CN105337230B - A kind of pipe bus jump wire connection gold utensil - Google Patents

A kind of pipe bus jump wire connection gold utensil Download PDF

Info

Publication number
CN105337230B
CN105337230B CN201510840909.2A CN201510840909A CN105337230B CN 105337230 B CN105337230 B CN 105337230B CN 201510840909 A CN201510840909 A CN 201510840909A CN 105337230 B CN105337230 B CN 105337230B
Authority
CN
China
Prior art keywords
support
pipe
shielding
gold utensil
ball
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510840909.2A
Other languages
Chinese (zh)
Other versions
CN105337230A (en
Inventor
徐健涛
常林晶
杨国华
宋铁创
李俊辉
王刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Pinggao Group Co Ltd
Original Assignee
State Grid Corp of China SGCC
Pinggao Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Pinggao Group Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201510840909.2A priority Critical patent/CN105337230B/en
Publication of CN105337230A publication Critical patent/CN105337230A/en
Application granted granted Critical
Publication of CN105337230B publication Critical patent/CN105337230B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G5/00Installations of bus-bars

Landscapes

  • Connections Effected By Soldering, Adhesion, Or Permanent Deformation (AREA)

Abstract

The present invention relates to a kind of pipe bus jump wire connection gold utensils, it include the base support for being connected on support insulator, base support is equipped with spaced apart two pipe busbares support for two pipe busbares of the fixed support in same level correspondingly, connection gold utensil further includes being assembled for realizing the wire jumper of described two pipe busbar water conservancy diversion thread-changings, it further include the shielding ball being fixed in the base support, the pipe busbar support, wire jumper assembles and base support is arranged in the inner cavity of the shielding ball, shielding ball is equipped with for passing through the insulator via to be connected with base support and the pipe busbar via for being passed through for described two pipe busbares for the support insulator.Since the base support of connection gold utensil, wire jumper assembly and the support of pipe busbar are arranged in shielding ball, improve the anti-corona effect of shielding of entire pipe bus jump wire connection gold utensil by shielding ball.

Description

A kind of pipe bus jump wire connection gold utensil
Technical field
The present invention relates to a kind of pipe bus jump wire connection gold utensils.
Background technology
Converter station valve hall is enclosure space, due to being equipped with the important equipments such as valve tower, casing, voltage transformer in the valve Room, and And the conversion of alternating current-direct current is also completed in valve body, just the connection to each component of valve inner and shielding propose higher requirement for this. When especially pipe bus jump wire bridges, lifting and support insulator mounting means can be selected to pacify according to actual conditions needs Tubulature bus jump wire connection gold utensil.
A kind of stay pipe busbar peace is disclosed in the Chinese utility model patent that Authorization Notice No. is CN201594721U Assembling structure comprising the pipe bus bar cupport for being fixed on support insulator, with two pipe busbares on pipe bus bar cupport Two sections of pipe busbares of fixed installation, two sections of pipe busbares are horizontally disposed, the pipe that two sections of pipe busbares are assembled by being equivalent to wire jumper Bus telescoping section connects.
For the connection gold utensil of direct-current ultra high voltage converter station valve hall, the rated current of ± 800kV current conversion stations reaches 5900A, it is more demanding to the electric field strength of connection gold utensil, it is unable to bloom.But this simple stay pipe bus mounting structure Overall structure is relatively simple, and commonly used in low-voltage, the installation site of low current, the anti-corona effect of shielding is poor, can not apply Extra-high voltage place.
Invention content
The present invention provides a kind of simple in structure and has the pipe bus jump wire connection gold utensil for preferably shielding anti-corona effect.
The technical solution of pipe bus jump wire connection gold utensil provided by the present invention is:A kind of pipe bus jump wire connection gold utensil, Include the base support for being connected on support insulator, base support is equipped with to be in for fixed support correspondingly Spaced apart two pipe busbares of two pipe busbares in same level support, and connection gold utensil further includes for realizing described The wire jumper assembly of two pipe busbar water conservancy diversion thread-changings, connection gold utensil further includes the shielding ball being fixed in the base support, The pipe busbar support, wire jumper assembly and base support are arranged in the inner cavity of the shielding ball, and shielding ball, which is equipped with, to be used for It is passed through with the insulator via connected with base support for the support insulator and for supplying described two pipe busbares to pass through Pipe busbar via.
The shielding ball is fixed at by supporting rack in the base support, in base support with the support The portion of being fixedly connected that frame is fixedly connected is arranged in the bottom position of base support.
The base support includes upper backup pad, lower supporting plate and the intermediate support being arranged between two support plates, Described two pipe busbar supports are corresponding to be arranged on the upper backup pad, being fixed with support frame as described above in the base support The portion of being fixedly connected of connection is arranged on the lower supporting plate.
The portion of being fixedly connected is the installation slot hole being arranged on the lower supporting plate.
Circumferentially directional spreding has multiple the installation slot hole, and support frame as described above includes one a pair of corresponding each installation slot hole The support arm that should be located at, each support arm respectively include being bolted together with structure fixing assembling with the installation slot hole The hound that level board and both ends are connected with level board and shielding ball bonding respectively.
The spaced apart direction that described two pipe busbares support is defined as left and right directions, the lower supporting plate is in left and right The width at the middle part on direction is more than the width at both ends.
The upper backup pad is the rectangle structure extended in left-right direction, and two pipe busbar supports are installed on described The left and right ends of support plate.
The shielding ball includes the coupling ring of two shielding hemisphere of upper shielding hemisphere, lower shielding hemisphere and connection, coupling ring Medial surface welding with shielding hemisphere one of in two shielding hemisphere is connected, and passes through with the medial surface of another shielding hemisphere Trip bolt fixing assembling is evenly equipped with multiple trip bolt mounting holes on the coupling ring around circumferential.
The insulator via of the described shielding ball is recessed in the shielding outer surface of ball, and the outer end aperture of insulator via It is circular arc chamfering structure at crossover position.
The described wire jumper assembly include for two pipe busbares respectively it is conductive be connected embrace wire clamp and be arranged in described two If embracing the top of wire clamp and realizing the carried interest aluminum stranded conductor that two armfuls of wire clamps are conductively connected, each armful of wire clamp is respectively included for coordinating to embrace Upper armful folder and lower the armful folder of tight respective tube busbar, the both ends of the aluminum stranded conductor are connected with upper armful folder conduction of two armfuls of wire clamps respectively.
The beneficial effects of the invention are as follows:When in use, two are managed for pipe bus jump wire connection gold utensil provided by the present invention Busbar is penetrated by pipe busbar via in shielding ball, and is fixedly supported in base support by the support of pipe busbar, meanwhile, pass through The water conservancy diversion commutation of two pipe busbares is realized in wire jumper assembly, since the base support of connection gold utensil, wire jumper assembly and the support of pipe busbar are equal It is arranged in shielding ball, improves the anti-corona effect of shielding of entire pipe bus jump wire connection gold utensil by shielding ball.Also, it will shielding Ball and the support of pipe busbar are arranged in base support, and its own gravity for shielding ball is fallen by base support in support insulator On, will not have any impact to pipe busbar, and assemble in this way specific installation when it is also relatively simple.
Further, shielding ball is installed in by supporting rack in base support, and being connected with supporting rack in base support The portion of being fixedly connected be arranged in the bottom position of base support, the height of ball can be entirely shielded with relative reduction in this way, also just In installation.
Further, base support includes upper and lower support plate and intermediate support, and overall structure is relatively easy, convenient in base The support of setting pipe busbar and supporting rack in plinth support.
Further, the portion of being fixedly connected in base support is installation slot hole, is convenient for adjustment branch according to actual needs in this way The installation site of support.
Further, the width at the middle part of lower supporting plate in the lateral direction be more than both ends width, in this way can with Support insulator obtains higher bonding strength when being connected.
Further, shielding ball includes the coupling ring of two shielding hemisphere of upper and lower shielding hemisphere and connection, and assembling structure is simple It is convenient.
Further, the insulator via for shielding ball is recessed in shielding outer surface, and the outer end hole of insulator via is made a slip of the tongue Spend position at be circular arc chamfering structure, in this way can be further avoid electric field from concentrating.
Description of the drawings
Fig. 1 is a kind of structural schematic diagram of embodiment of pipe bus jump wire connection gold utensil provided by the present invention;
Fig. 2 is the vertical view of Fig. 1(Hemisphere is shielded in removal);
Fig. 3 is the left side view of Fig. 1;
Fig. 4 is the structural schematic diagram that ball assembly is shielded in Fig. 1;
Fig. 5 is the structural schematic diagram of upper shielding hemisphere in Fig. 4;
Fig. 6 is sectional view at A-A in Fig. 5;
Fig. 7 is the structural schematic diagram of lower shielding hemisphere in Fig. 4;
Fig. 8 is lower shielding hemisphere welding structure schematic diagram;
Fig. 9 is the vertical view that lower shielding hemisphere is welded shown in Fig. 8;
Figure 10 is partial sectional view at B-B in Fig. 9;
Figure 11 is the structural schematic diagram that wire jumper assembles in Fig. 1;
Figure 12 is the side view of the assembly of wire jumper shown in Fig. 9;
Figure 13 is the structural schematic diagram of Fig. 1 middle pipe busbares support;
Figure 14 is the structural schematic diagram of the base support in Fig. 1;
Figure 15 is the vertical view of base support shown in Figure 14;
Figure 16 is the structural schematic diagram of upper backup pad in Figure 14;
Figure 17 is the structural schematic diagram of lower supporting plate in Figure 14.
Specific implementation mode
As shown in Fig. 1 to Figure 17, a kind of embodiment of pipe bus jump wire connection gold utensil, the connection gold utensil packet in the embodiment The base support 5 for being connected on support insulator is included, base support 5 is equipped with to be in for fixed support correspondingly Spaced apart two pipe busbares support 4 of two pipe busbares 6 in same level, the interval cloth that two pipe busbares are supported The direction set is defined as left and right directions, connection gold utensil further includes being filled for realizing the wire jumper of 6 water conservancy diversion thread-changing of described two pipe busbares With 2, connection gold utensil further includes the shielding ball 1 being fixed in base support 5, pipe busbar support 4, wire jumper assembly 2 and basis Support 5 is arranged in the inner cavity of shielding ball 1.Shielding ball 1 on be equipped with for for support insulator pass through with base support 5 Connected insulator via 8 and the pipe busbar via 7 for being passed through for two pipe busbares 6.
In the present embodiment, shielding ball 1 be fixed in base support 5 by supporting rack 3, in base support 5 with branch The portion of being fixedly connected that support 3 is fixedly connected is arranged in the bottom position of base support 5.Specifically, base support 5 herein Include including upper backup pad 51, lower supporting plate 53 and the intermediate support 52 being arranged between two support plates, intermediate support 52 Multiple vertical supporting plates.Upper backup pad 51 is the rectangle structure extended in left-right direction, and two pipe busbar supports 4 are corresponding It is arranged at the left and right ends position of upper backup pad 51.The portion of being fixedly connected being fixedly connected with supporting rack 3 in base support 5 is set It sets on lower supporting plate 53, the portion of being fixedly connected herein is specially the installation slot hole 54 being arranged on lower supporting plate 53, lower support The width at the middle part of plate 53 in the lateral direction is more than the width at both ends, and installation slot hole 54 is located at the medium position of lower supporting plate 53 Place, installation slot hole 54 herein circumferentially directional spreding have it is multiple.
In fact, in the present embodiment, multiple vertical supporting plates of intermediate support 52 include positioned at the collateral of the left and right sides Fagging and the intermediate support plate for being arranged in centre, since the upper and lower ends correspondence of intermediate support plate and upper and lower support plate welding are solid Even, due to being additionally provided with installation slot hole on lower supporting plate, to avoid installation slot hole and welding intermediate support plate on lower supporting plate Weld seam causes to interfere, so that the width at the middle part of lower supporting plate 53 in the lateral direction is more than the width at both ends.
In the present embodiment, supporting rack 3 specifically includes corresponding each installation slot hole and corresponds the support arm being located at, each support arm Respectively include with installation slot hole 54 be bolted level board 31 together with structure fixing assembling and both ends respectively with level The hound 32 that plate 31 and the shielding welding of ball 1 are connected.
In the present embodiment, shielding ball 1 specifically includes two shielding hemisphere of shielding hemisphere 11, lower shielding hemisphere 13 and connection Coupling ring 14, coupling ring 14 with it is lower shielding hemisphere 13 medial surface welding be connected, with it is upper shielding hemisphere 11 medial surface pass through 12 fixing assembling of trip bolt is evenly equipped with multiple trip bolt mounting holes on coupling ring 14 around circumferential.Also, it is set on coupling ring There are multiple gusset pieces 15 around circumferentially-spaced distribution, gusset piece 15 is equipped with fixed slot hole 16, when in use, by penetrating fixation The fixing screws of slot hole 16 realize the adjustable fixing assembling of hound and gusset piece 15.
Hemisphere assemble welding is shielded under coupling ring wood frog's fallopian tube together, accuracy is installed to improve, after welding reprocessing connection The threaded hole on ring is connect, and matches and processes with the unthreaded hole of upper shielding hemisphere.
The insulator via 8 for shielding ball 1 is recessed in shielding outer surface of ball, is specifically located at the bottom position of lower shielding ball Place, and be circular arc chamfering structure at the outer end aperture crossover position of insulator via 8, avoid shadow of the tip to external electrical field It rings.
In the present embodiment, wire jumper assembly 2 includes for embracing wire clamp 22 and arrangement with what two pipe busbares difference conduction was connected If the carried interest aluminum stranded conductor 21 that two armfuls of wire clamps are conductively connected in the top of two armfuls of wire clamps 22 and realization, each armful of wire clamp 22 are distinguished Include for coordinating to hold upper armful folder 221 and the lower armful of folder 222 of respective tube busbar tightly, the both ends of aluminum stranded conductor 21 respectively with two armfuls of lines Upper armful 221 conduction of folder of folder is connected.
Specifically application publication number can be used by being carried in the Chinese invention application of CN104143800A in two pipe busbar supports The pipe busbar support of other structures in the prior art can also be used in the pipe bus bar fixing hardware of confession.
In use, base support 5 is fixed on support insulator, and two pipe busbares 6 is made to pass through shielding accordingly The pipe busbar perforation 7 that ball 1 is equipped with, moreover, supporting 4 pairs of pipe busbares to be formed with by the pipe busbar being arranged in base support 5 Effect support is fixed, and realizes that the change of current of two pipe busbares is connected by wire jumper assembly 2.It is apt to entire pipe bus jump wire connection by shielding ball The anti-corona effect of shielding of gold utensil.Ensure wire jumper connection gold utensil at a distance from support insulator by base support 5.Also, it will screen It covers ball 1 and pipe busbar support 4 is arranged in base support 5, its own gravity of shielding ball 1, which is fallen by base support 5, is propping up On column insulator, it will not have any impact to pipe busbar.
In the present embodiment, base support can also use other supporting structures, as long as can support pipe busbar, shielding The supports such as ball are mounted on support insulator.
In the present embodiment, the supporting rack of support installation shielding ball is fixedly connected in the bottom position of base support, in this way The height of shielding ball can be reduced as far as possible.In other embodiments, supporting rack can also be fixedly connected in base support Medium position at.

Claims (6)

  1. Include the base support for being connected on support insulator 1. a kind of pipe bus jump wire connection gold utensil, in base support Equipped with spaced apart two pipe busbares for two pipe busbares of the fixed support in same level correspondingly The spaced apart direction that two pipe busbares support is defined as left and right directions by support, and connection gold utensil further includes for realizing institute State the wire jumper assembly of two pipe busbar water conservancy diversion thread-changings, it is characterised in that:Connection gold utensil further includes being fixed at the basis branch Shielding ball in support, the pipe busbar support, wire jumper assembly and base support are arranged in the inner cavity of the shielding ball, shielding Ball is equipped with for being passed through with the insulator via connected with base support and for for described two for the support insulator The pipe busbar via that pipe busbar passes through, the shielding ball are fixed at by supporting rack in the base support, basis branch The portion of being fixedly connected being fixedly connected with support frame as described above in support is arranged in the bottom position of base support, the basis branch Support includes upper backup pad, lower supporting plate and the intermediate support being arranged between two support plates, and intermediate support includes multiple perpendicular To support plate, multiple vertical supporting plates of intermediate support include being located at the side support plate of the left and right sides and being arranged in centre Between support plate, corresponding weld with upper and lower support plate of the upper and lower ends of intermediate support plate is connected, described two pipe busbares supports Corresponding to be arranged on the upper backup pad, the portion of being fixedly connected being fixedly connected with support frame as described above in the base support is set It sets on the lower supporting plate, the portion of being fixedly connected is the installation slot hole being arranged on the lower supporting plate, in order to avoid Installation slot hole causes to interfere with the weld seam for welding intermediate support plate on lower supporting plate so that lower supporting plate is in left and right directions on direction Middle part width be more than both ends width.
  2. 2. pipe bus jump wire connection gold utensil according to claim 1, it is characterised in that:The installation slot hole is circumferentially square Multiple to being distributed with, support frame as described above includes the support arm being arranged in a one-to-one correspondence with each installation slot hole, and each support arm respectively includes With the installation slot hole be bolted level board together with structure fixing assembling and both ends respectively with level board and shielding The connected hound of ball bonding.
  3. 3. pipe bus jump wire connection gold utensil according to claim 1, it is characterised in that:The upper backup pad is along left and right The rectangle structure that direction extends, two pipe busbar supports are installed in the left and right ends of the upper backup pad.
  4. 4. pipe bus jump wire connection gold utensil as claimed in any of claims 1 to 3, it is characterised in that:The screen The coupling ring that ball includes two shielding hemisphere of upper shielding hemisphere, lower shielding hemisphere and connection is covered, coupling ring and two shields in hemisphere The medial surface welding of one of shielding hemisphere is connected, and is fixed and is filled by trip bolt with the medial surface of another shielding hemisphere Match, multiple trip bolt mounting holes are evenly equipped with around circumferential on the coupling ring.
  5. 5. pipe bus jump wire connection gold utensil as claimed in any of claims 1 to 3, it is characterised in that:The screen The insulator via for covering ball is recessed in the shielding outer surface of ball, and is circular arc at the outer end aperture crossover position of insulator via Shape chamfering structure.
  6. 6. pipe bus jump wire connection gold utensil as claimed in any of claims 1 to 3, it is characterised in that:The jump It is traditional thread binding with include for the two pipe busbares conductive top embraced wire clamp and be arranged in two armfuls of wire clamps being connected and real respectively If the carried interest aluminum stranded conductor that existing two armfuls of wire clamps are conductively connected, each armful of wire clamp are respectively included for coordinating to hold respective tube busbar tightly Embrace folder and lower armful folder, the both ends of the aluminum stranded conductor are connected with upper armful folder conduction of two armfuls of wire clamps respectively.
CN201510840909.2A 2015-11-27 2015-11-27 A kind of pipe bus jump wire connection gold utensil Active CN105337230B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510840909.2A CN105337230B (en) 2015-11-27 2015-11-27 A kind of pipe bus jump wire connection gold utensil

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510840909.2A CN105337230B (en) 2015-11-27 2015-11-27 A kind of pipe bus jump wire connection gold utensil

Publications (2)

Publication Number Publication Date
CN105337230A CN105337230A (en) 2016-02-17
CN105337230B true CN105337230B (en) 2018-08-17

Family

ID=55287605

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510840909.2A Active CN105337230B (en) 2015-11-27 2015-11-27 A kind of pipe bus jump wire connection gold utensil

Country Status (1)

Country Link
CN (1) CN105337230B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106403753B (en) * 2016-09-14 2018-12-14 平高集团有限公司 Shield ball position of opening localization method and positioning device, subpoint caliberating device
CN108922820B (en) * 2018-09-29 2023-07-21 湖南长高高压开关有限公司 Large-scale suspension open-pore split type shielding cover for extra-high voltage isolating switch and buckling method
CN109599812B (en) * 2018-12-03 2021-10-22 平高集团有限公司 Tubular bus suspension fitting
CN110047689A (en) * 2019-03-15 2019-07-23 平高集团有限公司 A kind of grading shield and disconnecting switch
CN112133507B (en) * 2020-08-10 2022-05-24 国家电网有限公司 Shielding ball

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201435575Y (en) * 2009-06-29 2010-03-31 中国电力工程顾问集团公司 Tubing bus bar telescopic combined hardware and corner combined hardware used for ultra-high voltage substation
CN202268664U (en) * 2011-10-25 2012-06-06 南京线路器材厂 250 tubular bus bar bridging suspension fitting for 400kV converter station
CN202268663U (en) * 2011-10-25 2012-06-06 北京网联直流工程技术有限公司 Bridging over-current hardware of CT (Current Transformer) equipment and tubular bus bar for converter station
CN103296623B (en) * 2013-05-31 2016-09-14 国家电网公司 Tube busbar suspension fitting for converter station valve hall
CN104036979B (en) * 2014-05-29 2017-02-15 国家电网公司 Fixed contact assembly of valve hall and tubular bus and fixed contact connection fitting thereof
CN205283033U (en) * 2015-11-27 2016-06-01 平高集团有限公司 Pipe generating line jumper connection gold utensil

Also Published As

Publication number Publication date
CN105337230A (en) 2016-02-17

Similar Documents

Publication Publication Date Title
CN105337230B (en) A kind of pipe bus jump wire connection gold utensil
CN205283033U (en) Pipe generating line jumper connection gold utensil
CN202268663U (en) Bridging over-current hardware of CT (Current Transformer) equipment and tubular bus bar for converter station
CN104036979B (en) Fixed contact assembly of valve hall and tubular bus and fixed contact connection fitting thereof
CN103618213B (en) A kind of 800kV current conversion station cannula tip connects gold utensil
CN105048385B (en) A kind of split conductor conductor spacer and the wire clamp gold utensil using the conductor spacer
CN203541929U (en) Adjustable hoop welding tool
CN107332151A (en) A kind of GIS device
CN103646797A (en) Ground knife static contact armour clamp used for 800kV convertor station low end valve hall
CN203690131U (en) Grounding knife static contact fitting for 800kV converter station low-end valve hall
CN104332911A (en) Inclined tube bus connecting fitting for ultrahigh-voltage converter station
CN206332416U (en) A kind of current conversion station slides/be fixedly connected excessively stream with pipe mother and static contact fixes gold utensil
CN203839222U (en) Static contact assembling for valve hall, and connecting metal fitting for connecting tubular busbar with static contact
CN202110913U (en) Star frame structure dry type air core reactor
CN204361638U (en) 800kV current conversion station DC fields polar curve is put down anti-terminal and is connected gold utensil
CN104577920B (en) 800 kV convertor station direct-current field polar line smoothing reactor terminal connecting ironware
CN110017052A (en) A kind of compound cross-arm
CN205211610U (en) Static contact gold utensil
KR102075824B1 (en) Supporting unit for switch
CN106848638A (en) Water conservancy diversion supports gold utensil and fixed conductor and cantilever conductor attachment structure
CN204304361U (en) A kind of air bus duct
CN203895901U (en) Pipe bus connecting metal ware and pipe bus conductive connecting structure using the same
CN107332180A (en) A kind of GIS device and its three-phase non-segregated bus cylinder
CN203632158U (en) Aluminum profile for laying insulating tube busbar
CN207926040U (en) A kind of practicality metering handcart

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant