 低,可广泛用于高塔高墩施工。

Description

本发明与钢筋混凝土高层结构物施工装置有关,尤其与钢筋混凝土高塔高墩施工技术,脚手架自升装置有关。
在钢筋混凝土高层结构物,特别是高桥墩的施工中,为了保证施工安全、便于集中管理模板和脚手架自升,使用爬模施工技术。在高桥墩底部的1-4节仍用传统的脚手架施工,第4节完成后组装爬模设备施工。爬模设备包括内爬模,外爬模,上升***,锚固件外侧爬模***由锚定件,导轨,脚手框架和脚手架组成。锚定件预埋在底节混凝土中,支承着爬模***的全部载荷,并将它传递给桥墩锚定件共有两种,一种用于框架,一种用于导轨。导轨是爬模上升和下降***的中枢,承受油压千斤顶和推进螺丝杆传来的荷载,并将它传递给锚定件。外爬模借助于导轨上升。在脚手框架为固定状态时,先让导轨上升并固定锚定件。然后把脚手框架的荷载交给已固定的导轨,让脚手框架上升并固定于锚定件。由于锚定是整个爬模***重要支承部分。施工前要对锚定螺栓进行各种条件的试验,在其安全性得到充分保证后方可投入使用。实际施工中,混凝土强度必须达到一定强度以上,并要充分保证前一灌注节段的混凝土龄期。爬模技术需用设备较多,装置均造较为复杂。由于爬模的施工装置是支承在混凝土结构物、预埋锚定件上的,上升需交替进行,施工复杂,工序多,周期较长。
本发明的目的是提供一种结构简单,使用方便灵活、安全可靠,成本低廉的滑升翻模施工装置。
本发明是这样实现的:
滑升翻模施工装置由翻模,可滑升工作桁架与脚手框架组成。翻模至少包括上、下组合的两节钢模,每节钢模至少由三块模板组成。上、下节钢模间有活动连接装置,每节钢模相邻模板间有活动连接装置。每节钢模至少有一块承重模板,导轨固连于承重模板外侧,上、下节钢模的承重模板保持连续,其导轨衔接。脚手框架通过数个轨道连接装置可在导轨上滑动或固定。上升***由模板,建筑材料提升装置和脚手框架举升装置组成。
本发明的轨道连接装置可是由对称两钢件组成的钢夹头。其一端由活动连接装置锁定在导轨上,另一端固连在工作桁架节点上。工作桁架上可连接摇头扒杆和脚手框架。
本发明的工作桁架是可以沿承重模板背面的轨道向上滑升的,其上安装起重设备(如机械)和其它施工装置。
本发明用于高层结构物施工时,整个装置均附在建造中的钢筋混凝土结构顶端,并随着结构物的上升而上升;全部施工设备的重量均由已硬化的混凝土结构自身承受,可省掉庞大的施工支架。本发明结构简单,使用方便、整个装置的重量通过模板框均匀地负载在混凝土结构物上,十分安全可靠。本发明的翻模和附有全部施工装置的滑升架可交替上升,周而复始循环操作,使用十分方便、灵活,施工速度快。本发明需用设备较少,成本较低,可广泛用于高桥墩或其它高塔的的的施工中。
如下是本发明的附图:
图1为本发明的施工图
图2为图1的B-B视图
图3为钢夹头及其连接构造图
图4为图3的A-A视图。
如下是本发明的实施例:
本发明包括三节钢模1、每节钢模高2.5米,由4块钢模板2组成矩形截面模框,每节钢模中只有一块为承重模板,其背面焊接有两根轨道4,间距为两米。当施工高桥墩时,每节钢模可以设2块或4块承重钢模,每块钢模上可焊接两条或一条滑轨,承重模板彼此相向并用拉杆螺栓代替锚固钢筋固定承重模板。其它模板也由拉杆螺栓固定。当翻模作业时,拆卸最下面的一节包括承重钢模在内的四块钢模,重新在最上面组成一节完整的钢模。
滑升桁架5由常备式钢构件或其它自制钢构件组拼而成,通过六个特制的钢夹头6与翻模的承重模板背面的两条滑轨4相接,并可沿轨道向上滑行和固定在轨道上的任意位置。滑升桁架为本发明的主工作桁架,其上可安装起重设备、电焊机等施工机械。摇头扒杆7,轻型脚手架平台8,上人安全吊笼9即安装其上。灌注一段混凝土并达到一定强度以后,用倒链或千斤顶提升滑升桁架,并将桁架通过钢夹头重新固定在上一节承重模板的轨道上,空出下节钢模后进行翻模作业,如此循环操作,不断上升,直至浇完全部混凝土结构。
根据施工对象的不同截面变化情况,滑升桁架可有多种变化不同的布置。本发明的滑升桁架为在结构单边布置的竖向桁架,主要由万能杆件拼制,其上配备两付摇头扒杆,用以保证混凝土的垂直起吊入模、材料的输送和翻模作业中钢模的拆装。
本发明的钢夹头6由对称的两钢件10组成,螺栓11将钢夹头嵌锁在滑轨里,无论拉、压夹头均不会脱离滑轨。钢夹头的外端与万能杆件组拼的桁架节点12相连接。

Claims (2)

1、滑升翻模施工装置,其特征在于由至少两节钢模组成,每节钢模由至少三块模板组成,模板间有连接装置,上、下节钢模间有连接装置,每节钢模至少有一块承重模板,有导轨固连于承重模板外侧,上、下节钢模的承重模板保持连续,其导轨衔接,工作桁架通过数个轨道连接装置可沿导轨上滑动或固定。其上安装扒杆等施工设备。
2、根据权利要求1所述的滑升翻模施工装置,其特征在于所说的轨道连接装置由对称两钢件组成,其一端由活动连接装置锁定在导轨上,另一端固连于工作桁架节点,将工作桁架沿承重模板荷面的轨道向上提升的装置为千斤顶或倒链。
CN 90105766 1990-02-19 1990-02-19 滑升翻模施工装置 Pending CN1054112A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 90105766 CN1054112A (zh) 1990-02-19 1990-02-19 滑升翻模施工装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 90105766 CN1054112A (zh) 1990-02-19 1990-02-19 滑升翻模施工装置

Publications (1)

Publication Number Publication Date
CN1054112A true CN1054112A (zh) 1991-08-28

Family

ID=4879569

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 90105766 Pending CN1054112A (zh) 1990-02-19 1990-02-19 滑升翻模施工装置

Country Status (1)

Country Link
CN (1) CN1054112A (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102900024A (zh) * 2012-11-07 2013-01-30 中铁大桥局集团第六工程有限公司 大型混凝土结构翻升模板以及使用方法
CN105839543A (zh) * 2016-05-04 2016-08-10 中国十九冶集团有限公司 桥梁高墩自升外架翻模施工工艺
CN106284086A (zh) * 2016-08-30 2017-01-04 山西路桥第二工程有限公司 一种利用电动爬模装置浇注高墩柱的方法
CN107022956A (zh) * 2017-04-13 2017-08-08 王燕 一种桥梁墩柱钢模板爬升***及其实施方法

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102900024A (zh) * 2012-11-07 2013-01-30 中铁大桥局集团第六工程有限公司 大型混凝土结构翻升模板以及使用方法
CN102900024B (zh) * 2012-11-07 2015-07-08 中铁大桥局集团第六工程有限公司 大型混凝土结构翻升模板的使用方法
CN105839543A (zh) * 2016-05-04 2016-08-10 中国十九冶集团有限公司 桥梁高墩自升外架翻模施工工艺
CN105839543B (zh) * 2016-05-04 2017-08-29 中国十九冶集团有限公司 桥梁高墩自升外架翻模施工工艺
CN106284086A (zh) * 2016-08-30 2017-01-04 山西路桥第二工程有限公司 一种利用电动爬模装置浇注高墩柱的方法
CN106284086B (zh) * 2016-08-30 2017-11-28 山西路桥第二工程有限公司 一种利用电动爬模装置浇注高墩柱的方法
CN107022956A (zh) * 2017-04-13 2017-08-08 王燕 一种桥梁墩柱钢模板爬升***及其实施方法

Similar Documents

Publication Publication Date Title
CN101537976B (zh) 双塔桅巨型自升降起重设备及其跟携吊装方法
CN201400500Y (zh) 异型高耸建筑施工用带平台式多功能升降机
CN109653481A (zh) 一种悬挂导轨式高空操作平台及制作方法
CN106592962A (zh) 一种大高差、大跨度劲性骨架外包混凝土模板施工方法及施工设备
CN217175692U (zh) 一种用于超高层核心筒施工的智能化液压提升模架***
CN210288140U (zh) 一种简易的预制桥面板吊装台车
CN201507112U (zh) 一种滑动模板***
CN210460016U (zh) 一种集成式单动力升降料台
CN209456892U (zh) 斜拉桥钢悬挑人行道结构
CN112030777B (zh) 一种下行式移动模架支撑托架跨越式转运施工方法
CN1048065C (zh) 混凝土筒体的建筑方法
CN113090014A (zh) 一种高层装配式建筑整体作业平台及其施工方法与应用
CN1054112A (zh) 滑升翻模施工装置
CN112482317A (zh) 一种门槽二期混凝土自爬升滑模浇筑***及施工方法
CN216810895U (zh) 一种电梯井作业平台
CN216336227U (zh) 一种采用液压顶升组件进行高层建筑施工的装置
CN101457587A (zh) 模板互升式爬模装置及方法
CN214573768U (zh) 一种门槽二期混凝土浇筑自爬升滑模浇筑***
CN213653209U (zh) 一种用于桥梁翼缘板的一体化施工活动平台
CN212507304U (zh) 用于预制盖梁安装的自爬升装置
CN209603469U (zh) 一种悬挂导轨式高空操作平台
CN212771944U (zh) 穿心钢棒式可调作业平台
CN212249184U (zh) 一种建筑施工用电动爬模装置
CN107700363B (zh) 一种自带提升***的桥塔台架及施工方法
CN218880593U (zh) 现浇箱梁预应力张拉操作平台

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C01 Deemed withdrawal of patent application (patent law 1993)
WD01 Invention patent application deemed withdrawn after publication