CN105229385B - Air-supply arrangement - Google Patents

Air-supply arrangement Download PDF

Info

Publication number
CN105229385B
CN105229385B CN201480028872.7A CN201480028872A CN105229385B CN 105229385 B CN105229385 B CN 105229385B CN 201480028872 A CN201480028872 A CN 201480028872A CN 105229385 B CN105229385 B CN 105229385B
Authority
CN
China
Prior art keywords
air
mentioned
outlet
blow
supply arrangement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201480028872.7A
Other languages
Chinese (zh)
Other versions
CN105229385A (en
Inventor
花井孝广
森本克嗣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sharp Corp
Original Assignee
Sharp Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sharp Corp filed Critical Sharp Corp
Publication of CN105229385A publication Critical patent/CN105229385A/en
Application granted granted Critical
Publication of CN105229385B publication Critical patent/CN105229385B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F7/00Ventilation
    • F24F7/007Ventilation with forced flow
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/70Control systems characterised by their outputs; Constructional details thereof
    • F24F11/72Control systems characterised by their outputs; Constructional details thereof for controlling the supply of treated air, e.g. its pressure
    • F24F11/79Control systems characterised by their outputs; Constructional details thereof for controlling the supply of treated air, e.g. its pressure for controlling the direction of the supplied air

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Air Conditioning Control Device (AREA)
  • Ventilation (AREA)

Abstract

Also intermittent duty Air Blast fan when out of service standby, and efficiently use blinds, yaw function so that the wind of blowout will not be directly blown onto user.Moreover, being characterized in sending out alarm in the case of the condition as defined in environmental condition is detached from.

Description

Air-supply arrangement
Technical field
The present invention relates to air-supply arrangement it is standby when control.
Background technology
Existing air cleaner is disclosed in patent document 1.The air cleaner has blowing unit, air cleaner list The detection unit of the pollution of member and detection room air.It discloses:Air cleaner is set to run, when detecting indoor environment When pollution is reduced, stopping reduces power consumption to the energization of pollution detection unit.
Existing air cleaner is also disclosed in patent document 2.It is clear that the air cleaner has blowing unit, air The detection unit of the pollution of clean unit and detection room air.It discloses:It is standby with the state not run in air cleaner When, it is stopped periodically or reduces the energization to the heating part of pollution detection unit and reduce power consumption.
Existing technical literature
Patent document
Patent document 1:Special open 2010-89043 bulletins
Patent document 2:Special open 2011-127821 bulletins
Invention content
Problems to be solved by the invention
But according to above-mentioned existing air cleaner, because being out-of-blast state when standby, and control empty The preheating of gas pollution detection unit, so there is following problem:The detection of pollution detection unit postpones, and convenience declines.
In addition, in the variation for also detecting temperature, humidity and other environmental conditions with the pollution being not limited in detection air Detection unit in the case of respond and also postpone, reduce reply in the case of environmental condition change dramatically, convenience.
The purpose of the present invention is to provide the detection of environmental change when preventing standby delay, improves convenience and do not allow User feels uncomfortable air-supply arrangement.
The solution to the problem
In order to achieve the above objectives, air-supply arrangement of the invention has:Setting unit is set to setting face;Rotation section, It stands up in above-mentioned setting unit, can rotationally configure;Rotating mechanism, be located at above-mentioned setting unit and above-mentioned rotation section it Between, make above-mentioned rotation section relative to above-mentioned setting unit reciprocating rotation;Suction inlet and blow-off outlet are opened in the table of above-mentioned rotation section Face;Air supply path is configured in above-mentioned rotation section, and above-mentioned suction inlet is made to be connected to blow-off outlet;Air Blast fan is configured at above-mentioned Air supply path;Detection unit detects environmental condition;Operation panel is configured at the outer surface of above-mentioned rotation section, has multiple behaviour Make button;And control device, the action of air-supply arrangement is accordingly controlled with the input from aforesaid operations panel, in user Do not carry out operation instruction it is standby when, at intervals of set time on one side with the above-mentioned Air Blast fan of driven at low speed, on one side from above-mentioned suction Entrance air-breathing and make its reach environmental condition detection unit.In addition, being characterized in that there is such as lower unit:It sends out from blow-off outlet When the air that Air Blast fan sucks when standby, blow-off outlet is closed so that user will not feel wind.
In addition, the air-supply arrangement of the present invention is characterized in that:Sending out what Air Blast fan when standby sucked from blow-off outlet When air, the direction of blow-off outlet is changed to allow user not feel wind, does not bring discomfort to user.
In addition, the air-supply arrangement of the present invention is characterized in that:In the case of air-supply when standby, blow-off outlet is closed, and By by above-mentioned yaw action make blow-off outlet towards the left end of slewing area or right end direction in the way of carry out spinning movement.
In addition, the air-supply arrangement of the present invention is characterized in that:With unit, the feelings blown when standby existing for detection people Under condition, spinning movement is carried out in the way of making blow-off outlet direction that direction existing for people be not detected by the action of above-mentioned yaw.
In addition, the air-supply arrangement of the present invention is characterized in that:It is detached from scheduled temperature humidity in the environmental condition detected Alarm is sent out when condition.
Invention effect
According to the present invention, user do not indicate air-supply arrangement operation it is standby when, user will not be allowed to feel not relax Suitable wind, and quickly detect out the variation of environmental condition.
In addition, in the case where being detached from scheduled environmental condition, the alarm pointed out is sent out to user.
Description of the drawings
Fig. 1 is the face side stereoscopic figure for the air-supply arrangement for indicating embodiment of the present invention 1.
Fig. 2 is the back side stereoscopic figure for the air-supply arrangement for indicating embodiment of the present invention 1.
Fig. 3 is the side view of the internal structure for the air-supply arrangement for indicating embodiment of the present invention 1.
Fig. 4 is the front view of the operation panel for the air-supply arrangement for indicating embodiment of the present invention 1.
Fig. 5 is the control block diagram of the air-supply arrangement of embodiment of the present invention 1.
Fig. 6 is the flow chart of the yaw action for the air-supply arrangement for indicating embodiment of the present invention 1.
Fig. 7 is the flow chart for indicating to act when the air-supply arrangement of embodiment of the present invention 1 is standby.
Fig. 8 is indicated the figure of the blow-off outlet closed state of the air-supply arrangement of embodiment of the present invention 1.
Fig. 9 is the figure for judging benchmark of the environmental condition for the air-supply arrangement for indicating embodiment of the present invention 1.
Figure 10 be indicate embodiments of the present invention 2 air-supply arrangement it is standby when the flow chart that acts.
Figure 11 be indicate embodiments of the present invention 3 air-supply arrangement it is standby when the flow chart that acts.
Figure 12 is the stereoscopic figure for the air-supply arrangement for indicating embodiments of the present invention 4.
Figure 13 be indicate embodiments of the present invention 4 air-supply arrangement it is standby when the flow chart that acts.
Figure 14 is the control block diagram of the air-supply arrangement of embodiments of the present invention 4.
Figure 15 is the stereoscopic figure of the air-supply arrangement of embodiments of the present invention 5.
Specific implementation mode
(embodiment 1)
Embodiments of the present invention will be described referring to the drawings.Fig. 1 is the air-supply that embodiment 1 is watched from front The stereogram of device 1, Fig. 2 are the stereograms watched from rear, and Fig. 3 indicates the side view for unloading outer cover.The sky of Fig. 1~Fig. 3 Heart arrow indicates the circulation path and circulating direction of the air of air-supply arrangement.
Air-supply arrangement 1 has rotation section 2 on top, has setting unit 3 in lower part.Rotation section 2 storage have blow-off outlet and The wind pushing mechanism of suction inlet.Has power cord 8 at the rear portion of setting unit 3 and set on the attaching plug (not shown) of its front end.It send Wind apparatus 1 receives power supply by power cord 8 from commercial ac power source.
Rotation section 2 is stood up in setting unit 3, can rotationally be configured.The bottom surface of rotation section 2 is formed as round, lower part For cone shape, rectangular shape is shaped generally as from upper and lower directions substantially central portion to upper end.It is equipped at the back side of rotation section 2 Handle part 10, handle part 10 are recessed made of setting on rotation section 2.User carries air-supply arrangement handle part 10 is hold 1.In addition, rotation section 2 has yaw motor 28 in lower part, when driving yaw motor 28, centered on rotation axis 2a to the left and right Make yaw action.
It is logical that rotation section 2 has the suction inlet 4 opened up in lower side, the blow-off outlet 5 opened up in top front face and air-supply Road 20.The air-supply access 20 being configured in rotation section 2 vertically extends, and blow-off outlet 5 and Air Blast fan 7 are connected.It is inhaling Entrance 4 collects the dust-collecting filter (not shown) of dust configured with capture, and the ventilating board 9 for opening up multiple ventilation holes is filtered in dust The outside of device is configured as shell.
The air sucked from suction inlet 4 is inhaled into Air Blast fan 7 after removing dust by dust-collecting filter.Detection temperature, The environmental condition detection unit of humidity, dust etc. is configured at any place of the air-supply path midway from suction inlet 4 to blow-off outlet 5. Temperature detecting unit, humidity detection unit, dust detection unit each unit can be usually used units, can also be extensive Commercially available unit, omits the description.
The downstream portion in the air circulation direction of air-supply access 20 extends upward, and is bent towards front.Air-supply is logical The downstream portion on road 20 divides into 6 ventilation path 22 by 5 partition boards 21.
The inlet portion 23 of ventilation path 22 is located at the configuration position of aftermentioned ion generating device 30 immediately downstream, outlet portion 24 Positioned at the tight upstream of blow-off outlet 5.6 ventilation path 22 form a line at inlet portion 23 in the front-rear direction of air-supply arrangement 1, are going out Oral area 24 is in upper and lower directions and forms a line.
Between the outlet portion 24 and blow-off outlet 5 of ventilation path 22 be equipped with 6 movable blinds 25,25 ....Movable blinds 25 is each From upstream end and the siding 26 of 5 partition boards 21 and the bottom of outlet portion 24 continuously install.The downstream side of movable blinds 25 Link with grille motor 27.When driving grille motor 27, the end of downstream side of 6 movable blinds 25 is consistently with defined week Phase vertically conjugates.
In the lower part of air-supply access 20 configured with the Air Blast fan 7 for including Sirocco fan.The air entry of Air Blast fan 7 (not shown) is adjacent with suction inlet 4, and the exhaust outlet 7a of Air Blast fan 7 is connect with the inlet portion 23 of ventilation path 20 is sent upwards.Air-supply Fan 7 makes to circulate from the air that suction inlet 4 sucks towards blow-off outlet 5.
It is configured with ion generating device 30 in the top of Air Blast fan 7.The ion generated by ion generating device 30 includes In the air-flow to circulate in access 20 of blowing.
Ion generating device 30 is configured at the downstream side in air circulation direction relative to Air Blast fan 7.Ion generating device 30 have cation generating unit and anion generating unit (not shown).Cation generating unit has positive discharge electrode and (does not scheme Show), anion generating unit has negative discharge electrode (not shown).Two pairs of positive discharge electrodes and negative discharge electrode are each formed as needle Shape is arranged at a prescribed interval, is configured towards air-supply access 20.
Ion generating device 30 provides positive discharge electrode, negative discharge electrode occurs the height electricity that circuit generates by high-voltage electricity Pressure generates gas discharge and discharges ion.Here, positive discharge electrode, the negative discharge electrode to ion generating device 30 apply packet Include AC wave shape or the voltage of impulse waveform.
Positive voltage is applied to positive discharge electrode, using corona discharge, hydrogen ion is combined with the moisture in air, is generated main Including H+(H2O)mCation.Negative voltage is applied to negative discharge electrode, using corona discharge, oxonium ion and the moisture in air In conjunction with it includes mainly O to generate2 -(H2O)nAnion.Here, m, n are arbitrary natural number.H+(H2O)mAnd O2 -(H2O)nIn sky The surface of flcating germ, malodorous elements in gas condenses and surrounds them.
Also, as shown in following (1) formulas~(3) formula, due to the collision of two ions, generates and make on the surface of microorganism etc. For [OH] hydroxy radical, the H of reactive species2O2Hydrogen peroxide utilizes its action breaks down flcating germ, malodorous elements.Here, m ', n ' It is arbitrary natural number.
Therefore, ion generating device 30 so that air-supply access 20 internal circulation air be included in positive discharge electrode and Negative discharge electrode is discharged in the way of the cation and anion that electric discharge generates, so as to carry out for example indoor kill Bacterium, deodorization.
[mathematical expression 1]
H+(H2O)m+O2 +(H2O)n→·OH+1/2O2+(m+n)H2O·(1)
H+(H2O)m+H+(H2O)m++O2 +(H2O)n+O2 -(H2O)n+→2·OH+O2+(m+m++n+n+)H2O···(2)
H+(H2O)m+H+(H2O)m++O2 +(H2O)n+O2 -(H2O)n+→H2O2+O2+(m+m++n+n+)H2O···(3)
It is configured with operation panel 6 in the upper surface of rotation section 2.In addition, being internally provided with control device 60 in rotation section 2. Fig. 4 is the front view for indicating operation panel 6.It is equipped with multiple operating knobs in the operation panel 6 formed using touch panel.Operating knob Including operation button 6a, air quantity switch bar 6b, 6c, ion mode button 6d, filter replacement lamp 6e, reset button 6g, yaw button 6h with And blinds button 6j.In addition, operation panel 6 can also be set to the outer surface of rotation section 2.
Run connection-shutdown of the power supply of button 6a switching air-supply arrangements 1, when energized, Air Blast fan 7 and ion hair Generating apparatus 30 starts to drive.The air quantity of air quantity switch bar 6b, 6c regulating air feeding device 1.Button 6a is run with the position when yaw acts The mode also not moved is set to be configured on rotation axis 2a.
Ion mode button 6d can change the diffusion of ion, can select preset operational mode.Including LED light source Filter replacement lamp 6e, lighted when as the replacement period of dust-collecting filter (not shown).Reset button 6g filter more It is pressed when changing, the filter replacement lamp 6e lighted is extinguished.
When the yaw action of rotation section 2 temporarily ceases, when pressing yaw button 6h, then continue to stop yaw action, when When yaw action continues to stop, when pressing yaw button 6h, then start yaw action.Yaw action is with 5 grades of setting left and right directions Swaying angle, when connecting yaw button 6h, with initially set left and right angular amplitude be 15 ° progress yaw actions.Yaw angle Degree can be changed by pressing the yaw button of remote controler (not shown), cycle be set as amplitude of fluctuation angle be 15 ° → 30 ° → 60°→90°→120°→15°。
The operation carried out on operation panel 6 is transmitted to control device 60, not shown built-in CPU (central processings Device) it is handled, driving or out-of-blast fan 7, ion generating device 30 etc..The control of air-supply arrangement 1 is indicated in Fig. 5 Box.
When yaw button 6h is operated first after the power supply of air-supply arrangement 1 is connected, control device 60 makes rotation section 2 to the left and right Rotation, automatically detects the position at the center as hunt and storage.Control device 60 is in determining left and right directions Behind heart position, rotation section 2 is made to be rotated in the way of equal angular by the amplitude of fluctuation of the left and right.
Fig. 6 is the flow chart of the processing for the usual running yaw action for indicating air-supply arrangement 1.In step sl, sentence Whether disconnected user contacts each operating knob and operates operating knob.At this point, can not only contact each operating knob, behaviour can also be contacted Make the space 6f between button.S2 is entered step when detecting contact.
In step s 2, judge whether rotation section 2 is in yaw action.It is entered step in being acted for yaw S4 enters step S3 in the case where not being in yaw action.
In step s3, receive the operation input of user, carry out action corresponding with operation.It is operated in yaw button 6h In the case of start yaw.In addition, out of service in the case where running button 6a and being operated.
In step s 4, air-supply arrangement 1 yaw action in the case of stop operating portion 2 yaw action.Work as yaw When action stops, air-supply arrangement 1 keeps the new input to operating knob effective, in step s 5, judges whether have from operation panel 6 The operation input of user.S6 is entered step in the case where there is operation input, and S7 is entered step in the case of no operation.
In step s 6, receive the operation from user, carry out action corresponding with operation.At this point, in yaw button 6h In the case of operating, so that the yaw in temporarily ceasing is acted and continue to stop.
In the step s 7, after the action of the yaw of rotation section 2 stops, judging whether to have passed through the stipulated time.It has passed through S8 is entered step in the case of stipulated time, S5 is entered step in the case of no process, repeats step S5~S7.
In step s 8, judge whether to continue to stop yaw action.Return to step S1 in the case of stopping.Do not stopping In the case of enter step S9.In step 8, air-supply arrangement 1 restarts the yaw action of rotation section 2.
Blinds button 6j carry out blinds 25,25 ... the action of yaw up and down connection-shutdown.Stop when in the action of upper and lower yaw Start yaw action up and down when being pressed when only.Stop yaw action up and down when being pressed in the action of upper and lower yaw.In addition, By the blinds button of remote controller, to make the direction of blinds 25 be cyclically changed to it is horizontal → upwards → horizontal → downwards → Level, and it can be made static in each position.
Space 6f between each operating knob can detect that user is contacted using touch panel.
In air-supply arrangement 1 as constructed as above, user is not indicated operation it is standby when action be illustrated.It is so-called It refer to following state when standby:Power cord 8 is connect with power supply, but user does not operate operation button 6a, or utilize remote control Device stop timing device is run, to which air-supply arrangement 1 is out of service.In this case, Air Blast fan 7, ion generating device 30, hundred The action of leaf 25, yaw motor 28 stops, and display corresponding with these is also extinguished.
But in the present invention, when air-supply arrangement 1 is standby, control device 60 is powered always, remain can with from except The input corresponding state of operation input unit except operation button 6a.In addition, also continuing to logical to environmental condition detection unit Electricity, testing result are output to control device 60.
In the present invention, the dustiness of temperature, humidity, air is also detected when air-supply arrangement 1 is standby.About it is standby when Action, represents control flow in the figure 7.In the present invention, at the time point for entering standby mode, using in control device 60 The timing units that have of CPU (not shown) (central processing unit) measure and pass through the time from stopping operation.Meanwhile by hundred The direction of leaf 25,25 is changed to upward and static.
Then, it is made whether to operate the judgement of any of operating knob from operation panel 6 using step 11 (S11). In the case where being operated (being "Yes" in S11), receives operation content, terminate standby mode, into run action. In the case of not operated (being "No" in S11), continues standby mode as former state, enter step 12.
In step 12 (S12), judge whether to have passed through scheduled stipulated time 2, such as 5 minutes.It has passed through regulation In the case of time 2 (being "Yes" in S12), operation starts the time, such as several seconds to more than ten seconds of Air Blast fan 7, stops It is powered.Air Blast fan 7 is set to be rotated with the rotating speed before and after 100rpm as a result, the air sucked reaches environmental condition detection unit.
Stipulated time 2 is used to determine that air-supply arrangement 1 to repeat to detect the time of environmental condition the interval, it is specified that intermittent duty. Carry out intermittent duty interval do not need it is particularly severe, when interval can unnecessarily consume very much electric power in short-term.In addition, when too long When, do not have monitoring effect in summer etc..In addition, if interval is shortened to several minutes of degree in summer, it in winter will interval Extend to dozens of minutes degree, then can simultaneously double as monitoring and it is energy saving.In addition, specifically, using such as inferior control method:It is waiting for Interval is shortened when room temperature when machine is beyond certain temperature, such as 27 DEG C, extends interval etc. when less than 27 DEG C.
Environmental condition detection unit is set to the air-supply access midway between suction inlet 4 and blow-off outlet 5, can pass through blow-off outlet 5, the air of the ventilation hole of ventilating board 9 and surrounding, but contacted with environmental condition detection unit by the air-flow of Air Blast fan 7, More quickly detection variation.
In addition, the operation about Air Blast fan 7, if the air-flow of fan can reach environmental condition detection unit both can, no Air-flow must be blown out from blow-off outlet 5.Therefore, Air Blast fan 7 is provided with the pulse current for the width being sufficiently great to initiate.
Starting required time difference according to type, the characteristic of motor, so the width of experiment decision pulse can be utilized. If the rotating speed of Air Blast fan 7 reaches 100rpm degree, can reach sucking air makes it reach environmental condition detection unit Purpose, so minimum rotating speed can be realized for example, by setting pulse width in a manner of being powered several seconds to more than ten seconds.
Without by (being "No" in S12) in the case of scheduled stipulated time 2, returning to step in step 12 (S12) Rapid 11 (S11), determine whether the input from operation panel 6.
In the present invention, multiple blinds 25 are equipped in blow-off outlet 5, so that the end on the downside of its wind is conjugated to the top, thus Each blinds 25,25, which overlaps, to inhibit the air-flow blown out from blow-off outlet 5 as rolling screen door.It is indicated at this time with schematic diagram in Fig. 8 State.
Even if it is upward if generating the direction of gap blinds 25 between blinds 25,25, therefore the air-flow leaked out is filled towards air-supply 1 top blowout is set, so can avoid wind is directly blown onto user.
Whether judgement within the limits prescribed carries out the environmental condition of detection in step 13 (S13).Ring is indicated in Fig. 9 An example for judging benchmark of border condition.In the case where temperature, damp condition are in prescribed limit, such as in the A in Fig. 9 Or in the case of B area, it is judged as in prescribed limit (being "Yes" in S13), return to step 11 determines whether operation.
In the case where the temperature of detection, humidity are in the regions C D in Fig. 9, be judged as be detached from prescribed limit ( It is "No" in S13), it sends out alarm and is shown.Then, return to step 11, into the action for waiting for user's operation.
If user notices alarm, what operation (being "Yes" in S11) is carried out from operation panel 6, then has been terminated It is acted when standby, into the run action of operated content.
Although having issued alarm, (it is in S11 in the case where user does not carry out the operation of air-supply arrangement 1 "No"), it repeats step 11 and arrives step 13.
Although having issued alarm, the operation of air-supply arrangement 1 is not carried out in user, and with other air conditioners etc. In the case of carrying out temperature humidity adjusting, detect that the variation of environmental condition, the judgement of step 13 become in step 13 (S13) "Yes" stops alarm, and returns to S11, is acted when continuing standby.
(embodiment 2)
In the present embodiment, different from embodiment 1, blow-off outlet 5 is not closed, and changes the direction of blow-off outlet 5.Scheming Control flow related with present embodiment is represented in 10.Same reference numerals are marked to part same as embodiment 1, It omits the description.In the air-supply arrangement 1 that embodiment 1 illustrates, capable of making rotation section 2, reciprocating rotation drives in the lateral direction, at this In embodiment, when standby drive Air Blast fan 7 in the case of, make blow-off outlet 5 towards the slewing area of left and right directions certain One end is static.
The end of slewing area is connect in the power cord 8 of air-supply arrangement 1 with power supply, the stage that yaw button 6h is operated first, Due to being identified, as long as itself not interrupted so powering, right end or left end of the blow-off outlet 5 towards slewing area can be made.
One people of user in a room in the case of, using yaw function when, generally have positioned at left and right directions turn The tendency that the immediate vicinity of dynamic range uses, only makes certain one end of blow-off outlet 5 towards left and right directions, even if air-flow is from blow-off outlet 5 leak out, and also can avoid air-flow and are directly blown onto user.
In the present embodiment, in addition to making blow-off outlet 5 towards the left end of slewing area when being acted when entering standby or Other than right end and static action, action same as embodiment 1 is carried out, so omitting later explanation.
(embodiment 3)
In the present embodiment, blinds 25 is made to close blow-off outlet 5 upward and make a left side of the rotation section 2 towards slewing area The static both of which in certain right one end is implemented.The control flow of present embodiment is indicated in Figure 11.Into it is standby when act, make hundred Leaf 25,25 ..., closing blow-off outlet 5 upwards, and keep blow-off outlet 5 static towards the left end or right end of slewing area.Pass through this Sample can also become smaller on the blowing of user influence, it is not necessary to strictly supervise although the rotating speed of Air Blast fan 7 can have some deviations Depending on rotating speed.That is, even if the width of the width of current impulse, motor characteristic has deviation, wind not all to be directly blown onto user, not only It can avoid bringing discomfort, and can realize the simplification of control software.
Judgement in control flow is identical as embodiment 1 or 2, about Air Blast fan operation control also with embodiment party Formula 1, embodiment 2 are carried out similarly.Therefore, later to illustrate to omit.
(embodiment 4)
Figure 12 is the stereogram for the air-supply arrangement 100 for indicating embodiment 4.For convenience of description, pair same with embodiment 1 The part of sample marks identical reference numeral.It is different from embodiment 1 in the present embodiment, it is equipped with force-feeling sensor 15.Its Its composition is same as embodiment 1.
Force-feeling sensor 15 is infrared heat electric transducer, and detecting in prescribed limit has unmanned presence.By people's propagated sensation sense In the presence of device 15 detects people, the interval of the Air Blast fan 7 when sending out standby towards the direction that user is not present is transported The case where capable air-flow, this is than embodiment 1, is more reliable.
Force-feeling sensor 15 is set to the front surface of rotation section 2, and for example there is in the front 3m of air-supply arrangement 100, a left side for detection Right angular amplitude is the people in the range of 10 ° of degree.The range for detecting people can be according to the light receiving window for being configured at force-feeling sensor Optical filter adjusting, the shape of slit is set in light receiving window, light receiving window is set as the mounting structure of deep-well shape etc. appoints Meaning setting.
Air-supply arrangement 100 is the air-supply arrangement for having in above-below direction elongated blow-off outlet 5, and the eolian of submitting is laminar flow, Therefore few, holding shape conveying same as blow-off outlet is spread.It therefore, can be to fixed region by yaw in the lateral direction Send out wind.
The control flow of air-supply arrangement 100 related to embodiment 4 is indicated in Figure 13, and control block is indicated in Figure 14. It is same as embodiment 1, the measurement of time is begun to pass through at the time point for entering standby mode, and keep blinds 25,25 upward And keep its static.
Then, in step 20 (S20), determine whether the input from force-feeling sensor 15.It is detected in prescribed limit Direction is changed scheduled yaw range partition by (being "Yes" in S20), driving yaw motor 28 in the presence of going out people 1 grade, again return to step 20.Such as from swaying angle 15 ° be changed to 30 ° of swaying angle, detect the presence of again people presence, and into Action is made.Repeat the action, direction of the searching and detecting less than people.
If people's (being "No" in S20) is not detected in force-feeling sensor 15,21 (S21) are entered step, are determined whether Input from operation panel 6.If there is operation (being "Yes" in S21), acted when terminating standby, into run action.
If not operating (being "No" in S21), 22 (S22) are entered step, judge the process of stipulated time 2.When regulation Between 2 be, for example, 5 minutes.If it is less than stipulated time 2 (being "No" in S22), return to step 21 determines whether operation.If through The stipulated time 2 (being "Yes" in S22) is spent, starts Air Blast fan 7, runs several seconds to more than ten seconds, detected to environmental condition single Member air-supply.
Whether judgement within the limits prescribed carries out the environmental condition detected in step 23 (S23).Environmental condition Judge that benchmark uses benchmark same as embodiment 1.In temperature, damp condition in the case of prescribed limit, such as in Fig. 9 In A or B area in the case of, be judged as in prescribed limit (in S23 be "Yes"), return to step 21 determines whether Operation.
Detect temperature, humidity regions C D in fig.9 in the case of, be judged as being detached from prescribed limit ( It is "No" in S23), it sends out alarm and is shown.Then, return to step 21, into the action for waiting for user's operation.
If user notices that alarm has carried out certain operation (being "Yes" in S21), acted when terminating standby, into institute The run action of the content of operation.
Although having issued alarm, (it is in S21 in the case where user does not carry out the operation of air-supply arrangement 100 "No"), it repeats step 21 and arrives step 23.
Alternatively, although having issued alarm, the operation of air-supply arrangement 100 is not carried out in user, and with other air In the case that adjusting machine etc. has carried out temperature humidity adjusting, in step 22 after the stipulated time 2, in step 23 (S23) Detect that the variation of environmental condition, the judgement of step 23 become "Yes", acted when stopping alarm, and continuing standby.
(embodiment 5)
Present embodiment is substituted in the force-feeling sensor 15 used in embodiment 4 and uses camera unit 16.It is other It constitutes identical as embodiment 4.Outside drawing is indicated in Figure 15.
In the present embodiment, it is that camera unit uses the miniature camera for being equipped on portable phone etc..About from gained The method of the image zooming-out people arrived is practical, as long as so utilizing this method.In addition, in advance in control device 60 or In peripheral device storage analysis image as a result, with the cycle of control flow correspondingly compare before and after data, it can thus be appreciated that people into Enter prescribed limit still to have dropped out, so in the case where people has dropped out, it also can be into the alarm stopping etc. that enforcement have been sent from Control.
In addition, in the present embodiment, although the initial off blow-off outlet 5 acted when standby, as described above The action can be omitted.
Industrial utilizability
The present invention can utilize in air conditioner, air-supply arrangement with environmental condition detection unit etc..
Reference sign
1 air-supply arrangement
2 rotation sections
2a rotation axis
3 setting units
4 suction inlets
5 blow-off outlets
6 operation panels
7 Air Blast fans
8 power cords
9 ventilating boards
10 handle parts
15 force-feeling sensors
16 camera units
22 air-supply accesses
30 ion generating devices

Claims (4)

1. a kind of air-supply arrangement, has:
Suction inlet sucks indoor air;
Blow-off outlet sends out the air of sucking;
Air supply path makes above-mentioned suction inlet be connected to above-mentioned blow-off outlet;
Air Blast fan is configured at above-mentioned air supply path;
Environmental condition detection unit is configured at above-mentioned air supply path;
Close the unit of above-mentioned blow-off outlet;And
Control device controls above-mentioned Air Blast fan and closes the unit of above-mentioned blow-off outlet, and has clocking capability,
Above-mentioned air-supply arrangement is characterized in that,
When above-mentioned air-supply arrangement is standby, closed in the case where making above-mentioned Air Blast fan intermittent duty at intervals of set time above-mentioned Blow-off outlet,
It is further equipped with the rotating mechanism for making the direction of above-mentioned blow-off outlet rotate to the left and right,
When above-mentioned air-supply arrangement is standby, make left end or right end of the above-mentioned blow-off outlet towards slewing area.
2. air-supply arrangement according to claim 1, which is characterized in that the unit for closing above-mentioned blow-off outlet is wind direction Request for Change Member.
3. a kind of air-supply arrangement, has:
Suction inlet sucks indoor air;
Blow-off outlet sends out the air of sucking;
Air supply path makes above-mentioned suction inlet be connected to above-mentioned blow-off outlet;
Air Blast fan is configured at above-mentioned air supply path;
Environmental condition detection unit is configured at above-mentioned air supply path;
The unit for making the direction of above-mentioned blow-off outlet rotate to the left and right;And
Control device, controls the unit of above-mentioned Air Blast fan and above-mentioned rotation, and has clocking capability,
Above-mentioned air-supply arrangement is characterized in that,
When above-mentioned air-supply arrangement is standby, in the case where making above-mentioned Air Blast fan intermittent duty at intervals of set time, make above-mentioned Left end or right end of the blow-off outlet towards slewing area.
4. air-supply arrangement according to any one of claims 1 to 3, which is characterized in that
The unit for also having notification abnormal;
Alarm is sent out in the case where the environmental condition detected by above-mentioned environmental condition detection unit is detached from prescribed limit.
CN201480028872.7A 2013-06-10 2014-02-25 Air-supply arrangement Expired - Fee Related CN105229385B (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2013121384A JP6059606B2 (en) 2013-06-10 2013-06-10 Blower
JP2013-121384 2013-06-10
PCT/JP2014/054432 WO2014199668A1 (en) 2013-06-10 2014-02-25 Blower device

Publications (2)

Publication Number Publication Date
CN105229385A CN105229385A (en) 2016-01-06
CN105229385B true CN105229385B (en) 2018-09-21

Family

ID=52021976

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201480028872.7A Expired - Fee Related CN105229385B (en) 2013-06-10 2014-02-25 Air-supply arrangement

Country Status (3)

Country Link
JP (1) JP6059606B2 (en)
CN (1) CN105229385B (en)
WO (1) WO2014199668A1 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016152256A1 (en) * 2015-03-25 2016-09-29 三菱電機株式会社 Air purifier
JP6443276B2 (en) * 2015-09-09 2018-12-26 三菱電機株式会社 humidifier
JP6250207B1 (en) * 2017-03-23 2017-12-20 株式会社日本医化器械製作所 Thin duct panel
JPWO2021234997A1 (en) * 2020-05-19 2021-11-25

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202382382U (en) * 2011-12-28 2012-08-15 珠海格力电器股份有限公司 Air conditioner and air outlet sliding cover device thereof
CN202581586U (en) * 2012-04-20 2012-12-05 冠德科技(北海)有限公司 Novel ultrathin indoor air purifier

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0493549A (en) * 1990-08-07 1992-03-26 Matsushita Electric Ind Co Ltd Air-conditioner
JPH0493594A (en) * 1990-08-08 1992-03-26 Matsushita Electric Ind Co Ltd Finned heat exchanger
US5461875A (en) * 1993-06-24 1995-10-31 Samsung Electronics Co., Ltd. Automatic outlet opening/closing apparatus of air-conditioner and control method thereof
JP2002295873A (en) * 2001-03-30 2002-10-09 Fujitsu General Ltd Air cleaner
JP5009049B2 (en) * 2007-05-23 2012-08-22 パナソニック株式会社 Air conditioner
JP2010089043A (en) * 2008-10-10 2010-04-22 Panasonic Corp Air cleaning machine
JP2011153725A (en) * 2010-01-26 2011-08-11 Daikin Industries Ltd Ceiling-mounted type indoor unit of air conditioning device
JP2012029782A (en) * 2010-07-29 2012-02-16 Sanyo Electric Co Ltd Air purification element and air cleaner incorporating the same

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202382382U (en) * 2011-12-28 2012-08-15 珠海格力电器股份有限公司 Air conditioner and air outlet sliding cover device thereof
CN202581586U (en) * 2012-04-20 2012-12-05 冠德科技(北海)有限公司 Novel ultrathin indoor air purifier

Also Published As

Publication number Publication date
JP6059606B2 (en) 2017-01-11
CN105229385A (en) 2016-01-06
WO2014199668A1 (en) 2014-12-18
JP2014238231A (en) 2014-12-18

Similar Documents

Publication Publication Date Title
CN105229385B (en) Air-supply arrangement
ES2891363T3 (en) Ventilation system
KR101385290B1 (en) Air conditioner and control method of the same
US20110000251A1 (en) Air conditioner
US10139119B2 (en) Air conditioner and control method thereof
KR20170051112A (en) Air Conditioner and Controlling method for the same
JP2014238230A (en) Blower
CN104024646A (en) Air blowing device and air blowing method
SG176106A1 (en) Air blowing device and ion generating device
JP5441353B2 (en) Equipment
AU2010293674A1 (en) Air conditioner
JP2010038386A (en) Equipment monitoring system
JP5443315B2 (en) Air conditioner
JP3744784B2 (en) Air conditioner with ion generator
CN102422498A (en) Ion generating device
JP2017116255A (en) Blower
JP4506334B2 (en) Ventilation equipment
KR20120061515A (en) Air conditioner and method for cleaning filter
JP5910670B2 (en) Equipment
WO2016038938A1 (en) Ion generator
JP6441328B2 (en) Ion generator
JP2012072945A (en) Humidification device
JP2002228180A (en) Air conditioner
JP2014102027A (en) Blowing device
KR20200000207U (en) Air Conditioner

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180921