CN105328406B - The method that high pressure gas cylinder is prepared with two-phase stainless steel seamless steel tube - Google Patents

The method that high pressure gas cylinder is prepared with two-phase stainless steel seamless steel tube Download PDF

Info

Publication number
CN105328406B
CN105328406B CN201510687185.2A CN201510687185A CN105328406B CN 105328406 B CN105328406 B CN 105328406B CN 201510687185 A CN201510687185 A CN 201510687185A CN 105328406 B CN105328406 B CN 105328406B
Authority
CN
China
Prior art keywords
stainless steel
phase stainless
heating
spinning
high pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510687185.2A
Other languages
Chinese (zh)
Other versions
CN105328406A (en
Inventor
史隽涛
刘学歧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
QINYANG GUOSHUN SILICON SOURCE PHOTOELECTRIC GAS Co Ltd
Original Assignee
QINYANG GUOSHUN SILICON SOURCE PHOTOELECTRIC GAS Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by QINYANG GUOSHUN SILICON SOURCE PHOTOELECTRIC GAS Co Ltd filed Critical QINYANG GUOSHUN SILICON SOURCE PHOTOELECTRIC GAS Co Ltd
Priority to CN201510687185.2A priority Critical patent/CN105328406B/en
Publication of CN105328406A publication Critical patent/CN105328406A/en
Application granted granted Critical
Publication of CN105328406B publication Critical patent/CN105328406B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C1/00Pressure vessels, e.g. gas cylinder, gas tank, replaceable cartridge
    • F17C1/14Pressure vessels, e.g. gas cylinder, gas tank, replaceable cartridge constructed of aluminium; constructed of non-magnetic steel
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2203/00Vessel construction, in particular walls or details thereof
    • F17C2203/06Materials for walls or layers thereof; Properties or structures of walls or their materials
    • F17C2203/0634Materials for walls or layers thereof
    • F17C2203/0636Metals
    • F17C2203/0639Steels
    • F17C2203/0643Stainless steels
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2209/00Vessel construction, in particular methods of manufacturing
    • F17C2209/21Shaping processes
    • F17C2209/2181Metal working processes, e.g. deep drawing, stamping or cutting

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)
  • Heat Treatment Of Articles (AREA)

Abstract

The invention discloses a kind of method that use two-phase stainless steel seamless steel tube prepares high pressure gas cylinder, the certain two-phase stainless steel seamless steel tube of diameter and thickness is cut into required length first, the blank of cutting is mechanically polished;The two-port of blank is respectively heated with heating furnace again and spinning and spinning closing-in is carried out, spinning completes to be cooled to room temperature progress bottleneck drilling;Then heated in solid solution furnace, isothermal holding, rapid water cooling is carried out after heating and thermal insulation;Finally to being rinsed in bottle.Two-phase stainless steel seamless steel tube is used for the manufacture of high pressure gas cylinder by the present invention first, hence it is evident that reduces the thickness of steel cylinder in itself, reduces the use of material, reduces production and transport cost, improves the intensity, corrosion resistance and inwall cleanliness factor of gas cylinder;Solution heat treatment, quick water cooling are carried out to shaping steel cylinder in preparation process, ensure that every mechanical performance of gas cylinder and the content ratio of metallographic structure do not change.

Description

The method that high pressure gas cylinder is prepared with two-phase stainless steel seamless steel tube
Technical field
The invention belongs to the applied technical field of two-phase stainless Steel material, and in particular to a kind of two-phase stainless steel seamless steel tube Application and preparation method in high pressure gas cylinder is prepared.
Background technology
Two-phase stainless Steel material refers to that its metallographic structure ferrite respectively accounts for 50% with austenite, the content of general less phase It is minimum be also required to reach 30% stainless steel, the characteristics of such steel has austenite and ferritic stainless steel concurrently, and ferritic phase ratio, Plasticity, toughness are higher, and no brittleness at room temperature, intergranular corrosion resistance performance and welding performance are significantly increased, while also maintaining iron element The 475 degrees Celsius of fragility and thermal conductivity factor of body stainless steel are high, the features such as with superplasticity.Compared with austenitic stainless steel, by force Degree is high and intergranular corrosion resistance and resistance to chloride stress corrosion are significantly improved.Two phase stainless steel has excellent resistance to pitting performance, It is also a kind of section nickel and stainless steel.Based on above good characteristics, two phase stainless steel has wide in terms of aeronautical material, Marine Materials General application, but have no the application in high-pressure cylinder at present.
Pressure gas cylinder applies most special equipments as China, is widely applied to fire-fighting, medical treatment, chemical industry section Grind, food, urban construction, machinery in terms of have a wide range of applications.In early days, high pressure gas cylinder is largely prepared with carbon steel material, carbon Although the standby high pressure gas cylinder intensity of steel is up to 700MPa, its decay resistance is very poor.Prepare gas bomb at present What material was commonly used has austenitic stainless steel, manganese steel, chrome-molybdenum steel, and many steel cylinders use austenitic stainless steel material conduct in preparing at present Steel cylinder prepares material, and austenitic stainless steel strength ratio is relatively low, in order to ensure steel cylinder in the security of high-pressure work situation and make With the life-span, its thickness will increase by 1.5 ~ 2 times, therefore, and although the application of austenitic stainless steel material improves the corrosion-resistant of steel cylinder The cleanliness factor of property and inwall, but the thickness of steel cylinder is significantly increased, the consumption of material is added, production cost is added, and And due to the increase of thickness, steel cylinder quality, which is also greatly increased, improves cost of transportation, reduces operating efficiency.
The content of the invention
In order to solve the above problems, the invention provides a kind of two-phase stainless steel seamless steel tube in high pressure gas cylinder is prepared Application, the quality of steel cylinder in itself is not only alleviated as the material of high pressure gas cylinder using two-phase stainless Steel material, and drop Low production cost, improves social benefit.
Present invention also offers a kind of method that use two-phase stainless steel seamless steel tube prepares high pressure gas cylinder, this method is being received Mechanical polishing processing is carried out before mouth, receipts bottom to steel pipe, it is simple to operate, eliminate defect and the corrosion of inner wall of steel cylinder, it is ensured that steel The high-pure gas contained in bottle is not contaminated;Solution heat treatment finally is carried out to the steel cylinder of first one-step forming, so that in hot spinning During the metallographic structure of two-phase stainless Steel material that changes of metallographic structure recovered.
The present invention is realized by following technical scheme
Application of the two-phase stainless steel seamless steel tube in the preparation of high pressure gas cylinder.
The method that above-mentioned two-phase stainless steel seamless steel tube prepares high pressure gas cylinder, comprises the following steps:
(1)Take two-phase stainless steel seamless steel tube, on request, be cut into blank;
(2)By step(1)Steel pipe after cutting is mechanically polished;
(3)To after polishing two-phase stainless steel seamless steel tube blank carry out hot spinning receive bottom, milling bottom of bottle, heating close up, Bottleneck drills, and obtains steel cylinder bottle;
(4)To step(3)Steel cylinder bottle after drilling carries out solution heat treatment;
(5)Step(4)Steel cylinder after processing rinsed in shoulder inner face processing, screw thread process, bottle, obtains high pressure gas Steel cylinder.
Described two-phase stainless steel seamless steel tube prepares the method for high pressure gas cylinder, step(1)Described two phase stainless steel A diameter of 159 ~ 350 mm of seamless steel pipe, thickness is 3 ~ 8mm;The length that cutting obtains blank is 800 ~ 1800mm.
Described two-phase stainless steel seamless steel tube prepares the method for high pressure gas cylinder, step(3)Bottom, milling are received in described heating Bottom of bottle, heating is closed up, bottleneck drilling concrete operation step is:
A. one end of cleaved two-phase stainless steel seamless steel tube blank is placed in heating furnace, heated length is from end Mouth starts length at 230 ~ 300mm, and heating-up temperature is 1150 ~ 1350 DEG C, and the heat time is 5 ~ 10min;
B. the blank after heating is subjected to spinning immediately, spinning main shaft rotating speed is 600 ~ 800r/s, once completes to receive Bottom, the receipts bottom time is 80 ~ 120s;Initial temperature when receiving bottom is 1100 ~ 1200 DEG C, is mended in spinning process with gas nozzle Air cooling is molded after heat, spinning, last milling bottom of bottle, is repaiied and is cut;
C. repeat step a, b carries out hot spinning to the other end of blank, and heating is closed up;
D. the heating closing in described in step c treats that bottle is cooled to room temperature after completing, and is drilled on bottleneck.
Described two-phase stainless steel seamless steel tube prepares the method for high pressure gas cylinder, the instrument used in spinning described in step b Device is roller type spinning machine.
The method that described two-phase stainless steel seamless steel tube prepares high pressure gas cylinder, the spinning machine described in step b is revolved When turning to receive bottom, spinning main shaft rotation is in 100 ° between mould rotation centerline and blank rotation centerline, during mould rotates along mould Heart line rotates 100 °.
The method that described two-phase stainless steel seamless steel tube prepares high pressure gas cylinder, the combustion gas described in step b is acetylene, day Right gas or oxygen.
Steel pipe heating receive bottom during, for make up because temperature reduce caused by steel pipe plasticity compromises, with natural gas, Acetylene or oxygen jet carry out concurrent heating;The rotating speed of spinning main shaft is 600 ~ 800r/s, and the time used in bottom of receiving is 80 ~ 120s.
Described two-phase stainless steel seamless steel tube prepares the method for high pressure gas cylinder, step(4)Described solution heat treatment Detailed process is:Bottle after bottleneck is drilled is heated in solid solution furnace, and 1050 ~ 1100 were heated to from room temperature with 3 ~ 5 hours DEG C, 30 ~ 40min of insulation, carries out quick water cooling from 1050 ~ 1100 DEG C immediately after after being heated to 1050 ~ 1100 DEG C.
Compared with prior art, the present invention has following positive beneficial effect
(1)Two-phase stainless steel seamless steel tube is had a wide range of applications based on its excellent mechanical performance and Corrosion Protection, But without the application found in high pressure gas cylinder is prepared.The high-pressure cylinder prepared at present using austenitic stainless steel surrenders strong Degree can only achieve 170 ~ 200 MPa, and the high-pressure cylinder prepared using austenitic stainless steel steel pipe will reach pressure requirements, its bottle Wall thickness will be 1.5 ~ 2 times of manganese steel or chrome-molybdenum steel, and thickness is greatly increased, and is added the usage amount of material, is considerably increased life Cost is produced, and because the increase of thickness also increases steel cylinder weight, is made troubles to transport, cost of transportation is added.This hair The conventional austenite of the wall ratio of the high pressure oxygen steel cylinder of bright use two-phase stainless steel making reduces more than 50%, reduces production Cost also reduces cost of transportation simultaneously, and two-phase stainless steel seamless steel tube intensity is significantly larger than austenitic stainless steel, has Excellent corrosion resistance.
(2)The present invention is prepared using two-phase stainless steel seamless steel tube during high pressure gas cylinder, carries out machine to steel cylinder first Tool is polished, and is improved the cleanliness factor of bottle inwall, is greatly reduced the influence to gas purity in steel cylinder;To steel cylinder in preparation process Solution heat treatment is carried out, to ensure that during hot spinning two phase stainless steel has occurred and that the metallographic structure of change(Austenite, Ferrite)Recovered, the properties for keeping two phase stainless steel original, that is, reduce quenching, the complex operations step of tempering The premium properties of prepared steel cylinder is also ensure that simultaneously.
Embodiment
Further description carried out to the present invention with specific embodiment below, but embodiment of the invention is not It is limited to the following example.
Embodiment 1
Two phase stainless steel used in the embodiment is 2205(Alloy pipe fitting Co., Ltd of nation is reached purchased from Wuxi).
The method that high pressure oxygen steel cylinder is prepared with two-phase stainless steel seamless steel tube, comprises the following steps:
(1)The two phase stainless steel steel pipe for taking a diameter of 159mm, wall thickness to be 5mm, is cut into the short tube that length is 800mm, And mechanically polished;
(2)To step(1)Bottom, milling bottom of bottle are received in steel pipe progress heating after mechanical polishing, and heating is closed up, bottleneck drills Processing, obtains steel cylinder bottle;
(3)To step(2)Steel cylinder bottle after drilling carries out solution heat treatment;
(4)To step(3)Steel cylinder shoulder inner face after processing, which is processed, is allowed to smooth, screw thread process, rinses, obtains in bottle To high pressure gas cylinder.
Wherein step(2)Bottom, milling bottom of bottle are received in described heating, and heating is closed up, bottleneck drilling operation step is as follows:
One end of two-phase stainless steel seamless steel tube blank after polishing is placed in heating furnace, heated length be from Port starts at length 250mm, and heating-up temperature is 1150 DEG C, and the heat time is 10min;Blank after heating is used into roller immediately Formula spinning machine carries out spinning, and the roller type spinning machine speed of mainshaft is 600r/s, during mould rotation centerline rotates with blank It is in 100 ° between heart line, mould rotates 100 ° along mould rotation centerline.Once complete to receive bottom, the time used in spinning is 80s, Initial temperature when receiving bottom is 1100 ~ 1200 DEG C, and concurrent heating is carried out with natural gas nozzle in spinning process, during being somebody's turn to do with balance The temperature of reduction;After the completion of spinning air cooling be molded, then milling bottom of bottle, repair and cut;Above step is repeated, the other end of blank is carried out Heating is closed up, and room temperature is cooled to after the completion of closing in, carries out bottleneck drilling.
Step(3)Steel cylinder after the drilling, which carries out solid hot melt processing, to be carried out in solid solution furnace, is added in solid solution furnace Heat 3 hours, by room temperature to 1050 ~ 1100 DEG C, be then incubated 30 ~ 40min, quick water cooling carried out immediately after 30 ~ 40min But.
During bottom is received in heating and heating is closed up, described receipts bottom length is 150mm, and the length for the gained bottleneck that closes up is 24 ~ 26mm, bottleneck a diameter of 46 ~ 48mm of φ.
The volume of the seamless high pressure gas cylinder of two phase stainless steel prepared by the embodiment is that 10L, temperature in use are -20 ~ 60 DEG C, design pressure be 15Mpa.
The performance indications of two phase stainless steel high pressure gas cylinder prepared by the embodiment are as follows:Yield strength is 610 N/mm2, Tensile strength is 820 N/mm2, elongation after fracture is 28%.
Embodiment 2
Two phase stainless steel used in the embodiment is 2205(Alloy pipe fitting Co., Ltd of nation is reached purchased from Wuxi).
The method that high pressure gas cylinder is prepared with two-phase stainless steel seamless steel tube, comprises the following steps:
(1)The two phase stainless steel steel pipe for taking a diameter of 232mm, wall thickness to be 6mm, it is the short of 1800mm to be cut into length Pipe, and mechanically polished;
(2)To step(1)Steel pipe after polishing carries out heating and receives bottom, milling bottom of bottle, and heating is closed up, bottleneck drilling processing, Obtain steel cylinder bottle;
(3)To step(2)Steel cylinder bottle after drilling carries out solution heat treatment;
(4)To step(3)Steel cylinder shoulder inner face after processing, which is processed, is allowed to smooth, screw thread process, rinses, obtains in bottle To high pressure gas cylinder.
Wherein step(2)Bottom, milling bottom of bottle are received in described heating, and heating is closed up, bottleneck drilling operation step is as follows:
One end of two-phase stainless steel seamless steel tube blank after polishing is placed in heating furnace, heated length be from Port starts at length 300mm, and heating-up temperature is 1350 DEG C, and the heat time is 5min;Blank after heating is used into roller immediately Formula spinning machine carries out spinning, and the roller type spinning machine speed of mainshaft is 600r/s, during mould rotation centerline rotates with blank It is in 100 ° between heart line, mould rotates 100 ° along mould rotation centerline.Once complete to receive bottom, the time used in spinning is 120s, initial temperature when receiving bottom is 1100 ~ 1200 DEG C, carries out concurrent heating to balance the mistake with natural gas nozzle in spinning process The temperature reduced in journey;After the completion of spinning air cooling be molded, then milling bottom of bottle, repair and cut;Above step is repeated, to the other end of blank Heating closing in is carried out, room temperature is cooled to after the completion of closing in, bottleneck drilling is carried out.
Step(3)Steel cylinder after the drilling, which carries out solid hot melt processing, to be carried out in solid solution furnace, is added in solid solution furnace Heat 5 hours, by room temperature to 1050 ~ 1100 DEG C, be then incubated 30 ~ 40min, quick water cooling carried out immediately after 30 ~ 40min But.
During bottom is received in heating and heating is closed up, described receipts bottom length is 180mm, and the length for the gained bottleneck that closes up is 24 ~ 26mm, the diameter of bottleneck are 46 ~ 48mm of φ.
The volume of the seamless high pressure gas cylinder of two phase stainless steel prepared by the embodiment is that 50L, temperature in use are -20 ~ 60 DEG C, design pressure be 15Mpa.
The performance indications of two phase stainless steel high pressure gas cylinder prepared by the embodiment are as follows:Yield strength is 600N/mm2, Tensile strength is 810 N/mm2, elongation after fracture is 35%.
Embodiment 3
Two phase stainless steel used in the embodiment is 2205(Alloy pipe fitting Co., Ltd of nation is reached purchased from Wuxi).
The method that high pressure gas cylinder is prepared with two-phase stainless steel seamless steel tube, comprises the following steps:
(1)The two phase stainless steel steel pipe for taking a diameter of 219mm, wall thickness to be 6mm, it is the short of 1400mm to be cut into length Pipe, and mechanically polished;
(2)To step(1)Steel pipe after polishing carries out heating and receives bottom, milling bottom of bottle, and heating is closed up, bottleneck drilling processing, Obtain steel cylinder bottle;
(3)To step(2)Steel cylinder bottle after drilling carries out solution heat treatment;
(4)To step(3)Steel cylinder shoulder inner face after processing, which is processed, is allowed to smooth, screw thread process, rinses, obtains in bottle To high pressure gas cylinder.
Wherein step(2)Bottom, milling bottom of bottle are received in described heating, and heating is closed up, bottleneck drilling operation step is as follows:
One end of two-phase stainless steel seamless steel tube blank after polishing is placed in heating furnace, heated length be from Port starts at length 230mm, and heating-up temperature is 1350 DEG C, and the heat time is 7min;Blank after heating is used into roller immediately Formula spinning machine carries out spinning, and the roller type spinning machine speed of mainshaft is 600r/s, during mould rotation centerline rotates with blank It is in 100 ° between heart line, mould rotates 100 ° along mould rotation centerline.Once complete to receive bottom, the time used in spinning is 100s, initial temperature when receiving bottom is 1100 ~ 1200 DEG C, carries out concurrent heating to balance the mistake with natural gas nozzle in spinning process The temperature reduced in journey;After the completion of spinning air cooling be molded, then milling bottom of bottle, repair and cut;Above step is repeated, to the other end of blank Heating closing in is carried out, room temperature is cooled to after the completion of closing in, bottleneck drilling is carried out.
Step(3)Steel cylinder after the drilling, which carries out solid hot melt processing, to be carried out in solid solution furnace, is added in solid solution furnace Heat 4.5 hours, by room temperature to 1050 ~ 1100 DEG C, be then incubated 30 ~ 40min, quick water cooling carried out immediately after 30 ~ 40min But.
During bottom is received in heating and heating is closed up, described receipts bottom length is 160mm, and the length for the gained bottleneck that closes up is 24mm, the diameter of bottleneck are φ 46mm.
The volume of the seamless high pressure gas cylinder of two phase stainless steel prepared by the embodiment is that 30L, temperature in use are -20 ~ 60 DEG C, design pressure be 15Mpa.
The performance indications of two phase stainless steel high pressure gas cylinder prepared by the embodiment are as follows:Yield strength is 610N/mm2, Tensile strength is 820N/mm2, elongation after fracture is 31%.
Embodiment 4
Two phase stainless steel used in the embodiment is 2205(Alloy pipe fitting Co., Ltd of nation is reached purchased from Wuxi).
The method that high pressure gas cylinder is prepared with two-phase stainless steel seamless steel tube, comprises the following steps:
(1)The two phase stainless steel steel pipe for taking a diameter of 350mm, wall thickness to be 8mm, it is the short of 1350mm to be cut into length Pipe, and mechanically polished;
(2)To step(1)Steel pipe after polishing carries out heating and receives bottom, milling bottom of bottle, and heating is closed up, bottleneck drilling processing, Obtain steel cylinder bottle;
(3)To step(2)Steel cylinder bottle after drilling carries out solution heat treatment;
(4)To step(3)Steel cylinder shoulder inner face after processing, which is processed, is allowed to smooth, screw thread process, rinses, obtains in bottle To high pressure gas cylinder.
Wherein step(2)Bottom, milling bottom of bottle are received in described heating, and heating is closed up, bottleneck drilling operation step is as follows:
One end of two-phase stainless steel seamless steel tube blank after polishing is placed in heating furnace, heated length be from Port starts at length 300mm, and heating-up temperature is 1300 DEG C, and the heat time is 10min;Blank after heating is used into roller immediately Formula spinning machine carries out spinning, and the roller type spinning machine speed of mainshaft is 560r/s, during mould rotation centerline rotates with blank It is in 100 ° between heart line, mould rotates 100 ° along mould rotation centerline.Once complete to receive bottom, the time used in spinning is 100s, initial temperature when receiving bottom is 1100 ~ 1200 DEG C, carries out concurrent heating to balance the mistake with natural gas nozzle in spinning process The temperature reduced in journey;After the completion of spinning air cooling be molded, then milling bottom of bottle, repair and cut;Above step is repeated, to the other end of blank Heating closing in is carried out, room temperature is cooled to after the completion of closing in, bottleneck drilling is carried out.
Step(3)Steel cylinder after the drilling, which carries out solid hot melt processing, to be carried out in solid solution furnace, is added in solid solution furnace Heat 5 hours, by room temperature to 1050 ~ 1100 DEG C, be then incubated 30 ~ 40min, quick water cooling carried out immediately after 30 ~ 40min But.
During bottom is received in heating and heating is closed up, described receipts bottom length is 300mm, and the length for the gained bottleneck that closes up is 24 ~ 26mm, the diameter of bottleneck are 46 ~ 48mm of φ.
The volume of the seamless high pressure gas cylinder of two phase stainless steel prepared by the embodiment is that 50L, temperature in use are -20 ~ 60 DEG C, design pressure be 25Mpa.
The performance indications of two phase stainless steel high pressure gas cylinder prepared by the embodiment are as follows:Yield strength is 620N/mm2, Tensile strength is 810N/mm2, elongation after fracture is 32%.

Claims (5)

1. the method for high pressure gas cylinder is prepared with two-phase stainless steel seamless steel tube, it is characterised in that comprise the following steps:
(1)Two-phase stainless steel seamless steel tube is taken, on request, cutting stock blank;
(2)By step(1)Steel pipe after cutting is mechanically polished;
(3)Hot spinning is carried out to the two-phase stainless steel seamless steel tube blank after polishing and receives bottom, milling bottom of bottle, heating is closed up, bottleneck Drilling is handled, and obtains steel cylinder bottle;
Bottom, milling bottom of bottle are received in described heating, and heating is closed up, bottleneck drilling concrete operation step is:
A. one end of the two-phase stainless steel seamless steel tube blank after cutting mechanics are polished is as in heating furnace, and heating is grown Spend for length is at 230 ~ 300mm since port, heating-up temperature is 1150 ~ 1350 DEG C, the heat time is 5 ~ 10min;
B. the blank after heating is subjected to spinning immediately, spinning main shaft rotating speed is 600 ~ 800r/s, once completes to receive bottom, receives The bottom time is 80 ~ 120s;Initial temperature when receiving bottom is 1100 ~ 1200 DEG C, and concurrent heating is carried out with gas nozzle in spinning process, is revolved Air cooling is molded after pressure, last milling bottom of bottle, is repaiied and is cut;
C. repeat step a, b carries out hot spinning to the other end of blank, and heating is closed up;
D. after completion is closed up in the heating described in step c, room temperature is cooled to, bottleneck drilling is carried out;
(4)To step(3)Steel cylinder bottle after drilling carries out solution heat treatment;Described solution heat treatment detailed process is:Will Bottle after bottleneck drilling heat in solid solution furnace, and 1050 ~ 1100 DEG C were heated to by room temperature with 3 ~ 5 hours, it is incubated 30 ~ 40min, carries out quick water cooling immediately after;
(5)Step(4)Steel cylinder after processing rinsed in shoulder inner face processing, screw thread process, bottle, obtains high pressure gas steel Bottle.
2. the method that two-phase stainless steel seamless steel tube according to claim 1 prepares high pressure gas cylinder, it is characterised in that step Suddenly(1)A diameter of 159 ~ 350 mm of described two-phase stainless steel seamless steel tube, thickness is 3 ~ 8mm;Cutting obtains the length of blank Spend for 800 ~ 1800mm.
3. the method that two-phase stainless steel seamless steel tube according to claim 1 prepares high pressure gas cylinder, it is characterised in that step The instrument used in spinning described in rapid b is roller type spinning machine.
4. the method that two-phase stainless steel seamless steel tube according to claim 1 prepares high pressure gas cylinder, it is characterised in that:Step When spinning machine described in rapid b carries out rotation receipts bottom, spinning main shaft rotation is between mould rotation centerline and blank rotation centerline 100 °, mould rotates 100 ° along mould rotation centerline.
5. the method that two-phase stainless steel seamless steel tube according to claim 1 prepares high pressure gas cylinder, it is characterised in that step Combustion gas described in rapid b is acetylene, natural gas or oxygen.
CN201510687185.2A 2015-10-22 2015-10-22 The method that high pressure gas cylinder is prepared with two-phase stainless steel seamless steel tube Active CN105328406B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510687185.2A CN105328406B (en) 2015-10-22 2015-10-22 The method that high pressure gas cylinder is prepared with two-phase stainless steel seamless steel tube

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510687185.2A CN105328406B (en) 2015-10-22 2015-10-22 The method that high pressure gas cylinder is prepared with two-phase stainless steel seamless steel tube

Publications (2)

Publication Number Publication Date
CN105328406A CN105328406A (en) 2016-02-17
CN105328406B true CN105328406B (en) 2017-10-20

Family

ID=55279277

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510687185.2A Active CN105328406B (en) 2015-10-22 2015-10-22 The method that high pressure gas cylinder is prepared with two-phase stainless steel seamless steel tube

Country Status (1)

Country Link
CN (1) CN105328406B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105690039B (en) * 2016-04-05 2018-01-19 山东天海高压容器有限公司 The preparation method of high-pressure seamless steel cylinder
CN106917953A (en) * 2017-01-25 2017-07-04 安徽绿动能源有限公司 A kind of manufacture method of thin-walled steel inner container and application thereof
KR102012795B1 (en) * 2018-03-07 2019-11-04 주식회사 엔케이 Cylinder assembly method for ultra-high purity gas filling
CN113334026B (en) * 2021-05-12 2022-08-09 山西昊坤法兰股份有限公司 00Cr22Ni5Mo3N lock ring processing method capable of eliminating deformation and reducing material consumption

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3910192C2 (en) * 1989-03-23 1994-06-01 Mannesmann Ag Process for the production of compressed gas cylinders made of steel
CN101376204B (en) * 2007-08-30 2010-07-28 北京首宏钢科技开发有限公司 Novel technique for producing seamless steel pipe
CN102011933A (en) * 2010-09-29 2011-04-13 沈阳斯林达安科新技术有限公司 Hydrogen aluminum alloy inner container carbon fiber fully-winding gas cylinder for vehicle and production process thereof
CN202199140U (en) * 2011-08-18 2012-04-25 长沙有色冶金设计研究院有限公司 Flash tank
CN102848153A (en) * 2012-09-17 2013-01-02 南京长江工业炉科技有限公司 Method for manufacturing steel cylinders
CN104451419B (en) * 2014-11-28 2017-01-11 成都格瑞特高压容器有限责任公司 High-pressure seamless 10CrNi3MoV steel cylinder and manufacturing process thereof

Also Published As

Publication number Publication date
CN105328406A (en) 2016-02-17

Similar Documents

Publication Publication Date Title
CN105328406B (en) The method that high pressure gas cylinder is prepared with two-phase stainless steel seamless steel tube
CN104451419B (en) High-pressure seamless 10CrNi3MoV steel cylinder and manufacturing process thereof
JP5252131B2 (en) Hardening method of steel pipe
CN101413088B (en) Sulfurated hydrogen stress etching-resisting petroleum casing pipe and manufacturing method thereof
CN105039863A (en) Manufacturing method of martensite stainless steel seamless tube for oil well
CN107739893B (en) High temperature alloy thin footpath thin-walled capillary pipe and preparation method thereof
CN101205594A (en) X80 steel made pipe fittings and manufacture technique thereof
CN103484782A (en) Method for manufacturing large-aperture high-strength gathering and transportation seamless steel tube for environment with high content of hydrogen sulfide
CN101486044A (en) Method for producing restraint core rod of diameter above 330mm for tandem rolling tube
CN106011638A (en) Expansion casing for heavy oil thermal recovery well and manufacturing method of expansion casing
CN104451381A (en) Large-caliber Gr3 seamless steel tube applied at low temperature and production method thereof
CN109161788B (en) High-temperature-resistant petroleum casing pipe for thermal recovery well of hot steam injection thickened oil and manufacturing method thereof
CN115074504B (en) Manufacturing method of 630 ℃ ultra-supercritical unit G115 large-caliber thick-wall seamless steel tube
CN104060079A (en) Sprayer processing technique capable of lowering processing difficulty
CN102363833B (en) Method for manufacturing transformation induced plasticity steel seamless tube on line
CN102560244B (en) Microalloying and heat treatment method for 20MnMo steel
JPH09241746A (en) Production of high strength duplex stainless steel tube
CN105546228A (en) Seamless steel pipe for ship and preparing method of seamless steel pipe
CN103737020B (en) The method for turning of the steam turbine main steam control valve bar cylindrical of high temperature alloy GH901 material
CN109454316A (en) High temperature high voltage resistant high alloy submerged-arc welding steel pipe welding procedure
CN110938784A (en) Thick-wall large-caliber high-steel grade pipeline pipe with thickness of 40-60 mm and manufacturing method thereof
CN106811589A (en) A kind of steel pipe process for quenching
CN101716613A (en) Medium-temperature drawing process of magnesium alloy circular tube
CN112872089A (en) Manufacturing method of 25Cr high-strength steel thick-wall seamless pipe
Jin et al. Corrosion failure analysis of the condensate collector vessel head of evaporation system in ethylene glycol device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Method for manufacturing high-pressure cylinder through double-phase stainless steel seamless steel pipe

Effective date of registration: 20181225

Granted publication date: 20171020

Pledgee: Qinyang Credit Guarantee Co., Ltd.

Pledgor: QINYANG GUOSHUN SILICON SOURCE PHOTOELECTRIC GAS CO., LTD.

Registration number: 2018990001254

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20191220

Granted publication date: 20171020

Pledgee: Qinyang Credit Guarantee Co., Ltd.

Pledgor: QINYANG GUOSHUN SILICON SOURCE PHOTOELECTRIC GAS CO., LTD.

Registration number: 2018990001254