CN105401699A - Light roof panel installation walking vehicle and method for installing roof panels - Google Patents

Light roof panel installation walking vehicle and method for installing roof panels Download PDF

Info

Publication number
CN105401699A
CN105401699A CN201510764128.XA CN201510764128A CN105401699A CN 105401699 A CN105401699 A CN 105401699A CN 201510764128 A CN201510764128 A CN 201510764128A CN 105401699 A CN105401699 A CN 105401699A
Authority
CN
China
Prior art keywords
roof panels
installation
side slideway
lightweight
supporting leg
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510764128.XA
Other languages
Chinese (zh)
Inventor
刘宏扬
雷逢胜
刘炜
杜峰峰
付国社
肖海文
蔡亦农
蔺旭宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
UNIT 63926 OF PLA
Original Assignee
UNIT 63926 OF PLA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by UNIT 63926 OF PLA filed Critical UNIT 63926 OF PLA
Priority to CN201510764128.XA priority Critical patent/CN105401699A/en
Publication of CN105401699A publication Critical patent/CN105401699A/en
Pending legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention belongs to the technical field of light roof panel auxiliary installation tools and methods for installation and discloses a light roof panel installation walking trolley and a method for installing roof panels. The light roof panel installation walking trolley is mainly characterized by comprising a frame body with two rows of supporting legs; walking wheels are arranged below the supporting legs; lifting mechanisms with lifting hooks are arranged on the frame body; and the height of one row of supporting legs is smaller than that of the supporting legs of the other row. When the roof panels are installed, a roof striding panel close to one end of a building and the first roof panel which is installed in place and strides the end of an adjacent roof striding panel 7 are installed in place firstly, then sliding ways are laid on the outer sides of the roof panel which is installed in place and the outer side of the roof panel to be installed, and the roof panel to be installed is conveyed to a designated position through the light roof panel installation walking trolley. A worker stands on the roof panel which is installed in place and pushes or pulls the light roof panel installation walking trolley to the designated position, safety coefficients are high, labor intensity is low, and working efficiency is high.

Description

The method that the installed rows mule carriage of lightweight roof panels and roof panels are installed
Technical field
The invention belongs to the method and technology field of lightweight roof panels mounting auxiliary and roof panels installation, particularly relate to a kind of method of lightweight roof panels installed rows mule carriage and roof panels installation.
Background technology
Along with the raising to environmental requirement, the house of steel work or space truss structure gets more and more.The house span of said structure is large, the area of roof panels is large, but its quality is light, mainly contain following two kinds of methods when mounted: one, adopt above roof panels is lifted into by crane, then artificial roof panels is lifted to assigned address, not only labour intensity is large, and lift weight and walk on steel work, the danger that easy generation personnel drop, and inefficiency; Its two, adopt crane lifting, with crane, each block roof panels is lifted into assigned address, for all right the house that span is less, but for the larger house of span, arm is difficult to reach correct position, not only installation rate is slow, and labour intensity is high, easily high-altitude accident occurs.
Summary of the invention
First technical problem that the present invention will solve just is to provide the lightweight roof panels installed rows mule carriage that a kind of operating efficiency is high, labour intensity is little, safety factor is high.
For solving the problem, the technical scheme that lightweight roof panels installed rows mule carriage of the present invention adopts is: comprise the support body with two row's supporting legs, travel wheel is provided with below described supporting leg, described support body is provided with the elevating mechanism with lifting hook, and the height of described wherein row's supporting leg is less than the height of another row's supporting leg.
Its additional technical feature is:
Described number of often arranging supporting leg is two, and described supporting leg is positioned at described support body surrounding.
Second technical problem that the present invention will solve just is to provide a kind of method using the mule carriage of above-mentioned lightweight roof panels installed rows to carry out the installation of lightweight roof panels.
For solving the problem, the technical solution used in the present invention is:
The method comprises the following steps:
The first step, installs the roof panels near building one end
With crane by near building one end one across roof panels installation in position;
Second step, installs adjacent first piece of roof panels across end
With crane by with mounted one across adjacent one across first piece of roof panels installation in position of end;
3rd step, installs side slideway
Upper side slideway is fixed on installation in position one across roof panels above;
4th step, installs lower side slideway
The lower side slideway parallel with upper side slideway is fixed on roof panels bracing frame on the upper surface in outside;
5th step, is lifted on the mule carriage of lightweight roof panels installed rows on upper side slideway and lower side slideway
The mule carriage of lightweight roof panels installed rows sling with crane or other lifting device, make the travel wheel of short supporting leg be placed in side slideway, the travel wheel of the side making supporting leg high is placed in lower side slideway;
6th step; Roof panels to be installed is placed in above first piece of roof panels
By need the roof panels of installing be lifted on this across first piece of installation in position roof panels above;
7th step, hangs away installation by roof panels lightweight roof panels installed rows to be installed mule carriage, again lifts next block roof panels to be installed simultaneously
The mule carriage of lightweight roof panels installed rows is moved to above first piece of roof panels, start elevating mechanism, lifting hook is reduced, hang on the hoisting rope of roof panels, then lifting hook and roof panels to be installed are together risen, the mule carriage of lightweight roof panels installed rows is moved forward, behind in-position along on upper side slideway and lower side slideway, lifting hook and roof panels to be installed are reduced, makes roof panels be placed on bracing frame; Simultaneously with crane by roof panels to be installed for next block lifting to should across above first piece of roof panels, and so forth, until should across the whole installation in position of roof panels;
8th step, repeats second step to the 7th step, until all install.
The method that lightweight roof panels installed rows mule carriage provided by the present invention and roof panels are installed compared with prior art, have the following advantages: one, owing to comprising the support body with two row's supporting legs, travel wheel is provided with below described supporting leg, described support body is provided with the elevating mechanism with lifting hook, the height of described wherein row's supporting leg is less than the height of another row's supporting leg, when installing roof panels, first with crane by near building one end one across roof panels installation in position, then with crane by with one of installation in position across adjacent one across first piece of roof panels installation in position of end, upper side slideway is fixed on installation in position one across roof panels above, the lower side slideway parallel with upper side slideway is fixed on roof panels bracing frame on the upper surface in outside, the mule carriage of lightweight roof panels installed rows sling with crane or other lifting device, make the travel wheel of short supporting leg be placed in side slideway, the travel wheel of the side making supporting leg high is placed in lower side slideway, by need the roof panels of installing be lifted on this across first piece of installation in position roof panels above, installation is hung away in roof panels lightweight roof panels installed rows to be installed mule carriage, again lifts next block roof panels to be installed simultaneously, repeat above-mentioned steps, until all install, upper side slideway is positioned at above mounted roof panels, lower side slideway is fixed on roof panels bracing frame on the upper surface in outside, lightweight roof panels is made to be limited in inside slideway, lightweight roof panels installed rows walks the width of vehicle-width slightly larger than roof panels, roof panels keeps flat in the mule carriage of lightweight roof panels installed rows, and lifting freely, be convenient to the installation of roof panels, staff stands in above the roof panels that has been in place, promote or pull the mule carriage of lightweight roof panels installed rows to assigned address, safety factor is high, labour intensity is little, operating efficiency is high, its two, because described number of often arranging supporting leg is two, described supporting leg is positioned at described support body surrounding, walking more freely.
Accompanying drawing explanation
Fig. 1 is the structural representation of lightweight roof panels installed rows of the present invention mule carriage;
Fig. 2 is the structural representation using lightweight roof panels installed rows of the present invention mule carriage to carry out roof panels installation.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the structure of the fastening method of lightweight roof panels installed rows mule carriage of the present invention and oblique pull reinforcing bar and use principle are described in further details.
As shown in Figure 1, the structural representation of lightweight roof panels installed rows of the present invention mule carriage, lightweight roof panels installed rows of the present invention mule carriage comprises the support body 1 with two row's supporting legs 2, the below of supporting leg 2 is provided with travel wheel 3, support body 1 is provided with the elevating mechanism 5 with lifting hook 4, and supporting leg comprises the short supporting leg of a row 21 and high supporting leg 22.As shown in Figure 2, when installing roof panels, first with crane by near building one end one across roof panels 6 installation in position, then with crane by with one of installation in position across adjacent one across first piece of roof panels installation in position of the end of roof panels 7, upper side slideway 8 is fixed on installation in position one across roof panels 6 above; The lower side slideway 9 parallel with upper side slideway 8 is fixed on roof panels bracing frame 10 on the upper surface in outside; With crane or other lifting device, the mule carriage of lightweight roof panels installed rows is sling, the travel wheel 3 of short supporting leg 21 is placed in side slideway 8, make the travel wheel of high supporting leg 22 be placed in lower side slideway 9; By need the roof panels of installing be lifted on this across first piece of installation in position roof panels above; Installation is hung away in roof panels lightweight roof panels installed rows to be installed mule carriage, again lifts next block roof panels to be installed simultaneously; 8th step, repeats above-mentioned steps, until all install; Upper side slideway 8 is positioned at above mounted roof panels, lower side slideway 9 is fixed on roof panels bracing frame 10 on the upper surface in outside, lightweight roof panels installed rows walks the width of vehicle-width slightly larger than roof panels, roof panels keeps flat in the mule carriage of lightweight roof panels installed rows, and lifting freely, be convenient to the installation of roof panels, staff stands in above the roof panels that has been in place, promote or pull the mule carriage of lightweight roof panels installed rows to assigned address, safety factor is high, labour intensity is little, operating efficiency is high.
The number of often arranging supporting leg 2 is two, and supporting leg 2 is positioned at the surrounding of support body 1, and walking more freely.
Use the mule carriage of above-mentioned lightweight roof panels installed rows to carry out the method for roof panels installation, the method comprises the following steps:
The first step, installs the roof panels near building one end
With crane by near building one end one across roof panels installation in position;
Second step, installs adjacent first piece of roof panels across end
With crane by with mounted one across adjacent one across first piece of roof panels installation in position of end;
3rd step, installs side slideway
Upper side slideway is fixed on installation in position one across roof panels above;
4th step, installs lower side slideway
The lower side slideway parallel with upper side slideway is fixed on roof panels bracing frame on the upper surface in outside;
5th step, is lifted on the mule carriage of lightweight roof panels installed rows on upper side slideway and lower side slideway
The mule carriage of lightweight roof panels installed rows sling with crane or other lifting device, make the travel wheel of short supporting leg be placed in side slideway, the travel wheel of the side making supporting leg high is placed in lower side slideway;
6th step; Roof panels to be installed is placed in above first piece of roof panels
By need the roof panels of installing be lifted on this across first piece of installation in position roof panels above;
7th step, hangs away installation by roof panels lightweight roof panels installed rows to be installed mule carriage, again lifts next block roof panels to be installed simultaneously
The mule carriage of lightweight roof panels installed rows is moved to above first piece of roof panels, start elevating mechanism, lifting hook is reduced, hang on the hoisting rope of roof panels, then lifting hook and roof panels to be installed are together risen, the mule carriage of lightweight roof panels installed rows is moved forward, behind in-position along on upper side slideway and lower side slideway, lifting hook and roof panels to be installed are reduced, makes roof panels be placed on bracing frame; Simultaneously with crane by roof panels to be installed for next block lifting to should across above first piece of roof panels, and so forth, until should across the whole installation in position of roof panels;
8th step, repeats second step to the 7th step, until all install.
Protection scope of the present invention is not only confined to above-described embodiment, as long as structure is identical with the method structure that lightweight roof panels installed rows mule carriage of the present invention and the oblique wire bond of partition connect, just drops on the scope of protection of the invention.

Claims (3)

1. lightweight roof panels installed rows mule carriage, it is characterized in that: comprise the support body with two row's supporting legs, travel wheel is provided with below described supporting leg, described support body is provided with the elevating mechanism with lifting hook, and the height of described wherein row's supporting leg is less than the height of another row's supporting leg.
2. lightweight roof panels installed rows according to claim 1 mule carriage, is characterized in that: described number of often arranging supporting leg is two, and described supporting leg is positioned at described support body surrounding.
3. use the lightweight roof panels installed rows mule carriage described in claim 1 or 2 to carry out the method for roof panels installation, it is characterized in that: the method comprises the following steps:
The first step, installs the roof panels near building one end
With crane by near building one end one across roof panels installation in position;
Second step, installs adjacent first piece of roof panels across end
With crane by with mounted one across adjacent one across first piece of roof panels installation in position of end;
3rd step, installs side slideway
Upper side slideway is fixed on installation in position one across roof panels above;
4th step, installs lower side slideway
The lower side slideway parallel with upper side slideway is fixed on roof panels bracing frame on the upper surface in outside;
5th step, is lifted on the mule carriage of lightweight roof panels installed rows on upper side slideway and lower side slideway
The mule carriage of lightweight roof panels installed rows sling with crane or other lifting device, make the travel wheel of short supporting leg be placed in side slideway, the travel wheel of the side making supporting leg high is placed in lower side slideway;
6th step; Roof panels to be installed is placed in above first piece of roof panels
By need the roof panels of installing be lifted on this across first piece of installation in position roof panels above;
7th step, hangs away installation by roof panels lightweight roof panels installed rows to be installed mule carriage, again lifts next block roof panels to be installed simultaneously
The mule carriage of lightweight roof panels installed rows is moved to above first piece of roof panels, start elevating mechanism, lifting hook is reduced, hang on the hoisting rope of roof panels, then lifting hook and roof panels to be installed are together risen, the mule carriage of lightweight roof panels installed rows is moved forward, behind in-position along on upper side slideway and lower side slideway, lifting hook and roof panels to be installed are reduced, makes roof panels be placed on bracing frame; Simultaneously with crane by roof panels to be installed for next block lifting to should across above first piece of roof panels, and so forth, until should across the whole installation in position of roof panels;
8th step, repeats second step to the 7th step, until all install.
CN201510764128.XA 2015-11-11 2015-11-11 Light roof panel installation walking vehicle and method for installing roof panels Pending CN105401699A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510764128.XA CN105401699A (en) 2015-11-11 2015-11-11 Light roof panel installation walking vehicle and method for installing roof panels

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510764128.XA CN105401699A (en) 2015-11-11 2015-11-11 Light roof panel installation walking vehicle and method for installing roof panels

Publications (1)

Publication Number Publication Date
CN105401699A true CN105401699A (en) 2016-03-16

Family

ID=55467419

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510764128.XA Pending CN105401699A (en) 2015-11-11 2015-11-11 Light roof panel installation walking vehicle and method for installing roof panels

Country Status (1)

Country Link
CN (1) CN105401699A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106437047A (en) * 2016-07-21 2017-02-22 中铁四局集团建筑工程有限公司 Plant roof panel transporting and mounting equipment
CN112482673A (en) * 2020-12-04 2021-03-12 刘琛 Mounting construction method for prefabricated building roof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2937070Y (en) * 2006-07-27 2007-08-22 云南百集龙实业集团钢结构工程有限公司 Small hoist for mounting steel structure building
CN201560539U (en) * 2009-09-30 2010-08-25 中太建设集团股份有限公司 Tool car for long-span net rack roof space plate
CN101979803A (en) * 2009-12-04 2011-02-23 深圳市建设(集团)有限公司 Method for mounting prefabricated members of roof or floor in place and mounting equipment
CN103590547A (en) * 2013-11-13 2014-02-19 森特士兴集团股份有限公司 Roof composite board roof conveying system and construction method
CN203821720U (en) * 2014-05-14 2014-09-10 中建八局第三建设有限公司 High-altitude large roof panel installing tool trolley
CN205088879U (en) * 2015-11-11 2016-03-16 中国人民解放军63926部队 Light roof panel mounting walking car

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2937070Y (en) * 2006-07-27 2007-08-22 云南百集龙实业集团钢结构工程有限公司 Small hoist for mounting steel structure building
CN201560539U (en) * 2009-09-30 2010-08-25 中太建设集团股份有限公司 Tool car for long-span net rack roof space plate
CN101979803A (en) * 2009-12-04 2011-02-23 深圳市建设(集团)有限公司 Method for mounting prefabricated members of roof or floor in place and mounting equipment
CN103590547A (en) * 2013-11-13 2014-02-19 森特士兴集团股份有限公司 Roof composite board roof conveying system and construction method
CN203821720U (en) * 2014-05-14 2014-09-10 中建八局第三建设有限公司 High-altitude large roof panel installing tool trolley
CN205088879U (en) * 2015-11-11 2016-03-16 中国人民解放军63926部队 Light roof panel mounting walking car

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106437047A (en) * 2016-07-21 2017-02-22 中铁四局集团建筑工程有限公司 Plant roof panel transporting and mounting equipment
CN106437047B (en) * 2016-07-21 2018-10-09 中铁四局集团建筑工程有限公司 A kind of equipment transported for factory building roof plate with installing
CN112482673A (en) * 2020-12-04 2021-03-12 刘琛 Mounting construction method for prefabricated building roof
CN112482673B (en) * 2020-12-04 2021-12-28 湖北信德建设集团有限公司 Mounting construction method for prefabricated building roof

Similar Documents

Publication Publication Date Title
CN201228207Y (en) Portable window hoister
CN105003082A (en) Glass curtain wall mounting equipment and glass curtain mounting method
CN202080836U (en) Material lifting equipment for aerial operation
CN201417657Y (en) Installation device of indoor transformer
CN104153586B (en) A kind of suspension cable hangs the construction method of mounting purlines
CN205637622U (en) Perpendicular unit glass curtain wall hoist and mount system
CN103375022B (en) Multi-functional dynamic rail attached lifting scaffold
CN104878918A (en) Rock-climbing type robot protective screen
CN204850497U (en) Promote no lower hem material platform
CN105401699A (en) Light roof panel installation walking vehicle and method for installing roof panels
CN104291222A (en) Rigid protection and crane integration system inside super high-rise building core tube
CN204024013U (en) A kind of self-climbing lifting material platform
CN203382467U (en) Hanging operation vehicle
CN202465099U (en) Single-girder partial hanging gantry crane
CN209585654U (en) Adhesion type goes up and down discharging platform
CN103470057B (en) A kind of high-altitude component hoisting construction method
CN201577351U (en) Greenhouse truss crawler-type lifting erecting equipment
CN201411334Y (en) Simple traveling crane
CN205088879U (en) Light roof panel mounting walking car
CN208732495U (en) A kind of small gun carriage
CN203257106U (en) Multifunctional power-driven walking type walking system
CN204386449U (en) A kind of photovoltaic green-house electrification component promotes ladder
CN202787930U (en) Hanging basket for high-place operations
CN203229334U (en) Lifting framework for lifting and translating single steel member
CN202988663U (en) Return hook suspension mechanism

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160316