CN105223932B - Nuclear plant safety method for early warning, system and nuclear power station emulation technology platform - Google Patents

Nuclear plant safety method for early warning, system and nuclear power station emulation technology platform Download PDF

Info

Publication number
CN105223932B
CN105223932B CN201510688247.1A CN201510688247A CN105223932B CN 105223932 B CN105223932 B CN 105223932B CN 201510688247 A CN201510688247 A CN 201510688247A CN 105223932 B CN105223932 B CN 105223932B
Authority
CN
China
Prior art keywords
simulation
operation data
prediction value
warning
manual intervention
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510688247.1A
Other languages
Chinese (zh)
Other versions
CN105223932A (en
Inventor
张超
谢红云
卢超
王春冰
平嘉临
颜振宇
段奇志
谭珂
黄伟军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China General Nuclear Power Corp
China Nuclear Power Engineering Co Ltd
Original Assignee
China General Nuclear Power Corp
China Nuclear Power Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China General Nuclear Power Corp, China Nuclear Power Engineering Co Ltd filed Critical China General Nuclear Power Corp
Priority to CN201510688247.1A priority Critical patent/CN105223932B/en
Publication of CN105223932A publication Critical patent/CN105223932A/en
Application granted granted Critical
Publication of CN105223932B publication Critical patent/CN105223932B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
    • G05B19/41865Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21DNUCLEAR POWER PLANT
    • G21D3/00Control of nuclear power plant
    • G21D3/04Safety arrangements
    • G21D3/06Safety arrangements responsive to faults within the plant
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/20Pc systems
    • G05B2219/24Pc safety
    • G05B2219/24024Safety, surveillance
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • High Energy & Nuclear Physics (AREA)
  • Plasma & Fusion (AREA)
  • Emergency Management (AREA)
  • Business, Economics & Management (AREA)
  • Manufacturing & Machinery (AREA)
  • Quality & Reliability (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Testing And Monitoring For Control Systems (AREA)
  • Monitoring And Testing Of Nuclear Reactors (AREA)

Abstract

A kind of nuclear plant safety method for early warning, system and nuclear power station emulation technology platform, method include: whether the deviation between the DCS operation data and secure threshold of the characteristic parameter that S1, judgement obtain in real time reaches characteristic condition and differentiate point, then enter S2 in this way;S2, it calculates when executing fast based on current DCS operation data to obtain the first simulation and prediction value of the characteristic parameter in no investment manual intervention;S3, judge that the first simulation and prediction value whether within secure setting, turns S1 in this way, otherwise turns S4;S4, the means of intervention based on determined by current DCS operation data put into manual intervention;S5, it calculates when executing fast based on the DCS operation data currently obtained to obtain the second simulation and prediction value of the characteristic parameter when putting into manual intervention;S6, judge that the second simulation and prediction value whether within secure setting, then terminates in this way, otherwise turns S4.Whether the present invention judges whether in advance suitable it is necessary to which manual intervention is added and verifies manual intervention, improves unit safety in operation.

Description

Nuclear plant safety method for early warning, system and nuclear power station emulation technology platform
Technical field
The present invention relates to technical field of nuclear power more particularly to a kind of nuclear plant safety method for early warning, system and Nuclear power station emulation technology platform.
Background technique
Nuclear plant digital I&C system (DCS) is widely applied in nuclear power station, and shows great superiority.Core Power station digitlization I&C system is the system of the dcs based on computer, network communication, is nuclear power station Informational nerve and control axis, for monitoring the main and supporting process of controllable nuclear power station thermal energy and electrical energy production, all Under operational mode, including case of emergency, safety, operability and the reliability of power plant are maintained, to guarantee nuclear plant safety, steady Fixed and economical operation.Nuclear plant digital I&C system is by sensor collection nuclear power station operation information, by controlling cable, net Network etc. transmits information, complete complicated calculations in the processor, then pass to man-machine interface etc..Pass through nuclear plant digital instrument control system System can acquire the various informations parameter for being collected into nuclear power station operation, provide input information for nuclear plant safety early warning system.
Nuclear power station gamut analogue simulation machine is to establish one " virtual nuclear power plant ", that is, establishes a set of Processes and apparatus model (including fluid network, heating power network, neutron pile etc.), instrument control and electrical model (control system model, protection system model, people Machine picture model etc.).Simulation model is the core of nuclear power station analogue simulation machine, must meet high precision, fidelity, in real time degree It is required that.
Currently, the warning function of nuclear power plant is realized using fault detection technique, principle is supervised using monitoring instrument Depending on any deviation operated normally, failure is found earlier before the generation of serious failure and is alarmed.Nuclear plant digital instrument It is usually to carry out early warning using the real-time alarm system of emulation platform secondary development in control system.Real-time alarm system is responsible for full factory Acquisition, processing and the instruction of each system alarm information, facilitate power plant operator to monitor unit operating condition.Nuclear power station Compared by the secure threshold that the parameter of acquisition power station operating parameter and power station setting operates normally, when detection parameters are more than threshold When value, show faulty generation.When an error occurs, alarm system is shown after acquisition process eventually by visual alarm Notify operator, operator that can judge the severity of failure according to the type of alarm with alarm sound signal, and It takes appropriate measures in time and eliminates failure, ensure that unit operates normally.This alarm mode is Realtime Alerts, is in equipment Failure has occurred or operating parameter and operating condition occur it is abnormal after find the problem after device detection after testing.
Summary of the invention
The technical problem to be solved in the present invention is that in view of the above drawbacks of the prior art, providing a kind of nuclear plant safety Method for early warning, system and nuclear power station emulation technology platform.
The technical solution adopted by the present invention to solve the technical problems is: constructing a kind of nuclear plant safety method for early warning, institute The method of stating includes:
Whether the deviation between the DCS operation data and secure threshold of the characteristic parameter that S1, judgement obtain in real time reaches special Condition distinguishing point is levied, if yes then enter step S2;
S2, it calculates when executing fast based on the DCS operation data that currently obtains to obtain in no investment manual intervention this First simulation and prediction value of characteristic parameter;
S3, the first simulation and prediction value is judged whether within secure setting, if it is go to step S1, otherwise Enter step S4;
S4, the means of intervention based on determined by the DCS operation data currently obtained put into manual intervention;
S5, it calculates to obtain this feature when putting into manual intervention when executing fast based on the DCS operation data that currently obtains Second simulation and prediction value of parameter;
S6, the second simulation and prediction value is judged whether within secure setting, if it is ending method, otherwise jumps to Step S4.
In nuclear plant safety method for early warning of the present invention, the step S1 is before entering step S2 further include: Judge whether auxiliary parameter reaches early-warning conditions, if yes then enter step S2, otherwise go to step S1.
In nuclear plant safety method for early warning of the present invention, the step S3 further includes step before entering step S4 Rapid S34: the warning information of the characteristic parameter in display step S1, and the warning information is sent to client.
In nuclear plant safety method for early warning of the present invention, the method is based on secondary development on emulation technology platform Safety pre-warning system realize that the emulation technology platform connect to obtain and adopt in real time with the data acquisition unit in DCS system The DCS operation data of collection, the method also includes: the emulation technology platform is according to the DCS operation data obtained in real time Carry out on-line tuning.
In nuclear plant safety method for early warning of the present invention, the emulation technology platform includes real-time alarm system, When deviation of the real-time alarm system between the DCS operation data and secure threshold of characteristic parameter reaches alarm threshold value It alarms;
The characteristic condition differentiates that point is greater than the alarm threshold value;
The secure setting is equal to the secure threshold and subtracts the alarm threshold value;
The characteristic parameter includes: temperature, pressure, liquid level.
The invention also discloses a kind of nuclear plant safety early warning system, characteristic condition discrimination module obtains in real time for judging Whether the deviation between the DCS operation data and secure threshold of the characteristic parameter taken, which reaches characteristic condition, differentiates point, if it is Send the first trigger signal;
First simulation and prediction value computing module, for being transported based on the DCS currently obtained when receiving the first trigger signal It is calculated when row data execute fast to obtain the first simulation and prediction value of this feature parameter in no investment manual intervention;
First simulation and prediction value judgment module, for judge the first simulation and prediction value whether within secure setting, If it is triggering characteristic condition discrimination module is again started up, and otherwise sends the second trigger signal;
Manual intervention module, for receiving after second trigger signal based on the DCS operation data institute currently obtained really Fixed means of intervention puts into manual intervention;
Second simulation and prediction value computing module calculates when for executing fast based on the DCS operation data currently obtained to obtain Take the second simulation and prediction value of this feature parameter when putting into manual intervention;
Second simulation and prediction value judgment module, for judge the second simulation and prediction value whether within secure setting, such as Otherwise fruit triggers manual intervention module and is again started up.
In nuclear plant safety early warning system of the present invention, the system also includes early-warning conditions judgment modules, use In the first trigger signal of reception and judge whether auxiliary parameter reaches early-warning conditions, and when reaching early-warning conditions by the first triggering Signal is transmitted to the first simulation and prediction value computing module, triggers characteristic condition discrimination module again when not reaching early-warning conditions Starting.
In nuclear plant safety early warning system of the present invention, the safety pre-warning system further includes early warning list Member,
The first simulation and prediction value judgment module is also used to send early warning while sending second trigger signal Signal gives the early warning unit;Early warning unit is used to show the early warning letter of characteristic parameter when receiving pre-warning signal Breath, and the warning information is sent into client.
In nuclear plant safety early warning system of the present invention, the safety pre-warning system is based on to emulation technology platform Secondary development realize that the emulation technology platform is connect to obtain and acquire in real time with the data acquisition unit in DCS system DCS operation data, the nuclear power station emulation technology platform are used to carry out on-line tuning according to the DCS operation data obtained in real time.
In nuclear plant safety early warning system of the present invention, the safety pre-warning system is based on to emulation technology platform Secondary development realize that the emulation technology platform is connect to obtain and acquire in real time with the data acquisition unit in DCS system DCS operation data, the emulation technology platform includes real-time alarm system, and the real-time alarm system is used in characteristic parameter Deviation between DCS operation data and secure threshold is alarmed when reaching alarm threshold value;
The characteristic condition differentiates that point is greater than the alarm threshold value;
The secure setting is equal to the secure threshold and subtracts the alarm threshold value;
The characteristic parameter includes: temperature, pressure, liquid level.
The invention also discloses a kind of nuclear power station emulation technology platforms, including connect with data acquisition unit to obtain DCS The communication interface of operation data, the DCS operation data and secure threshold being used in characteristic parameter being connect with the communication interface Between deviation whether reach the real-time alarm system alarmed when alarm threshold value, which is characterized in that further include with it is described logical The nuclear plant safety early warning system as described above of communication interface connection.Preferably, the nuclear power station emulation technology platform is used for root The DCS operation data obtained when factually carries out on-line tuning.
Implement nuclear plant safety method for early warning of the invention, system and nuclear power station emulation technology platform, has with following Beneficial effect: when whether deviation of this hair between DCS operation data and secure threshold reaches characteristic condition differentiation point, judge system Deviate operate normally or i.e. will deviate from, and by it is fast when calculate acquisition earlier than current time simulation and prediction value, to obtain in advance Know equipment or the system failure, whether judge whether in advance suitable it is necessary to which manual intervention and verifying manual intervention is added, thus Corrective action is carried out in advance, improves the safety of unit operation.
Detailed description of the invention
Present invention will be further explained below with reference to the attached drawings and examples, in attached drawing:
Fig. 1 is the structural schematic diagram of nuclear power station emulation technology platform and nuclear plant safety early warning system;
Fig. 2 is the flow chart of nuclear plant safety method for early warning.
Specific embodiment
For a clearer understanding of the technical characteristics, objects and effects of the present invention, now control attached drawing is described in detail A specific embodiment of the invention.
It is the structural schematic diagram of nuclear power station emulation technology platform and nuclear plant safety early warning system with reference to Fig. 1.
Emulation technology platform is connect by communication interface with the data acquisition unit in DCS system, and data acquisition unit is used In the DCS operation data that acquisition acquires in real time, the DCS operation data got can be imported by communication interface and copy to emulation Technology platform.
The secondary development to emulation technology platform is usually utilized to design relevant function system in DCS system.Such as it is existing Real-time alarm system in technology is the progress secondary development on emulation technology platform.Real-time alarm system and communication interface Connection, is reported when whether reaching alarm threshold value for the deviation between the DCS operation data and secure threshold of characteristic parameter It is alert.
Nuclear plant safety early warning system of the invention is also based on the realization of the secondary development to emulation technology platform, and safety is pre- Alert system is also to connect with communication interface, and nuclear plant safety early warning system specifically includes:
Characteristic condition discrimination module, the DCS operation data of the characteristic parameter for judging to obtain in real time and secure threshold it Between deviation whether reach characteristic condition differentiate point, if it is send the first trigger signal;
First simulation and prediction value computing module, for being transported based on the DCS currently obtained when receiving the first trigger signal It is calculated when row data execute fast to obtain the first simulation and prediction value of this feature parameter in no investment manual intervention;
First simulation and prediction value judgment module, for judge the first simulation and prediction value whether within secure setting, If it is triggering characteristic condition discrimination module is again started up, and otherwise sends the second trigger signal;
Manual intervention module, for receiving after second trigger signal based on the DCS operation data institute currently obtained really Fixed means of intervention puts into manual intervention;
Second simulation and prediction value computing module calculates when for executing fast based on the DCS operation data currently obtained to obtain Take the second simulation and prediction value of this feature parameter when putting into manual intervention;
Second simulation and prediction value judgment module, for judge the second simulation and prediction value whether within secure setting, such as Otherwise fruit triggers manual intervention module and is again started up.
In practice process, generally when meeting the condition of characteristic condition differentiation point, it is also necessary to whether judge auxiliary parameter Reach early-warning conditions, when two conditions are all satisfied, just sends the first trigger signal, auxiliary parameter is that have according to the object of monitoring What body determined.It is preferred, therefore, that the system also includes early-warning conditions judgment module, for receiving the first trigger signal and sentencing Whether disconnected auxiliary parameter reaches early-warning conditions, and the first trigger signal is transmitted to the first simulation and prediction when reaching early-warning conditions It is worth computing module, characteristic condition discrimination module is triggered when not reaching early-warning conditions and is again started up.
Mode constitutes emulation support platform time scale together with real-time mode and slow speed mode when fast, and mode is logical when fast It crosses simulation model double frequency operation, is completed in a short time the operation result of several times of time spans of real-time mode.It is counted when fast Calculation is to execute operation under mode when fast with double frequency (calculating relative to real-time).Wherein, meter when fast under mode Calculating model includes the model for not putting into manual intervention, the model for putting into manual intervention.
Wherein, the characteristic condition differentiates that point is greater than the alarm threshold value, i.e., the starting of early warning system is earlier than Realtime Alerts The starting of system.The secure setting is equal to the secure threshold and subtracts the alarm threshold value, i.e. secure setting is real-time Alarm system numerical value corresponding when starting.
Wherein, the characteristic parameter includes: temperature, pressure, liquid level etc., and operator can according to circumstances set and monitor Parameter.
Preferably, the safety pre-warning system further includes early warning unit.First simulation and prediction value judgment module is also used In while sending second trigger signal send pre-warning signal to the early warning unit;Early warning unit is used for The warning information of characteristic parameter is shown when receiving pre-warning signal, and the warning information is sent into client.I.e. if passed through It calculates and is predicted when needing to put into manual intervention when fast, then notified with client communication two ways to operator by display Member, the means of intervention that operator can prompt according to manual intervention module manipulate manual intervention module.
Early warning display unit can be to be shown using existing display screen, and client can be computer terminal.
Preferably, the nuclear power station emulation technology platform can also carry out online according to the DCS operation data obtained in real time Adjustment.Nuclear power station emulation technology platform itself is equivalent to an established model, and model is all based on during foundation Sample data training obtains.So can be carried out according to the DCS operation data obtained in real time online in the model application in later period Adjustment, the principle of adjustment is identical as principle when model foundation, and details are not described herein again, the difference is that only sample data be The real time data that line obtains.
It is the flow chart of safe early warning method with reference to Fig. 2.
In conjunction with above-mentioned safety pre-warning system, which comprises
Whether the deviation between the DCS operation data and secure threshold of the characteristic parameter that S1, judgement obtain in real time reaches special Condition distinguishing point is levied, if yes then enter step S2;
S2, it calculates when executing fast based on the DCS operation data that currently obtains to obtain in no investment manual intervention this First simulation and prediction value of characteristic parameter;
S3, the first simulation and prediction value is judged whether within secure setting, if it is go to step S1, otherwise Enter step S4;
S4, the means of intervention based on determined by the DCS operation data currently obtained put into manual intervention;
S5, it calculates to obtain this feature when putting into manual intervention when executing fast based on the DCS operation data that currently obtains Second simulation and prediction value of parameter;
S6, the second simulation and prediction value is judged whether within secure setting, if it is ending method, otherwise jumps to Step S4 puts into manual intervention again.
In practice process, it is preferred that the step S1 further includes step S12 before entering step S2: judgement auxiliary Whether parameter reaches early-warning conditions, and if yes then enter step S2, otherwise go to step S1.
Mode constitutes emulation support platform time scale together with real-time mode and slow speed mode when fast, and mode is logical when fast It crosses simulation model double frequency operation, is completed in a short time the operation result of several times of time spans of real-time mode.It is counted when fast Calculation is to execute operation under mode when fast with double frequency (calculating relative to real-time).Wherein, meter when fast under mode Calculating model includes the model for not putting into manual intervention, the model for putting into manual intervention.
Wherein, the characteristic condition differentiates that point is greater than the alarm threshold value, i.e., the starting of early warning system is earlier than Realtime Alerts The starting of system.
The secure setting is equal to the secure threshold and subtracts the alarm threshold value, i.e. secure setting is Realtime Alerts System numerical value corresponding when starting.
The characteristic parameter includes: temperature, pressure, liquid level etc., and operator can according to circumstances set the ginseng to be monitored Number.
Preferably, in the step S3, (i.e. judgement needs to put into manual intervention) further includes following before entering step S4 Step S34: the warning information of the characteristic parameter in display step S1, and the warning information is sent to client.Operator See that warning information is known to need to put into manual intervention, so that it may be determined by calculation means of intervention operation according to system Manual intervention module.
Preferably, method further include: according to the DCS operation data obtained in real time, the emulation technology platform is carried out Line adjustment.
The principle of the present invention is illustrated with a specific example below:
By taking the early warning of temperature as an example, secure threshold is 50 degree, real-time alarm system be real time temperature and secure threshold it Between 5 degree of difference alarmed (i.e. alarm threshold value for 5 degree namely 45 degree alarm), early warning system of the invention is to differ 10 degree of (i.e. characteristic condition differentiates that point is 10 degree namely 40 degree progress early warning) Shi Jinhang early warning, early warning include:
By the first simulation and prediction value computing module execute it is fast when calculate (calculating be based in emulation platform without putting into The model realization of manual intervention), obtain the first simulation and prediction value, if the first simulation and prediction value judgment module judge this first On the one hand simulation and prediction value then sends warning message and notifies operator, another party not within secure setting (i.e. 45 degree) Face trigger manual intervention module calculate means of intervention, if the first simulation and prediction value within secure setting (i.e. 45 degree), It does not put into manual intervention then and exits early warning;
If it is the case where putting into manual intervention is needed, then manual intervention module is based on the DCS operation data currently obtained Means of intervention is calculated, and the means of intervention is shown, operator operates manual intervention mould according to the means of intervention Block, meanwhile, manual intervention module triggers calculating when the second simulation and prediction value computing module executes fast again, and (calculating is based on emulation The model realization without putting into manual intervention in platform), the second simulation and prediction value is obtained, if the second simulation and prediction value judges Module judges the second simulation and prediction value within secure setting (i.e. 45 degree), then illustrates that the manual intervention of investment can solve Certainly problem exits;Otherwise, if the second simulation and prediction value is not within secure setting (i.e. 45 degree), then it represents that current Manual intervention not can solve problem, and manual intervention module, which recalculates to obtain new means of intervention, is prompted to operator's operation, Again put into manual intervention after trigger fast again when calculate, until the second simulation and prediction value secure setting (i.e. 45 degree) with It is interior.
In conclusion implement nuclear plant safety method for early warning, system and nuclear power station emulation technology platform of the invention, tool Have it is following the utility model has the advantages that deviation of this hair between DCS operation data and secure threshold whether reach characteristic condition differentiate point when, Judgement system deviate operate normally or i.e. will deviate from, and by it is fast when calculate acquisition earlier than current time simulation and prediction value, from And equipment or the system failure are known in advance, judge whether that it is necessary to be added whether manual intervention and verifying manual intervention close in advance It is suitable, to carry out corrective action in advance, improve the safety of unit operation.
The embodiment of the present invention is described with above attached drawing, but the invention is not limited to above-mentioned specific Embodiment, the above mentioned embodiment is only schematical, rather than restrictive, those skilled in the art Under the inspiration of the present invention, without breaking away from the scope protected by the purposes and claims of the present invention, it can also make very much Form, all of these belong to the protection of the present invention.

Claims (9)

1. a kind of nuclear plant safety method for early warning, which comprises the following steps:
Whether the deviation between the DCS operation data and secure threshold of the characteristic parameter that S1, judgement obtain in real time reaches feature item Part differentiates point, if yes then enter step S2;
S2, it calculates to obtain this feature in no investment manual intervention when executing fast based on the DCS operation data that currently obtains First simulation and prediction value of parameter;
S3, the first simulation and prediction value is judged whether within secure setting, if it is go to step S1, otherwise enters Step S4;
S4, the means of intervention based on determined by the DCS operation data currently obtained put into manual intervention, and the means of intervention are shown It shows and;
S5, it calculates to obtain this feature parameter when putting into manual intervention when executing fast based on the DCS operation data that currently obtains The second simulation and prediction value;
S6, the second simulation and prediction value is judged whether within secure setting, if it is ending method, otherwise gos to step S4;
The step S3 further includes step S34 before entering step S4: the warning information of the characteristic parameter in display step S1, And the warning information is sent to client;
The method is based on the safety pre-warning system realization to secondary development on emulation technology platform, the emulation technology platform packet Real-time alarm system is included, the real-time alarm system is for inclined between the DCS operation data and secure threshold of characteristic parameter Difference is alarmed when reaching alarm threshold value;
The characteristic condition differentiates that point is greater than the alarm threshold value;
The secure setting is equal to the secure threshold and subtracts the alarm threshold value.
2. nuclear plant safety method for early warning according to claim 1, which is characterized in that the step S1 is entering step S2 Before further include step S12: judging whether auxiliary parameter reaches early-warning conditions, if yes then enter step S2, otherwise jumps to Step S1.
3. nuclear plant safety method for early warning according to claim 1, which is characterized in that the emulation technology platform and DCS Data acquisition unit in system is connected to obtain the DCS operation data acquired in real time, the method also includes: it is described imitative True technology platform carries out on-line tuning according to the DCS operation data obtained in real time.
4. a kind of nuclear plant safety early warning system characterized by comprising
Characteristic condition discrimination module, between the DCS operation data and secure threshold of the characteristic parameter for judging to obtain in real time Whether deviation, which reaches characteristic condition, differentiates point, if it is sends the first trigger signal;
First simulation and prediction value computing module, for running number based on the DCS currently obtained when receiving the first trigger signal The first simulation and prediction value of this feature parameter in no investment manual intervention is obtained according to calculating when executing fast;
First simulation and prediction value judgment module, for judge the first simulation and prediction value whether within secure setting, if It is to trigger characteristic condition discrimination module to be again started up, otherwise sends the second trigger signal;
Manual intervention module, for receiving after second trigger signal based on determined by the DCS operation data currently obtained Means of intervention puts into manual intervention, and the means of intervention is shown;
Second simulation and prediction value computing module calculates when for executing fast based on the DCS operation data currently obtained to obtain Second simulation and prediction value of this feature parameter when putting into manual intervention;
Second simulation and prediction value judgment module, for judging the second simulation and prediction value whether within secure setting, if not It is again started up then triggering manual intervention module within secure setting;
The safety pre-warning system further includes early warning unit, and the early warning unit is used for when receiving pre-warning signal It shows the warning information of characteristic parameter, and the warning information is sent into client;
The safety pre-warning system realizes that the emulation technology platform includes real-time based on the secondary development to emulation technology platform Alarm system, deviation of the real-time alarm system between the DCS operation data and secure threshold of characteristic parameter reach It alarms when alarm threshold value;
The characteristic condition differentiates that point is greater than the alarm threshold value;
The secure setting is equal to the secure threshold and subtracts the alarm threshold value.
5. nuclear plant safety early warning system according to claim 4, which is characterized in that the system also includes early-warning conditions Judgment module for receiving the first trigger signal and judging whether auxiliary parameter reaches early-warning conditions, and is reaching early-warning conditions When the first trigger signal is transmitted to the first simulation and prediction value computing module, characteristic condition is triggered when not reaching early-warning conditions Discrimination module is again started up.
6. nuclear plant safety early warning system according to claim 4, which is characterized in that the first simulation and prediction value judgement Module is also used to send pre-warning signal while sending second trigger signal to the early warning unit.
7. nuclear plant safety early warning system according to claim 4, which is characterized in that the emulation technology platform and DCS To obtain the DCS operation data acquired in real time, the nuclear power station emulation technology platform is used for data acquisition unit connection in system According to the DCS operation data progress on-line tuning obtained in real time.
8. a kind of nuclear power station emulation technology platform is connect including connecting with data acquisition unit with obtaining the communication of DCS operation data Whether mouth and the deviation of communication interface connection being used between the DCS operation data and secure threshold of characteristic parameter reach The real-time alarm system alarmed when to alarm threshold value, which is characterized in that further include being connect with the communication interface such as power Benefit requires the described in any item nuclear plant safety early warning systems of 4-7.
9. nuclear power station emulation technology platform according to claim 8, which is characterized in that the nuclear power station emulation technology platform It is also used to carry out on-line tuning according to the DCS operation data obtained in real time.
CN201510688247.1A 2015-10-21 2015-10-21 Nuclear plant safety method for early warning, system and nuclear power station emulation technology platform Active CN105223932B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510688247.1A CN105223932B (en) 2015-10-21 2015-10-21 Nuclear plant safety method for early warning, system and nuclear power station emulation technology platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510688247.1A CN105223932B (en) 2015-10-21 2015-10-21 Nuclear plant safety method for early warning, system and nuclear power station emulation technology platform

Publications (2)

Publication Number Publication Date
CN105223932A CN105223932A (en) 2016-01-06
CN105223932B true CN105223932B (en) 2019-03-05

Family

ID=54992964

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510688247.1A Active CN105223932B (en) 2015-10-21 2015-10-21 Nuclear plant safety method for early warning, system and nuclear power station emulation technology platform

Country Status (1)

Country Link
CN (1) CN105223932B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106426847A (en) * 2016-10-14 2017-02-22 深圳万发创新进出口贸易有限公司 Producing system for manufacturing pipe materials through fly ash
CN108052019B (en) * 2017-12-15 2021-01-19 中广核工程有限公司 Method and system for inhibiting calculation overflow of fluid model of full-range simulator of nuclear power station
EP3905263A4 (en) * 2018-12-11 2022-09-14 China Nuclear Power Engineering Co., Ltd. Nuclear power plant leakage monitoring alarm method and alarm system
CN112447308A (en) * 2019-08-30 2021-03-05 海南核电有限公司 Early warning system for avoiding shutdown and shutdown of unit
CN110703733B (en) * 2019-10-18 2021-10-01 国电电力内蒙古新能源开发有限公司 Application method and system of neural network in fault prediction based on genetic algorithm feedforward processing
CN111797511B (en) * 2020-06-16 2023-07-14 上海交通大学 Nuclear power station high-precision high-fidelity real-time simulation and behavior prediction method and device
CN112820433B (en) * 2021-01-06 2023-01-13 广东核电合营有限公司 Early warning method and device for nuclear power operating system of nuclear power station and electronic equipment

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20060069547A (en) * 2004-12-17 2006-06-21 두산중공업 주식회사 Apparaus for monitoring and diagnosing the real-time operating performance of a thermoelectric power plant
CN1845029A (en) * 2005-11-11 2006-10-11 南京科远控制工程有限公司 Setting method for fault diagnosis and accident prediction
WO2011053925A2 (en) * 2009-10-30 2011-05-05 Qgen Ltd. Control and solar power improvements of a concentrated solar power-enabled power plant
CN102456417A (en) * 2010-10-21 2012-05-16 中国广东核电集团有限公司 Method and system for nuclear power equipment state monitoring
CN103744389A (en) * 2013-12-30 2014-04-23 中国石油天然气股份有限公司 Operating state early-warning method of oil and gas production equipment
CN104766138A (en) * 2015-03-27 2015-07-08 大唐淮南洛河发电厂 Thermal power plant equipment property evaluation and early warning method and system based on industrial internet

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20060069547A (en) * 2004-12-17 2006-06-21 두산중공업 주식회사 Apparaus for monitoring and diagnosing the real-time operating performance of a thermoelectric power plant
CN1845029A (en) * 2005-11-11 2006-10-11 南京科远控制工程有限公司 Setting method for fault diagnosis and accident prediction
WO2011053925A2 (en) * 2009-10-30 2011-05-05 Qgen Ltd. Control and solar power improvements of a concentrated solar power-enabled power plant
CN102456417A (en) * 2010-10-21 2012-05-16 中国广东核电集团有限公司 Method and system for nuclear power equipment state monitoring
CN103744389A (en) * 2013-12-30 2014-04-23 中国石油天然气股份有限公司 Operating state early-warning method of oil and gas production equipment
CN104766138A (en) * 2015-03-27 2015-07-08 大唐淮南洛河发电厂 Thermal power plant equipment property evaluation and early warning method and system based on industrial internet

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
非能动安全型核电站运行预警***设计;王黎泽 等;《发电设备》;20150930;第29卷(第5期);第377-380页

Also Published As

Publication number Publication date
CN105223932A (en) 2016-01-06

Similar Documents

Publication Publication Date Title
CN105223932B (en) Nuclear plant safety method for early warning, system and nuclear power station emulation technology platform
CN106527339B (en) A kind of highly reliable preparation equipment fault diagnosis system and method based on industrial cloud
WO2018099316A1 (en) Steam generator water level warning method and device
CN108596445A (en) Intelligent substation relay-protection pressing plate status assessing system
CN104483567B (en) 500kV circuit relay protections device detection method and system
CN110688774A (en) Power grid fault simulation deduction system and method
CN111932816B (en) Fire alarm management method and device for offshore wind farm and island microgrid
CN107910086A (en) One kind is based on nuclear plant safety abnormal parameters condition adjudgement system and method
CN109000826A (en) The alarm method of the vapor (steam) temperature of Steam Turbine, device and system
CN107784791A (en) A kind of earthquake monitoring warning system and method for nuclear power plant
CN107036545A (en) A kind of dam body monitoring and pre-alarming method and device
CN104007757B (en) Self-diagnosis method and system for gateway communication abnormity in distributed control system of nuclear power plant
CN105788678A (en) Leakage rate calculating and monitoring method and system
KR101276856B1 (en) Image data based remote monitoring and control system
CN116242449A (en) Water resource remote measurement terminal system
CN110620813A (en) Equipment fault alarm system and method based on NBIoT
CN209028784U (en) A kind of front end early warning system of engineering structure safe condition
CN112579665A (en) Energy equipment control method and device and energy equipment
CN116107265B (en) Remote control system and method for artificial board processing equipment
CN106340333B (en) Nuclear plant safety action executing condition monitoring method and system
CN206865152U (en) A kind of voltage powerless control system of quick response maintenance instructions
KR102641034B1 (en) IIoT-based LNG Bunkering Emergency Release System
CN204480018U (en) A kind of thermal power unit operation early warning and fault diagnosis system
JPH11296206A (en) Power generating operation system
CN213220694U (en) Monitoring device and system of fire extinguisher

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant