CN105371455A - Pipeline assembly and air conditioner with same - Google Patents
Pipeline assembly and air conditioner with same Download PDFInfo
- Publication number
- CN105371455A CN105371455A CN201510776504.7A CN201510776504A CN105371455A CN 105371455 A CN105371455 A CN 105371455A CN 201510776504 A CN201510776504 A CN 201510776504A CN 105371455 A CN105371455 A CN 105371455A
- Authority
- CN
- China
- Prior art keywords
- pipeline
- orientation structure
- circular orientation
- pipeline assembly
- assembly according
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F13/00—Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
- F24F13/02—Ducting arrangements
- F24F13/0209—Ducting arrangements characterised by their connecting means, e.g. flanges
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F13/00—Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
- F24F13/02—Ducting arrangements
- F24F13/0254—Ducting arrangements characterised by their mounting means, e.g. supports
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Butt Welding And Welding Of Specific Article (AREA)
- Rigid Pipes And Flexible Pipes (AREA)
Abstract
The invention provides a pipeline assembly and an air conditioner with the same. The pipeline assembly comprises a first pipeline (10) and a second pipeline (20) which is arranged on the first pipeline (10) in a sleeving mode, and an annular positioning structure (30) which is matched with the first pipeline (10) is disposed on the inner wall of the second pipeline (20). By means of the technical scheme, the problems that deviation is prone to occur during positioning when a large pipe and a small pipe are matched and the product quality cannot be guaranteed in the prior art can be effectively solved.
Description
Technical field
The present invention relates to air-conditioning duct technical field, in particular to a kind of pipeline assembly and the air-conditioner with it.
Background technology
As shown in Figure 1, in the prior art, air-conditioning often needs to carry out pipe arrangement to bassoon 1 and tubule 2, both are at normally used connection fit system: first former and later two positioning pit 3 (or salient point) of design processing in the bassoon 1 that caliber is larger, again tubule 2 less for caliber to be inserted in above-mentioned bassoon 1 and to make it arrive positioning pit 3 place, now, above-mentioned positioning pit 3 coordinates with tubule 2 effect playing assembling and positioning, finally by welding, both are welded together at the overlapping part of bassoon 1 and tubule 2.But when using above-mentioned connection fit system to assemble bassoon 1 and tubule 2, location is easily departed from, and pipeline is easily partially welded, and cannot ensure product quality.
Summary of the invention
Main purpose of the present invention is the air-conditioner providing a kind of pipeline assembly and have it, locates the problem easily departing from, cannot ensure product quality during to solve bassoon of the prior art and tubule cooperation.
To achieve these goals, according to an aspect of the present invention, provide a kind of pipeline assembly, comprising: the first pipeline; Second pipeline, is set on the first pipeline, the inwall of the second pipeline has the circular orientation structure coordinated with the first pipeline.
Further, circular orientation structure is inwardly concaved by the sidewall of the second pipeline and is formed.
Further, circular orientation structure has the first location fit face, and the first location fit face is arranged along the radial direction of the second pipeline, matches with the end face of the first pipeline in the first location fit face.
Further, circular orientation structure has the second location fit face, and the second location fit face is arranged along the axial direction of the second pipeline, matches with the circumferential exterior surface of the first pipeline in the second location fit face.
Further, circular orientation structure comprises the annular protrusion in the circumferential inner surface being arranged on the second pipeline.
Further, between the first pipeline and the second pipeline by being welded to connect.
Further, the second pipeline comprises main paragraph and welding coordinates section, and circular orientation structure coordinates between section at main paragraph with weld, welding cooperation section to be set on the first pipeline also and between the first pipeline by being welded to connect.
Further, the internal diameter of main paragraph is greater than the internal diameter that welding coordinates section.
Further, main paragraph forms circular orientation structure by necking down process, circular orientation structure forms welding by enlarging technique and coordinates section.
According to a further aspect in the invention, provide a kind of air-conditioner, comprise pipeline assembly, pipeline assembly is above-mentioned pipeline assembly.
Apply technical scheme of the present invention, the inwall of the second pipeline arranges circular orientation structure, this circular orientation structure coordinates with the first pipeline with the location realized the first pipeline.Above-mentioned circular orientation structure coordinates area larger with the first pipeline, and assembling is more prone to, and positioning precision is higher, thus makes not easily to depart from when fixing between the first pipeline and the second pipeline, ensure that product quality.
Accompanying drawing explanation
The Figure of description forming a application's part is used to provide a further understanding of the present invention, and schematic description and description of the present invention, for explaining the present invention, does not form inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 shows the structural representation of the pipeline assembly of prior art; And
Fig. 2 shows the structural representation of the embodiment one according to pipeline assembly of the present invention.
Wherein, above-mentioned accompanying drawing comprises the following drawings mark:
1, bassoon; 2, tubule; 3, positioning pit; 10, the first pipeline; 20, the second pipeline; 21, main paragraph; 22, welding coordinates section; 30, circular orientation structure.
Detailed description of the invention
It should be noted that, when not conflicting, the embodiment in the application and the feature in embodiment can combine mutually.Below with reference to the accompanying drawings and describe the present invention in detail in conjunction with the embodiments.
As shown in Figure 2, embodiment one pipeline assembly is air-conditioning duct assembly.This pipeline assembly comprises the first pipeline 10 and the second pipeline 20, second pipeline 20 is set on the first pipeline 10, the inwall of the second pipeline 20 has the circular orientation structure 30 coordinated with the first pipeline 10.In the present embodiment, circular orientation structure 30 is inwardly concaved by the sidewall of the second pipeline 20 and is formed.By being welded to connect between first pipeline 10 and the second pipeline 20.
The pipeline assembly of application the present embodiment, inwardly concaved by the sidewall of the second pipeline 20 and form circular orientation structure 30, this circular orientation structure 30 coordinates to realize the location to the first pipeline 10 with the first pipeline 10.Above-mentioned circular orientation structure 30 coordinates area larger with the first pipeline 10, and assembling is more prone to, and positioning precision is higher, thus makes not easily to be partially welded when welding between the first pipeline 10 and the second pipeline 20, ensure that product quality.
In the prior art, when locating and machining concave point (or salient point), there is the risk of beating tube wall, pipe fitting can be caused to leak once tube wall beats.In addition, locating and machining concave point (or salient point) needs special equipment and special operating personnel, therefore, it is separate that processing concave point (or salient point) operation operates with processing tube body, need to carry out transhipment pipe fitting, above-mentioned situation causes the increase of production cost, the waste of human resources.
As shown in Figure 2, in the pipeline assembly of embodiment one, the second pipeline 20 comprises main paragraph 21 and welding coordinates section 22.Circular orientation structure 30 coordinates between section 22 at main paragraph 21 with welding, and welding coordinates section 22 to be set on the first pipeline 10 and and by being welded to connect between the first pipeline 10.The internal diameter of main paragraph 21 is greater than the internal diameter of welding cooperation section 22.The external diameter of main paragraph 21 is greater than the external diameter of welding cooperation section 22.In the present embodiment, circular orientation structure 30 can be formed by carrying out deformation operation to the tube body of the second pipeline 20 on the equipment of processing tube body.Particularly, first on the main paragraph 21 of the second pipeline 20, form one by necking down process and enclose scrobicular ring, namely form circular orientation structure 30, then form welding cooperation section 22 by enlarging technique in circular orientation structure 30.Above-mentioned circular orientation structure 30 coordinates between section 22 at main paragraph 21 and welding.First pipeline 10 is inserted in the second pipeline 20, and circular orientation structure 30 coordinates with the first pipeline 10 and positions, and positioning precision is higher.Simultaneously, the risk of beating saturating tube wall and causing leaking can not be there is in the processing of above-mentioned circular orientation structure 30, significantly improve product quality, and the processing of the processing of circular orientation structure 30 and processing tube body uses same equipment, can complete without the need to replacement operation equipment, more convenient to operate, production efficiency is higher, reduce pipe fitting transhipment and operating personnel's quantity (reducing the personnel of processing sags and crests), play the effect of significantly cutting payroll to improve efficiency.
In the pipeline assembly of embodiment one, circular orientation structure 30 has the first location fit face, and the first location fit face is arranged along the radial direction of the second pipeline 20, matches with the end face of the first pipeline 10 in the first location fit face.When circular orientation structure 30 positions the first pipeline 10, match with the end face of the first pipeline 10 in above-mentioned first location fit face, namely the end face of the first pipeline 10 is held in the first location fit face, thus realize the effect to the first pipeline 10 location.After this, then to fixing by being welded to connect between the first pipeline 10 and the second pipeline 20.Certainly, the fit form of circular orientation structure 30 and the first pipeline 10 is not limited thereto, and in other embodiments, annular recess can coordinate with other positions of the first pipeline, can to the positioning instant of the first pipeline as long as can realize.
The pipeline assembly (not shown) of embodiment two and the main distinction of embodiment one are, circular orientation structure has the second location fit face, second location fit face is arranged along the axial direction of the second pipeline, matches with the first pipeline circumferential exterior surface in the second location fit face.When circular orientation structure positions the first pipeline, above-mentioned second location fit face matches with the circumferential exterior surface of the first pipeline circular orientation structure and the first pipeline are clamped, thus realizes the effect to the first pipeline location.
The pipeline assembly (not shown) of embodiment three and the main distinction of embodiment one are, circular orientation structure comprises the annular protrusion in the circumferential inner surface being arranged on the second pipeline.When assembling first pipeline and the second pipeline, above-mentioned annular protrusion positions the first pipeline, end face or the circumferential exterior surface of this annular protrusion and the first pipeline match, coordinate area larger, assembling is more prone to, positioning precision is higher, thus makes not easily to be partially welded when welding between the first pipeline and the second pipeline, ensure that product quality.
Present invention also provides a kind of air-conditioner, the embodiment according to the air-conditioner of the application comprises pipeline assembly, and pipeline assembly is above-mentioned pipeline assembly.The pipeline assembly assembling of above-mentioned air-conditioner is more prone to, good product quality.
The foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, for a person skilled in the art, the present invention can have various modifications and variations.Within the spirit and principles in the present invention all, any amendment done, equivalent replacement, improvement etc., all should be included within protection scope of the present invention.
Claims (10)
1. a pipeline assembly, is characterized in that, comprising:
First pipeline (10);
Second pipeline (20), is set on described first pipeline (10), the inwall of described second pipeline (20) has the circular orientation structure (30) coordinated with described first pipeline (10).
2. pipeline assembly according to claim 1, is characterized in that, described circular orientation structure (30) is inwardly concaved by the sidewall of described second pipeline (20) and formed.
3. pipeline assembly according to claim 2, it is characterized in that, described circular orientation structure (30) has the first location fit face, described first location fit face is arranged along the radial direction of described second pipeline (20), matches with the end face of described first pipeline (10) in described first location fit face.
4. pipeline assembly according to claim 2, it is characterized in that, described circular orientation structure (30) has the second location fit face, described second location fit face is arranged along the axial direction of described second pipeline (20), matches with the circumferential exterior surface of described first pipeline (10) in described second location fit face.
5. pipeline assembly according to claim 1, is characterized in that, described circular orientation structure (30) comprises the annular protrusion in the circumferential inner surface being arranged on described second pipeline (20).
6. the pipeline assembly according to any one of claim 2 to 5, is characterized in that, by being welded to connect between described first pipeline (10) and described second pipeline (20).
7. pipeline assembly according to claim 6, it is characterized in that, described second pipeline (20) comprises main paragraph (21) and welding coordinates section (22), described circular orientation structure (30) is positioned at described main paragraph (21) and coordinates between section (22) with described welding, and it is upper and and by being welded to connect between described first pipeline (10) that described welding coordinates section (22) to be set in described first pipeline (10).
8. pipeline assembly according to claim 7, is characterized in that, the internal diameter of described main paragraph (21) is greater than the internal diameter of described welding cooperation section (22).
9. pipeline assembly according to claim 7, it is characterized in that, described main paragraph (21) forms described circular orientation structure (30) by necking down process, described circular orientation structure (30) forms described welding by enlarging technique and coordinates section (22).
10. an air-conditioner, comprises pipeline assembly, it is characterized in that, the pipeline assembly of described pipeline assembly according to any one of claim 1 to 9.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510776504.7A CN105371455B (en) | 2015-11-13 | 2015-11-13 | Pipeline assembly and air conditioner with it |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510776504.7A CN105371455B (en) | 2015-11-13 | 2015-11-13 | Pipeline assembly and air conditioner with it |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105371455A true CN105371455A (en) | 2016-03-02 |
CN105371455B CN105371455B (en) | 2019-08-13 |
Family
ID=55373881
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510776504.7A Active CN105371455B (en) | 2015-11-13 | 2015-11-13 | Pipeline assembly and air conditioner with it |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105371455B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2023143087A1 (en) * | 2022-01-27 | 2023-08-03 | 浙江盾安人工环境股份有限公司 | End cover machining method, end cover, and pipeline assembly |
Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0914699A (en) * | 1995-06-27 | 1997-01-17 | Sanyo Electric Co Ltd | Flare header and air conditioner using the flare header |
JP2001153402A (en) * | 1999-11-24 | 2001-06-08 | Sharp Corp | Refrigerating cycle apparatus |
CN101093038A (en) * | 2006-06-20 | 2007-12-26 | 浙江三花制冷集团有限公司 | Connecting lines between indoor devices and outdoor devices in household air conditioning system |
CN101191642A (en) * | 2006-11-21 | 2008-06-04 | 乐金电子(天津)电器有限公司 | Indoor machine of air conditioner |
CN101294646A (en) * | 2007-04-24 | 2008-10-29 | 三星电子株式会社 | Pipe connection sleeve and air conditioner with the same |
CN201242387Y (en) * | 2008-07-01 | 2009-05-20 | 谭伟宏 | Welded structure for cuprum aluminum tube of heat exchanger and heat exchanger equipped with the cuprum aluminum tube |
CN201343742Y (en) * | 2008-10-24 | 2009-11-11 | 吕志刚 | Acoustic testing pipe |
CN202520401U (en) * | 2012-03-31 | 2012-11-07 | 三河三友汽车部件有限公司 | Automobile silencer |
CN202812618U (en) * | 2012-07-16 | 2013-03-20 | 江苏精华环保设备有限公司 | Reducing nipple of plastic pipe |
CN203533012U (en) * | 2013-04-25 | 2014-04-09 | 广东美的暖通设备有限公司 | Connecting pipe, valve body assembly and air conditioner |
CN203560641U (en) * | 2013-10-21 | 2014-04-23 | 杭州银博交通工程材料有限公司 | Plug bush type spring clamp joint |
CN203869386U (en) * | 2014-05-29 | 2014-10-08 | 浙江三花制冷集团有限公司 | Gas collecting tube component |
CN204611127U (en) * | 2015-04-30 | 2015-09-02 | 合肥中安机械电器有限公司 | A kind of compressor copper-plated tube assembly |
JP6064486B2 (en) * | 2012-09-24 | 2017-01-25 | 株式会社富士通ゼネラル | Refrigerant circuit unit |
-
2015
- 2015-11-13 CN CN201510776504.7A patent/CN105371455B/en active Active
Patent Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0914699A (en) * | 1995-06-27 | 1997-01-17 | Sanyo Electric Co Ltd | Flare header and air conditioner using the flare header |
JP2001153402A (en) * | 1999-11-24 | 2001-06-08 | Sharp Corp | Refrigerating cycle apparatus |
CN101093038A (en) * | 2006-06-20 | 2007-12-26 | 浙江三花制冷集团有限公司 | Connecting lines between indoor devices and outdoor devices in household air conditioning system |
CN101191642A (en) * | 2006-11-21 | 2008-06-04 | 乐金电子(天津)电器有限公司 | Indoor machine of air conditioner |
CN101294646A (en) * | 2007-04-24 | 2008-10-29 | 三星电子株式会社 | Pipe connection sleeve and air conditioner with the same |
CN201242387Y (en) * | 2008-07-01 | 2009-05-20 | 谭伟宏 | Welded structure for cuprum aluminum tube of heat exchanger and heat exchanger equipped with the cuprum aluminum tube |
CN201343742Y (en) * | 2008-10-24 | 2009-11-11 | 吕志刚 | Acoustic testing pipe |
CN202520401U (en) * | 2012-03-31 | 2012-11-07 | 三河三友汽车部件有限公司 | Automobile silencer |
CN202812618U (en) * | 2012-07-16 | 2013-03-20 | 江苏精华环保设备有限公司 | Reducing nipple of plastic pipe |
JP6064486B2 (en) * | 2012-09-24 | 2017-01-25 | 株式会社富士通ゼネラル | Refrigerant circuit unit |
CN203533012U (en) * | 2013-04-25 | 2014-04-09 | 广东美的暖通设备有限公司 | Connecting pipe, valve body assembly and air conditioner |
CN203560641U (en) * | 2013-10-21 | 2014-04-23 | 杭州银博交通工程材料有限公司 | Plug bush type spring clamp joint |
CN203869386U (en) * | 2014-05-29 | 2014-10-08 | 浙江三花制冷集团有限公司 | Gas collecting tube component |
CN204611127U (en) * | 2015-04-30 | 2015-09-02 | 合肥中安机械电器有限公司 | A kind of compressor copper-plated tube assembly |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2023143087A1 (en) * | 2022-01-27 | 2023-08-03 | 浙江盾安人工环境股份有限公司 | End cover machining method, end cover, and pipeline assembly |
Also Published As
Publication number | Publication date |
---|---|
CN105371455B (en) | 2019-08-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2835568A1 (en) | Pipe joint, air conditioner, method for producing connecting pipe, connecting pipe, and connection method | |
ATE531989T1 (en) | SEALING RING FOR A CONNECTION OF TWO PIPES | |
CN105371455A (en) | Pipeline assembly and air conditioner with same | |
CN105772778A (en) | Split type annular locating sleeve, locating device and machining equipment | |
CN104633337A (en) | Sealing structure of pipeline flanges | |
CN108006337A (en) | A kind of double-wall hose | |
CN105864535A (en) | Pipeline welding structure and air conditioner | |
CN213929902U (en) | Bent pipe and pipeline system | |
CN202719303U (en) | Flat welding flange | |
CN106907156B (en) | Multi-edge tail shield structural member assembly point manufacturing method | |
CN202733238U (en) | Pipeline connection structure | |
CN213929899U (en) | Bent pipe, straight pipe and pipeline system | |
CN104595602A (en) | Engine oil tube assembly and manufacturing method of engine oil tube assembly | |
JP5350045B2 (en) | Attaching the cylindrical universal joint | |
CN103358042B (en) | Object including welding point | |
CN208793230U (en) | A kind of compressor and a kind of air-conditioning | |
CN103062534B (en) | Flange assembly, concrete delivery pipeline and method for manufacturing flange assembly | |
CN104500890A (en) | Rubber tube buckling structure | |
US9605783B2 (en) | Rotary fluid coupling | |
CN204099780U (en) | A kind of car air-conditioner pipeline structure | |
CN212900278U (en) | Vacuum bellows for vacuum pumping system | |
CN210460998U (en) | Compressor shell structure and refrigeration equipment | |
CN209289110U (en) | Joint for pipe positioning fixture | |
JP2019007573A (en) | Manufacturing method of cylindrical joint | |
CN207049498U (en) | Non-dismountable type Split type air pipe connector |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |