A kind of source/net/storage/lotus coordinated management system and method for energy Internet service Download PDF

Info

Publication number
CN105375483B
CN105375483B CN201510943469.3A CN201510943469A CN105375483B CN 105375483 B CN105375483 B CN 105375483B CN 201510943469 A CN201510943469 A CN 201510943469A CN 105375483 B CN105375483 B CN 105375483B
Authority
CN
China
Prior art keywords
lotus
storage
source
net
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510943469.3A
Other languages
Chinese (zh)
Other versions
CN105375483A (en
Inventor
黄学良
季振亚
孙厚涛
李军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southeast University
Original Assignee
Southeast University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southeast University filed Critical Southeast University
Priority to CN201510943469.3A priority Critical patent/CN105375483B/en
Publication of CN105375483A publication Critical patent/CN105375483A/en
Application granted granted Critical
Publication of CN105375483B publication Critical patent/CN105375483B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • H02J13/0006
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/46Controlling of the sharing of output between the generators, converters, or transformers
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/12Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/14Energy storage units
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
    • Y04S40/128Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment involving the use of Internet protocol

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Power Engineering (AREA)
  • Economics (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Public Health (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Primary Health Care (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a kind of source/net/storage/lotus coordinated management systems and method for energy Internet service, which includes source/net/storage/lotus intelligent management system and source/net/storage/lotus interconnected communication system;Interconnected communication system realizes the acquisition and monitoring of system metadata using communication network, and provides communication for the control instruction of intelligence control system and support.Intelligence control system is designed as the three-decker of demand layer, state layer and control layer, by the way that the comprehensive coordination control of source/net/storage/lotus is arranged with optimum management, it can be achieved that the targets such as the equilibrium of supply and demand, maintenance power quality, demand side management.The present invention is based on the growth requirements of energy internet, provide a set of high degree of autonomy, the rapid energy management strategies of response for the interconnection of the energy, realize the efficient utilization of distributed generation resource under energy Internet architecture.

Description

A kind of source/net/storage/lotus coordinated management system and method for energy Internet service
Technical field
The present invention relates to energy internet arenas and distributed electrical source domain, and in particular to one kind being applied to energy internet Source/net/storage/lotus coordinated management system and method.
Background technology
Distributed generation resource, communication and the fast development of control technology bring the research fields such as intelligent grid, active distribution network Rise, source/net/storage/lotus coordination optimization is a kind of integrated management to distributed generation resource, power grid, energy storage device and load, is contained Lid electrical energy production, transmission, distribution and each link of consumption, the consumption that can further increase distribution type renewable energy are horizontal and simultaneous Care for system economy and safety.The energy internet currently risen is the new developing direction of energy system, it is intended to make transverse direction The energy source interconnection circle of the complementary, longitudinal source/net/storage/lotus coordination and interaction of multiple-energy-source body, farthest utilizes distributed type renewable energy Energy supply and the interconnection of large-scale energy of localization are realized in source.Source/net/storage/lotus coordination optimization management will realize the energy One of important technology of internet.
Under the background that energy internet rapidly develops, the importance of source/net/storage/lotus coordination optimization management increasingly improves. Research both domestic and external concentrates on the region home rule within the scope of micro-capacitance sensor, the optimal coordination of shorter mention and power grid, side at present The single or Partial coordination control for overweighting distributed generation resource, energy storage device, lacks source/net/storage/lotus is excellent as a tunable Change the whole research of management, fails to play powerful support to Economic Load Dispatch.Related coordinated management method or level be strong, Master Control Center data volume is excessive, is not up to the control of energy internet rank requirement, or only does frame suggestion, management structure pine It dissipates, response speed, degree of flexibility when practical application etc. can all be restricted.
Invention content
To overcome in above-mentioned background technology to distributed generation resource, energy storage device, load and electric system in energy internet Interconnection and its integrated management deficiency, purpose provided by the invention be to provide a kind of source/net for energy Internet service/ Storage/lotus coordinated management system and method.
To achieve the above object, the present invention uses following technical scheme:
A kind of source/net/storage/lotus coordinated management system for energy Internet service, including source/net/storage/lotus intelligent management System and source/net/storage/lotus interconnected communication system;
Source/net/storage/lotus the intelligent management system includes demand layer, state layer and control layer, wherein
The demand layer is for receiving setting information, i.e., source/net/storage/lotus that source/net/storage/lotus interconnected communication system collects Basic data and control targe information, include at least output state of the distributed generation resource under MPPT maximum power point tracking PDG_M, maximum power P that power distribution network provides or receivesG_S_lim、PG_I_lim, the voltage on line side U that acquires under grid-connected conditions*, battery storage The minimum of energy default and maximum state-of-charge SOCmin、SOCmax, user mode selection, user agree to receive demand side management When minimum load demand PL_min
The state layer for receiving operation information, that is, utilize source that source/net/storage/lotus interconnected communication system acquires in real time/ Net/storage/lotus running state parameter includes at least distributed generation resource actual generation power PDG, the reality of busbar where source/storage/lotus Measure voltage U, the instant SOC of battery energy storage system and output PS, user's real-time load PL, power grid offer power PG
The control layer includes central controller, and the information data provided by demand layer, state layer is controlled according to center The optimum management set in device carries out condition judgment and control;The associated control parameters of control layer include at least distributed generation resource It contributes and adjustsUser mode switching, energy-storage units charge and discharge switching;The optimization pipe set in the central controller Reason is:Introduce the power regulation factorThe power partition coefficient K of energy-storage units and power gridD, proportional controller coefficient lambda, table It is as follows up to formula:
Wherein, U is busbar voltage where source/storage/lotus that state layer measures;λ indicates proportional controller coefficient;P*Indicate total The power regulation factor, beThe sum of;
Source/net/storage/lotus the interconnected communication system includes dispatch command, requirement command, controllable burden, spatial load forecasting list Member, power electronic equipment, distributed generation resource, control unit, wherein the dispatch command connects upper layer power grid, and scheduling is referred to Information is enabled to be transmitted to demand layer and state layer;The requirement command connects controllable burden, and the requirement command of controllable burden is believed Breath is transmitted to demand layer;The status information of controllable burden is transmitted to state layer, and load control unit receives the information of control layer, and Transmit information to controllable burden;Power electronic equipment connects distributed generation resource, and transmits information to state layer, control unit The information of reception state layer and control layer, and transmit a signal to power electronic equipment.
A kind of source/net/storage/lotus for energy Internet service coordinates and manages method, utilizes source/net/storage/lotus interconnected communication System is that source/net/storage/lotus intelligent management system transmits demand variable, and the control requirement of feedback intelligent management system, specific to wrap It includes:
Control parameter, the state for collecting source/net/storage/lotus by demand layer such as define at the letter of basic datas and control targe Breath;
Acquire the running state parameter of source/net/storage/lotus in real time by state layer;
Realize that system power balance, general objective function representation are finally by control layer:
PDG+PS+PG=PL
In formula, PDG, PS, PGDistributed generation resource, the output of energy-storage units and power grid are indicated respectively;PLIndicate user's total load;
When customer charge is contributed more than distributed generation resource, system judges the state of energy-storage system, if SOC is less than setting immediately Minimum value SOCmin, need to be powered by grid side;Pass through the power grid P being collected into demand layer the last timeG_S_limAnd corresponding electricity Valence instructs, according to the pre-set routine of user, economic dispatch operational mode with PL_minIt indicates after user receives demand side management Minimum load demand, i.e. the uncontrollable part of load determines whether user cuts economic model operation.
The control that distributed generation resource preferentially presses MPPT is contributed, when energy-storage units state-of-charge is beyond setting maximum value SOCmax And the power regulation factorWhen setting the maximum power received more than power grid, control layer can determine to contribute distributed generation resourceIt is set as:
The beneficial effects of the invention are as follows:The present invention by establish measure, control etc. signals communication network, realize source/net/ Real-time information collection between storage/lotus, and carried by data transmission intelligent control system, and for the control instruction of intelligent management system It is supported for communication.Compared with prior art, the present invention is the coordination optimization management to source/net/storage/lotus, it is contemplated that future source of energy The mass data of internet, control system is realized using three-decker, can be responded according to communication speed, operational capability and system It is required that flexibly selection system control targe, control effect also more accurately, have the function of demand side management, distribution is further promoted The utilization rate of formula power supply.
Description of the drawings
Fig. 1 is source/net/storage/lotus coordinated management system schematic diagram of the present invention;
Fig. 2 is the workflow example of the present invention.
Specific implementation mode
With reference to the accompanying drawings of the specification to a kind of source/net/storage/lotus coordinated management system for energy Internet service and side Method is described further.
As shown in Figure 1 be the present invention it is a kind of be energy Internet service source/net/storage/lotus coordinated management system, scheme In, solid line indicates that the interconnection between device, dotted line indicate the communication network of signals such as to measure, control, and utilizes communication network Network realizes the acquisition and monitoring of system metadata, and establishes information channel between source/storage/lotus, is the control of intelligence control system System instruction provides communication and supports.Including source/net/storage/lotus intelligent management system and source/net/storage/lotus interconnected communication system;Source/ Net/storage/lotus intelligent management system includes demand layer, state layer and control layer, wherein
Demand layer is for receiving setting information, i.e., source/net/storage that source/net/storage/lotus interconnected communication system collects/lotus control Parameter, state such as define at the information of basic datas and control targe, include at least distributed generation resource under MPPT maximum power point tracking Output state PDG_M, maximum power P that power distribution network provides or receivesG_S_lim、PG_I_lim, system reference voltage U*, it is being incorporated to electricity Under conditions of net, this value comes from the voltage on line side acquisition of demand layer;Network operater or other instruction letters of regulator's publication Breath can also collect in demand layer;The minimum of battery energy storage system setting and maximum state-of-charge SOCmin、SOCmax, user mode choosing It selects, minimum load demand P when user agrees to receive demand side managementL_min, battery use can be extended within this range by working Service life.
State layer for receiving operation information, that is, utilize source/net that source/net/storage/lotus interconnected communication system acquires in real time/ Storage/lotus running state parameter includes at least distributed generation resource actual generation power PDG, the practical measurement of busbar where source/storage/lotus Voltage U, the instant SOC of battery energy storage system and output PS, user's real-time load PL, power grid offer power PG
Control layer includes central controller, the information data provided by demand layer, state layer, according in central controller The optimum management of setting carries out condition judgment and control;The associated control parameters of control layer include at least the output of distributed generation resource AdjustmentUser mode switching, energy-storage units charge and discharge switching;The optimum management set in the central controller For:Introduce the power regulation factorThe power partition coefficient K of energy-storage units and power gridD, proportional controller coefficient lambda, table It is as follows up to formula:
Wherein, U is busbar voltage where source/storage/lotus that state layer measures;λ indicates proportional controller coefficient;P*Indicate total The power regulation factor, beThe sum of;
Source/net/storage/lotus interconnected communication system includes dispatch command, requirement command, controllable burden, load control unit, electricity Power electronic equipment, distributed generation resource, control unit, wherein dispatch command connects upper layer power grid, and communication with dispatch instructions is transmitted To demand layer and state layer;The requirement command connects controllable burden, and the requirement command information of controllable burden is transmitted to need to Seek layer;The status information of controllable burden is transmitted to state layer, and load control unit receives the information of control layer, and information is transmitted To controllable burden;Power electronic equipment connects distributed generation resource, and transmits information to state layer, control unit reception state layer With the information of control layer, and power electronic equipment is transmitted a signal to.
A kind of source/net/storage/lotus for energy Internet service coordinates and manages method, utilizes source/net/storage/lotus interconnected communication System is that source/net/storage/lotus intelligent management system transmits demand variable, and the control requirement of feedback intelligent management system, specific to wrap It includes:
Control parameter, the state for collecting source/net/storage/lotus by demand layer such as define at the letter of basic datas and control targe Breath;
Acquire the running state parameter of source/net/storage/lotus in real time by state layer;
Realize that system power balance, general objective function representation are finally by control layer:
PDG+PS+PG=PL
In formula, PDG, PS, PGDistributed generation resource, the output of energy-storage units and power grid are indicated respectively;PLIndicate user's total load.
In the present embodiment, the output of default distributed generation resource, i.e. photovoltaic generating system is preferentially used for local self-sufficiency, point The SOC states of analysis demand layer and state layer setting and the battery energy storage system received, determine the charging operations to energy-storage units, if There is dump energy, accesses power distribution network.
When customer charge is contributed more than distributed generation resource, system judges the state of energy-storage system, if SOC is less than setting immediately Minimum value SOCmin, need to be powered by grid side.Pass through the power grid P being collected into demand layer the last timeG_S_limAnd corresponding electricity Valence instructs, according to the pre-set routine of user, economic dispatch operational mode, with PL_minIt indicates after user receives demand side management Minimum load demand, i.e. the uncontrollable part of load determines whether user cuts economic model operation.
The control that distributed generation resource preferentially presses MPPT is contributed, when energy-storage units state-of-charge is beyond setting maximum value SOCmax And the power regulation factorWhen setting the maximum power received more than power grid, control layer can determine to contribute distributed generation resourceIt is set as:
Control targe is coordinated and optimized to realize, the flow criterion of control layer refers to Fig. 2:
(1) demand layer receives setting information, including:Output state of the distributed generation resource under MPPT maximum power point tracking PDG_M, maximum power P that power distribution network provides or receivesG_S_lim、PG_I_lim, system reference voltage U*;Battery energy storage system setting Minimum and maximum state-of-charge SOCmin、SOCmax;User mode selects, minimum load when user agrees to receive demand side management Demand PL_min
(2) state layer receives status information, including:Distributed generation resource actual generation power PDG;It is female where source/storage/lotus The practical measurement voltage U of line, power grid provide power PG;The instant SOC of battery energy storage system and output PS, user's real-time load PL
(3) central controller of control layer first determines whether PL> PDGIt is whether true,
PL> PDGIt is invalid, then judge SOC >=SOCmaxIt is whether true, be, thenIt is invalid, thenMatch The power that power grid receivesJudge PG_I≥PG_I_limIt is whether true, be, thenContinue to sentence Disconnected PDG=PDG_MIt is whether true, it is that then distributed generation resource operating status switches, no, then the minimum of distributed generation resource generated output ValueWherein, CpFor proportional controller coefficient;PG_S≥PG_S_limIt is invalid, then
In conclusion by the comprehensive coordination control and optimum management of above energy internet Zhong Yuan/net/storage/lotus, controlling Preparative layer realizes the equilibrium of supply and demand, maintains power quality, the targets such as demand side management, realizes distributing rationally for electric energy, reach source/net/ The purpose of storage/lotus coordinated management.
The above is only a preferred embodiment of the present invention, it should be pointed out that:For the ordinary skill people of the art For member, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications are also answered It is considered as protection scope of the present invention.

Claims (3)

1. a kind of source/net/storage/lotus for energy Internet service coordinates and manages method, it is characterised in that:Using source/net/storage/ Lotus interconnected communication system is that source/net/storage/lotus intelligent management system transmits demand variable, and the control of feedback intelligent management system It is required that;
Wherein, the source/net/storage/lotus coordinated management system includes source/net/storage/lotus intelligent management system and source/net/storage/lotus Interconnected communication system;
Source/net/storage/lotus the intelligent management system includes demand layer, state layer and control layer, wherein
The demand layer is for receiving setting information, i.e., the base for source/net/storage/lotus that source/net/storage/lotus interconnected communication system collects The information of plinth data and control targe includes at least output state P of the distributed generation resource under MPPT maximum power point trackingDG_M, electricity The maximum power P that net provides or receivesG_S_lim、PG_I_lim, system reference voltage U*, battery energy storage system setting minimum with most Big state-of-charge SOCmin、SOCmax, user mode selection, minimum load demand when user agrees to receive demand side management PL_min
The state layer for receiving operation information, that is, utilize source/net that source/net/storage/lotus interconnected communication system acquires in real time/ Storage/lotus running state parameter includes at least distributed generation resource actual generation power PDG, the practical measurement of busbar where source/storage/lotus Voltage U, the instant SOC of battery energy storage system and output PS, user's real-time load PL, power grid exchange power PG
The control layer includes central controller, the information data provided by demand layer, state layer, according in central controller The optimum management of setting carries out condition judgment and control;The associated control parameters of control layer include at least the power of distributed generation resource AdjustmentUser mode switching, battery energy storage system charge and discharge switching;The optimization pipe set in the central controller Reason is:Introduce the power regulation factorThe power partition coefficient K of battery energy storage system and power gridD, proportional controller system Number λ, expression formula are as follows:
Wherein, U is busbar voltage where source/storage/lotus that state layer measures;λ indicates proportional controller coefficient;P*Indicate total work( Rate regulatory factor isThe sum of;
Source/net/storage/lotus the interconnected communication system includes dispatch command, requirement command, controllable burden, load control unit, electricity Power electronic equipment, distributed generation resource, control unit, wherein the dispatch command connects upper layer power grid, and by communication with dispatch instructions It is transmitted to demand layer and state layer;The requirement command connects controllable burden, and the requirement command information of controllable burden is transmitted To demand layer;The status information of controllable burden is transmitted to state layer, and load control unit receives the information of control layer, and by information It is transmitted to controllable burden;Power electronic equipment connects distributed generation resource, and transmits information to state layer, and control unit receives shape The information of state layer and control layer, and transmit a signal to power electronic equipment;
The method specifically includes:
Control parameter, the state for collecting source/net/storage/lotus by demand layer define information with control targe;
Acquire the running state parameter of source/net/storage/lotus in real time by state layer;
Realize that system power balance, general objective function representation are finally by control layer:
PDG+PS+PG=PL
In formula, PDG, PS, PGDistributed generation resource power generation, the work(that the instant SOC of battery energy storage system is exchanged with output, power grid are indicated respectively Rate;PLIndicate user's real-time load;
Wherein, the flow criterion of control layer is:
(1) demand layer receives setting information, including:Power P of the distributed generation resource under MPPT maximum power point trackingDG_M, power grid gives The maximum power P for going out or receivingG_S_lim、PG_I_lim, system reference voltage U*;The minimum of battery energy storage system setting and maximum lotus Electricity condition SOCmin、SOCmax;User mode selects, minimum load demand P when user agrees to receive demand side managementL_min
(2) state layer receives status information, including:Distributed generation resource generated output PDG;The reality of busbar where source/storage/lotus Voltage U is measured, power grid exchanges power PG;The instant SOC of battery energy storage system and output PS, user's real-time load PL
(3) central controller of control layer first determines whether PL> PDGIt is whether true,
If set up, the state-of-charge SOC < SOC of battery energy storage system are judgedminIt is whether true, it sets up, thenNot at It is vertical, thenThe power that power grid providesJudge PG_S≥PG_S_limIt is whether true, it sets up, thenContinue to judge user's original loads demand PLD≥PLIt is whether true, it is then to continue to judge " whether user agrees to Economical operation " is, thenIn above-mentioned Rule of judgment, PG_S≥PG_S_lim, PLD≥PL, " whether user Agree to economical operation " in have one it is invalid, then
PL> PDGIt is invalid, then judge SOC >=SOCmaxIt is whether true, be, thenIt is invalid, thenPower grid receives PowerJudge PG_I≥PG_I_limIt is whether true, be, thenContinue to judge PDG= PDG_MIt is whether true, it is that then distributed generation resource operating status switches, no, then the power adjustment P of distributed generation resourceDG_lim=PL P*+Cp(U*- U), wherein CpFor proportional controller coefficient;PG_S≥PG_S_limIt is invalid, then
2. coordinating and managing method as described in claim 1 for source/net/storage of energy Internet service/lotus, it is characterised in that: When customer charge is more than distributed generation resource generated output, system judges the state of energy-storage system, if SOC is less than setting most immediately Small value SOCmin, need to be powered by grid side;Pass through the power grid P being collected into demand layer the last timeG_S_limAnd corresponding electricity price refers to It enables, according to the pre-set routine of user, economic operation model with PL_minIndicate the minimum after user receives demand side management Workload demand, the i.e. uncontrollable part of load, determine whether user cuts economic model operation.
3. coordinating and managing method as described in claim 1 for source/net/storage of energy Internet service/lotus, it is characterised in that: Distributed generation resource preferentially sends out power by the control of MPPT, when battery energy storage system state-of-charge is beyond setting maximum value SOCmax And the power regulation factorWhen setting the maximum power received more than power grid, control layer can be determined distributed generation resource power adjustmentIt is set as:
CN201510943469.3A 2015-12-16 2015-12-16 A kind of source/net/storage/lotus coordinated management system and method for energy Internet service Active CN105375483B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510943469.3A CN105375483B (en) 2015-12-16 2015-12-16 A kind of source/net/storage/lotus coordinated management system and method for energy Internet service

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510943469.3A CN105375483B (en) 2015-12-16 2015-12-16 A kind of source/net/storage/lotus coordinated management system and method for energy Internet service

Publications (2)

Publication Number Publication Date
CN105375483A CN105375483A (en) 2016-03-02
CN105375483B true CN105375483B (en) 2018-09-18

Family

ID=55377400

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510943469.3A Active CN105375483B (en) 2015-12-16 2015-12-16 A kind of source/net/storage/lotus coordinated management system and method for energy Internet service

Country Status (1)

Country Link
CN (1) CN105375483B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105868846A (en) * 2016-03-24 2016-08-17 武汉大学 Regional power grid framework based distributed power resource access operation system
CN105762934B (en) * 2016-03-30 2017-09-26 南京邮电大学 A kind of distributed coordination mixed control method based on energy interconnected electric power system
CN106786754A (en) * 2016-12-29 2017-05-31 中国南方电网有限责任公司电网技术研究中心 Cooperative control device and system for distributed energy
CN106911149B (en) * 2017-04-14 2019-11-12 许继集团有限公司 A kind of active distribution network demand response control method based on layering energy storage
CN108667012A (en) * 2018-05-21 2018-10-16 国网山东省电力公司电力科学研究院 Regional Energy the Internet sources lotus based on more scenes stores up dual-stage coordination optimizing method
CN109861281A (en) * 2019-02-21 2019-06-07 国网山东省电力公司临沂供电公司 One provenance net lotus stores up integrated coordination optimizing method and device, system
CN109728650B (en) * 2019-03-14 2022-09-23 江苏金智科技股份有限公司 Active power distribution network based on source network load and storage coordination control
CN110380397B (en) * 2019-06-18 2022-12-23 天津大学 Control framework suitable for medium-low voltage direct current power distribution and utilization system
CN111864748A (en) * 2020-08-14 2020-10-30 国网山东省电力公司威海供电公司 Monitoring and scheduling integrated system and method suitable for distributed photovoltaic grid connection

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104242337A (en) * 2014-08-14 2014-12-24 广东易事特电源股份有限公司 Real-time coordination and control method of photovoltaic micro-grid system
CN104333037A (en) * 2014-11-02 2015-02-04 中国科学院电工研究所 Cooperative control method for participating in frequency modulation and pressure regulation of power system by wind storage cluster
CN104734195A (en) * 2015-04-13 2015-06-24 成都鼎智汇科技有限公司 Monitoring method of wind, photovoltaic and storage-integrated micro-grid capable of being operated in a grid-connected manner
CN104836334A (en) * 2014-02-08 2015-08-12 中国农业大学 Low voltage microgrid group independent coordination control system

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2477302A1 (en) * 2011-01-18 2012-07-18 Siemens Aktiengesellschaft Control of the distribution of electric power generated by a wind farm between an AC power transmission link and a DC power transmission link

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104836334A (en) * 2014-02-08 2015-08-12 中国农业大学 Low voltage microgrid group independent coordination control system
CN104242337A (en) * 2014-08-14 2014-12-24 广东易事特电源股份有限公司 Real-time coordination and control method of photovoltaic micro-grid system
CN104333037A (en) * 2014-11-02 2015-02-04 中国科学院电工研究所 Cooperative control method for participating in frequency modulation and pressure regulation of power system by wind storage cluster
CN104734195A (en) * 2015-04-13 2015-06-24 成都鼎智汇科技有限公司 Monitoring method of wind, photovoltaic and storage-integrated micro-grid capable of being operated in a grid-connected manner

Also Published As

Publication number Publication date
CN105375483A (en) 2016-03-02

Similar Documents

Publication Publication Date Title
CN105375483B (en) A kind of source/net/storage/lotus coordinated management system and method for energy Internet service
CN105207267B (en) Micro-grid energy management system
CN106487036B (en) A kind of independent photovoltaic dragging system capacity collocation method based on multi-objective optimization algorithm
CN105870950B (en) A kind of multi-objective coordinated system of the adjustable resource of intelligent building and optimal control method
CN106849343B (en) The independently-powered switching system of communication base station wind-solar-diesel storage and power switching method
CN109103893A (en) A kind of cluster temperature control load participates in the auxiliary frequency modulation method of power grid AGC
CN102055241B (en) Integrated realtime power and solar-electricity station control system
CN105449719A (en) Distributed energy power supply control method, device and system
JP6311470B2 (en) Battery control device, control device, battery control system, battery control method, and battery control support method
CN206099371U (en) New forms of energy microgrid system of community
CA2998104C (en) Grid tied, real time adaptive, distributed intermittent power
CN105896610B (en) A kind of micro-capacitance sensor dispatching method
CN109066822A (en) A kind of multi-point dispersion formula distribution system dispatching method based on electric power electric transformer
CN202134924U (en) Structure of multifunctional system of solar power and self use connected grid
KR20130078680A (en) Integrated power control device and control method for wind power plant control system
CN207631002U (en) A kind of charging pile control system
CN109066802A (en) A kind of microgrid energy management system and method
CN109888774A (en) A kind of Optimal Scheduling and method of Internet of Things energy router
CN104319774A (en) Monitoring method and device for intelligent community
CN104753068A (en) Two-way interaction load dispatch system
CN109494813A (en) A kind of power dispatching method, electronic equipment and storage medium
CN109560577A (en) A kind of control method and system of alternating current-direct current mixed distribution formula renewable energy system
Sayeed et al. A novel and comprehensive mechanism for the energy management of a Hybrid Micro-grid System
CN106847019A (en) A kind of micro-capacitance sensor Dispatching monitor and control system and control method
US9989949B2 (en) Grid tied, real time adaptive, distributed intermittent power

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant