CN105297769A - Screeder used for installation of foundation - Google Patents
Screeder used for installation of foundation Download PDFInfo
- Publication number
- CN105297769A CN105297769A CN201510873169.2A CN201510873169A CN105297769A CN 105297769 A CN105297769 A CN 105297769A CN 201510873169 A CN201510873169 A CN 201510873169A CN 105297769 A CN105297769 A CN 105297769A
- Authority
- CN
- China
- Prior art keywords
- screeder
- screwed hole
- bolt
- levelling
- section steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Road Paving Machines (AREA)
Abstract
The invention discloses a screeder used for installation of a foundation. The screeder comprises a supporting device, a positioning device and a screeding device. The positioning device comprises a positioning bolt. The screeding device comprises a screeding bolt. The supporting device comprises a cross beam, a transverse supporting frame and a longitudinal supporting frame, wherein the two ends of the cross beam are connected with the longitudinal supporting frame, one end of the longitudinal supporting frame is connected with the cross beam, and the other end of the longitudinal supporting frame is connected with the transverse supporting frame. The screeder meets the requirement of screeding of the panel installation foundation, can be reused, is a detachable device capable of being freely adjusted according to the length and width of foundation channel steel and the levelness of the ground, meets the requirement of foundation screeding, and is simple in structure, convenient to operate and low in cost.
Description
Technical field
The present invention relates to a kind of leveling unit, particularly relate to a kind of screeder for installation foundation.
Background technology
At present, carry out, in the installation of panel basis, needing again to carry out levelling to basic channel-section steel in equipment technological transformation upgrading, and the mode such as levelling often employing range estimation or the levelling bolt of temporary weld.
Especially carry out in equipment technological transformation upgrade job in the power station of long period of going into operation or factory, original basic channel-section steel often needs to change and original levelling mode effect when basic channel-section steel is longer is undesirable, the levelling bolt of temporary weld is needed repeatedly to regulate and weld, central control room or near have the equipment such as charging operation not allow to get angry place can only adopt level gauge or add artificial visually examine's mode and carry out, effect is undesirable; And it can not arbitrarily regulate and dismantle, and can not meet the requirement that panel installation foundation is levelling.
Summary of the invention
The object of this invention is to provide a kind of screeder for installation foundation, this screeder solves the levelling needs of panel installation foundation, it can be reused, can carry out the detachable apparatus of arbitrarily adjustment according to basic channel-section steel length, width and ground flat degree, meet the levelling requirement of installation foundation, and its structure is simple, easy to operate, cost is low.
The present invention realizes its goal of the invention, and the technical scheme adopted is:
For a screeder for installation foundation, wherein: comprise bracing or strutting arrangement, positioner, leveling unit, described positioner comprises positioning bolt, and described leveling unit comprises levelling bolt; Described bracing or strutting arrangement comprises crossbeam, cross binding frame, longitudinal bracing frame, and the two ends of described crossbeam are connected with longitudinal bracing frame respectively, and one end of described longitudinal bracing frame is connected with described crossbeam, and the other end is connected with described cross binding frame.
Further, in order to be fixed by object, above-mentioned longitudinal bracing frame is provided with a screwed hole, positioning bolt described in fit on described screwed hole.
Further, in order to find horizontal level at horizontal direction, above-mentioned cross binding frame is provided with a screwed hole, levelling bolt described in fit on described screwed hole.
Further, in order to firmly be fixed by object better, above-mentioned longitudinal bracing frame is provided with two or more screwed hole, positioning bolt described in fit on described screwed hole.
Further, in order to find horizontal level accurately at horizontal direction better, above-mentioned cross binding frame is provided with two or more screwed hole, levelling bolt described in fit on described screwed hole.
Compared with prior art, the invention has the beneficial effects as follows:
(1), the present invention has two-way location, by the positioning bolt be linked on longitudinal bracing frame, object is positioned, horizontal location is carried out again by the levelling bolt be linked on cross binding frame, the planeness of base area surface evenness and installation foundation, realize levelling object fast, improve levelling quality.
(2), positioning bolt of the present invention, levelling bolt are detachable, by changing positioning bolt, the levelling bolt of different length, the installation foundation without width can be adapted to, practical, also efficiently solve all deficiencies caused because of operating environment restriction (ground uneven, do not allow dynamic weldering).
(3), the invention belongs to and can reuse, avoid the meaningless welding job in installation process, i.e. safety, saves time again, again saving of labor, and general personnel all can skillfully use, simple and convenient, do not limit to by environment.
(4), the installation foundation of the present invention by using the screeder without quantity to go for different length and weight.
Below in conjunction with the drawings and specific embodiments, the present invention is described in further detail.
Accompanying drawing explanation
Fig. 1 is the cross-sectional schematic of the embodiment of the present invention one.
Fig. 2 is the right TV structure schematic diagram of Fig. 1.
Fig. 3 is the plan structure schematic diagram of Fig. 1.
Detailed description of the invention
Embodiment one
Fig. 1,2,3 illustrates, a kind of screeder for installation foundation, comprises bracing or strutting arrangement, positioner, leveling unit, and described positioner comprises two positioning bolts 1, and described leveling unit comprises two levelling bolts 2; Described bracing or strutting arrangement comprises crossbeam 3, cross binding frame 4, longitudinal bracing frame 5, and the two ends of described crossbeam 3 are connected with longitudinal bracing frame 5 respectively, and one end of described longitudinal bracing frame 5 is connected with described crossbeam 3, and the other end is connected with described cross binding frame 4.
The longitudinal bracing frame 5 of this example is provided with two screwed holes, positioning bolt 1 described in fit on described screwed hole.
The cross binding frame 4 of this example is provided with two screwed holes, levelling bolt 2 described in fit on described screwed hole.
The installation foundation of this example is channel-section steel 6, and the course of work of this example is:
Bracing or strutting arrangement is placed on channel-section steel 6, then with positioning bolt 1, the longitudinal bracing frame 5 of bracing or strutting arrangement and channel-section steel 6 are fixed, level gauge is placed on channel-section steel 6, then Bound moisture level, regulate with levelling bolt 2, being fixed channel-section steel 6 by the mode such as welding or build after levelling, complete channel-section steel 6 installation work.
In practical operation, according to the channel-section steel of different in width, need positioning bolt 1, the levelling bolt 2 of adaptive concrete different length: a kind of is can according to the width of different channel-section steel 6, if the channel-section steel 6 of 100mm width, it is larger than channel-section steel width that the width of crossbeam 3 can be decided to be 120mm(, channel-section steel can be comprised), the length of positioning bolt 1 is 20mm, the length of levelling bolt 2 considers ground flat degree and scene reality, can use 200mm length; If the channel-section steel 6 of 200mm width, it is larger than channel-section steel width that the width of crossbeam 3 can be decided to be 220mm(, channel-section steel can be comprised), the length of positioning bolt 1 is 20mm, the length of levelling bolt 2 considers ground flat degree and scene reality, can use 300mm length; The channel-section steel of other width also can carry out convergent-divergent according to this kind of ratio.
Another kind is the channel-section steel width often used according to each company, if the basic channel-section steel width often used is 30mm-100mm, then the width of crossbeam 3 can be decided to be 120mm, the length of positioning bolt 1 is then for 100mm gets final product (ensureing to be regulated by bolt length to adapt to basic channel-section steel width), and the length of levelling bolt 2 is 200mm.In like manner, if the basic channel-section steel width often used is 50-200mm, then the selectable width of crossbeam 3 selects 220mm, and positioning bolt 1 length is that 200mm gets final product (ensureing to be regulated by bolt length to adapt to basic channel-section steel width), and the length of levelling bolt 2 is 200mm.
If the channel-section steel of 50 meters, according to the planeness of site operation experience and channel-section steel itself, generally set a screeder as good by 5-10 rice, namely need 5-10 screeder to be good.If the channel-section steel of 100 meters then needs 10-20 screeder to be good.General selection 10 meters in practical application, for short channel-section steel (within 20 meters), generally just passable with 3 screeders.
Longitudinal bracing frame 5 of the present invention also can establish a screwed hole, a cover unification positioning bolt 1; A screwed hole on cross binding frame 4, a cover unification levelling bolt 2.Also can be that longitudinal bracing frame 5 also can establish three screwed holes, fit three positioning bolts 1; Two screwed holes on cross binding frame 4, the levelling bolt 2 of fit two.
Certainly, the material of bracing or strutting arrangement of the present invention can be that plastics are made, but considers that plastics exist aging and frangible phenomenon, generally still uses on-deformable metal material to be made as good.
Embodiments of the present invention are not restricted to the described embodiments, and the change done, modification, substitute, combination, to simplify under other any does not deviate from principle of the present invention, all should be the substitute mode of equivalence, are included within protection scope of the present invention.
Claims (5)
1. for a screeder for installation foundation, it is characterized in that: comprise bracing or strutting arrangement, positioner, leveling unit, described positioner comprises positioning bolt, and described leveling unit comprises levelling bolt; Described bracing or strutting arrangement comprises crossbeam, cross binding frame, longitudinal bracing frame, and the two ends of described crossbeam are connected with longitudinal bracing frame respectively, and one end of described longitudinal bracing frame is connected with described crossbeam, and the other end is connected with described cross binding frame.
2. a kind of screeder for installation foundation according to claim 1, is characterized in that: described longitudinal bracing frame is provided with a screwed hole, positioning bolt described in fit on described screwed hole.
3. a kind of screeder for installation foundation according to claim 2, is characterized in that: described cross binding frame is provided with a screwed hole, levelling bolt described in fit on described screwed hole.
4. a kind of screeder for installation foundation according to claim 1, is characterized in that: described longitudinal bracing frame is provided with two or more screwed hole, positioning bolt described in fit on described screwed hole.
5. a kind of screeder for installation foundation according to claim 4, is characterized in that: described cross binding frame is provided with two or more screwed hole, levelling bolt described in fit on described screwed hole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510873169.2A CN105297769A (en) | 2015-12-02 | 2015-12-02 | Screeder used for installation of foundation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510873169.2A CN105297769A (en) | 2015-12-02 | 2015-12-02 | Screeder used for installation of foundation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105297769A true CN105297769A (en) | 2016-02-03 |
Family
ID=55195531
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510873169.2A Pending CN105297769A (en) | 2015-12-02 | 2015-12-02 | Screeder used for installation of foundation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105297769A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109162399A (en) * | 2018-10-24 | 2019-01-08 | 湖南远大建工股份有限公司 | Leveling unit and its levelling construction method for prefabricated anti-bank |
CN110374300A (en) * | 2019-07-06 | 2019-10-25 | 深圳市新雅建设工程有限公司 | Stone floor system and its construction method |
CN110695873A (en) * | 2019-10-14 | 2020-01-17 | 济南重工股份有限公司 | Distributing machine ground supporting wheel leveling tool and method |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11229409A (en) * | 1998-02-18 | 1999-08-24 | Toshiba Plant Kensetsu Co Ltd | Installation of machinery base |
KR200169480Y1 (en) * | 1999-09-09 | 2000-02-15 | 송영택 | A leveling device for carrying out the ground |
CN201605818U (en) * | 2009-12-18 | 2010-10-13 | 广东浩和建筑有限公司 | Adjustable leveling guide track |
CN204266600U (en) * | 2014-11-06 | 2015-04-15 | 江苏省建工集团有限公司 | A kind of concrete planeness and height controller |
CN104746529A (en) * | 2015-03-30 | 2015-07-01 | 河南省第二建筑工程发展有限公司 | Pre-buried steel channel installing tool |
CN204780983U (en) * | 2015-06-10 | 2015-11-18 | 宏盛建业投资集团有限公司 | Whole pre -buried major diameter bolt crowd structure of raft board basis high accuracy |
CN205134357U (en) * | 2015-12-02 | 2016-04-06 | 国电大渡河流域水电开发有限公司 | A ware of making level for installing basis |
-
2015
- 2015-12-02 CN CN201510873169.2A patent/CN105297769A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11229409A (en) * | 1998-02-18 | 1999-08-24 | Toshiba Plant Kensetsu Co Ltd | Installation of machinery base |
KR200169480Y1 (en) * | 1999-09-09 | 2000-02-15 | 송영택 | A leveling device for carrying out the ground |
CN201605818U (en) * | 2009-12-18 | 2010-10-13 | 广东浩和建筑有限公司 | Adjustable leveling guide track |
CN204266600U (en) * | 2014-11-06 | 2015-04-15 | 江苏省建工集团有限公司 | A kind of concrete planeness and height controller |
CN104746529A (en) * | 2015-03-30 | 2015-07-01 | 河南省第二建筑工程发展有限公司 | Pre-buried steel channel installing tool |
CN204780983U (en) * | 2015-06-10 | 2015-11-18 | 宏盛建业投资集团有限公司 | Whole pre -buried major diameter bolt crowd structure of raft board basis high accuracy |
CN205134357U (en) * | 2015-12-02 | 2016-04-06 | 国电大渡河流域水电开发有限公司 | A ware of making level for installing basis |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109162399A (en) * | 2018-10-24 | 2019-01-08 | 湖南远大建工股份有限公司 | Leveling unit and its levelling construction method for prefabricated anti-bank |
CN110374300A (en) * | 2019-07-06 | 2019-10-25 | 深圳市新雅建设工程有限公司 | Stone floor system and its construction method |
CN110374300B (en) * | 2019-07-06 | 2021-07-06 | 深圳市新雅建设工程有限公司 | Stone floor system and construction method thereof |
CN110695873A (en) * | 2019-10-14 | 2020-01-17 | 济南重工股份有限公司 | Distributing machine ground supporting wheel leveling tool and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104259717B (en) | Adjustable splicing mould bed | |
CN206458918U (en) | A kind of adjustable subway suspension and support | |
CN105297769A (en) | Screeder used for installation of foundation | |
MY147923A (en) | A slab formwork system | |
CN104061369B (en) | The assembled movable cable support of medium and high voltage cable line arrangement in a kind of distance passage | |
CN204402041U (en) | A kind of inclined-plane body of wall cantilever adjustable angle formwork mechanism | |
CN105569242A (en) | Assembling method for composite floor slabs | |
CN202073323U (en) | Supporting frame for regulating installing horizontality of embedded part | |
CN102287058B (en) | Method for installing and leveling large-plane high-precision embedded part | |
CN103352476A (en) | Large-scale bolt high-precision pre-burying construction method | |
CN205134357U (en) | A ware of making level for installing basis | |
CN204238570U (en) | The spiral adjuster of absolute altitude of frame ball node is installed | |
CN103912120B (en) | Tool type rectangular column mould reinforcement device | |
CN207419267U (en) | A kind of bridge preassembling simulates frock with side longeron | |
CN106958353B (en) | Spread thick liquid device with reel | |
CN206693630U (en) | A kind of concreting servicing unit | |
CN105133638B (en) | Spring vibration isolation foundation construction template leveling device and construction method thereof | |
CN204512824U (en) | A kind of adjustable diesel engine hydraulic installalion supporting leg | |
CN203755568U (en) | Combined height-adjustable support for overlength roof slab construction | |
CN107795148A (en) | The support mechanism that construction site uses | |
CN204075597U (en) | A kind of adjustable assembled moulding bed | |
CN208014918U (en) | GIS device is grounded copper billet and adjusts setting tool | |
CN202596190U (en) | Adjustable wallboard inclined strut for large-size storage tank | |
CN104882792A (en) | Assembly-type support of transformer substation secondary equipment room | |
CN204243551U (en) | A kind of power distribution cabinet electric leveling device based on channel-section steel fixed electrical machinery |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160203 |
|
RJ01 | Rejection of invention patent application after publication |