CN105240023B - A kind of method of Curve Pipe Jacking supporting construction enlarging shield-tunneling construction subway station - Google Patents

A kind of method of Curve Pipe Jacking supporting construction enlarging shield-tunneling construction subway station Download PDF

Info

Publication number
CN105240023B
CN105240023B CN201510614040.XA CN201510614040A CN105240023B CN 105240023 B CN105240023 B CN 105240023B CN 201510614040 A CN201510614040 A CN 201510614040A CN 105240023 B CN105240023 B CN 105240023B
Authority
CN
China
Prior art keywords
construction
shield
supporting
subway station
shield tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510614040.XA
Other languages
Chinese (zh)
Other versions
CN105240023A (en
Inventor
张鹏
马保松
曾聪
孔耀祖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Geosciences
Original Assignee
China University of Geosciences
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Geosciences filed Critical China University of Geosciences
Priority to CN201510614040.XA priority Critical patent/CN105240023B/en
Publication of CN105240023A publication Critical patent/CN105240023A/en
Application granted granted Critical
Publication of CN105240023B publication Critical patent/CN105240023B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The invention provides a kind of method of Curve Pipe Jacking supporting construction enlarging shield-tunneling construction subway station, once constructed using Curve Pipe Jacking technology and directly form subway station outside-supporting structure, reduce the soil deformation amount in work progress, concrete is injected into supporting pipeline;Subsequent construction mid-board, it is to avoid mid-board hinders the construction of subway station outside-supporting structure;Then shield duct piece is removed, station two is applied and serves as a contrast and accessory structure;This method has the characteristics of efficiency of construction is high, process is simple, station is substantially reduced to excavate to urban environmental impact, improve shield subway work efficiency, save construction cost, and adapt to city shallow embedding complex geological condition, the Metro Station Structure intensity built using this method is high, and supporting is safe and reliable.

Description

A kind of method of Curve Pipe Jacking supporting construction enlarging shield-tunneling construction subway station
Technical field
The present invention relates to a kind of method for extending shield-tunneling construction subway station, belong to underground engineering trenchless technology field.
Background technology
As China's economic development and the level of urbanization are improved, the key that traffic problems have become restriction urban development is asked Topic, urgent need to resolve.Shield method subway to alleviation traffic jam, is improved as the important component of Urban Public Transportation Network Urban development speed, the modernization level in lifting city play huge effect.But it is due to that shield zone distance is short, station Quantity is more, and shield often has to wait for ability transition after the completion of station, causes the improper driving time excessive, Suporting structure is utilized Rate is relatively low, causes construction delay phenomenon, increases construction cost, therefore shield station is the master for restricting subway work cycle and cost Want factor.
At present, the conventional construction method of subway station includes cut and cover method, cap excavation method and subsurface excavation method etc..Cut and cover method is applied to Broad construction site, disturbs big to urban life, traffic, the influence to environment such as noise and vibrations is blocked for a long time.Lid is dug Method stud construction joint is more, need to carry out water-proofing treatment, and inconvenience of being unearthed, work efficiency is low, and speed of application is slow.Shallow mining method work Phase is longer, and influence of the settlement of stratum to adjacent buildings security is larger, and construction risk is big, and construction costs is also very high.
The content of the invention
It is an object of the invention to solve the deficiencies in the prior art, and provide a kind of Curve Pipe Jacking supporting construction enlarging shield The method of construction subway station, this method has the characteristics of efficiency of construction is high, process is simple, substantially reduces station and excavates to city City's ambient influnence, improves shield subway work efficiency, saves construction cost, and adapts to city shallow embedding complex geological condition, The Metro Station Structure intensity built using this method is high, and supporting is safe and reliable.
Realize technical scheme that the object of the invention used for a kind of Curve Pipe Jacking supporting construction extends shield-tunneling construction subway The method at station, comprises the following steps:
(1) underground space formation shield tunnel is reserved using shield construction subway station, shield tunnel is by shield duct piece Support, installs vertical temporary support in shield tunnel, and push pipe workbench is installed on shield tunnel top;
(2) pipe jacking equipment is installed on push pipe workbench, symmetric borehole cuts and installed in shield duct piece top flat both sides Opening arrangement is as push pipe originating terminal, and in shield duct piece egative film both sides, symmetric borehole cuts to form push pipe receiving terminal, passes through push pipe Equipment is using the outside of Curve Pipe Jacking normal direction shield tunnel two more than 2 supporting pipelines of jacking side by side, and supporting pipeline is from shield tunnel Top originates and in shield tunnel bottom reception, constituted along each supporting pipeline of the axially in parallel arrangement of shield tunnel outside subway station Lateral support structure;
(3) fill concrete into each supporting pipeline, Construction Support basis and mid-board in shield tunnel, mid-board Top is connected with shield duct piece top flat;
(4) vertical temporary support is removed, along the shield duct piece on the axially away shield tunnel top of shield tunnel, both sides are excavated The soil body between supporting pipeline and shield tunnel, lining and vault two are served as a contrast at the beginning of construction vault;
(5) after the lining of vault two reaches design strength, the shield duct piece being located above shield duct piece egative film is removed simultaneously symmetrical The soil body between both sides supporting pipeline and shield tunnel is excavated to metno station design absolute altitude is reached, lining and side wall at the beginning of side wall of constructing Two linings, constructed after the lining of side wall two reaches design strength base plate and subway station internal structure, complete metro station construction.
In step (2) on supporting pipeline preset injected hole, pass through the slip casting of supporting pipeline after the completion of supporting pipeline jacking Hole carries out grouting and reinforcing to the soil body of adjacent two supporting pipeline enclosures, forms grouting and reinforcing area.
In step (2) two interconnected freezing pipes, two freezing pipes are axially inside symmetrically installed in supporting pipeline It is symmetrically distributed in the two ends of place supporting internal diameter of the pipeline and is fitted with the inwall of place supporting pipeline, the jacking of supporting pipeline is completed Cryogen is injected in backward freezing pipe, cryogen is freezed to the soil body of adjacent two supporting pipeline enclosures, and formation is freezed Stabilization zone.
The particular content served as a contrast in step (4) at the beginning of construction vault is top of being constructed on the vault of subway station outside-supporting structure Portion's waterproof layer and vault template is anchored, the particular content that construction vault two is served as a contrast is assembling reinforcement and to be poured mixed in vault template Solidifying soil.
The particular content served as a contrast in step (5) at the beginning of construction side wall is side of being constructed on the side wall of subway station outside-supporting structure Wall waterproof layer and anchored side wall form, the particular content that construction side wall two is served as a contrast is the assembling reinforcement in side wall template and pours mixed Solidifying soil.
The particular content of construction base plate is construction bottom waterproof layer in step (5) and anchors bottom template, in bottom mould Assembling reinforcement and casting concrete on plate.
As shown from the above technical solution, the Curve Pipe Jacking supporting construction enlarging shield-tunneling construction subway station that the present invention is provided Method, using Curve Pipe Jacking technology in shield tunnel both sides construction supporting pipeline, supporting pipeline is originated simultaneously at the top of shield tunnel In shield tunnel bottom reception, once construction can be formed directly in subway station outside-supporting structure, reduce in work progress Soil deformation amount, compared to prior art sequential construction vault supporting construction and the method for side wall supporting structure, the present invention is simplified Working procedure, greatly reduce the engineering time;Shield tunnel itself has some strength, can bear soil pressure in the short time Indeformable, this method, which is once constructed, directly forms subway station outside-supporting structure, and the engineering time is short, therefore on the outside of subway station Supporting construction is not required to construction mid-board as supporting construction before construction, and the installation for push pipe workbench and pipe jacking equipment is provided Enough spaces, and subway station outside-supporting structure hinders in work progress without mid-board, and efficiency of construction is higher.
Compared with prior art, the construction method that the present invention is provided has the following advantages that:
(1) directly missed the stop using shield method, being not required to stop work waits station construction, improves the utilization rate of Suporting structure;
(2) enlarging inside subway station is realized by construction supporting pipeline, is not required to excavate urban road, to city City's Coherent traffic noise is small, and process is simple, and efficiency of construction is high;
(3) supporting pipeline is originated at the top of shield tunnel and in shield tunnel bottom reception, all constructing operations are all in shield Completed in structure tunnel, be not required to take other construction sites;
(4) vault of subway station as at the beginning of the vault of subway station outside-supporting structure (supporting pipeline group), vault lining and The lining of vault two is constituted, and compared to sidepiece and bottom, the vault top soil body is relatively thin therefore intensity is less than station sidepiece and bottom, existing Increase supporting pipeline group in the structure that lining and vault two at the beginning of having vault are served as a contrast, the intensity of vault, and supporting pipeline can be greatly promoted Between grouting and reinforcing formation grouting and reinforcing area, on the one hand intensity between increase supporting pipeline pipe, while playing good waterproof effect;
(5) Curve Pipe Jacking method jacking supporting pipeline is used, therefore the subway station outside-supporting structure formed presents arching Wire, curve-like adds the lifting surface area of supporting pipeline while expanding station space, and supporting pipeline stress more Rationally;
(6) the side wall of subway station as at the beginning of the side wall of subway station outside-supporting structure (supporting pipeline group), side wall lining and The lining of side wall two is constituted, and subway station side wall is primarily subjected to the squeezing action from the lateral soil body, is likely to result in when active force is larger There is crackle in side wall lining cutting, and the present invention is for above-mentioned true using three layers of liner structure of side wall, lining and side wall at the beginning of existing side wall Increase supporting pipeline group in the structure of two linings, grouting and reinforcing between the intensity of side wall, and supporting pipeline can be greatly promoted and formed Grouting and reinforcing area, on the one hand increases intensity between supporting pipeline pipe, while playing good waterproof effect;For groundwater pressure compared with When big or grouting consolidation effect is poor, freezing pipe can be installed in supporting pipeline, two freezing pipes are symmetrically distributed in place supporting Two ends of internal diameter of the pipeline, and being fitted with the inwall of place supporting pipeline, inject cryogen into freezing pipe, cryogen from Flow into and always flowed out from another freezing pipe in place supporting pipeline in wherein one freezing pipe, to adjacent two supporting pipelines Between the soil body freezed, play the soil body between sealing, consolidation by freezing pipe, therefore this method is not required to extra for sealing enter Capable dewatering operation;
(7) equal fill concrete in each supporting pipeline, the rigidity of structure is big, good stability, reduces follow-up station excavation and causes Surrounding soil deformation;
(8) present invention is provided first lining, two are lined with and base plate is set up defences in water layer and template in and assembling reinforcement and poured The structure of concrete is built, waterproof layer plays a part of secondary waterproof, and template, reinforcing bar and concrete pour into a mould the rigidity of structure to be formed Greatly, good stability has good durability simultaneously.
Brief description of the drawings
The Construction Principle figure for the construction subway station method that Fig. 1 provides for the present invention.
Fig. 2 is the A-A profiles of subway station outside-supporting structure in embodiment 1.
Fig. 3 is the vertical temporary support of construction and the schematic diagram of push pipe workbench.
Fig. 4 is the schematic diagram of Curve Pipe Jacking method construction subway station outside-supporting structure.
Fig. 5 is the schematic diagram of fill concrete.
Fig. 6 is the schematic diagram of Construction Support basis and mid-board.
The schematic diagram that Fig. 7 lining and vault two at the beginning of construction vault are served as a contrast.
Fig. 8 is excavation soil at both sides to the schematic diagram for reaching metno station design absolute altitude.
Fig. 9 is served as a contrast at the beginning of construction side wall, side wall two is served as a contrast and the schematic diagram of base plate.
Figure 10 is the schematic diagram of construction subway station internal structure.
Figure 11 is the A-A profiles of subway station outside-supporting structure in embodiment 2.
Wherein, vertical temporary support on the left of shield duct piece in the middle part of shield duct piece on the upside of 1- top flats, 2-, 3-, 4- egative films, 5-, Vertical temporary support on the right side of 6-, 7- supporting pipelines, 8- concrete, 9- brace foundations, 10- mid-boards, 11- vaults two are served as a contrast, 12- sides Wall two is served as a contrast, 13- base plates, 14- platforms, 15- push pipe workbenches, 16- grouting and reinforcings area, 17- injected holes, 18- freezing pipes, 19- Consolidation by freezing area.
Embodiment
The present invention is illustrated in detail with reference to the accompanying drawings and examples, present disclosure is not limited to following Embodiment.
Embodiment 1:
The method for the Curve Pipe Jacking supporting construction enlarging shield-tunneling construction subway station that the present invention is provided, Construction Principle such as Fig. 1 It is shown, comprise the following steps:
(1) underground space formation shield tunnel is reserved using shield construction subway station, shield tunnel is by shield duct piece Support, shield duct piece includes top flat 1, upside shield duct piece 2, middle part shield duct piece 3 and egative film 4, symmetrically pacifies in shield tunnel Dress left side vertical interim branch 5 and the vertical temporary support 6 in right side, install push pipe workbench 15, such as Fig. 3 institutes on shield tunnel top Show;
(2) pipe jacking equipment is installed on push pipe workbench 15, cuts and pacify in the both sides symmetric borehole of shield duct piece top flat 1 Opening arrangement is filled as push pipe originating terminal, cuts to form push pipe receiving terminal in the both sides symmetric borehole of shield duct piece egative film 4, passes through top Tube apparatus is using the outside of Curve Pipe Jacking normal direction shield tunnel two more than 2 supporting pipelines 7 of jacking side by side, and supporting pipeline is from shield tunnel Originate and in shield tunnel bottom reception, referring to Fig. 4, constituted along each supporting pipeline of the axially in parallel arrangement of shield tunnel at the top of road Subway station outside-supporting structure, before jacking on supporting pipeline preset injected hole 17, after the completion of supporting pipeline jacking pass through branch The injected hole in pillar road carries out grouting and reinforcing to the soil body of adjacent two supporting pipeline enclosures, grouting and reinforcing area 16 is formed, such as Fig. 2 institutes Show;
(3) fill concrete into each supporting pipeline, referring to Fig. 5, Construction Support basis 9 and mid-board in shield tunnel 10, the top of mid-board is connected with shield duct piece top flat 1, supports the supporting pipeline 7 of both sides, as shown in Figure 6;
(4) left side vertical interim branch 5 and the vertical temporary support 6 in right side are removed, along the axially away shield tunnel of shield tunnel The shield duct piece (upside shield duct piece 2) on top, excavates the soil body between both sides supporting pipeline and shield tunnel, in subway station Construction top waterproof layer and anchor vault template on the vault of outside-supporting structure and served as a contrast as at the beginning of vault, tied up in vault template Wire-tie and casting concrete formation vault two lining 11, as shown in Figure 7;
(5) after the lining of vault two reaches design strength, shield duct piece (the middle part shield being located above shield duct piece egative film is removed Structure section of jurisdiction 3) and the soil body between both sides supporting pipeline and shield tunnel is symmetrically excavated to reaching metno station design absolute altitude, referring to Fig. 8, constructed on the side wall of subway station outside-supporting structure side wall waterproof layer and anchored side wall form are served as a contrast as at the beginning of side wall, Assembling reinforcement and casting concrete formation side wall two lining 12 in side wall template, referring to Fig. 9;
(6) constructed after the lining of side wall two reaches design strength and bottom waterproof layer and anchor bottom template, in bottom template Upper assembling reinforcement and casting concrete formation base plate, subway station internal structure of finally constructing, complete metro station construction, such as scheme Shown in 10.
Embodiment 2:
The method for the Curve Pipe Jacking supporting construction enlarging shield-tunneling construction subway station that the present invention is provided, Construction Principle such as Fig. 1 It is shown, comprise the following steps:
(1) underground space formation shield tunnel is reserved using shield construction subway station, shield tunnel is by shield duct piece Support, shield duct piece includes top flat 1, upside shield duct piece 2, middle part shield duct piece 3 and egative film 4, symmetrically pacifies in shield tunnel Dress left side vertical interim branch 5 and the vertical temporary support 6 in right side, install push pipe workbench 15, such as Fig. 3 institutes on shield tunnel top Show;
(2) pipe jacking equipment is installed on push pipe workbench 15, cuts and pacify in the both sides symmetric borehole of shield duct piece top flat 1 Opening arrangement is filled as push pipe originating terminal, cuts to form push pipe receiving terminal in the both sides symmetric borehole of shield duct piece egative film 4, passes through top Tube apparatus is using the outside of Curve Pipe Jacking normal direction shield tunnel two more than 2 supporting pipelines 7 of jacking side by side, and supporting pipeline is from shield tunnel Originate and in shield tunnel bottom reception, referring to Fig. 4, constituted along each supporting pipeline of the axially in parallel arrangement of shield tunnel at the top of road Subway station outside-supporting structure, freezing pipe 18, two freezing pipes pair are axially inside symmetrically installed before jacking in supporting pipeline 7 Claim the two ends of supporting internal diameter of the pipeline where being distributed in, and fitted with the inwall of place supporting pipeline, the jacking of supporting pipeline is completed Inject cryogen in backward freezing pipe, cryogen is flowed into and from another in place supporting pipeline in a freezing pipe therefrom A piece freezing pipe is always flowed out, and the soil body of adjacent two supporting pipeline enclosures is freezed, and consolidation by freezing area 19 is formed, such as Figure 11 institutes Show;
(3) fill concrete into each supporting pipeline, referring to Fig. 5, Construction Support basis 9 and mid-board in shield tunnel 10, the top of mid-board is connected with shield duct piece top flat 1, supports the supporting pipeline 7 of both sides, as shown in Figure 6;
(4) left side vertical interim branch 5 and the vertical temporary support 6 in right side are removed, along the axially away shield tunnel of shield tunnel The shield duct piece (upside shield duct piece 2) on top, excavates the soil body between both sides supporting pipeline and shield tunnel, in subway station Construction top waterproof layer and anchor vault template on the vault of outside-supporting structure and served as a contrast as at the beginning of vault, tied up in vault template Wire-tie and casting concrete formation vault two lining 11, as shown in Figure 7;
(5) after the lining of vault two reaches design strength, shield duct piece (the middle part shield being located above shield duct piece egative film is removed Structure section of jurisdiction 3) and the soil body between both sides supporting pipeline and shield tunnel is symmetrically excavated to reaching metno station design absolute altitude, referring to Fig. 8, constructed on the side wall of subway station outside-supporting structure side wall waterproof layer and anchored side wall form are served as a contrast as at the beginning of side wall, Assembling reinforcement and casting concrete formation side wall two lining 12 in side wall template, referring to Fig. 9;
(6) constructed after the lining of side wall two reaches design strength and bottom waterproof layer and anchor bottom template, in bottom template Upper assembling reinforcement and casting concrete formation base plate, subway station internal structure of finally constructing, complete metro station construction, such as scheme Shown in 10.

Claims (6)

1. a kind of method of Curve Pipe Jacking supporting construction enlarging shield-tunneling construction subway station, it is characterised in that comprise the following steps:
(1) underground space formation shield tunnel is reserved using shield construction subway station, shield tunnel is supported by shield duct piece, Vertical temporary support is installed in shield tunnel, push pipe workbench is installed on shield tunnel top;
(2) pipe jacking equipment is installed on push pipe workbench, symmetric borehole cutting and mounting hole in shield duct piece top flat both sides Device is as push pipe originating terminal, and in shield duct piece egative film both sides, symmetric borehole cuts to form push pipe receiving terminal, passes through pipe jacking equipment Using the outside of Curve Pipe Jacking normal direction shield tunnel two more than 2 supporting pipelines of jacking side by side, supporting pipeline is at the top of shield tunnel Originate and in shield tunnel bottom reception, subway station lateral branch is constituted along each supporting pipeline of the axially in parallel arrangement of shield tunnel Support structure;
(3) fill concrete into each supporting pipeline, Construction Support basis and mid-board, the top of mid-board in shield tunnel It is connected with shield duct piece top flat;
(4) vertical temporary support is removed, along the shield duct piece on the axially away shield tunnel top of shield tunnel, both sides supporting is excavated The soil body between pipeline and shield tunnel, lining and vault two are served as a contrast at the beginning of construction vault;
(5) after the lining of vault two reaches design strength, remove the shield duct piece being located above shield duct piece egative film and symmetrically excavate The soil body between both sides supporting pipeline and shield tunnel is to metno station design absolute altitude is reached, lining and side wall two at the beginning of side wall of constructing Lining, constructed after the lining of side wall two reaches design strength base plate and subway station internal structure, completes metro station construction.
2. the method for Curve Pipe Jacking supporting construction enlarging shield-tunneling construction subway station according to claim 1, its feature exists In:In step (2) on supporting pipeline preset injected hole, by the injected hole of supporting pipeline to phase after the completion of supporting pipeline jacking The soil body of adjacent two supporting pipeline enclosures carries out grouting and reinforcing, forms grouting and reinforcing area.
3. the method for Curve Pipe Jacking supporting construction enlarging shield-tunneling construction subway station according to claim 1, its feature exists In:Two interconnected freezing pipes are axially inside symmetrically installed in supporting pipeline in step (2), two freezing pipes symmetrically divide It is distributed in the two ends of place supporting internal diameter of the pipeline and is fitted with the inwall of place supporting pipeline, the jacking of supporting pipeline completes backward freeze Cryogen is injected in knot pipe, cryogen is freezed to the soil body of adjacent two supporting pipeline enclosures, form consolidation by freezing area.
4. the method for Curve Pipe Jacking supporting construction enlarging shield-tunneling construction subway station according to claim 1, its feature exists In:The particular content served as a contrast in step (4) at the beginning of construction vault is to prevent on the vault of subway station outside-supporting structure at the top of construction Water layer and vault template is anchored, the particular content that construction vault two is served as a contrast is assembling reinforcement and to pour coagulation in vault template Soil.
5. the method for Curve Pipe Jacking supporting construction enlarging shield-tunneling construction subway station according to claim 1, its feature exists In:The particular content served as a contrast in step (5) at the beginning of construction side wall is that construction side wall is prevented on the side wall of subway station outside-supporting structure Water layer and anchored side wall form, the particular content that construction side wall two is served as a contrast is the assembling reinforcement in side wall template and pours coagulation Soil.
6. the method for Curve Pipe Jacking supporting construction enlarging shield-tunneling construction subway station according to claim 1, its feature exists In:The particular content of construction base plate is construction bottom waterproof layer in step (5) and anchors bottom template, is tied up in the template of bottom Wire-tie and casting concrete.
CN201510614040.XA 2015-09-23 2015-09-23 A kind of method of Curve Pipe Jacking supporting construction enlarging shield-tunneling construction subway station Expired - Fee Related CN105240023B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510614040.XA CN105240023B (en) 2015-09-23 2015-09-23 A kind of method of Curve Pipe Jacking supporting construction enlarging shield-tunneling construction subway station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510614040.XA CN105240023B (en) 2015-09-23 2015-09-23 A kind of method of Curve Pipe Jacking supporting construction enlarging shield-tunneling construction subway station

Publications (2)

Publication Number Publication Date
CN105240023A CN105240023A (en) 2016-01-13
CN105240023B true CN105240023B (en) 2017-07-14

Family

ID=55037814

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510614040.XA Expired - Fee Related CN105240023B (en) 2015-09-23 2015-09-23 A kind of method of Curve Pipe Jacking supporting construction enlarging shield-tunneling construction subway station

Country Status (1)

Country Link
CN (1) CN105240023B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106837357B (en) * 2017-03-24 2019-07-12 山东大学 A kind of no-dig technique pipe-roof method using curve pipe canopy
CN107559026A (en) * 2017-08-18 2018-01-09 中铁隧道勘测设计院有限公司 A kind of subway station of double hole bilayer push pipe Spatial Couplings
CN110670578A (en) * 2019-10-23 2020-01-10 中铁西南科学研究院有限公司 Permanent-temporary integrated enclosure structure for subway station and construction method
CN111305851B (en) * 2020-04-15 2021-10-19 石家庄铁道大学 Soft soil layer subway station extension method and structure based on inserted beam freezing method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3725963A1 (en) * 1987-08-05 1989-02-16 Gewerk Eisenhuette Westfalia Method and apparatus for constructing a concrete foundation in the earth, in particular in a built-up area
CN201875282U (en) * 2010-11-17 2011-06-22 代丽华 Pneumatic curve puncher
CN104632245A (en) * 2015-02-04 2015-05-20 北京市政建设集团有限责任公司 Method using multi-pilot-tunnel expanding excavation large-diameter shield tunnel for building subway station
CN104632235A (en) * 2015-02-04 2015-05-20 北京市政建设集团有限责任公司 Method for expanding excavation of large-diameter shield tunnel for subway station construction through pile arch wall support
CN204457792U (en) * 2015-02-04 2015-07-08 北京市政建设集团有限责任公司 A kind ofly dig large diameter shield tunnel with many pilot tunnel methods and the subway station of building

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02132295A (en) * 1988-11-14 1990-05-21 Mitsui Constr Co Ltd Constructing method for tunnel lining work

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3725963A1 (en) * 1987-08-05 1989-02-16 Gewerk Eisenhuette Westfalia Method and apparatus for constructing a concrete foundation in the earth, in particular in a built-up area
CN201875282U (en) * 2010-11-17 2011-06-22 代丽华 Pneumatic curve puncher
CN104632245A (en) * 2015-02-04 2015-05-20 北京市政建设集团有限责任公司 Method using multi-pilot-tunnel expanding excavation large-diameter shield tunnel for building subway station
CN104632235A (en) * 2015-02-04 2015-05-20 北京市政建设集团有限责任公司 Method for expanding excavation of large-diameter shield tunnel for subway station construction through pile arch wall support
CN204457792U (en) * 2015-02-04 2015-07-08 北京市政建设集团有限责任公司 A kind ofly dig large diameter shield tunnel with many pilot tunnel methods and the subway station of building

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
"地铁车站曲线顶管暗挖新方法数值模拟研究";汤渊;《地下空间与工程学报》;20140630;第10卷(第3期);第650-655页 *
盾构法结合CRD法建造地铁车站方案研究;曾鹏;《中国优秀硕士学位论文全文数据库工程科技Ⅱ辑》;20110915(第9期);第C034-231页 *

Also Published As

Publication number Publication date
CN105240023A (en) 2016-01-13

Similar Documents

Publication Publication Date Title
CN105240024B (en) A kind of method of parallel shield method enlarging construction subway station
CN105065009B (en) A kind of method extending shield-tunneling construction subway station
CN104404974B (en) The thick sand-pebble layer deep basal pit of high artesian slip casting back cover structure and construction technology thereof
CN105240023B (en) A kind of method of Curve Pipe Jacking supporting construction enlarging shield-tunneling construction subway station
CN108086328A (en) A kind of dynamic sealing, assembled building enclosure and its construction method from recharge
CN103485790A (en) Shallow tunneling method for pipe-proof-supporting structure combined system
CN203924137U (en) A kind of diaphragm wall serious leakage plugging structure
CN104762955B (en) A kind of Belled Pile construction method based on freezing process
CN108396780B (en) Existing inspection well reconstruction method
CN105525619A (en) Occlusive pipe curtain for bored tunnel in water-rich stratum and construction method of occlusive pipe curtain
CN106812540A (en) A kind of shield launching element wall closing water sealing consolidation structure and construction technology
CN108843337A (en) A kind of construction method carrying out shield launching using short sleeve
CN102817621B (en) Comprehensive construction method applicable to controlling arch basement sedimentation for tunnel in unfavorable geological conditions
CN209339169U (en) A kind of precipitation well in foundation pit plugging device
CN105464105B (en) One kind is without friction pile pile making method
CN110004991A (en) Underground structure anti-floating system and construction method based on raised type tangs plate
CN104612722B (en) Tunnel gate strengthening method for starting and arriving of annular shield or annular pushing pipe
CN111365005A (en) Reinforcing structure and method for shield tunnel lower-penetrating elevated bridge foundation
CN108661652B (en) Reinforcing device and method for shield starting and receiving ends in mine tunnel
CN204941551U (en) A kind of subway station of Curve Pipe Jacking supporting and protection structure enlarging shield-tunneling construction
CN109469068A (en) A kind of rich water soft stratum excavation of foundation pit and Support Method
CN206157860U (en) Drainage pipeline
CN110821498B (en) Safe and rapid water plugging and reinforcing method in strong water-rich soft surrounding rock of operation tunnel
CN203050779U (en) Tunnel drainage structure suitable for bias pressure rich water strata
CN204252148U (en) High artesian thick sand-pebble layer deep foundation ditch slip casting back cover structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170714

Termination date: 20180923

CF01 Termination of patent right due to non-payment of annual fee