CN105350813B CN201510818814.0A CN201510818814A CN105350813B CN 105350813 B CN105350813 B CN 105350813B CN 201510818814 A CN201510818814 A CN 201510818814A CN 105350813 B CN105350813 B CN 105350813B
Authority
CN
China
Prior art keywords
tower
dimensional
skeleton
carbon fiber
leg
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510818814.0A
Other languages
Chinese (zh)
Other versions
CN105350813A (en
Inventor
朱波
曹伟伟
王永伟
乔琨
赵圣尧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Zhongheng New Carbon Fiber Technology Development Co Ltd
Original Assignee
Shandong Zhongheng New Carbon Fiber Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Zhongheng New Carbon Fiber Technology Development Co Ltd filed Critical Shandong Zhongheng New Carbon Fiber Technology Development Co Ltd
Priority to CN201510818814.0A priority Critical patent/CN105350813B/en
Publication of CN105350813A publication Critical patent/CN105350813A/en
Application granted granted Critical
Publication of CN105350813B publication Critical patent/CN105350813B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention relates to a kind of D braided composites transmission tower and preparation method thereof, mix shaped three dimensional braid using multiple fiber, realize that flange connector answers the integrally formed 3 D weaving shaft tower preparation method of material slotless design with tower bar, prepared by the assorted fibre braiding structure that the different type rod piece at the positions such as shaft tower tower head, tower body and tower leg is transitioned into outer layer carbon fiber tri-dimensional fabric using core glass fibre three dimensional fabric, wherein skeleton is done in the glass fabric center of core using carbon fiber zero degree yarn.At the same time, it is attached between the rod piece of D braided composites shaft tower by the flange arrangement (embedded metal flange skeleton) woven in tower bar termination integration assorted fibre (carbon fiber and glass mix), the boots plate that tower leg is connected with ground base uses full carbon fiber three-dimensional braided structure.Assembling application of the D braided composites transmission tower component suitable for polytype transmission tower of the multiple material flange connection of band can be prepared using this method.

Description

A kind of D braided composites transmission tower and preparation method thereof
Technical field
The present invention relates to a kind of D braided composites transmission tower and preparation method thereof, belong to composite material power transmission rod Tower preparing technical field.
Background technology
Shaft tower is the important and extraordinary support knot of the infrastructure such as power Transmission, communication, high-speed railway and municipal administration Structure facility, the structural behaviour of shaft tower directly influence the security, economy and reliability of variety classes circuit.From the material of shaft tower From the point of view of matter development, the shaft tower applied both at home and abroad in overhead transmission line mainly has wooden shaft tower, concrete shaft tower or prestressing force Concrete shaft tower, concrete filled steel tube shaft tower, all-metal material shaft tower (steel pipe tower or steel tower etc.) several classes.
Wherein wooden shaft tower is mainly used in area of the forest reserves such as Canada and the U.S. compared with horn of plenty, concrete or pre- Prestressed concrete shaft tower is mainly used in the more poor area of the forest reserves such as South America, Europe, Africa, Asia or development Country.For China, wooden shaft tower is not used substantially, was once largely used on 35-110V circuits before concrete shaft tower, Also arrived certain application in 330KV and the transport of following circuit and the preferable Plain of execution conditions and hilly country, steel pipe tower and Concrete filled steel tube shaft tower is applied more in Construction of Intercity Network in recent years and transformation.Traditional transmission tower was using Receive the test of natural environment in journey for a long time, there are quality is heavy, perishable, corrosion or the shortcomings of cracking, environment durability degree is poor, Especially its service life is more insufficient in the natural environments such as desert solarization, the moist erosion of seawater and dust storm deflation.In face of this The shaft tower that kind goes wrong will be repaired or replaced, and difficulty is larger, it, which is constructed, transports and run extremely difficult.Therefore at present Larger potentiality have gradually been given play in application of the fibrous composite in transmission tower.
Current composite material quality transmission tower is mainly using discontinuous staple fiber as concrete reinforced fiber material With by the use of continuous fiber composite material muscle material as two kinds of reinforcing bar alternative materials, there is a kind of transmission tower of full composite material to lead to It is often Wrapping formed by prepreg tape using polymer matrix composites.To sum up, the structure of conventional composite materials shaft tower is typically each Prepared using the enhancing of zero dimension discrete chopped strand or continuous fiber two dimension winding form, and for being used under complex environment Shaft tower, on the one hand will be tested be subject to environmental factor, on the other hand also have stronger mechanics durability degree to be subjected to transmission line of electricity Pulling force and lateral wind fatigue load, this mechanics either environmental test for conventional composite materials such as zero dimension or two dimensions More harsh for enhanced form, there is also problems, particularly composite material interlayer from the point of view of current applicable cases The destruction at interface is always that such a composite material pole tower the centrostigma of defect occurs, in addition the tower of high-voltage transmission line pole tower Head, tower body and column foot combination need truss to connect mostly, and the connection mode of conventional composite materials built-in metal component is also deposited In more fault of construction hidden danger.
The content of the invention
It is contemplated that overcome the deficiencies of the prior art and provide a kind of D braided composites transmission tower and its preparation Method, the performance of composite material transmission tower and the purpose of durability degree are further improved to realize.
In order to achieve the above object, the present invention uses following technical scheme:
A kind of D braided composites transmission tower, including sequentially connected tower head, tower body and tower leg, tower head include horizontal stroke Load rod piece and the supporting bar being connected between tower body and cross-arm rod piece;Tower body includes the main limb of tower body and is connected to tower body master Tower body supporting rod between limb;Tower leg includes the main limb of tower leg and the tower leg supporting rod being connected between the main limb of tower leg;The tower head, All parts in tower body and tower leg all include 3 D weaving skeleton and resin matrix;
3 D weaving skeleton includes the glass fabric of core and is wrapped in outermost hybrid fabrics transition zone, The inside of the glass fabric sets carbon fiber zero degree yarn skeleton.
Carbon fiber zero degree yarn improves integral composite shaft tower rigidity, in the braiding process of tower bar component as skeleton In dosage along cross-section radial from inside to outside of adjustment carbon fiber and glass fibre in real time, realize core part fiber and outer fiber ratio Natural transition change so that formed hybrid fabrics entirety.
Preferably, the setting position of the cross-arm body of rod is embedded into ceramic insulation terminal.
It is further preferred that the hybrid fabrics transition zone is by the one or more and glass in T300, T700, T800 Glass fiber shuffling forms, and the glass fabric is formed by high-strength S is fiberglass braided.
Preferably, the flange arrangement of connection function has been both provided with all parts in the tower head, tower body and tower leg, Each flange arrangement includes flange skeleton and the 3 D weaving flange layer being coated on the outside of flange skeleton.
It is further preferred that the flange skeleton is metal flange skeleton, the 3 D weaving flange layer is by flange skeleton An entirety is connected as with main body.The metal material of metal flange skeleton is stainless steel or special steel alloy.
Preferably, the thickness of the cross-arm rod piece of the tower head and the carbon fiber zero degree yarn skeleton of supporting bar is cross-arm rod piece The 5-10% of section radius;Or the type of weave of glass fabric be three-dimensional four-way, three-dimensional five to, three-dimensional six to or three-dimensional seven One or more in, the thickness of glass fabric account for the 70-80% of cross-arm bar cross section radius;Or the assorted fibre Transition zone is formed by carbon fiber and high-strength glass fibre shuffling, and ratio of the carbon fiber in blended yarns is more than 90%, is mixed The type of weave of fiber transition zone using three-dimensional four-way, three-dimensional five to, three-dimensional six to or three-dimensional seven one or more in.
Preferably, the thickness of the carbon fiber zero degree yarn skeleton of the main limb of the tower body of the tower body is the main limb section radius of tower body 10-15%, the thickness of the carbon fiber zero degree yarn skeleton of tower body supporting rod are the 5-10% of the radius of tower body supporting rod;Or tower body master The type of weave of the glass fabric of limb and tower body supporting rod be three-dimensional four-way, three-dimensional five to, three-dimensional six to or three-dimensional seven to In one or more;Or the thickness of the glass fabric of the main limb of tower body accounts for the 60-70% of the main limb section radius of tower body, tower The thickness of the glass fabric of body supporting rod accounts for the 70-80% of tower body supporting rod section radius;Or the main limb of the tower body and tower In the assorted fibre transition zone of body supporting rod, ratio of the carbon fiber in blended yarns is more than 95%, assorted fibre transition zone Type of weave using three-dimensional four-way, three-dimensional five to, three-dimensional six to or three-dimensional seven one or more in.
Preferably, the thickness of the carbon fiber zero degree yarn skeleton of the main limb of the tower leg of the tower leg is the main limb section radius of tower leg 15-20%, the thickness of the carbon fiber zero degree yarn skeleton of tower leg supporting rod are the 5-10% of the radius of tower leg supporting rod;Or tower leg master The type of weave of the glass fabric of limb and tower leg supporting rod be three-dimensional four-way, three-dimensional five to, three-dimensional six to or three-dimensional seven to In one or more;Or the thickness of the glass fabric of the main limb of tower leg accounts for the 50-60% of the main limb section radius of tower leg, tower The thickness of the glass fabric of leg supporting rod accounts for the 70-80% of tower leg supporting rod section radius;Or the main limb of the tower leg and tower In the assorted fibre transition zone of leg supporting rod, ratio of the carbon fiber in blended yarns is more than 95%, assorted fibre transition zone Type of weave using three-dimensional four-way, three-dimensional five to, three-dimensional six to or three-dimensional seven one or more in.
Preferably, the carbon fibre thread in the 3 D weaving flange layer accounts for more than the 50% of blended yarns dosage, or three Seamless three-dimensional weaves between dimension braiding flange layer and rod piece main body, type of weave be three-dimensional four-way, three-dimensional five to, three-dimensional six to or Three-dimensional seven one or more in.
Preferably, the resin matrix is the modified resin of thermosetting resin and the compound preparation of thermoplastic resin;It is or described Thermosetting resin is epoxy resin, the one or more in phenolic resin, unsaturated polyester resin, and the thermoplastic resin is poly- One or more in urethane resin, polyphenylene sulfide or polyimide resin, thermosetting resin and thermoplastic resin are matched somebody with somebody Than depending on the working environment of transmission tower and mechanical property requirements are specific.The mechanics of comprehensive thermosetting property and thermoplastic resin is special Point, makes impact resistance of rigidity of the composite material pole tower i.e. with thermosetting resin but also with thermoplastic resin.
A kind of preparation method of D braided composites transmission tower, mainly includes the following steps that:
1) all parts of transmission tower are individually woven, ceramic insulation end is embedded into the setting position of cross-arm rod piece Son;
2) in the pre-buried flange skeleton of all parts of transmission tower and the junction of miscellaneous part, and in the outer of flange skeleton Side weaves 3 D weaving flange layer, and seamless knitted is carried out between main body rod piece;
3) woven all parts difference vacuum is imported into resin matrix, curing molding;
4) all parts of curing molding are linked in sequence, up to D braided composites transmission tower.
Preferably, in step 3), the vacuum that vacuum imports is 0.06-0.1MPa;Or cured temperature is 80-120 DEG C, Hardening time is 2-4h.
The D braided composites transmission tower answering in power Transmission, communication, high-speed railway and municipal administration With.
D braided composites be it is a kind of with three-dimensional preform fabric construction with high performance resin is compound is similar to The characteristics of high-performance composite materials of homogeneous material, no interlayer structure weakening strength, in precursor structure, fiber is mutually handed over Knit, direction has the characteristics that arbitrary orientation, identical from the proportion of fibers for spatially realizing plane all directions so that effectively Lamination problem in the Two-dimensional Composites avoided;3 D weaving can realize a knitting forming of various complicated shapes, real The uniformity of the mechanical property of component is showed;In addition 3 D weaving can realize being used in mixed way for multiple fiber, give full play to each The overall characteristic of kind fiber, while be molded with high performance resin composite curing, it is suitable for complex environment and mechanical requirements.
The beneficial effects of the invention are as follows:
(1) present invention is by flange connector and the seamless integrally formed 3 D weaving shaft tower of tower bar composite structure Preparation method, the D braided composites transmission tower component that flanged connection structure can be prepared using this method are suitable for The assembling application of polytype transmission tower.
(2) present invention uses new assorted fibre (carbon fiber, high-strength fiber glass) transition integrated three-dimensional braided structure, will High intensity S glasses and high-strength carbon fiber apply in the preparation of composite material pole tower at the same time, have effectively played two kinds of fibers High intensity and rigidity, effectively improve the mechanical property of composite material pole tower.
(3) D braided composites transmission tower of the invention, " carbon fiber center bone is used by section core to surface The transition combination of frame structure-high intensity S glass inner core three dimensional fabrics structure-high-strength carbon fiber hybrid three-dimensional braiding structure ", it is whole A structural transition realizes adjustment by the yarn amount ratio of 3 D weaving yarn, forms the overall three dimensional fabric structure of no boundary layer.
(4) connection mode that core crab in metal flange adds full carbon fiber tri-dimensional fabric outer surface is employed, eventually through Resin vacuum introductory technique realizes the preparation of the integral composite shaft tower part with three-dimensional braided structure flange connector, 3 D weaving Flange can effectively improve the mechanical coupling strength of different shaft tower parts from core crab in metal flange, ensure that the mechanics of shaft tower entirety is firm Degree and use environment durability degree.
Brief description of the drawings
Fig. 1 is the cross-arm member structure schematic diagram of the present invention;
Fig. 2 is the main limb of tower body of the present invention or the structure diagram of the main limb of tower leg;
Fig. 3 is the tower body supporting rod of the present invention or the structure diagram of tower leg supporting rod.
Wherein, 1, carbon fiber center zero degree yarn skeleton, 2, glass fabric, 3, hybrid fabrics transition zone, 4, gold Belong to flange skeleton, 5, surface three dimension braiding flange layer, 6, ceramic insulation terminal.
Embodiment
Embodiment 1
The preparation of shaft tower tower head cross-arm rod piece and supporting bar:Use T300 carbon fibers for zero degree yarn prepare cross-arm rod piece and The carbon fiber center zero degree yarn skeleton 1 of supporting bar, the thickness of T300 carbon fiber zero degree yarns are to account for cross-arm bar and rod member The 6% of section radius, it is three-dimensional to craft woven using three-dimensional five on the basis of carbon fibre thread skeleton after preparing zero degree yarn Fabric cored structure, the structure braiding of the glass fabric 2 of core select high-strength S glasses to be carried out for material, whole braiding Thickness accounts for the 75% of cross arm of tower bar and rod member section radius, and yarn is adjusted after the completion of the braiding of core glass three dimensional fabric Line type simultaneously introduces T700 carbon fibers, and ratio of the carbon fiber in blended yarns accounts for 93%, select three-dimensional four-way braiding structure into Row outer layer three dimensional fabric is processed, and the thickness of obtained hybrid fabrics transition zone 3 accounts for the 19% of body of rod section radius.In cross-arm In the pre-buried ceramic insulation terminal 6 of carbon fiber hybrid fabrics specific location during rod piece braiding, in case cross-arm rod piece is led with transmission of electricity The support connection of line.Metal flange skeleton 4 is embedded into the specific connecting portion of cross-arm and supporting rod, in metal flange skeleton 4 Surface prepares surface three dimension braiding flange layer 5 using T700 carbon fiber three-dimensional velocity fields.
The preparation of shaft tower tower body main limb, tower body supporting rod:T700 carbon fibers are used to prepare the main limb of shaft tower tower body for zero degree yarn Carbon fiber center zero degree yarn skeleton 1, the thickness of carbon fiber center zero degree yarn skeleton 1 is to account for the main limb section radius of tower body 12%, the thickness of carbon fiber center zero degree yarn skeleton 1 accounts for the 8% of tower body supporting rod section radius;Using high-strength S glass fibers maintenance and operation Glass fabric 2 is carried out with three-dimensional six to technology to prepare, the thickness of glass fabric 2 accounts for the main limb section radius of tower body 65%, account for the 75% of tower body supporting rod section radius;Yarn types are adjusted after the completion of core part fabric, are drawn in high-strength fiber glass yarn Enter high-strength T300 carbon fibers, carbon fiber accounts for 96% in blended yarns, the blended yarns based on carbon fiber as tower body rod piece outside Layer, selecting three-dimensional five, the thickness of hybrid fabrics transition zone 3 accounts for the 18% of the main limb section radius of tower body, accounts for braiding structure The 15% of tower body supporting rod section radius.Metal flange skeleton 4 is embedded into the specific connecting portion of all parts, in metal method Blue 4 surface of skeleton prepares 3 D weaving flange layer 5 using T800 carbon fibers three-dimensional five to braiding.
The preparation of the tower leg main limb, tower leg supporting rod of shaft tower tower leg:T800 carbon fibers are used to prepare shaft tower tower for zero degree yarn The carbon fiber center zero degree yarn skeleton 1 of the main limb of leg, the thickness of T800 carbon fiber zero degree yarns are to account for the main limb section radius of tower leg 16%, zero degree yarn skeleton 1 thickness in carbon fiber center accounts for the 7% of tower leg supporting rod section radius;Used using high-strength S glass fibres Three-dimensional four-way technology carries out glass fabric 2 and prepares, and the thickness of glass fabric 2 accounts for the main limb section radius of tower leg 55%, account for the 72% of tower leg supporting rod section radius;Yarn types are adjusted after the completion of core part fabric, are drawn in high-strength fiber glass yarn Enter high-strength T300 carbon fibers, carbon fiber accounts for 97% in blended yarns, the blended yarns based on carbon fiber as tower leg rod piece outside Layer, selecting three-dimensional seven, the thickness of hybrid fabrics transition zone 3 accounts for the 23% of the main limb section radius of tower leg, accounts for braiding structure The 16% of tower leg supporting rod section radius.Metal flange skeleton 4 is embedded into the specific connecting portion of the main limb of tower leg, in metal method Blue 4 surface of skeleton prepares 3 D weaving flange layer 5 using T800 carbon fiber three-dimensional four-way braidings.
After preparing the connection of boots plate using the three-dimensional four-way fabric construction of T700 carbon fibre threads selection, by above-mentioned preparation not With composite material pole tower component using Special Resin (epoxy of the epoxy resin with polyurethane resin after mixed and modified:Polyurethane weight Amount is than being 5:1) carry out vacuum and import shaping.Vacuum is maintained at 0.1MPa during vacuum imports, and solidification temperature is 110 DEG C, is cured Time is 2h, and final composite material pole tower resin content is 40%.
It can effectively realize that composite material pole tower integrally assembles using the flange connection of above-mentioned different tower bars, while cross-arm The pre-buried insulating ceramics terminal of rod piece can realize effective support of power transmission line.
Embodiment 2
The preparation of shaft tower tower head cross-arm rod piece and supporting bar:Use T300 carbon fibers for zero degree yarn prepare cross-arm rod piece and The carbon fiber center zero degree yarn skeleton 1 of supporting bar, the thickness of T300 carbon fiber zero degree yarns are to account for cross-arm bar and rod member The 7% of section radius, it is three-dimensional to craft woven using three-dimensional five on the basis of carbon fibre thread skeleton after preparing zero degree yarn Fabric cored structure, the structure braiding of the glass fabric 2 of core select high-strength S glasses to be carried out for material, whole braiding Thickness accounts for the 74% of cross arm of tower bar and rod member section radius, and yarn is adjusted after the completion of the braiding of core glass three dimensional fabric Line type simultaneously introduces T300 carbon fibers, and ratio of the carbon fiber in blended yarns accounts for 92%, select three-dimensional four-way braiding structure into Row outer layer three dimensional fabric is processed, and the thickness of obtained hybrid fabrics transition zone 3 accounts for the 19% of body of rod section radius.In cross-arm In the pre-buried ceramic insulation terminal 6 of carbon fiber hybrid fabrics specific location during rod piece braiding, in case cross-arm rod piece is led with transmission of electricity The support connection of line.Metal flange skeleton 4 is embedded into the specific connecting portion of cross-arm and supporting rod, in metal flange skeleton 4 Surface prepares surface three dimension braiding flange layer 5 using T300 carbon fiber three-dimensional velocity fields.
The preparation of shaft tower tower body main limb, tower body supporting rod:T800 carbon fibers are used to prepare the main limb of shaft tower tower body for zero degree yarn Carbon fiber center zero degree yarn skeleton 1, the thickness of carbon fiber center zero degree yarn skeleton 1 is to account for the main limb section radius of tower body 15%, the thickness of carbon fiber center zero degree yarn skeleton 1 accounts for the 9% of tower body supporting rod section radius;Using high-strength S glass fibers maintenance and operation Glass fabric 2 is carried out with three-dimensional five to technology to prepare, the thickness of glass fabric 2 accounts for the main limb section radius of tower body 60%, account for the 70% of tower body supporting rod section radius;Yarn types are adjusted after the completion of core part fabric, are drawn in high-strength fiber glass yarn Enter high-strength T300 carbon fibers, carbon fiber accounts for 97% in blended yarns, the blended yarns based on carbon fiber as tower body rod piece outside Layer, selecting three-dimensional seven, the thickness of hybrid fabrics transition zone 3 accounts for the 22% of the main limb section radius of tower body, accounts for braiding structure The 16% of tower body supporting rod section radius.Metal flange skeleton 4 is embedded into the specific connecting portion of all parts, in metal method Blue 4 surface of skeleton prepares 3 D weaving flange layer 5 using T300 carbon fiber three-dimensional four-way braidings.
The preparation of the tower leg main limb, tower leg supporting rod of shaft tower tower leg:T300 carbon fibers are used to prepare shaft tower tower for zero degree yarn The carbon fiber center zero degree yarn skeleton 1 of the main limb of leg, the thickness of T300 carbon fiber zero degree yarns are to account for the main limb section radius of tower leg 18%, zero degree yarn skeleton 1 thickness in carbon fiber center accounts for the 8% of tower leg supporting rod section radius;Used using high-strength S glass fibres Three-dimensional seven carries out glass fabric 2 to technology and prepares, and the thickness of glass fabric 2 accounts for the main limb section radius of tower leg 50%, account for the 70% of tower leg supporting rod section radius;Yarn types are adjusted after the completion of core part fabric, are drawn in high-strength fiber glass yarn Enter high-strength T700 carbon fibers, carbon fiber accounts for 98% in blended yarns, the blended yarns based on carbon fiber as tower leg rod piece outside Layer, selects three-dimensional four-way braiding structure, and the thickness of hybrid fabrics transition zone 3 accounts for the 32% of the main limb section radius of tower leg, accounts for The 20% of tower leg supporting rod section radius.Metal flange skeleton 4 is embedded into the specific connecting portion of the main limb of tower leg, in metal method Blue 4 surface of skeleton prepares 3 D weaving flange layer 5 using T800 carbon fiber three-dimensional velocity fields.
After preparing the connection of boots plate to fabric construction using T800 carbon fibre threads selection three-dimensional five, by above-mentioned preparation not It is (unsaturated poly- with Special Resin of the composite material pole tower component using unsaturated polyester resin with polyurethane resin after mixed and modified Ester resin:Weight polyurethane ratio is 8:1) carry out vacuum and import shaping.Vacuum is maintained at 0.08MPa during vacuum imports, and cures Temperature is 115 DEG C, and hardening time 3h, final composite material pole tower resin content is 45%.
It can effectively realize that composite material pole tower integrally assembles using the flange connection of above-mentioned different tower bars, while cross-arm The pre-buried insulating ceramics terminal of rod piece can realize effective support of power transmission line.
Embodiment 3
The preparation of shaft tower tower head cross-arm rod piece and supporting bar:Use T300 carbon fibers for zero degree yarn prepare cross-arm rod piece and The carbon fiber center zero degree yarn skeleton 1 of supporting bar, the radius of T300 carbon fiber zero degree yarns are to account for cross-arm bar and rod member The 9% of section radius, it is three-dimensional using three-dimensional four-way craft woven on the basis of carbon fibre thread skeleton after preparing zero degree yarn Fabric cored structure, the structure braiding of the glass fabric 2 of core select high-strength S glasses to be carried out for material, whole braiding Thickness accounts for the 70% of cross arm of tower bar and rod member section radius, and yarn is adjusted after the completion of the braiding of core glass three dimensional fabric Line type simultaneously introduces T800 carbon fibers, and ratio of the carbon fiber in blended yarns accounts for 91%, select three-dimensional four-way braiding structure into Row outer layer three dimensional fabric is processed, and the thickness of obtained hybrid fabrics transition zone 3 accounts for the 21% of body of rod section radius.In cross-arm In the pre-buried ceramic insulation terminal 6 of carbon fiber hybrid fabrics specific location during rod piece braiding, in case cross-arm rod piece is led with transmission of electricity The support connection of line.Metal flange skeleton 4 is embedded into the specific connecting portion of cross-arm rod piece and supporting rod, in metal flange bone 4 surface of frame prepares surface three dimension braiding flange layer 5 using T700 carbon fibers three-dimensional five to braiding.
The preparation of shaft tower tower body main limb, tower body supporting rod:T700 carbon fibers are used to prepare the main limb of shaft tower tower body for zero degree yarn Carbon fiber center zero degree yarn skeleton 1, the thickness of carbon fiber center zero degree yarn skeleton 1 is to account for the main limb section radius of tower body 18%, the thickness of carbon fiber center zero degree yarn skeleton 1 accounts for the 7% of tower body supporting rod section radius;Using high-strength S glass fibers maintenance and operation Glass fabric 2 is carried out with three-dimensional four-way technology to prepare, the thickness of glass fabric 2 accounts for the main limb section radius of tower body 62%, account for the 71% of tower body supporting rod section radius;Yarn types are adjusted after the completion of core part fabric, are drawn in high-strength fiber glass yarn Enter high-strength T300 carbon fibers, carbon fiber accounts for 95% in blended yarns, the blended yarns based on carbon fiber as tower body rod piece outside Layer, selecting three-dimensional five, the thickness of hybrid fabrics transition zone 3 accounts for the 20% of the main limb section radius of tower body, accounts for braiding structure The 22% of tower body supporting rod section radius.Metal flange skeleton 4 is embedded into the specific connecting portion of all parts, in metal method Blue 4 surface of skeleton prepares 3 D weaving flange layer 5 using T800 carbon fibers three-dimensional five to braiding.
The preparation of the tower leg main limb, tower leg supporting rod of shaft tower tower leg:T300 carbon fibers are used to prepare shaft tower tower for zero degree yarn The carbon fiber center zero degree yarn skeleton 1 of the main limb of leg, the thickness of T300 carbon fiber zero degree yarns are to account for the main limb section radius of tower leg 14%, zero degree yarn skeleton 1 thickness in carbon fiber center accounts for the 7% of tower leg supporting rod section radius;Used using high-strength S glass fibres Three-dimensional seven carries out glass fabric 2 to technology and prepares, and the thickness of glass fabric 2 accounts for the main limb section radius of tower leg 51%, account for the 69% of tower leg supporting rod section radius;Yarn types are adjusted after the completion of core part fabric, are drawn in high-strength fiber glass yarn Enter high-strength T700 carbon fibers, carbon fiber accounts for 99% in blended yarns, the blended yarns based on carbon fiber as tower leg rod piece outside Layer, selects three-dimensional velocity field structure, and the thickness of hybrid fabrics transition zone 3 accounts for the 35% of the main limb section radius of tower leg, accounts for The 24% of tower leg supporting rod section radius.Metal flange skeleton 4 is embedded into the specific connecting portion of the main limb of tower leg, in metal method Blue 4 surface of skeleton prepares 3 D weaving flange layer 5 using T700 carbon fiber three-dimensional velocity fields.Carbon fiber mixes weight with glass Than for 2:1.
After preparing the connection of boots plate using the three-dimensional four-way fabric construction of T300 carbon fibre threads selection, by above-mentioned preparation not It is (unsaturated with Special Resin of the composite material pole tower component using unsaturated polyester resin with polyphenylene sulfide after mixed and modified Polyester resin:Polyphenylene sulfide weight ratio is 5:1) carry out vacuum and import shaping.Vacuum is maintained at 0.07MPa during vacuum imports, Solidification temperature is 105 DEG C, and hardening time 2h, final composite material pole tower resin content is 42%.
It can effectively realize that composite material pole tower integrally assembles using the flange connection of above-mentioned different tower bars, while cross-arm The pre-buried insulating ceramics terminal of rod piece can realize effective support of power transmission line.
Embodiment 4
The preparation of shaft tower tower head cross-arm rod piece and supporting bar:Use T700 carbon fibers for zero degree yarn prepare cross-arm rod piece and The carbon fiber center zero degree yarn skeleton 1 of supporting bar, the radius of T700 carbon fiber zero degree yarns are to account for cross-arm bar and rod member The 10% of section radius, after preparing zero degree yarn, using three-dimensional four-way craft woven three on the basis of carbon fibre thread skeleton Dimensional fabric cored structure, the structure braiding of the glass fabric 2 of core selects high-strength S glasses to be carried out for material, whole to compile Thickness accounts for cross arm of tower bar and rod member section radius 65% is knitted, is adjusted after the completion of the braiding of core glass three dimensional fabric Yarn types simultaneously introduce T300 carbon fibers, and ratio of the carbon fiber in blended yarns accounts for 90%, select three-dimensional four-way braiding structure Outer layer three dimensional fabric processing is carried out, the thickness of obtained hybrid fabrics transition zone 3 accounts for the 25% of body of rod section radius.In horizontal stroke Carry on a shoulder pole in the pre-buried ceramic insulation terminal 6 of carbon fiber hybrid fabrics specific location during rod piece weaves, in case cross-arm rod piece is with transmitting electricity The support connection of conducting wire.Metal flange skeleton 4 is embedded into the specific connecting portion of cross-arm rod piece and supporting rod, in metal flange 4 surface of skeleton prepares surface three dimension braiding flange layer 5 using T300 carbon fiber three-dimensional velocity fields.
The preparation of shaft tower tower body main limb, tower body supporting rod:T300 carbon fibers are used to prepare the main limb of shaft tower tower body for zero degree yarn Carbon fiber center zero degree yarn skeleton 1, the thickness of carbon fiber center zero degree yarn skeleton 1 is to account for the main limb section radius of tower body 17%, the thickness of carbon fiber center zero degree yarn skeleton 1 accounts for the 8% of tower body supporting rod section radius;Using high-strength S glass fibers maintenance and operation Glass fabric 2 is carried out with three-dimensional four-way technology to prepare, the thickness of glass fabric 2 accounts for the main limb section radius of tower body 61%, account for the 70% of tower body supporting rod section radius;Yarn types are adjusted after the completion of core part fabric, are drawn in high-strength fiber glass yarn Enter high-strength T300 carbon fibers, carbon fiber accounts for 94% in blended yarns, the blended yarns based on carbon fiber as tower body rod piece outside Layer, selecting three-dimensional five, the thickness of hybrid fabrics transition zone 3 accounts for the 22% of the main limb section radius of tower body, accounts for braiding structure The 22% of tower body supporting rod section radius.Metal flange skeleton 4 is embedded into the specific connecting portion of all parts, in metal method Blue 4 surface of skeleton prepares 3 D weaving flange layer 5 using T800 carbon fiber three-dimensional four-way braidings.
The preparation of the tower leg main limb, tower leg supporting rod of shaft tower tower leg:T300 carbon fibers are used to prepare shaft tower tower for zero degree yarn The carbon fiber center zero degree yarn skeleton 1 of the main limb of leg, the thickness of T300 carbon fiber zero degree yarns are to account for the main limb section radius of tower leg 13%, zero degree yarn skeleton 1 thickness in carbon fiber center accounts for the 11% of tower leg supporting rod section radius;Using high-strength S glass fibers maintenance and operation Glass fabric 2 is carried out with three-dimensional five to technology to prepare, the thickness of glass fabric 2 accounts for the main limb section radius of tower leg 50%, account for the 65% of tower leg supporting rod section radius;Yarn types are adjusted after the completion of core part fabric, are drawn in high-strength fiber glass yarn Enter high-strength T700 carbon fibers, carbon fiber accounts for 92% in blended yarns, the blended yarns based on carbon fiber as tower leg rod piece outside Layer, selects three-dimensional velocity field structure, and the thickness of hybrid fabrics transition zone 3 accounts for the 37% of the main limb section radius of tower leg, accounts for The 24% of tower leg supporting rod section radius.Metal flange skeleton 4 is embedded into the specific connecting portion of the main limb of tower leg, in metal method Blue 4 surface of skeleton prepares 3 D weaving flange layer 5, wherein T700 carbon fibers and glass using T700 carbon fibers three-dimensional five to braiding Weight ratio 4:1.
After preparing the connection of boots plate using the three-dimensional four-way fabric construction of T300 carbon fibre threads selection, by above-mentioned preparation not With composite material pole tower component using Special Resin (phenolic resin of the phenolic resin with polyurethane resin after mixed and modified:Poly- ammonia Ester weight ratio is 6:1) carry out vacuum and import shaping.Vacuum is maintained at 0.08MPa during vacuum imports, and solidification temperature is 115 DEG C, Hardening time is 2.5h, and final composite material pole tower resin content is 43%.
It can effectively realize that composite material pole tower integrally assembles using the flange connection of above-mentioned different tower bars, while cross-arm The pre-buried insulating ceramics terminal of rod piece can realize effective support of power transmission line.
Although above-mentioned be described the embodiment of the present invention with reference to attached drawing, model not is protected to the present invention The limitation enclosed, those skilled in the art should understand that, on the basis of technical scheme, those skilled in the art are not Need to make the creative labor the various modifications that can be made or deformation still within protection scope of the present invention.

Claims (8)

  1. A kind of 1. D braided composites transmission tower, it is characterised in that:Including sequentially connected tower head, tower body and tower leg, Tower head includes cross-arm rod piece and the supporting bar being connected between tower body and cross-arm rod piece;Tower body includes the main limb of tower body and company The tower body supporting rod being connected between the main limb of tower body;Tower leg includes the main limb of tower leg and the tower leg being connected between the main limb of tower leg support Bar;All parts in the tower head, tower body and tower leg all include 3 D weaving skeleton and resin matrix;
    The 3 D weaving skeleton includes the glass fabric of core and is wrapped in outermost hybrid fabrics transition zone, The inside of the glass fabric sets carbon fiber zero degree yarn skeleton;
    The resin matrix is the modified resin of thermosetting resin and the compound preparation of thermoplastic resin;The thermosetting resin is ring One or more in oxygen tree fat, phenolic resin, unsaturated polyester resin, the thermoplastic resin is polyurethane resin, polyphenyl The proportioning of one or more in sulfide resin or polyimide resin, thermosetting resin and thermoplastic resin is according to transmission tower Working environment and mechanical property requirements it is specific depending on;
    The flange arrangement of connection function, each flange knot have been both provided with all parts in the tower head, tower body and tower leg Structure includes flange skeleton and the 3 D weaving flange layer being coated on the outside of flange skeleton;The flange skeleton is metal flange Flange skeleton and main body are connected as an entirety by skeleton, the 3 D weaving flange layer.
  2. 2. D braided composites transmission tower according to claim 1, it is characterised in that:The cross-arm bar of the tower head The thickness of part and the carbon fiber zero degree yarn skeleton of supporting bar is the 5-10% of cross-arm bar cross section radius;Or glass fabric Type of weave be three-dimensional four-way, three-dimensional five to, three-dimensional six to or three-dimensional seven one or more in, glass fabric Thickness accounts for the 70-80% of cross-arm bar cross section radius;Or the assorted fibre transition zone is by carbon fiber and high-strength glass fibre shuffling Forming, ratio of the carbon fiber in blended yarns is more than 90%, the three-dimensional four-way of type of weave use of assorted fibre transition zone, Three-dimensional five to, three-dimensional six to or three-dimensional seven one or more in.
  3. 3. D braided composites transmission tower according to claim 1, it is characterised in that:The tower body master of the tower body The thickness of the carbon fiber zero degree yarn skeleton of limb be the main limb section radius of tower body 10-15%, the carbon fiber zero degree yarn of tower body supporting rod The thickness of skeleton is the 5-10% of the radius of tower body supporting rod;Or the volume of the glass fabric of the main limb of tower body and tower body supporting rod Knit form be three-dimensional four-way, three-dimensional five to, three-dimensional six to or three-dimensional seven one or more in;Or the glass of the main limb of tower body The thickness of fabric accounts for the 60-70% of the main limb section radius of tower body, and the thickness of the glass fabric of tower body supporting rod accounts for tower body The 70-80% of supporting rod section radius;Or in the assorted fibre transition zone of the main limb of the tower body and tower body supporting rod, carbon fiber exists Ratio in blended yarns is more than 95%, the type of weave of assorted fibre transition zone using three-dimensional four-way, three-dimensional five to, it is three-dimensional Six to or three-dimensional seven one or more in.
  4. 4. D braided composites transmission tower according to claim 1, it is characterised in that:The tower leg master of the tower leg The thickness of the carbon fiber zero degree yarn skeleton of limb be the main limb section radius of tower leg 15-20%, the carbon fiber zero degree yarn of tower leg supporting rod The thickness of skeleton is the 5-10% of the radius of tower leg supporting rod;Or the volume of the glass fabric of the main limb of tower leg and tower leg supporting rod Knit form be three-dimensional four-way, three-dimensional five to, three-dimensional six to or three-dimensional seven one or more in;Or the glass of the main limb of tower leg The thickness of fabric accounts for the 50-60% of the main limb section radius of tower leg, and the thickness of the glass fabric of tower leg supporting rod accounts for tower leg The 70-80% of supporting rod section radius;Or in the assorted fibre transition zone of the main limb of the tower leg and tower leg supporting rod, carbon fiber exists Ratio in blended yarns is more than 95%, the type of weave of assorted fibre transition zone using three-dimensional four-way, three-dimensional five to, it is three-dimensional Six to or three-dimensional seven one or more in.
  5. 5. D braided composites transmission tower according to claim 1, it is characterised in that:The 3 D weaving flange Carbon fibre thread in layer is accounted for seamless three between more than the 50% of blended yarns dosage, or 3 D weaving flange layer and rod piece main body Dimension braiding, type of weave be three-dimensional four-way, three-dimensional five to, three-dimensional six to or three-dimensional seven one or more in.
  6. A kind of 6. preparation method of D braided composites transmission tower, it is characterised in that:Comprise the following steps:
    1)The all parts of transmission tower are individually woven, ceramic insulation terminal is embedded into the setting position of cross-arm rod piece;
    2)Compiled in the pre-buried flange skeleton of all parts of transmission tower and the junction of miscellaneous part, and in the outside of flange skeleton 3 D weaving flange layer is knitted, and seamless knitted is carried out between main body rod piece;
    3)Woven all parts difference vacuum is imported into resin matrix, curing molding;
    4)The all parts of curing molding are attached, up to D braided composites transmission tower.
  7. 7. preparation method according to claim 6, it is characterised in that:In step 3), the vacuum that vacuum imports is 0.06- 0.1MPa;Or cured temperature is 80-120 DEG C, hardening time 2-4h.
  8. 8. any D braided composites transmission towers of claim 1-5 power Transmission, communication, high-speed railway with And the application in municipal administration.
CN201510818814.0A 2015-11-23 2015-11-23 A kind of D braided composites transmission tower and preparation method thereof Active CN105350813B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510818814.0A CN105350813B (en) 2015-11-23 2015-11-23 A kind of D braided composites transmission tower and preparation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510818814.0A CN105350813B (en) 2015-11-23 2015-11-23 A kind of D braided composites transmission tower and preparation method thereof

Publications (2)

Publication Number Publication Date
CN105350813A CN105350813A (en) 2016-02-24
CN105350813B true CN105350813B (en) 2018-05-15

Family

ID=55326860

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510818814.0A Active CN105350813B (en) 2015-11-23 2015-11-23 A kind of D braided composites transmission tower and preparation method thereof

Country Status (1)

Country Link
CN (1) CN105350813B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105715095B (en) * 2016-03-25 2018-10-19 四川省众能新材料技术开发有限公司 A kind of composite construction cross-arm and its manufacturing process
CN106218041B (en) * 2016-09-08 2019-08-16 山东中恒碳纤维科技发展有限公司 A kind of 3 D weaving transmission of electricity composite material cross arm and preparation method thereof
CN107448453B (en) * 2017-07-20 2023-07-11 山东大学 Carbon fiber composite material bracket
CN109812686A (en) * 2017-11-20 2019-05-28 国网河南省电力公司安阳供电公司 A kind of composite fibre rod structure part of clamping
CN108049691A (en) * 2017-11-20 2018-05-18 国网河南省电力公司安阳供电公司 A kind of composite material electric pole of zipper
CN108049692A (en) * 2017-11-20 2018-05-18 国网河南省电力公司安阳供电公司 A kind of composite material electric pole of clamping structure
CN108049693A (en) * 2017-11-20 2018-05-18 国网河南省电力公司安阳供电公司 A kind of composite material electric pole of braiding structure
CN114075890A (en) * 2021-12-06 2022-02-22 山东广域科技有限责任公司 Composite material electric pole with woven structure

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1386155A (en) * 2000-05-23 2002-12-18 鲍尔特鲁森2000国际公司 Composite utility poles and methods of manufacture
US6503856B1 (en) * 2000-12-05 2003-01-07 Hexcel Corporation Carbon fiber sheet materials and methods of making and using the same
CN1962970A (en) * 2005-11-08 2007-05-16 深圳市海川实业股份有限公司 Continuous long fiber FRP
CN103068720A (en) * 2010-09-23 2013-04-24 印度坎普尔理工学院 Carbon nanofiber/carbon nanocoil - coated substrate and nanocomposites
CN103552170A (en) * 2013-10-25 2014-02-05 中航复合材料有限责任公司 Preparation method of thermoplastic resin fiber one-way belt toughened one-way prepreg
CN203961409U (en) * 2014-07-09 2014-11-26 国家电网公司 A kind of 110kV used for transmission line composite material pole tower
CN205116861U (en) * 2015-11-23 2016-03-30 山东中恒碳纤维科技发展有限公司 Combined material transmission tower is woven to three -dimensional

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1386155A (en) * 2000-05-23 2002-12-18 鲍尔特鲁森2000国际公司 Composite utility poles and methods of manufacture
US6503856B1 (en) * 2000-12-05 2003-01-07 Hexcel Corporation Carbon fiber sheet materials and methods of making and using the same
CN1962970A (en) * 2005-11-08 2007-05-16 深圳市海川实业股份有限公司 Continuous long fiber FRP
CN103068720A (en) * 2010-09-23 2013-04-24 印度坎普尔理工学院 Carbon nanofiber/carbon nanocoil - coated substrate and nanocomposites
CN103552170A (en) * 2013-10-25 2014-02-05 中航复合材料有限责任公司 Preparation method of thermoplastic resin fiber one-way belt toughened one-way prepreg
CN203961409U (en) * 2014-07-09 2014-11-26 国家电网公司 A kind of 110kV used for transmission line composite material pole tower
CN205116861U (en) * 2015-11-23 2016-03-30 山东中恒碳纤维科技发展有限公司 Combined material transmission tower is woven to three -dimensional

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
用于结构件的三维编织复合材料;李嘉禄;《航天返回与遥感》;20070630;第28卷(第2期);第53-58页 *

Also Published As

Publication number Publication date
CN105350813A (en) 2016-02-24

Similar Documents

Publication Publication Date Title
CN105350813B (en) A kind of D braided composites transmission tower and preparation method thereof
CN104743087B (en) A kind of ship D braided composites propeller blade and preparation method thereof
CN103331919B (en) A kind of high rigidity, the preparation method of high intensity tank body
CN106298010A (en) A kind of high tenacity anti-splitting carbon fibre composite wire plug and preparation method thereof
CN104791200B (en) A kind of intelligence 3 D weaving fiber hybrid composite wind electricity blade and preparation method thereof
CN204527613U (en) A kind of aircraft D braided composites propeller blade
CN205836107U (en) Pultrusion tubing
CN109228547B (en) Fiber layering structure of reinforced material and pultrusion profile
CN106218041B (en) A kind of 3 D weaving transmission of electricity composite material cross arm and preparation method thereof
CN104008798B (en) The composite core rod and its manufacture method of a kind of modification
CN205116861U (en) Combined material transmission tower is woven to three -dimensional
CN105911657B (en) A kind of carbon fiber composite cable and preparation method thereof with optical fiber
CN204645795U (en) A kind of composite material electric pole
CN108342804A (en) A kind of composite material for weaving prefabricated component and its application
CN210126324U (en) Novel high-strength fiber pultrusion pipeline
CN104700949B (en) Production method of stranded fiber-reinforced resin matrix composite core aluminum conductor
CN106920581A (en) Carbon fiber rope strengthens core aluminum stranded wire and preparation method thereof
CN110517820A (en) A kind of electric power line carbon fiber compound core conducting wire plug
CN115013597A (en) Aeroengine high-damping clamp based on fiber and metal wire co-curing winding and preparation method thereof
CN207161454U (en) A kind of carbon fibre composite support
CN206528152U (en) A kind of 3 D weaving transmission of electricity composite material cross arm
CN212107241U (en) Woven pultrusion glass fiber reinforced plastic pipeline
CN206349162U (en) A kind of carbon fibre composite wire plug and its compound wire
CN204894560U (en) Combined material pole production facility
CN212087693U (en) Four-dimensional stereo cross braided fishing rod

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 251100 Qihe Qilu high tech Development Zone, Dezhou, Shandong

Applicant after: Shandong Zhongheng new carbon fiber technology development Co. Ltd.

Address before: 251100 Qihe Qilu high tech Development Zone, Dezhou, Shandong