CN105257321B - Shield tunnel construction at initial stage section of jurisdiction sockets device and construction method - Google Patents

Shield tunnel construction at initial stage section of jurisdiction sockets device and construction method Download PDF

Info

Publication number
CN105257321B
CN105257321B CN201510627284.1A CN201510627284A CN105257321B CN 105257321 B CN105257321 B CN 105257321B CN 201510627284 A CN201510627284 A CN 201510627284A CN 105257321 B CN105257321 B CN 105257321B
Authority
CN
China
Prior art keywords
jurisdiction
section
babinet
construction
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510627284.1A
Other languages
Chinese (zh)
Other versions
CN105257321A (en
Inventor
康杰
杨成龙
朱文良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Foundation Engineering Group Co Ltd
Original Assignee
Shanghai Foundation Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Foundation Engineering Group Co Ltd filed Critical Shanghai Foundation Engineering Group Co Ltd
Priority to CN201510627284.1A priority Critical patent/CN105257321B/en
Publication of CN105257321A publication Critical patent/CN105257321A/en
Application granted granted Critical
Publication of CN105257321B publication Critical patent/CN105257321B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The present invention relates to a kind of construction at shield tunnel initial stage section of jurisdiction to socket device and construction method, and step is:Front and rear portions babinet is fixed with section of jurisdiction center bolt;Manual hydraulic punching jack is fixed on the curved plate in anterior babinet;A piece fining twisted steel is passed through Manual hydraulic punching jack and section of jurisdiction center bolt center, and is fixed with anchor slab;Remaining fining twisted steel spreading to construction is needed length with connector of finish rolling thread steel, and is effectively connected with rear portion babinet;Manually formula hydraulic pressure punching jack oil pressure, stretches fining twisted steel, needs to adjust to socketing load before stretching, determines elongation;It is fixed with anchor slab, fixed anchoring after reaching construction requirement;Remove jack.The present invention is used to not only conventional diameter 6760mm balancing earth-pressure shielding machines, and suitable for the slurry balance shield machine of larger diameter, and after the completion of socketing, jack can be removed, section of jurisdiction sockets problem when efficiently solving shield tunnel construction at initial stage.

Description

Shield tunnel construction at initial stage section of jurisdiction sockets device and construction method
Technical field
The present invention relates to a kind of tunneling shield construction equipment and method, especially a kind of construction at shield tunnel initial stage section of jurisdiction Socket device and construction method.
Background technology
With the continuous development of shield law technology, the application of shield tunnel is more and more extensive, vcehicular tunnel, iron from early stage Develop into taking and discharging tunnel, nuclear power tunnel and subway tunnel etc. in road tunnel.Especially subway tunnel, is all century-old engineering, is held not There must be mishap, the normal operation of subway tunnel is related to the development process in whole city.
It is the construction quality of tunnel in itself to influence the principal element that subway tunnel uses.Shield machine appearance during such as shield construction State controls improper or measurement error etc., causes tunnel axis unreasonable with gap of the shield tail, causes section of jurisdiction to crush situation, leaks Regimen condition.When especially shield tunnel is constructed in the early stage, since the frictional force between section of jurisdiction and the soil body is smaller, and synchronous grouting is starched Liquid sedimentation is not stablized also, and leans on system stiffness uneven after shield launching, and molded section of jurisdiction is integrally to active well in order to prevent Displacement(The especially uneven dislocation in tunnel both sides)And cause tunnel axis offset, section of jurisdiction crushes, percolating water, screw rod are drawn Break, it is necessary to molded section of jurisdiction is carried out overall fixed.The experience and Shen Tong groups constructed according to Shanghai Underground build tube hub It is required that, it is desirable to provide this kind of set section of jurisdiction sockets device.
The content of the invention
Molded section of jurisdiction is overall in order to prevent causes tunnel axis offset, section of jurisdiction to crush, ooze to active well displacement The problems such as leak, screw rod are pulled off, the present invention are to provide for a kind of construction at shield tunnel initial stage section of jurisdiction and socket device and construction Method, when constructing in the early stage for solving shield tunnel, since the frictional force between section of jurisdiction and the soil body is smaller, and synchronous grouting is starched Liquid sedimentation is not stablized also, and by the technical problem such as system stiffness is uneven after shield launching.
To achieve the above object, the technical scheme is that:
A kind of construction at shield tunnel initial stage section of jurisdiction sockets device, for preventing molded section of jurisdiction overall to active well position Shift and cause tunnel axis offset, section of jurisdiction crushes, percolating water, screw rod are pulled off, the device include steel babinet, Manual hydraulic Punching jack, anchor slab, fixed anchor, fining twisted steel, connector of finish rolling thread steel, section of jurisdiction center bolt, the steel babinet by Front and rear portions babinet is formed, and front and rear portions babinet is fixedly connected by section of jurisdiction center bolt, and hand is housed in the front portion babinet Hydraulic pressure punching jack, is respectively equipped with anchor slab in the front and rear portions babinet, the fining twisted steel passes through actuated hydraulic punching thousand Jin top and section of jurisdiction center bolt center, and be fixedly connected with anchor slab.
Fining twisted steel length to required for constructing by connector of finish rolling thread steel spreading, and have with rear portion babinet Effect connection.
A kind of construction method that device is socketed using shield tunnel construction at initial stage section of jurisdiction, Specific construction step:1)With pipe Piece center bolt fixes front and rear portions babinet;2)Manual hydraulic punching jack is fixed on the curved plate in anterior babinet; 3)A piece fining twisted steel is passed through Manual hydraulic punching jack and section of jurisdiction center bolt center, and is fixed with anchor slab;4) Remaining fining twisted steel spreading to construction is needed length with connector of finish rolling thread steel, and is effectively connected with rear portion babinet Connect;5)Manually formula hydraulic pressure punching jack oil pressure, stretches fining twisted steel, needed before stretching to socket load into Row is adjusted, and determines elongation;6)It is fixed with anchor slab, fixed anchoring after reaching construction requirement;7)Remove jack.
The beneficial effects of the invention are as follows:
It is used to not only conventional diameter that shield tunnel construction at the initial stage section of jurisdiction of the present invention, which sockets device and method, 6760mm balancing earth-pressure shielding machines, and suitable for the slurry balance shield machine of larger diameter, and after the completion of socketing, jack can To remove, section of jurisdiction sockets problem when efficiently solving shield tunnel construction at initial stage.
Brief description of the drawings
Shield tunnel construction at the initial stage section of jurisdiction that Fig. 1 is the present invention sockets apparatus structure floor map;
Fig. 2 is that anterior babinet cuts open top view;
Fig. 3 is sectional view of Fig. 1 middle front parts babinet along A-A;
Fig. 4 is sectional view of Fig. 1 middle front parts babinet along B-B;
Fig. 5 is sectional view of Fig. 1 middle and backs babinet along C-C;
Fig. 6 is sectional view of Fig. 1 middle and backs babinet along D-D;
Fig. 7 is sectional view of Fig. 1 middle and backs babinet along E-E;
Fig. 8 is that rear portion babinet cuts open top view;
Fig. 9 is section of jurisdiction lifting center bolt schematic diagram.
Embodiment
With reference to specific embodiment, the present invention is further explained.
The present invention relates to a kind of construction at shield tunnel initial stage section of jurisdiction to socket device and construction method.Shield tunnel is first When phase constructs, since the frictional force between section of jurisdiction and the soil body is smaller, and simultaneous grouting slurry sedimentation is not stablized also, and shield launching It is uneven by system stiffness afterwards, in order to prevent molded section of jurisdiction it is overall to active well displacement and cause tunnel axis offset, Section of jurisdiction crushes, percolating water, screw rod are pulled off, and spy invents this device.
As shown in Figures 1 to 9, shield tunnel construction at initial stage section of jurisdiction of the invention sockets device, including following sections: Steel babinet 1, Manual hydraulic punching jack 2, anchor slab 3, fixed anchor, fining twisted steel 4, connector of finish rolling thread steel 5, section of jurisdiction Center bolt 6.
Steel babinet 1 is made of front and rear portions babinet, and front and rear portions babinet is fixedly connected by section of jurisdiction center bolt 6, anterior case Manual hydraulic punching jack 2 is housed in vivo, is respectively equipped with anchor slab 3 in front and rear portions babinet, fining twisted steel 4 passes through dynamic formula 6 center of hydraulic pressure punching jack 2 and section of jurisdiction center bolt, and be fixedly connected with anchor slab 3;Fining twisted steel 4 passes through finish rolling screw thread 5 spreading of steel connector length to required for constructing, and be effectively connected with rear portion babinet.
In constructing tunnel to 75 rings, i.e. section of jurisdiction abjection 25 ring of vehicle frame, start installation and socket device, in B1, B2 section of jurisdiction Heart hole for hoist height and position is respectively installed a set of.Specific construction step:(1)Steel babinet 1 is fixed with section of jurisdiction center bolt(Front and rear two Point);(2)Jack is fixed in steel babinet 1(First half)On curved plate;(3)The finish rolling spiral shell of a root long 1m or so Line steel 4 passes through 6 center of Manual hydraulic punching jack 2 and section of jurisdiction center bolt, and is fixed with anchor slab 3.(4)With finish rolling screw thread Remaining 4 spreading of fining twisted steel to construction is needed length by steel connector 5(25m), and with steel babinet 1(Latter half)Carry out Effectively connection;(5)Manually 2 oil pressure of formula hydraulic pressure punching jack, stretches fining twisted steel 4, is needed before stretching pair Socket load to be adjusted, determine elongation;(6)It is fixed with anchor slab 3, fixed anchoring after reaching construction requirement;(7)Remove very heavy Top.Section of jurisdiction sockets problem when efficiently solving shield tunnel construction at initial stage.
The present invention is applied in running tunnel total length about 1.73km, and 300 ring of tunnel outlet section is straight line ring, section of jurisdiction internal diameter 5900mm, outside diameter 6600mm, section of jurisdiction thickness 350mm.In uplink constructing tunnel to 75 ring, section of jurisdiction abjection 25 ring of vehicle frame, item Mesh portion is socketed to going out hole segment pipe sheet.It is more satisfactory to socket effect, when the later stage promotes, section of jurisdiction is overall basic not to active well Direction loosens, and occurs without broken and percolating water.

Claims (1)

1. a kind of construction at shield tunnel initial stage section of jurisdiction sockets the construction method of device, for preventing molded section of jurisdiction overall to work Make well displacement and cause tunnel axis offset, section of jurisdiction crushes, percolating water, screw rod are pulled off, which includes steel babinet (1), Manual hydraulic punching jack(2), anchor slab(3), fixed anchor, fining twisted steel(4), connector of finish rolling thread steel(5)、 Section of jurisdiction center bolt(6), the steel babinet(1)It is made of front and rear portions babinet, front and rear portions babinet passes through section of jurisdiction center bolt(6) It is fixedly connected, Manual hydraulic punching jack is housed in the front portion babinet(2), it is respectively equipped with the front and rear portions babinet Anchor slab(3), the fining twisted steel(4)Through Manual hydraulic punching jack(2)And section of jurisdiction center bolt(6)Center, and With anchor slab(3)It is fixedly connected;The fining twisted steel(4)Pass through connector of finish rolling thread steel(5)Spreading is long to required for constructing Degree, and be effectively connected with rear portion babinet, it is characterised in that Specific construction step:1)With section of jurisdiction center bolt(6)Fixation is forward and backward Portion's babinet;2)Manual hydraulic punching jack(2)It is fixed on the curved plate in anterior babinet;3)A finish rolling screw thread Steel(4)Through Manual hydraulic punching jack(2)And section of jurisdiction center bolt(6)Center, and and anchor slab(3)It is fixed;4)With essence Roll screw-thread steel connector(5)Remaining fining twisted steel(4)Spreading to construction needs length, and is carried out effectively with rear portion babinet Connection;5)Manually formula hydraulic pressure punching jack(2)Oil pressure, to fining twisted steel(4)Stretched, needed before stretching to drawing Connect load to be adjusted, determine elongation;6)After reaching construction requirement, anchor slab is used(3), fixed anchoring it is fixed;7)Remove jack.
CN201510627284.1A 2015-09-28 2015-09-28 Shield tunnel construction at initial stage section of jurisdiction sockets device and construction method Active CN105257321B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510627284.1A CN105257321B (en) 2015-09-28 2015-09-28 Shield tunnel construction at initial stage section of jurisdiction sockets device and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510627284.1A CN105257321B (en) 2015-09-28 2015-09-28 Shield tunnel construction at initial stage section of jurisdiction sockets device and construction method

Publications (2)

Publication Number Publication Date
CN105257321A CN105257321A (en) 2016-01-20
CN105257321B true CN105257321B (en) 2018-05-04

Family

ID=55097210

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510627284.1A Active CN105257321B (en) 2015-09-28 2015-09-28 Shield tunnel construction at initial stage section of jurisdiction sockets device and construction method

Country Status (1)

Country Link
CN (1) CN105257321B (en)

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2392836Y (en) * 1999-11-12 2000-08-23 开封预应力技术研究所 Pretensioned beam special clamp
JP2003268922A (en) * 2002-03-13 2003-09-25 Ps Mitsubishi Construction Co Ltd Anchorage body of pc steel member
CN101021100A (en) * 2006-11-10 2007-08-22 天津市耀新科技发展有限公司 Fiber reinforced ground tackle for fiber reinforcing method
CN101338680A (en) * 2008-08-08 2009-01-07 上海市隧道工程轨道交通设计研究院 Construction method for pretightening digging tunnel segment
KR20100053847A (en) * 2008-11-13 2010-05-24 한국건설기술연구원 Structure reinforcing apparatus and method for srtucture reinforcement under concrete surface
CN101748898A (en) * 2010-01-21 2010-06-23 武汉二航路桥特种工程有限责任公司 Method for implementing the middle connection tensioning of cables and device thereof
CN101851985A (en) * 2010-05-27 2010-10-06 卓清 Articulated anchor and prestress tensioning method of high strength fibre composite sheet
CN202323717U (en) * 2011-10-28 2012-07-11 科达集团股份有限公司 Cantilever type pre-stress hoop and special tensioning device thereof
CN202644401U (en) * 2012-05-15 2013-01-02 长安大学 Omnipotent prestress stretch-draw connecting structure for finish-rolling screw-thread steel
CN203065976U (en) * 2013-02-20 2013-07-17 郭逢庆 Active prestressed carbon fiber plate reinforcing system
CN103321430A (en) * 2013-06-07 2013-09-25 华北水利水电大学 Construction method of reinforcing large-span concrete structure with prestressed carbon fiber sheet
CN104264593A (en) * 2014-09-05 2015-01-07 华侨大学 Surface embedded bar reinforced prestress tension method and device
CN104631851A (en) * 2014-12-26 2015-05-20 柳州欧维姆机械股份有限公司 Prestressed carbon fiber plate tensioning device and method for tensioning prestressed carbon fiber plate

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004360399A (en) * 2003-06-06 2004-12-24 Sumiken Concrete Kogyo Kk Concrete member
KR101470056B1 (en) * 2011-09-15 2014-12-05 한국건설기술연구원 Segment body with the prestressed strand cables of a longitudinal direction and the shear keys of a horizontal direction
CN104406523A (en) * 2014-09-29 2015-03-11 樊晓莉 Shield tunnel segment shift detection method

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2392836Y (en) * 1999-11-12 2000-08-23 开封预应力技术研究所 Pretensioned beam special clamp
JP2003268922A (en) * 2002-03-13 2003-09-25 Ps Mitsubishi Construction Co Ltd Anchorage body of pc steel member
CN101021100A (en) * 2006-11-10 2007-08-22 天津市耀新科技发展有限公司 Fiber reinforced ground tackle for fiber reinforcing method
CN101338680A (en) * 2008-08-08 2009-01-07 上海市隧道工程轨道交通设计研究院 Construction method for pretightening digging tunnel segment
KR20100053847A (en) * 2008-11-13 2010-05-24 한국건설기술연구원 Structure reinforcing apparatus and method for srtucture reinforcement under concrete surface
CN101748898A (en) * 2010-01-21 2010-06-23 武汉二航路桥特种工程有限责任公司 Method for implementing the middle connection tensioning of cables and device thereof
CN101851985A (en) * 2010-05-27 2010-10-06 卓清 Articulated anchor and prestress tensioning method of high strength fibre composite sheet
CN202323717U (en) * 2011-10-28 2012-07-11 科达集团股份有限公司 Cantilever type pre-stress hoop and special tensioning device thereof
CN202644401U (en) * 2012-05-15 2013-01-02 长安大学 Omnipotent prestress stretch-draw connecting structure for finish-rolling screw-thread steel
CN203065976U (en) * 2013-02-20 2013-07-17 郭逢庆 Active prestressed carbon fiber plate reinforcing system
CN103321430A (en) * 2013-06-07 2013-09-25 华北水利水电大学 Construction method of reinforcing large-span concrete structure with prestressed carbon fiber sheet
CN104264593A (en) * 2014-09-05 2015-01-07 华侨大学 Surface embedded bar reinforced prestress tension method and device
CN104631851A (en) * 2014-12-26 2015-05-20 柳州欧维姆机械股份有限公司 Prestressed carbon fiber plate tensioning device and method for tensioning prestressed carbon fiber plate

Also Published As

Publication number Publication date
CN105257321A (en) 2016-01-20

Similar Documents

Publication Publication Date Title
CN105370290B (en) A kind of correcting and then reinforcing method of shield tunnel
CN105756685B (en) A kind of reinforced combined retaining structure of pipe-plate lining
CN104032678B (en) H type king-post internal force adjustable false stull structure and construction method thereof
CN106640120A (en) Ground-surface fixed-point deep hole layered grouting construction method
CN107100633B (en) Small-diameter slurry shield pipe changing device
CN105257321B (en) Shield tunnel construction at initial stage section of jurisdiction sockets device and construction method
CN210396748U (en) Shield tunnel repairing and reinforcing platform
CN105864538A (en) Portable spigot and socket pipeline jointing machine
CN209115124U (en) Rich water sand tomography tunnel per-fore pouring liquid with small pipe constructing structure
CN108678767B (en) Excavation and yielding-rigid combined supporting construction method for extruded large-deformation surrounding rock tunnel
CN104818995B (en) A kind of method of assembled confined concrete bow member
CN104891323B (en) Device and method for rapid replacement of lower connecting shaft of horizontal rolling mill
CN106996094B (en) A kind of full-automatic drawbench and its application for being used to extract cut-pff wall junction block
CN206874293U (en) Subway tunnel soft oil support device
CN103103990A (en) Underground diaphragm wall construction method utilizing large-diameter reinforced concrete filling pile as connector
CN206707746U (en) A kind of steel tendon anchor pole for being used to reinforce weak surrounding rock
CN105755967B (en) The separate type of cable-stayed bridge main-beam dragging suspension basket can adjust thrust key apparatus
CN205154183U (en) Weak surrounding rock tunnel warp reinforcing apparatus
CN203097906U (en) Pipe piece structure capable of conducting grouting
CN212583692U (en) Small conduit for tunnel advanced grouting
CN102094665B (en) Auxiliary support method for additional load during approaching construction of porous tunnel by shield method
CN105544507B (en) A kind of steel pipe pile device with overhanging arm
CN105220683B (en) A kind of I-shaped steel joint formula diaphram wall is around current processing device and method
CN208136959U (en) A kind of waters tunnel formwork erecting structure and internal mould supporter integral slipping structure
CN106988219A (en) A kind of method for connecting reel and cable hoisting Arch Bridge Construction being carried out using it

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant