CN105359575A - 一种接入点配置方法和控制器 - Google Patents
一种接入点配置方法和控制器 Download PDFInfo
- Publication number
- CN105359575A CN105359575A CN201380078000.7A CN201380078000A CN105359575A CN 105359575 A CN105359575 A CN 105359575A CN 201380078000 A CN201380078000 A CN 201380078000A CN 105359575 A CN105359575 A CN 105359575A
- Authority
- CN
- China
- Prior art keywords
- access point
- sub
- newly
- chromosome
- increased
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W28/00—Network traffic management; Network resource management
- H04W28/02—Traffic management, e.g. flow control or congestion control
- H04W28/08—Load balancing or load distribution
- H04W28/086—Load balancing or load distribution among access entities
- H04W28/0861—Load balancing or load distribution among access entities between base stations
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W24/00—Supervisory, monitoring or testing arrangements
- H04W24/02—Arrangements for optimising operational condition
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Mobile Radio Communication Systems (AREA)
- Data Exchanges In Wide-Area Networks (AREA)
Abstract
本发明实施例提供一种接入点配置方法和控制器,涉及通信领域,能够有效配置新增接入点,满足用户的容量和覆盖的需求,从而提高网络性能,降低维护成本。其方法为:接收控制器下的已有接入点发送的负载统计报告,根据负载统计报告确定第一集合,并根据第一集合中的接入点的数量和已有接入点数量确定新增接入点的配置方法,通过配置方法确定新增接入点的配置信息,配置信息包括新增接入点的数量、位置信息、工作模式、工作信道和发射功率,将配置信息下发至新增接入点。本发明实施例用于为新增接入点配置信息。
Description
PCT国内申请,说明书已公开。
Claims (1)
- PCT国内申请,权利要求书已公开。
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/CN2013/084080 WO2015042773A1 (zh) | 2013-09-24 | 2013-09-24 | 一种接入点配置方法和控制器 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105359575A true CN105359575A (zh) | 2016-02-24 |
Family
ID=52741729
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201380078000.7A Pending CN105359575A (zh) | 2013-09-24 | 2013-09-24 | 一种接入点配置方法和控制器 |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN105359575A (zh) |
WO (1) | WO2015042773A1 (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113473242A (zh) * | 2021-06-18 | 2021-10-01 | 深圳市炬力北方微电子有限公司 | 视频影像传输方法、相关***、设备及存储介质 |
CN114222347A (zh) * | 2021-12-01 | 2022-03-22 | 南京航空航天大学 | 一个基于灰色关联和距离分析的低功耗安全路由控制方法 |
CN116056123A (zh) * | 2023-03-24 | 2023-05-02 | 新华三技术有限公司 | 一种设备检测方法、装置、电子设备及存储介质 |
CN116828393A (zh) * | 2023-08-25 | 2023-09-29 | 北京城建智控科技股份有限公司 | Ap设备数量的配置方法及装置、电子设备及存储介质 |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107148053B (zh) * | 2016-03-01 | 2021-10-29 | 中兴通讯股份有限公司 | 一种数据配置方法和装置 |
CN107231269B (zh) * | 2016-03-25 | 2020-04-07 | 阿里巴巴集团控股有限公司 | 一种集群精确限速方法和装置 |
FR3118385A1 (fr) * | 2020-12-23 | 2022-06-24 | Sagemcom Broadband Sas | Procede de configuration d’une pluralite de dispositifs point d’acces sans fil et dispositif de configuration associe. |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1589055A (zh) * | 2004-08-10 | 2005-03-02 | 广州杰赛科技股份有限公司 | 无线接入点之间自动智能选择通信信道和发射功率的方法 |
CN1607846A (zh) * | 2003-10-08 | 2005-04-20 | 日本电气株式会社 | 无线电通信***的管理方法、***和管理设备 |
CN103188766A (zh) * | 2011-12-30 | 2013-07-03 | 中兴通讯股份有限公司 | 一种统一配置无线接入点的方法及接入控制器 |
CN103209136A (zh) * | 2012-01-11 | 2013-07-17 | 中兴通讯股份有限公司 | 一种网络负荷控制方法及登记服务器 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103313306A (zh) * | 2012-03-09 | 2013-09-18 | ***通信集团公司 | 一种wlan负载均衡的方法、装置及*** |
-
2013
- 2013-09-24 WO PCT/CN2013/084080 patent/WO2015042773A1/zh active Application Filing
- 2013-09-24 CN CN201380078000.7A patent/CN105359575A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1607846A (zh) * | 2003-10-08 | 2005-04-20 | 日本电气株式会社 | 无线电通信***的管理方法、***和管理设备 |
CN1589055A (zh) * | 2004-08-10 | 2005-03-02 | 广州杰赛科技股份有限公司 | 无线接入点之间自动智能选择通信信道和发射功率的方法 |
CN103188766A (zh) * | 2011-12-30 | 2013-07-03 | 中兴通讯股份有限公司 | 一种统一配置无线接入点的方法及接入控制器 |
CN103209136A (zh) * | 2012-01-11 | 2013-07-17 | 中兴通讯股份有限公司 | 一种网络负荷控制方法及登记服务器 |
Non-Patent Citations (2)
Title |
---|
刘宴兵,杨茜惠, 孙世新: "IEEE 802. 11宽带无线局域网负载均衡优化研究", 《计算机应用研究》 * |
陈然,令晓明: "基于无线接入点的WLAN网络成本优化", 《通信技术》 * |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113473242A (zh) * | 2021-06-18 | 2021-10-01 | 深圳市炬力北方微电子有限公司 | 视频影像传输方法、相关***、设备及存储介质 |
CN114222347A (zh) * | 2021-12-01 | 2022-03-22 | 南京航空航天大学 | 一个基于灰色关联和距离分析的低功耗安全路由控制方法 |
CN114222347B (zh) * | 2021-12-01 | 2024-04-02 | 南京航空航天大学 | 一个基于灰色关联和距离分析的低功耗安全路由控制方法 |
CN116056123A (zh) * | 2023-03-24 | 2023-05-02 | 新华三技术有限公司 | 一种设备检测方法、装置、电子设备及存储介质 |
CN116056123B (zh) * | 2023-03-24 | 2023-06-20 | 新华三技术有限公司 | 一种设备检测方法、装置、电子设备及存储介质 |
CN116828393A (zh) * | 2023-08-25 | 2023-09-29 | 北京城建智控科技股份有限公司 | Ap设备数量的配置方法及装置、电子设备及存储介质 |
CN116828393B (zh) * | 2023-08-25 | 2024-01-12 | 北京城建智控科技股份有限公司 | Ap设备数量的配置方法及装置、电子设备及存储介质 |
Also Published As
Publication number | Publication date |
---|---|
WO2015042773A1 (zh) | 2015-04-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105359575A (zh) | 一种接入点配置方法和控制器 | |
Tian et al. | Evaluation of the IEEE 802.11 ah restricted access window mechanism for dense IoT networks | |
US9900850B2 (en) | Method and apparatus for joint configuration of power and channel of WLAN | |
CN103369542A (zh) | 基于博弈论的同频异构网络功率分配方法 | |
Cheng et al. | An optimization framework for balancing throughput and fairness in wireless networks with QoS support | |
Huang et al. | Cross-layer scheduling and power control combined with adaptive modulation for wireless ad hoc networks | |
CN102970734B (zh) | 基于跨层设计的异构融合网络能耗最小设计方法 | |
Hu et al. | Optimal new site deployment algorithm for heterogeneous cellular networks | |
CN110049543B (zh) | 一种wlan中数据速率和功率控制的联合优化方法 | |
CN111313996A (zh) | 基于强化学习的ap信道分配和功率控制联合优化方法 | |
CN110035559A (zh) | 一种基于混沌q-学习算法的竞争窗口大小智能选择方法 | |
Carrascosa et al. | Decentralized AP selection using multi-armed bandits: Opportunistic ε-greedy with stickiness | |
CN109362093A (zh) | 网络功能虚拟化的总吞吐量最大化的资源优化方法 | |
Li et al. | Approximate optimization for proportional fair AP association in multi-rate WLANs | |
CN102946611B (zh) | 基于禁忌搜索的密集无线局域网多维资源分配方法 | |
CN104581918A (zh) | 基于非合作博弈的卫星跨层联合优化功率分配方法 | |
Guerra-Gómez et al. | Dynamic resource allocation in C-RAN with real-time traffic and realistic scenarios | |
Hu et al. | Modeling of Wi-Fi IEEE 802.11 ac offloading performance for 1000x capacity expansion of LTE-advanced | |
CN108260199A (zh) | 异构蜂窝网络基站中功率控制方法 | |
Jaber et al. | Energy-efficient SON-based user-centric backhaul scheme | |
Jiang et al. | TDOCP: A two-dimensional optimization integrating channel assignment and power control for large-scale WLANs with dense users | |
CN106301741B (zh) | 一种基于信道频选特性的时频资源分配方法 | |
CN104581905B (zh) | 一种协作HetNet中小基站激活的方法 | |
Venkatesan et al. | Interference mitigation approach using massive MIMO towards 5G networks | |
Fan et al. | Optimal base station density in cellular networks with self-similar traffic characteristics |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20160224 |