CN105370032B - Construction method for air bag type concrete project deformation joint water stop cavity mold - Google Patents

Construction method for air bag type concrete project deformation joint water stop cavity mold Download PDF

Info

Publication number
CN105370032B
CN105370032B CN201510916630.8A CN201510916630A CN105370032B CN 105370032 B CN105370032 B CN 105370032B CN 201510916630 A CN201510916630 A CN 201510916630A CN 105370032 B CN105370032 B CN 105370032B
Authority
CN
China
Prior art keywords
air bag
skeleton
concrete
groove
swaging die
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510916630.8A
Other languages
Chinese (zh)
Other versions
CN105370032A (en
Inventor
王东华
闫广聚
聂志刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nie Zhigang
Wang Donghua
Yan Guangju
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510916630.8A priority Critical patent/CN105370032B/en
Publication of CN105370032A publication Critical patent/CN105370032A/en
Application granted granted Critical
Publication of CN105370032B publication Critical patent/CN105370032B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G15/00Forms or shutterings for making openings, cavities, slits, or channels
    • E04G15/04Cores for anchor holes or the like around anchors embedded in the concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/16Sealings or joints
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • E21D11/385Sealing means positioned between adjacent lining members
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Architecture (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Paleontology (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Hydrology & Water Resources (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Sewage (AREA)

Abstract

The invention relates to a construction method for an air bag type concrete project deformation joint water stop cavity mold. The cavity mold comprises a skeleton and an air bag, a red copper water stop piece pre-embedded in the section of first-stage concrete is clamped in a groove by the cavity mold, air pressure is set in the air bag of the cavity mold, second-stage concrete is poured in layers, after initial setting of the concrete, air pressure in the air bag is released, the cavity mold is hung out, a semicircular cavity can be formed in the section of the second-stage concrete, and molten pitch is injected into the semicircular cavity to achieve the water stop function. The problem that deformation joint water leakage, caused by differential settlement or diastrophism of a stratum, of a water conservancy project can be solved, and the cavity mold can be used repeatedly.

Description

The construction method of gasbag-type concrete works movement joint sealing swaging die
Technical field
The present invention relates to a kind of underground/submerged structure water-tight device, more particularly to a kind of gasbag-type concrete works deformation The construction method of seam sealing swaging die.
Background technology
In existing xoncrete structure, such as underground such as checkdam, cistern, subway, culvert, sluice, tunnel, under water In engineering, due to being unable to continuous placing or the deformation due to settlement of foundation (earthquake), or the coagulation caused due to the change of temperature The reason such as expand with heat and contract with cold of native component, deliberately leave often movement joint pouring, and these gaps will take anti-seep measure, prevent External water or subsoil water are leaked in structure space, and present usual way is set between fist stage concrete and second stage concrete Concrete pit is put, maltha and copper sheet or rubber water-proof piece are set in groove, however, this method needs advance concrete soil box, be Enable concrete pit to combine closely with second stage concrete, need to carry out dabbing process to 3 faces of concrete pit periphery, thus can Extend the duration and increase artificial, simultaneously because concrete pit is general to only have 50-100cm per segment length (height), deformation gap will Connected and composed by multiple concrete pits, therefore a plurality of transverse slot, and the irregular deformation of multiple concrete pits, meeting can be produced The race for causing postorder perfusion maltha emits phenomenon, and is difficult to clean up;And adopt number of patent application 2014100489253 with channel-section steel Replace the technology of concrete pit, although can save expense and reduction of erection time than former construction method, but because channel-section steel will be retained In dam body, it is not possible to reuse, still cause to waste, therefore urgent need one kind can precast in second stage concrete section and put Hold the die cavity equipment of Colophonium.
The content of the invention
In order to solve the above problems, the present invention provides a kind of construction of gasbag-type concrete works movement joint sealing swaging die Method, the swaging die of the present invention can second stage concrete section it is preset go out a semicircle die cavity, pour into Colophonium, and Swaging die can be repeatedly used using rear taking-up, using the vertical water sealing structure of this swaging die can meet various ground condition/ Stratum differential settlement or the changing of the relative positions, telescopic displacement etc., can be with material-saving expense and reduction of erection time.
For achieving the above object, the present invention provides following technical scheme:
A kind of manufacture method of gasbag-type concrete works movement joint sealing swaging die, described swaging die include skeleton and Air bag, it is characterised in that including following technique and step:
1) carcasing:Skeleton is rectangular steel plates, and thickness 2-4mm, length is more than movement joint height 20-40cm, at middle part Fold/weld groove, depth of groove is 15-30cm, recess width 5-10cm, skeleton 30-50cm containing recess width, in skeleton Both sides are longitudinally spaced-apart setting fixing hole, and on the upper recess of skeleton lifting hole(eyelet) is arranged, and in the lower end of skeleton bottom is arranged Seat, the radius of described base is equal to the depth of the groove, and two sides of skeleton arrange 45 ° of chamferings;
2) air bag makes:Air bag is rubber casting, is semicircle or more than half elliptical cylinder-shape, and the middle part of its plane is longitudinally provided with gas Capsule groove, the size of air bag groove is matched with skeleton groove, and the thickness of its groove walls and two side is more than the thickness of antetheca circular arc, General air bag groove and both sides wall thickness are 2 times of antetheca circular arc thickness, and gradually forward wall circular arc is thinning for two side;Described Its upper end of air bag is provided with valve cock, and lower end sets Packed bottom, and the both sides of the fore-and-aft plane of air bag are provided with several fixing points, each solid The position of fixed point, size with corresponding skeleton fixing hole and match;The demoulding and some strength is reached for convenience, described gas Capsule selects quality of rubber materials, and reinforcing fiber silk in length and breadth is accompanied inside airbag wall, in order that Colophonium is in concrete-type intracavity Adhesive to be more preferably distributed with projection in air bag circular arc external surface, projection can be round point shape, or in vertical or horizontal convex Go out the glazing bar on surface, concave point or groove can be formed after the demoulding in die cavity, to increase the cohesive force of Colophonium.
3) assembling of swaging die:Air bag groove is directed at into skeleton groove, air bag bottom is arranged on skeleton base, positioned at gas The fixing point of capsule backward plane is sticked into be arranged on to be assembled integrally in the corresponding fixing hole of skeleton and formed swaging die.
The present invention also disclosed a kind of construction method of gasbag-type concrete works movement joint sealing swaging die, including as follows Technique and step:
1) fist stage concrete is poured:One side that sealing copper sheet has knuckle is preset in into the section part of deformed concrete crack, Copper sheet is longitudinally disposed at the centre of concrete cross section width, the pre-buried half of its width, protrudes half, fixed form and sealing piece After-pouring fist stage concrete;
2) setting of swaging die:Fist stage concrete solidifies a couple of days, and swaging die, the bone of swaging die are arranged at concrete cross section Frame groove is stuck on the copper sheet of fist stage concrete section protrusion, and coal tar hair is arranged on the concrete cross section of skeleton both sides Felt;
3) air bag pressurization:Add compression empty from the valve cock for being arranged on air bag top in the air bag of the swaging die for setting Gas, air bag forms certain air pressure;
4) second stage concrete is poured:After setting air bag pressure and template, second stage concrete is poured according to profile height layering Build, each every layer of 50cm or so, wait lower floor's initial set to have after certain degree of hardness and pour last layer again, until it reaches the height of needs;
5) die cavity is formed:After second stage concrete initial set, air pressure in air bag is released, suspension hook is set in the lifting hole(eyelet) of skeleton, Swaging die is hung out, in second stage concrete section part semicircle die cavity is formed;
6) asphalt reperfusion:Molten asphalt is filled in semicircle die cavity, is cooled down;
7) when multiple movement joints are arranged, repeat the above steps 1-6, Colophonium does and once irrigate or irrigate for several times;Hang out Swaging die is cleared up in time, maintained, storage, with profit recycling.
Beneficial effects of the present invention
1. using the swaging die preset mode of the present invention so that one, second stage concrete pour conveniently, section is neat;
2. swaging die hangs out second stage concrete using after and can reuse, and the reduction that can economize on resources is wasted;
3. the permanent seam in the undergrounds such as checkdam, cistern, subway, culvert, sluice, tunnel, Underwater Engineering can be solved Leakage problems;
4. compare with conventional construction method, because it is not required to concrete soil box, it is possible to reduce needed for concrete soil box Manually, the expense such as machinery, template;
5. again metal material consumption is saved because being not required to reserved channel-section steel internally;
6. constructed working procedure in the past on critical circuits using this method, be changed into non-key circuit operation, saved Duration, generate very big economic benefit and social benefit.
7. the technology of the present invention can solve the coagulation that various ground condition/stratum differential settlement or the change due to temperature cause The deformation joint seepage problem that the reason such as expand with heat and contract with cold of native component causes;Can also prevent because of breaking that the natural disasters such as earthquake cause Leakage problems caused by the face interface changing of the relative positions, deformation.
Description of the drawings
Fig. 1 is the overlooking the structure diagram of the skeleton of the swaging die of the present invention, wherein visible groove and base plate;
Fig. 2 is the dimensional structure diagram of the fluted one side of band of Fig. 1, it is seen that base plate radius is identical with groove height;
Fig. 3 is the dimensional structure diagram of the semicolumn plane one side of Fig. 1, it is seen that the longitudinally spaced spacing in both sides of skeleton From being provided with fixing hole;
Fig. 4 is the air bag projecting surface dimensional structure diagram of the swaging die of the present invention, it is seen that air bag is cylindrical to be provided with projection;
Fig. 5 is the air bag semicolumn flat and stereo structural representation of the swaging die of the present invention, it is seen that air bag groove and both sides Fixing point;
Fig. 6 is projecting surface dimensional structure diagram after the swaging die of the present invention is assembled, wherein the high outlet in visible skeleton top Capsule top certain distance, is typically higher by 20-40cm, to facilitate lifting;
Fig. 7 is another side flat and stereo structural representation after the swaging die of the present invention is assembled, wherein visible air bag plane The fixing hole of fixing point and skeleton plane coordinates, the groove in the middle part of air bag and the groove fit in the middle part of skeleton;
Fig. 8 is the swaging die overlooking the structure diagram of the present invention, wherein the fixing point of visible air bag plane protrudes from skeleton Fixing hole, to ensure not falling out to cause deformation;
Fig. 9 is mplifying structure schematic diagram at Fig. 8 A, it is seen that skeleton side is provided with 45 ° of chamferings;
Figure 10 is the swaging die cross-sectional structure schematic diagram of the present invention, it is seen that circle before the wall ratio of air bag groove and both sides It is thick at arc, and gradually forwardly circular arc is thinning for both sides;
Figure 11 is that the swaging die of the present invention is arranged on the dimensional structure diagram of fist stage concrete section part, wherein protrude Sealing piece is arranged in the groove of skeleton, sealing piece certain altitude of the skeleton higher than concrete cross section;
Figure 12 is the overlooking the structure diagram that the swaging die of the present invention is arranged on a phase and second stage concrete section part, wherein The sealing piece of protrusion is arranged in the groove of skeleton;
Figure 13 is the die cavity moulding/demoulding of the present invention and after hanging out, in the preset semicircle die cavity of second stage concrete section part The overlooking the structure diagram after Colophonium is filled, wherein sealing piece half is located in fist stage concrete, and the half of protrusion is located at die cavity In interior Colophonium;
Figure 14 is the swaging die schematic diagram of another money large semicircle of the present invention, wherein visible air bag is more than half ellipse, can The engineering narrow to be used in dam body, can reserve bigger concrete wall for both sides, with the effect for strengthening dam body.
Sequence number in figure:1. skeleton, 2. groove, 3. base, 4. fixing hole, 5. lifting hole(eyelet), 6. air bag groove, 7. antetheca, 8. gas Door mouth, 9. raised, 10. fixing point, 11. side walls, 12. fist stage concretes, 13. sealing copper sheets, 14. bituminous felts, 15. 2 Phase concrete, 16. Colophoniumes, 17. more than half ellipse swaging die air bags.
Specific embodiment
With reference to the accompanying drawings and examples the present invention will be further described.
Embodiment 1, refer to the attached drawing:A kind of manufacture method of gasbag-type concrete works movement joint sealing swaging die, it is described Swaging die include skeleton 1 and air bag, it is characterised in that including following technique and step:
1) skeleton 1 makes:Skeleton 1 is rectangular steel plates, and thickness 2-4mm, length is more than movement joint height 20-40cm, in Portion folds groove 2, or welds out groove 2, and the depth of groove 2 is 15-30cm, and the width 5-10cm of groove 2, skeleton 1 is wide containing groove 2 Degree 30-50cm, in the both sides of skeleton 1 setting fixing hole 4 is longitudinally spaced-apart, and is arranged on the upper recess 5 of skeleton 1 and is hung Hole 8, in the lower end of skeleton 1 base 3 is arranged, and the radius of described base 3 is equal to the depth of the groove 2, two sides of skeleton 1 45 ° of chamferings are set;
2) air bag makes:Air bag is rubber casting, and air bag is semicircle or more than half elliptical cylinder-shape, and the middle part of its plane longitudinally sets The size for having air bag groove 6, air bag groove 6 is matched with the groove 2 of skeleton 1, and the thickness of its groove walls and two side 11 is more than antetheca 7 The thickness of circular arc, the wall thickness of general groove 2 and the thickness of two side 11 are 2 times of the circular arc thickness of antetheca 7, and its two side 11 is thick to antetheca 7 thickness be from thickness to it is thin be a progressive formation;Its upper end of described air bag is provided with valve cock 8, and lower end sets Packed bottom, gas The both sides of the fore-and-aft plane of capsule are provided with several fixing points 10, the position of each fixing point 10, size with corresponding skeleton 1 fixing hole 4 and match;Air bag accompanies reinforcing fiber silk inside the airbag wall containing upper and lower termination, and its circular arc external surface is provided with raised 9;
3) assembling of swaging die:Air bag groove 6 is directed at into the groove 2 of skeleton 1, air bag bottom is arranged on the base 3 of skeleton 1, Stick into be arranged on to be assembled integrally in the corresponding fixing hole 4 of skeleton 1 positioned at the fixing point 10 of air bag backward plane and complete Swaging die.
The present embodiment also disclosed the construction method of above-mentioned gasbag-type concrete works movement joint sealing swaging die, including such as Lower technique and step:
1) fist stage concrete 12 is poured:One side that sealing copper sheet 13 has knuckle is preset in into the section of deformed concrete crack Place, copper sheet is longitudinally disposed at the centre of concrete cross section width, the pre-buried half of its width, protrudes half, fixed form and only The after-pouring fist stage concrete 12 of water copper sheet 13;
2) setting of swaging die:Fist stage concrete 12 solidifies a couple of days, and swaging die is arranged at concrete cross section, swaging die The groove 2 of skeleton 1 is stuck on the sealing copper sheet 13 of the section of fist stage concrete 12 protrusion, on the concrete cross section of the both sides of skeleton 1 Bituminous felt 14 is set;
3) air bag pressurization:Compression is added in the air bag of the swaging die for setting from the valve cock 8 for being arranged on air bag top Air, air bag forms certain air pressure;
4) second stage concrete 15 is poured:After setting air bag pressure and template, second stage concrete 15 is according to profile height point Layer is poured, general each, every layer of 50cm or so, is waited lower floor's initial set to have after certain degree of hardness and is poured last layer again, until it reaches needs The height wanted;
5) die cavity is formed:After the initial set of second stage concrete 15, general 20 DEG C 24 hours, release air bag in air pressure, in skeleton 1 Lifting hole(eyelet) 5 in suspension hook is set, hang out swaging die, form semicircle die cavity in the section part of second stage concrete 15;
6) asphalt reperfusion 16:No. 30 building asphalts 16 of melting are filled in semicircle die cavity, it is cold depending on job site temperature But time general 2-12 hours;
7) when concrete works length is longer, when needing to arrange multiple movement joints, repeat the above steps 1-6, Colophonium 16 can Do and once irrigate or irrigate for several times;The swaging die for hanging out is cleared up in time, maintained, storage, with profit recycling.
When narrower dam body engineering is applied to, the more than half ellipse swaging die air bag 17, its elongated die cavity can be selected can be Both sides reserve bigger concrete wall, and with the effect for strengthening despot's body bulk strength, general die cavity both sides concrete wall is big In 20cm.
The skeleton of the present invention is highly generally 2.5M, air bag height 2.0M, and each frame film can pour 2.0M concrete walls, If body of wall is more than 2.0M, after form removal, 2.0M, the aforementioned construction method of repetition, until meeting body of wall height are improved;The red copper sealing piece Site Welding is connected by with horizontal sealing piece.
The present invention is not required to concrete soil box, can be with 20-30 days reduction of erection time;Swaging die can be reused;Can be The construction of the box dam such as checkdam, cistern retaining wall, can also be used for undergrounds such as subway, culvert, sluice, tunnel, various mixed under water etc. The application of solidifying geotechnique's journey movement joint sealing, movement joint is neatly non-leakage;Stratum differential settlement can be solved using this technology to lead The deformation joint seepage water problems of cause, or the caused movement joint that expands with heat and contract with cold of the concrete component caused because of the change of ambient temperature Leakage problems;Deformation such as the movement joint section interface changing of the relative positions, displacement for causing because of natural disasters such as earthquakes etc. can also be prevented to cause Leakage problems.

Claims (1)

1. a kind of construction method of gasbag-type concrete works movement joint sealing swaging die, described swaging die includes that skeleton is gentle Capsule, described skeleton is rectangular steel plates, and thickness 2-4mm, length is more than movement joint height 20-40cm, folds/weld at middle part and be recessed Groove, depth of groove is 15-30cm, recess width 5-10cm, skeleton 30-50cm containing recess width, between the both sides longitudinal direction of skeleton Fixing hole is set at a certain distance, lifting hole(eyelet) is set on the upper recess of skeleton, base, described bottom are set in the lower end of skeleton The radius of seat is equal to the depth of the groove, and two sides of skeleton arrange 45 ° of chamferings;
Described air bag is rubber casting, and air bag is semicircle or more than half elliptical cylinder-shape, and it is recessed that the middle part of its plane is longitudinally provided with air bag Groove, the size of air bag groove is matched with skeleton groove, and the thickness of its groove walls and two side is more than the thickness of antetheca circular arc;It is described The upper end of air bag be provided with valve cock, lower end sets Packed bottom, and the both sides of the fore-and-aft plane of air bag are provided with several fixing points, respectively The position of fixing point, size with corresponding skeleton fixing hole and match;
The assembling of swaging die:Air bag groove is directed at into skeleton groove, air bag bottom is arranged on skeleton base, behind air bag The fixing point of plane is sticked into be arranged on to be assembled integrally in the corresponding fixing hole of skeleton and complete swaging die;
Implement the construction method of the gasbag-type concrete works movement joint sealing swaging die, it is characterised in that including following technique and Step:
1) fist stage concrete is poured:One side that sealing copper sheet has knuckle is preset in into the section part of deformed concrete crack, red copper Piece is longitudinally disposed at the centre of concrete cross section width, the pre-buried half of its width, protrudes half, fixed form and sealing copper sheet After-pouring fist stage concrete;
2) setting of swaging die:Fist stage concrete solidifies a couple of days, and swaging die is arranged at concrete cross section, and the skeleton of swaging die is recessed Groove is stuck on the sealing copper sheet of fist stage concrete section protrusion, and coal tar hair is arranged on the concrete cross section of skeleton both sides Felt;
3) air bag pressurization:Compressed air is added from the valve cock for being arranged on air bag top in the air bag of the swaging die for setting, Air bag forms certain air pressure;
4) second stage concrete is poured:After setting air bag pressure and template, second stage concrete according to profile height placement layer by layer, often Secondary every layer of 50cm, waits lower floor's initial set to have after certain degree of hardness and pours last layer again, until it reaches the height of needs;
5) die cavity is formed:After second stage concrete initial set, air pressure in air bag is released, suspension hook is set in the lifting hole(eyelet) of skeleton, hung out Swaging die, in second stage concrete section part semicircle die cavity is formed;
6) asphalt reperfusion:Molten asphalt is filled in semicircle die cavity, is cooled down;
7) when multiple movement joints are arranged, repeat the above steps 1) -6), Colophonium does and once irrigate or irrigate for several times;The type for hanging out Chamber mould is cleared up in time, maintained, storage, with profit recycling.
CN201510916630.8A 2014-11-10 2014-11-10 Construction method for air bag type concrete project deformation joint water stop cavity mold Expired - Fee Related CN105370032B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510916630.8A CN105370032B (en) 2014-11-10 2014-11-10 Construction method for air bag type concrete project deformation joint water stop cavity mold

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201410627784.0A CN104314048B (en) 2014-11-10 2014-11-10 Manufacturing and construction method of air bag type concrete engineering deformation joint water stop type cavity die
CN201510916630.8A CN105370032B (en) 2014-11-10 2014-11-10 Construction method for air bag type concrete project deformation joint water stop cavity mold

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201410627784.0A Division CN104314048B (en) 2014-11-10 2014-11-10 Manufacturing and construction method of air bag type concrete engineering deformation joint water stop type cavity die

Publications (2)

Publication Number Publication Date
CN105370032A CN105370032A (en) 2016-03-02
CN105370032B true CN105370032B (en) 2017-05-03

Family

ID=52369349

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201410627784.0A Expired - Fee Related CN104314048B (en) 2014-11-10 2014-11-10 Manufacturing and construction method of air bag type concrete engineering deformation joint water stop type cavity die
CN201510916630.8A Expired - Fee Related CN105370032B (en) 2014-11-10 2014-11-10 Construction method for air bag type concrete project deformation joint water stop cavity mold

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201410627784.0A Expired - Fee Related CN104314048B (en) 2014-11-10 2014-11-10 Manufacturing and construction method of air bag type concrete engineering deformation joint water stop type cavity die

Country Status (1)

Country Link
CN (2) CN104314048B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104746480B (en) * 2015-02-27 2016-05-18 姚伟华 Chamber mould skeleton structure
CN106120656B (en) * 2016-08-12 2018-03-30 武大巨成结构股份有限公司 A kind of application method of the underwater constructing device for changing waterstop
CN108978731A (en) * 2018-10-09 2018-12-11 郑州大学 Underground engineering waterproofing of movement joints construction and its construction method
CN109555314B (en) * 2019-01-17 2023-08-22 山东省交通科学研究院 Reusable expansion joint construction template and mounting and dismounting methods thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2809019Y (en) * 2005-08-05 2006-08-23 上海市隧道工程轨道交通设计研究院 Inner mounting structure for stainless steel water stop
CN201554225U (en) * 2009-11-17 2010-08-18 江苏江都建设工程有限公司 Hole-forming wood mould for preparing deep bolt holes on equipment basis
CN201891262U (en) * 2010-12-02 2011-07-06 上海市第二建筑有限公司 Embedded casing pipe for drainage pipeline crossing floor slab
CN202689046U (en) * 2012-05-18 2013-01-23 中建一局集团第三建筑有限公司 Closed advanced water stop post-pouring belt
CN202689053U (en) * 2012-07-17 2013-01-23 叶香菲 Water proof structure of basement expansion joint
JP5395469B2 (en) * 2009-03-11 2014-01-22 大成建設株式会社 Construction method of water stop structure and water stop structure
CN103821180A (en) * 2014-03-02 2014-05-28 张朝利 Double-water stop structure for concrete expansion joint and manufacturing and construction method for double-water stop structure

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4657071B2 (en) * 2005-01-27 2011-03-23 シバタ工業株式会社 Sealing material for joints and method for producing the same
CN104652364B (en) * 2014-02-12 2016-06-01 苏州多固工程设计有限公司 The constructional method of the vertical water sealing structure of a kind of hydro project
CN203808113U (en) * 2014-03-02 2014-09-03 杨玉霞 Concrete engineering expansion joint vertical water-stop structure
CN103774699B (en) * 2014-03-02 2015-07-15 福建九鼎建设集团有限公司 Vertical water-stop structure for concrete engineering expansion joint as well as manufacturing and construction methods for same

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2809019Y (en) * 2005-08-05 2006-08-23 上海市隧道工程轨道交通设计研究院 Inner mounting structure for stainless steel water stop
JP5395469B2 (en) * 2009-03-11 2014-01-22 大成建設株式会社 Construction method of water stop structure and water stop structure
CN201554225U (en) * 2009-11-17 2010-08-18 江苏江都建设工程有限公司 Hole-forming wood mould for preparing deep bolt holes on equipment basis
CN201891262U (en) * 2010-12-02 2011-07-06 上海市第二建筑有限公司 Embedded casing pipe for drainage pipeline crossing floor slab
CN202689046U (en) * 2012-05-18 2013-01-23 中建一局集团第三建筑有限公司 Closed advanced water stop post-pouring belt
CN202689053U (en) * 2012-07-17 2013-01-23 叶香菲 Water proof structure of basement expansion joint
CN103821180A (en) * 2014-03-02 2014-05-28 张朝利 Double-water stop structure for concrete expansion joint and manufacturing and construction method for double-water stop structure

Also Published As

Publication number Publication date
CN105370032A (en) 2016-03-02
CN104314048A (en) 2015-01-28
CN104314048B (en) 2017-02-15

Similar Documents

Publication Publication Date Title
CN105370032B (en) Construction method for air bag type concrete project deformation joint water stop cavity mold
CN105951891B (en) With raised sealing swaging die vertical with the concrete works movement joint of reinforcing fiber
CN106759111B (en) Water-bag type concrete works deformation joint sealing swaging die with reinforcing fiber
CN104452826B (en) A kind of concrete works swaging die air bag and manufacture method thereof
CN204097970U (en) The vertical sealing swaging die of a kind of concrete work deformation joint
CN204326013U (en) Water-bag type concrete work deformation joint sealing swaging die

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Wang Donghua

Inventor after: Yan Guangju

Inventor after: Nie Zhigang

Inventor before: Zhang Chaoli

CB03 Change of inventor or designer information
TA01 Transfer of patent application right

Effective date of registration: 20170330

Address after: 054000 Xingtai Province, the west side of the bridge in the town of Hebei Province, No. 84, the provincial hospital of family members, building No. 4, No. 38

Applicant after: Wang Donghua

Applicant after: Yan Guangju

Applicant after: Nie Zhigang

Address before: 215000 Xiangcheng District, Jiangsu, Huangqiao Street headquarters economic Park

Applicant before: SUZHOU DUOGU ENGINEERING DESIGN CO., LTD.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170503

Termination date: 20191110

CF01 Termination of patent right due to non-payment of annual fee