CN105275487A - 长臂开采n00工法通风*** - Google Patents
长臂开采n00工法通风*** Download PDFInfo
- Publication number
- CN105275487A CN105275487A CN201510707836.XA CN201510707836A CN105275487A CN 105275487 A CN105275487 A CN 105275487A CN 201510707836 A CN201510707836 A CN 201510707836A CN 105275487 A CN105275487 A CN 105275487A
- Authority
- CN
- China
- Prior art keywords
- hill
- passage
- ventilation system
- long
- belt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000005065 mining Methods 0.000 title claims abstract description 36
- 238000009423 ventilation Methods 0.000 title claims abstract description 28
- 238000010276 construction Methods 0.000 title abstract description 5
- 238000000034 method Methods 0.000 claims abstract description 18
- 238000012407 engineering method Methods 0.000 claims description 24
- 238000004891 communication Methods 0.000 claims description 4
- 239000003245 coal Substances 0.000 abstract description 21
- 230000005641 tunneling Effects 0.000 abstract description 3
- 238000011084 recovery Methods 0.000 description 9
- 238000004519 manufacturing process Methods 0.000 description 6
- 238000010586 diagram Methods 0.000 description 2
- YZAAUZMWCZGKMQ-UHFFFAOYSA-N 2,2,6,6,8,8-hexamethylchromene-5,7-dione Chemical compound O=C1C(C)(C)C(=O)C(C)(C)C2=C1C=CC(C)(C)O2 YZAAUZMWCZGKMQ-UHFFFAOYSA-N 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000033558 biomineral tissue development Effects 0.000 description 1
- 239000000428 dust Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000000505 pernicious effect Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F1/00—Ventilation of mines or tunnels; Distribution of ventilating currents
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C41/00—Methods of underground or surface mining; Layouts therefor
- E21C41/16—Methods of underground mining; Layouts therefor
- E21C41/18—Methods of underground mining; Layouts therefor for brown or hard coal
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Remote Sensing (AREA)
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
- Ventilation (AREA)
Abstract
本发明公开了一种长臂开采N00工法通风***,应用于采煤区,采煤区包括有三条下山通道,分别为回风下山通道、皮带下山通道和轨道下山通道,皮带下山通道设置在采煤区边界,同时作为大切眼使用,当皮带下山通道作为进风通道使用时,与回风下山通道连通,在任一工作面开采过程中,皮带下山通道与该工作面的上顺槽、工作面及下顺槽留巷顺序连通。本发明中皮带下山通道设置在采煤区边界,同时作为大切眼使用,并且在任一工作面开采过程中与该工作面的上顺槽、工作面及下顺槽留巷顺序连通,工作面下顺槽为切顶卸压留巷形成,从而可以实现整个采煤区在无需掘进顺槽的同时实现有效的通风,并在开采过程中实现动态通风***。
Description
技术领域
本发明涉及长臂开采工法的通风***,特别涉及到一种无煤柱且无顺槽掘进开采工法的通风***结构。
背景技术
传统的煤炭开采方式是通过留设煤柱、沿空掘巷来进行的,每个工作面需要掘进两条顺槽,留设一个煤柱,即121工法,121工法的万吨掘进率不高,煤炭回收率低。
随着大规模的煤炭开采,煤炭资源量日益减少,尤其在煤炭经济萧条的今天,传统的留设煤柱、沿空掘巷的开采方式造成的开采成本高,煤炭回收率低等问题日益突出。需要采用新的开采工法,但新的开采工法与传统的121工法下巷道布置相比必然发生重大改变,其通风方式也势必将发生改变。而矿井通风能向井下输送新鲜空气,冲淡井下有害气体和粉尘,调节井下气候,创造良好的工作环境,是矿井生产环节中最基本的一环,它在矿井建设和生产期间始终占有非常重要的地位,为矿井的安全生产提供了保障。因此,配合新工法的通风***已经成为当务之急。
发明内容
针对现有技术中存在的问题,本发明的目的为提供一种能够配合节约资源的新工法的提高工作面安全性的长臂开采N00工法通风***。
为实现上述目的,本发明的技术方案如下:
一种长臂开采N00工法通风***,应用于采煤区,所述采煤区包括有三条下山通道,分别为回风下山通道、皮带下山通道和轨道下山通道,所述皮带下山通道设置在所述采煤区边界,同时作为大切眼使用,当所述皮带下山通道作为进风通道使用时,与所述回风下山通道连通,在任一工作面开采过程中,所述皮带下山通道与该工作面的上顺槽、工作面及下顺槽留巷顺序连通。
在一可选的实施例中,所述采煤区包括多个工作面,在每个所述工作面开采过程中进行切顶沿空留巷,该留巷作为该工作面的下顺槽连通该下山通道,且在开采下一工作面时作为下一工作面的上顺槽。
在一可选的实施例中,每一所述工作面在完成开采后,上顺槽均不予保留。
在一可选的实施例中,每一所述工作面推进至停采线完成开采后,对工作面通道进行切顶留巷从而成为皮带下山通道的一部分,并平行于回风下山通道和轨道下山通道。
在一可选的实施例中,所述切顶沿空留巷过程中采用定向切缝。
在一可选的实施例中,所述切顶沿空留巷过程中采用锚杆和锚索进行顶板支护。
在一可选的实施例中,所述切顶沿空留巷过程中采用液压柱支护。
本发明中皮带下山通道设置在采煤区边界,同时作为大切眼使用,并且在任一工作面开采过程中与该工作面的上顺槽、工作面及下顺槽留巷顺序连通,工作面下顺槽为切顶卸压留巷形成,从而可以实现整个采煤区在无需掘进顺槽的同时实现有效的通风,并在开采过程中实现动态通风***,不但可配合N00工法实现不留设煤柱开采,节约资源,而且提高其安全性,保障了采煤工作面的安全。
附图说明
下面结合附图对本发明作进一步详细说明:
图1为本发明的长臂开采N00工法通风***的一具体应用示意图;
图2为采用本发明的长臂开采N00工法通风***开采过程示意图。
具体实施方式
体现本发明特征与优点的典型实施例将在以下的说明中详细叙述。应理解的是本发明能够在不同的实施例上具有各种的变化,其皆不脱离本发明的范围,且其中的说明及附图在本质上是当作说明之用,而非用以限制本发明。
长壁开采N00工法是一种新型煤矿开采方法,其特点是不用在工作面开采时挖掘上顺槽和下顺槽,也不需要留设煤柱,并且可保证整个盘区的通风。下面以一具体实施例的结构作展开说明。
本发明的长臂开采N00工法通风***,应用于N00工法。如图1和图2所示,在该示例性实施例中,在盘区10的一侧直接设置有回风下山通道7和轨道下山通道8。在盘区井口到另一侧连通设置有皮带下山通道,该皮带下山通道设置在采煤区边界,同时作为大切眼使用。
该实施例中,皮带下山通道为一动态变化的通道,在首采面开采之前,如图1所示,其包括井口段1、首采面上顺槽2、大切眼段5和回风巷6。在一工作面进行开采过程中,如图2所示,其包括井口段1、该开采的工作面的上顺槽2、开采面3、该开采的工作面留巷形成的下顺槽4、大切眼段5和回风巷6。
回风下山通道7、轨道下山通道8和皮带下山通道都连通井口,而且皮带下山通道环绕整个盘区10后连通回风下山通道7,形成盘区10的整体通风***。
该实施例中,盘区10包括多个工作面11。在首采面11上,皮带下山通道的一段作为该首采面11的上顺槽2,在开采过程中,在靠近下一工作面11的位置上进行留巷,形成下顺槽4。另外,开采面3上具有通道。每一工作面11在完成开采后,上顺槽2均不予保留。另外,每一工作面11在推进至停采线完成开采后,对工作面通道3进行切顶留巷从而成为皮带下山通道的一部分,并平行于回风下山通道7和轨道下山通道8。
该实施例中,切顶沿空留巷过程中采用定向切缝、锚杆和锚索支护以及液压柱支护,以加强留巷可靠性。
该实施例中,在进行一般工作面11开采时,其上一工作面的侧部留巷作为其上顺槽,开采面3的通道作为通风通道,自身留巷作为下顺槽,依旧形成完整的通风***。
在该过程中,始终无需对任一工作面11在开采作业前挖掘上顺槽和下顺槽,仅需留巷即可,因此提高工作效率,降低资源消耗。
另外,该实施例中,留巷是在切顶卸压的同时实现,切顶卸压后,顶板不再对采空区形成压力,因此无需留设煤柱作为支撑,可大大提高采煤率,降低成本,有效利用能源,市场前景非常好。
该实施例中,每一工作面11在开采过程包括:
从远离回风下山通道7和轨道下山通道8的一端(即靠近皮带下山通道5的一端)向回风下山通道7和轨道下山通道8方向开采;
形成采空区;
开采过程中,切顶卸压并留巷,留巷位置为靠近下一工作面11的侧部。
本发明的有益效果在于,本发明与现有技术相比,本发明中三条下山通道中的一条通道设置在采煤区边界,同时作为大切眼使用,并且在任一工作面开采过程中,该下山通道与该工作面的上顺槽、工作面及下顺槽留巷顺序连通,从而可以实现整个采煤区在无需掘进顺槽的同时实现有效的通风,并在开采过程中实现动态通风***,不但可配合N00工法实现不留设煤柱开采和不需要掘进顺槽,节约资源,而且提高其安全性,保障了采煤工作面的安全。
本发明的技术方案已由可选实施例揭示如上。本领域技术人员应当意识到在不脱离本发明所附的权利要求所揭示的本发明的范围和精神的情况下所作的更动与润饰,均属本发明的权利要求的保护范围之内。
Claims (7)
1.一种长臂开采N00工法通风***,应用于采煤区,其特征在于,所述采煤区包括有三条下山通道,分别为回风下山通道、皮带下山通道和轨道下山通道,所述皮带下山通道设置在所述采煤区边界,同时作为大切眼使用,当所述皮带下山通道作为进风通道使用时,与所述回风下山通道连通,在任一工作面开采过程中,所述皮带下山通道与该工作面的上顺槽、工作面及下顺槽留巷顺序连通。
2.如权利要求1所述的长臂开采N00工法通风***,其特征在于,所述采煤区包括多个工作面,在每个所述工作面开采过程中进行切顶沿空留巷,该留巷作为该工作面的下顺槽连通该下山通道,且在开采下一工作面时作为下一工作面的上顺槽。
3.如权利要求2所述的长臂开采N00工法通风***,其特征在于,每一所述工作面在完成开采后,上顺槽均不予保留。
4.如权利要求3所述的长臂开采N00工法通风***,其特征在于,每一所述工作面推进至停采线完成开采后,对工作面通道进行切顶留巷从而成为皮带下山通道的一部分,并平行于回风下山通道和轨道下山通道。
5.如权利要求2所述的长臂开采N00工法通风***,其特征在于,所述切顶沿空留巷过程中采用定向切缝。
6.如权利要求5所述的长臂开采N00工法通风***,其特征在于,所述切顶沿空留巷过程中采用锚杆和锚索进行顶板支护。
7.如权利要求5所述的长臂开采N00工法通风***,其特征在于,所述切顶沿空留巷过程中采用液压柱支护。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510707836.XA CN105275487B (zh) | 2015-10-27 | 2015-10-27 | 长臂开采n00工法通风*** |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510707836.XA CN105275487B (zh) | 2015-10-27 | 2015-10-27 | 长臂开采n00工法通风*** |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105275487A true CN105275487A (zh) | 2016-01-27 |
CN105275487B CN105275487B (zh) | 2017-07-18 |
Family
ID=55145219
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510707836.XA Active CN105275487B (zh) | 2015-10-27 | 2015-10-27 | 长臂开采n00工法通风*** |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105275487B (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2016206618A1 (zh) * | 2015-06-24 | 2016-12-29 | 何满潮 | 长壁开采n00工法 |
CN109611140A (zh) * | 2019-02-27 | 2019-04-12 | 河南理工大学 | 一种110及n00工法开采工作面采空区风流运移特性模拟测试装置及使用方法 |
CN111794749A (zh) * | 2020-07-16 | 2020-10-20 | 山东里能里彦矿业有限公司 | 一种适用于薄煤层的n00采煤工艺 |
US11008860B2 (en) | 2015-06-24 | 2021-05-18 | Manchao He | Equipment system for no-roadway no-coal-pillar retained roadway mining method |
WO2021219131A1 (zh) * | 2020-04-30 | 2021-11-04 | 中国矿业大学(北京) | 一种切顶留巷无煤柱开采方法 |
Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5769504A (en) * | 1996-03-11 | 1998-06-23 | Council Of Scientific & Industrial Research | Equipment for shortwall mining useful for extraction of pillars in underground coal mines |
CN1936271A (zh) * | 2006-08-21 | 2007-03-28 | 山东盛泉矿业有限公司 | 煤矿矸石充填无煤柱开采工作面采空区的方法 |
CN101033689A (zh) * | 2007-04-10 | 2007-09-12 | 闫振东 | 一种煤矿井下无煤柱回收方法 |
CN101649741A (zh) * | 2009-05-27 | 2010-02-17 | 山西晋城无烟煤矿业集团有限责任公司 | 大U套小u方式布置的巷道 |
CN101824985A (zh) * | 2010-03-25 | 2010-09-08 | 巩庆刚 | 煤矿保护煤柱的无煤柱开采方法 |
CN101906979A (zh) * | 2009-06-08 | 2010-12-08 | 兖州煤业股份有限公司 | 沿空留巷支护方法及其注巷滑模 |
CN102182460A (zh) * | 2011-04-14 | 2011-09-14 | 山西晋城无烟煤矿业集团有限责任公司 | 高瓦斯多巷无煤柱开采法 |
CN102287212A (zh) * | 2011-09-09 | 2011-12-21 | 贾民 | 一种“y”型通风的方法 |
CN102392642A (zh) * | 2011-11-02 | 2012-03-28 | 王晓利 | 一种无煤柱回采工作面的巷道布置方法 |
CN102536239A (zh) * | 2012-01-06 | 2012-07-04 | 何满潮 | 一种长壁工作面无煤柱开采方法 |
CN102966354A (zh) * | 2012-11-09 | 2013-03-13 | 中国矿业大学(北京) | 一种厚煤层坚硬顶板长壁工作面无煤柱开采方法 |
CN103233740A (zh) * | 2013-04-22 | 2013-08-07 | 中国矿业大学(北京) | 一种近距离薄煤层切顶成巷无煤柱开采方法 |
-
2015
- 2015-10-27 CN CN201510707836.XA patent/CN105275487B/zh active Active
Patent Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5769504A (en) * | 1996-03-11 | 1998-06-23 | Council Of Scientific & Industrial Research | Equipment for shortwall mining useful for extraction of pillars in underground coal mines |
CN1936271A (zh) * | 2006-08-21 | 2007-03-28 | 山东盛泉矿业有限公司 | 煤矿矸石充填无煤柱开采工作面采空区的方法 |
CN101033689A (zh) * | 2007-04-10 | 2007-09-12 | 闫振东 | 一种煤矿井下无煤柱回收方法 |
CN101649741A (zh) * | 2009-05-27 | 2010-02-17 | 山西晋城无烟煤矿业集团有限责任公司 | 大U套小u方式布置的巷道 |
CN101906979A (zh) * | 2009-06-08 | 2010-12-08 | 兖州煤业股份有限公司 | 沿空留巷支护方法及其注巷滑模 |
CN101824985A (zh) * | 2010-03-25 | 2010-09-08 | 巩庆刚 | 煤矿保护煤柱的无煤柱开采方法 |
CN102182460A (zh) * | 2011-04-14 | 2011-09-14 | 山西晋城无烟煤矿业集团有限责任公司 | 高瓦斯多巷无煤柱开采法 |
CN102287212A (zh) * | 2011-09-09 | 2011-12-21 | 贾民 | 一种“y”型通风的方法 |
CN102392642A (zh) * | 2011-11-02 | 2012-03-28 | 王晓利 | 一种无煤柱回采工作面的巷道布置方法 |
CN102536239A (zh) * | 2012-01-06 | 2012-07-04 | 何满潮 | 一种长壁工作面无煤柱开采方法 |
CN102966354A (zh) * | 2012-11-09 | 2013-03-13 | 中国矿业大学(北京) | 一种厚煤层坚硬顶板长壁工作面无煤柱开采方法 |
CN103233740A (zh) * | 2013-04-22 | 2013-08-07 | 中国矿业大学(北京) | 一种近距离薄煤层切顶成巷无煤柱开采方法 |
Non-Patent Citations (1)
Title |
---|
屠世浩等: "厚煤层全煤巷采区巷道布置关键技术研究", 《中国矿业大学学报》 * |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2016206618A1 (zh) * | 2015-06-24 | 2016-12-29 | 何满潮 | 长壁开采n00工法 |
US10494924B2 (en) | 2015-06-24 | 2019-12-03 | Manchao He | Longwall mine construction method N00 |
EA035591B1 (ru) * | 2015-06-24 | 2020-07-13 | Маньчао Хэ | Способ разработки длинными забоями |
US11008860B2 (en) | 2015-06-24 | 2021-05-18 | Manchao He | Equipment system for no-roadway no-coal-pillar retained roadway mining method |
CN109611140A (zh) * | 2019-02-27 | 2019-04-12 | 河南理工大学 | 一种110及n00工法开采工作面采空区风流运移特性模拟测试装置及使用方法 |
WO2021219131A1 (zh) * | 2020-04-30 | 2021-11-04 | 中国矿业大学(北京) | 一种切顶留巷无煤柱开采方法 |
CN111794749A (zh) * | 2020-07-16 | 2020-10-20 | 山东里能里彦矿业有限公司 | 一种适用于薄煤层的n00采煤工艺 |
Also Published As
Publication number | Publication date |
---|---|
CN105275487B (zh) | 2017-07-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105240013B (zh) | 长壁开采n00工法 | |
CN105275487A (zh) | 长臂开采n00工法通风*** | |
CN101749018B (zh) | 煤柱直接回收采煤法 | |
CN102392642A (zh) | 一种无煤柱回采工作面的巷道布置方法 | |
CN107882565B (zh) | 一种无掘进无煤柱采留一体开采工艺 | |
WO2021219131A1 (zh) | 一种切顶留巷无煤柱开采方法 | |
US20230175398A1 (en) | Three-Dimensional Ventilation Method And System For Mining By 110 Construction Method In Coal And Gas Outburst Mines | |
CN105952453B (zh) | 长壁前进式煤层工作面机械化无巷开采成套设备 | |
CN101649741A (zh) | 大U套小u方式布置的巷道 | |
CN105178962A (zh) | 长壁开采110工法 | |
CN109252860B (zh) | 一种薄煤层连采机高度机械化开采方法 | |
CN108397227A (zh) | 一种倾向递进消突巷道布置方法 | |
CN101881167B (zh) | 煤矿回采工作面小煤柱开采方法 | |
CN109209382A (zh) | 无煤柱无掘巷z型工作面回采方法 | |
CN109882175B (zh) | 实现一巷三用的工作面回采与停采设备回撤的协同作业方法 | |
CN104196554A (zh) | 一种采煤工作面u-u型通风方法及通风*** | |
CN106285770B (zh) | 一种开采煤层底板泥岩作为保护层增加近距离突出煤层群透气性的方法 | |
CN107083959A (zh) | 一种沿空留巷方法 | |
CN104533419A (zh) | 一种部分回收大煤柱残煤的方法 | |
CN105240012A (zh) | 一种实现煤柱同采的f型区段采煤方法 | |
CN103362511A (zh) | 急倾斜中厚煤层台阶式无煤柱采煤法 | |
CN103470286A (zh) | 一种采用条带钢筋网拦截自溜矸石支护的沿空留巷方法 | |
CN100529328C (zh) | 采掘同步、采巷复用的采矿生产方法 | |
CN204152536U (zh) | 一种采煤工作面u-u型通风*** | |
CN103850690A (zh) | 一种用于无煤柱开采的混凝土砌块配合锚索切顶沿空留巷方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |